2 CFR 200 § 200.313

Findings Citing § 200.313

Equipment.

Total Findings
40,601
Across all audits in database
Showing Page
138 of 813
50 findings per page
About this section
Section 200.313 states that equipment acquired with federal funds belongs to the recipient or subrecipient but comes with conditions, including using it for the project's intended purpose and obtaining approval before disposing of it. This section affects recipients like states and Indian Tribes, requiring them to manage and dispose of the equipment according to their laws or the specified federal guidelines.
View full section details →
FY End: 2024-06-30
Drexel University
Compliance Requirement: F
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in F...

Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.

FY End: 2024-06-30
Drexel University
Compliance Requirement: F
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in F...

Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.

FY End: 2024-06-30
Drexel University
Compliance Requirement: F
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in F...

Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.

FY End: 2024-06-30
Drexel University
Compliance Requirement: F
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in F...

Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.

FY End: 2024-06-30
Drexel University
Compliance Requirement: F
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in F...

Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.

FY End: 2024-06-30
Drexel University
Compliance Requirement: F
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in F...

Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.

FY End: 2024-06-30
Drexel University
Compliance Requirement: F
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in F...

Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.

FY End: 2024-06-30
Drexel University
Compliance Requirement: F
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in F...

Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.

FY End: 2024-06-30
Drexel University
Compliance Requirement: F
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in F...

Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.

FY End: 2024-06-30
Drexel University
Compliance Requirement: F
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in F...

Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.

FY End: 2024-06-30
Drexel University
Compliance Requirement: F
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in F...

Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.

FY End: 2024-06-30
Drexel University
Compliance Requirement: F
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in F...

Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.

FY End: 2024-06-30
Drexel University
Compliance Requirement: F
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in F...

Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.

FY End: 2024-06-30
Drexel University
Compliance Requirement: F
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in F...

Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.

FY End: 2024-06-30
Drexel University
Compliance Requirement: F
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in F...

Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.

FY End: 2024-06-30
Drexel University
Compliance Requirement: F
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in F...

Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.

FY End: 2024-06-30
Drexel University
Compliance Requirement: F
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in F...

Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.

FY End: 2024-06-30
Drexel University
Compliance Requirement: F
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in F...

Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.

FY End: 2024-06-30
Drexel University
Compliance Requirement: F
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in F...

Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.

FY End: 2024-06-30
Drexel University
Compliance Requirement: F
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in F...

Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.

FY End: 2024-06-30
Drexel University
Compliance Requirement: F
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in F...

Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.

FY End: 2024-06-30
Drexel University
Compliance Requirement: F
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in F...

Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.

FY End: 2024-06-30
Drexel University
Compliance Requirement: F
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in F...

Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.

FY End: 2024-06-30
Drexel University
Compliance Requirement: F
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in F...

Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.

FY End: 2024-06-30
Drexel University
Compliance Requirement: F
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in F...

Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.

FY End: 2024-06-30
Drexel University
Compliance Requirement: F
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in F...

Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.

FY End: 2024-06-30
Drexel University
Compliance Requirement: F
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in F...

Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.

FY End: 2024-06-30
Drexel University
Compliance Requirement: F
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in F...

Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.

FY End: 2024-06-30
Drexel University
Compliance Requirement: F
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in F...

Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.

FY End: 2024-06-30
Drexel University
Compliance Requirement: F
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in F...

Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.

FY End: 2024-06-30
Drexel University
Compliance Requirement: F
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in F...

Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.

FY End: 2024-06-30
Drexel University
Compliance Requirement: F
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in F...

Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.

FY End: 2024-06-30
Drexel University
Compliance Requirement: F
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in F...

Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.

FY End: 2024-06-30
Drexel University
Compliance Requirement: F
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in F...

Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.

FY End: 2024-06-30
Drexel University
Compliance Requirement: F
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in F...

Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.

FY End: 2024-06-30
Drexel University
Compliance Requirement: F
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in F...

Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.

FY End: 2024-06-30
Drexel University
Compliance Requirement: F
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in F...

Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.

FY End: 2024-06-30
Drexel University
Compliance Requirement: F
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in F...

Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.

FY End: 2024-06-30
Drexel University
Compliance Requirement: F
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in F...

Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.

FY End: 2024-06-30
Drexel University
Compliance Requirement: F
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in F...

Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.

FY End: 2024-06-30
Drexel University
Compliance Requirement: F
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in F...

Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.

FY End: 2024-06-30
Drexel University
Compliance Requirement: F
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in F...

Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.

FY End: 2024-06-30
Drexel University
Compliance Requirement: F
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in F...

Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.

FY End: 2024-06-30
Drexel University
Compliance Requirement: F
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in F...

Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.

FY End: 2024-06-30
Drexel University
Compliance Requirement: F
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in F...

Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.

FY End: 2024-06-30
Drexel University
Compliance Requirement: F
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in F...

Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.

FY End: 2024-06-30
Drexel University
Compliance Requirement: F
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in F...

Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.

FY End: 2024-06-30
Drexel University
Compliance Requirement: F
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in F...

Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.

FY End: 2024-06-30
Drexel University
Compliance Requirement: F
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in F...

Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.

FY End: 2024-06-30
Drexel University
Compliance Requirement: F
Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in F...

Criteria: 2 CFR 200.313 (d) contains equipment management requirements which include a physical inventory of research funded property and reconciliation with the property records at least once every two years. Condition: A physical inventory of the research funded property must be conducted and the results must be reconciled with the property records at least once every two years. The last physical inventory was conducted in FY2022. Cause: Management did not perform the physical inventory in FY2023 or FY2024 of the research funded property due to timing constraints. Management’s process includes other procedures such as an internal fixed asset confirmation over equipment and real property, however such procedures are not comprehensive or at a sufficient level of detail to meet the compliance requirement. Effect: Not performing the physical inventory could result in an inaccurate record of assets purchased with federal funds. Questioned Costs: None; Reccomendation: Management should ensure the physical inventory is scheduled early in the two year cycle to ensure completeness within the required two year timeframe. Managements's View and Corrective Action Plan: Management agrees with the finding. Refer to the Management Corrective Action Plan on page 81.