County Judge/Executive?s Response: The fiscal court would like to point out that ARPA funds were properly distributed. During this time there was little guidance on how to manage the reporting. All reporting has been corrected.
County Judge/Executive?s Response: The fiscal court would like to point out that ARPA funds were properly distributed. During this time there was little guidance on how to manage the reporting. All reporting has been corrected.
Views of Responsible Officials: Connect Our Kids acknowledges the findings of the audit and will take immediate corrective action. Planned Corrective Action: All accounts will be reconciled in a timely manner for the following fiscal year. The federal grant revenue and expenditure cutoff will be mai...
Views of Responsible Officials: Connect Our Kids acknowledges the findings of the audit and will take immediate corrective action. Planned Corrective Action: All accounts will be reconciled in a timely manner for the following fiscal year. The federal grant revenue and expenditure cutoff will be maintained for the end of the fiscal year with any adjustments for accrual purposes no later than January 31st of the following year. Responsible Official: Cara Dobbins, CFO Anticipated Completion Date: 9/30/2023
As requested, the New Mexico Coalition to End Homelessness has completed its corrective action plan for the audit findings in the 2022 fiscal year annual audit report. We have reviewed the findings and have made a corrective action plan to address each of the findings with completion dates. 2022-...
As requested, the New Mexico Coalition to End Homelessness has completed its corrective action plan for the audit findings in the 2022 fiscal year annual audit report. We have reviewed the findings and have made a corrective action plan to address each of the findings with completion dates. 2022-002?PREPARATION OF SCHEDULE OF EXPENDITURES OF FEDERAL AWARDS Federal Agency: All presented in the Schedule of Expenditures of Federal Awards. Program Name: All presented in the Schedule of Expenditures of Federal Awards. Assistance Listing Nos. and Program Expenditures: All presented in Schedule of Expenditures of Federal Awards. Award Number and Program Award Year: All presented in Schedule of Expenditures of Federal Awards. Compliance Requirement: Other ? Schedule of Expenditures of Federal Awards preparation Type of Finding: E Questioned Costs: None Statement of Condition While conducting the audit, the following was reviewed; the Coalition?s Federal grants report for the fiscal year and identified the federal grants, Assistance Listing # (AL#) and the amounts of the federal expenditures and all of the other items required to properly present the Schedule of Expenditures of Federal Awards (SEFA). The finance staff of the Coalition confirm the correctness of the SEFA. Despite the confirmation of accuracy, additional federal expenditures and grouping of grant expenditures were identified after several reviews of the SEFA. Criteria 2 CFR 200.510 indicates that the auditee must prepare a schedule of expenditures of Federal awards (SEFA) for the period covered by the auditee?s financial statements which must include the total Federal awards expended as determined in accordance with 2 CFR 200.502 Basis for Determining Federal Awards Expended. Per 2 CFR 200.502 the determination of when a Federal award is expended should be based on when the activity related to the Federal award occurs. Generally, the activity pertains to events that require the non-Federal entity to comply with Federal statutes, regulations, and the terms and conditions of Federal awards, such as expenditure/expense transactions associated with awards. In addition, 2 CFR Part 200.303 requires the program establish and maintain effective internal controls over Federal awards that provides reasonable assurance of compliance with Federal statutes, regulations, and the terms and conditions of Federal awards. Effect Without an established process governed by effective internal controls, the Coalition may not prevent or detect material misstatements on its SEFA in a timely manner. In addition, the errors could result in improper selections of major program(s) for the single audit and a substandard single audit. Cause Historically, the Coalition has requested the auditor assist in identifying accruals related to federal grant expenditures as the organization has maintained these records on a cash basis. As the organization has taken more responsibility on maintaining its federal grant expenditures on an accrual basis, an incomplete SEFA has been provided. Recommendation It is recommended the Coalition prepare the Schedule of Expenditures of Federal Awards and submit this to the auditor for testing. The SEFA should include the name of the grant, name of grantor, the AL #, the pass-through number if applicable and a reconciliation of the federal revenues and expenditures to the Coalition?s general ledger. The Coalition staff should perform more detailed reviews of the reports to ensure they properly reflect grant receipts and expenditures. This review should be performed by someone other than the preparer and should include documented evidence of agreeing the reported data to the accounting records. We further recommend training for those individuals involved in the preparation and review of the reports to ensure they are fully aware of the requirements. View of Responsible Officials and Corrective Action Plan: The corrective Action Plan will be carried out in the 2023 Fiscal Year and information will be given to the auditors when requested for the 2023 Audit. The Coalition will ensure that all information needed for the SEFA is kept and entered accurately. When the fiscal year closes out, the Coalition will provide the auditors with a test SEFA to confirm that the information we are collecting throughout the year and are asserting are the correct numbers for our federal grants, is indeed the correct information. Corrective Action Plan Timeline: Completed by October 31, 2023 (Final copy of the SEFA will not be given to the auditors until requested for the 2023 Audit) Designation Of Employee Position Responsible For Meeting Deadline: Executive Director, Monet Silva will oversee this project and work closely with the auditors to make sure that the information saved and shared is correct. Thank you, Monet Silva Executive Director
This finding relates to the preparation of the SEFA for the disclosure of the loan balances under the Company?s Railroad Rehabilitation & Improvement Financing (RRIF) loan. In the initial version of the SEFA, Amtrak did not reduce the audit period loan balance by the FY21 loan repayment. An updated ...
This finding relates to the preparation of the SEFA for the disclosure of the loan balances under the Company?s Railroad Rehabilitation & Improvement Financing (RRIF) loan. In the initial version of the SEFA, Amtrak did not reduce the audit period loan balance by the FY21 loan repayment. An updated version of the SEFA corrected the balance presented. The presentation on the SEFA of the balance of the RRIF loan has specific federal regulation requirements. Amtrak will review and update its SEFA Preparation Guide to ensure full compliance with 2 CFR Part 200 specifically for presentation of the RRIF loan balance. Amtrak will also consider providing training to key grants management personnel on an annual basis to keep them up to date with federal regulations. The contact for this item is Lucia Butts, AVP Funding and Grants. The Company anticipates that the updated procedures and training will remediate this finding in the fiscal year ending September 30, 2023 and beyond.
Finding 41957 (2022-003)
Material Weakness 2022
Management agrees with this finding and is in the process of developing internal controls to ensure timely and appropriate actions are made on the deficiency noted.
Management agrees with this finding and is in the process of developing internal controls to ensure timely and appropriate actions are made on the deficiency noted.
Recommendation: Procedures should be implemented to create a materially accurate schedule of expenditures of federal award financial statement, which should include ascertaining between loan and grant expenditures, and understanding the process for reporting loan balances on the SEFA. Views of Respo...
Recommendation: Procedures should be implemented to create a materially accurate schedule of expenditures of federal award financial statement, which should include ascertaining between loan and grant expenditures, and understanding the process for reporting loan balances on the SEFA. Views of Responsible Officials and Planned Corrective Actions: In order to create a materially accurate schedule of expenditures of federal award financial statement, the Authority will establish procedures to ascertain loan and grant expenditures, as well as taking into account the Uniform Guidance requirement for presenting loan balances on the SEFA.
Finding 41734 (2022-008)
Significant Deficiency 2022
2022-008 Inadequate Schedule of Federal Expenditures Reporting ? Assistance Listing No. 84.063, 84.268 Recommendation: We recommend the College design controls to ensure an adequate review process is in place to ensure compliance with reporting requirements. Explanation of disagreement with audit fi...
2022-008 Inadequate Schedule of Federal Expenditures Reporting ? Assistance Listing No. 84.063, 84.268 Recommendation: We recommend the College design controls to ensure an adequate review process is in place to ensure compliance with reporting requirements. Explanation of disagreement with audit finding: There is no disagreement with the audit finding. Action taken in response to finding: CFO prepared the FY 21 SEFA in advance of the 3/31/2022 Single Audit deadline. CFO will prepare the FY 22 SEFA in advance of the 3/31/2023 Single Audit deadline. Name(s) of the contact person(s) responsible for corrective action: Ashley Chancellor, CFO Planned completion date for corrective action plan: 11/1/2022
Finding Number: 2022-004 Condition: The schedule of expenditures of federal awards (SEFA) initially presented for audit was not complete and accurate. Planned Corrective Action: A new report in Workday is being created to ensure all expenditures for federal awards are included. Contact person respon...
Finding Number: 2022-004 Condition: The schedule of expenditures of federal awards (SEFA) initially presented for audit was not complete and accurate. Planned Corrective Action: A new report in Workday is being created to ensure all expenditures for federal awards are included. Contact person responsible for corrective action: Laura Randall Anticipated Completion Date: 10/31/2023
Finding 2022-006: Federal Financial Reporting Requirements (Significant Deficiency) Information on the Federal Program: U.S. Department of State ALN 19.040 Criteria or Specific Requirement: Code of Federal Regulations (CFR) Section 200.303(b) requires non-federal entities to establish and maintain...
Finding 2022-006: Federal Financial Reporting Requirements (Significant Deficiency) Information on the Federal Program: U.S. Department of State ALN 19.040 Criteria or Specific Requirement: Code of Federal Regulations (CFR) Section 200.303(b) requires non-federal entities to establish and maintain effective internal control over federal awards that provide reasonable assurance that the non-federal entity is managing federal awards in compliance with federal statutes, regulations, and terms and conditions of the federal award. CFR Section 200.502(a) states that the determination of when a federal award is expended should be based on when the activity related to the federal award occurs. CFR Section 200.510 states that the auditee must prepare a schedule of expenditures of federal awards for the period covered by the auditee's financial statements which must include the total federal awards expended as determined in accordance with CFR Section 200.502. Condition: The schedule of expenditures of federal awards for the year ended December 31, 2022, did not originally include indirect costs totaling $43,632. Cause: FCE's management prepared the schedule of expenditures of federal awards using only direct costs. However, FCE had applied the 10-percent de minimis indirect cost rate when submitting its financial reports. Effect or Potential Effect: The exclusion of indirect costs caused inaccurate amounts to be reported in the SEFA at the start of the audit. This could have caused an inaccurate major program determination. Recommendation: FCE should implement a process for preparing the SEFA that includes comparing amounts reported in the SEFA to amounts included in financial reports of expenditures that are submitted to federal agencies. Action Taken: FCE acknowledges the importance of proper Federal Financial Reporting. FCE will develop and implement formal accounting policies and procedures to ensure that Federal Financial Requirements are met. These will include the steps to follow for preparation of the SEFA, including comparing amounts reported in the SEFA to amounts included in financial reports of expenditures that are submitted to Federal agencies.
Individuals Responsible for Corrective Action Plan: Jason Penegar, BGCA Vice President ? Controller Shelby Mahoney, Accounting Manager - State Alliances Corrective Action: Management will review grant agreements to confirm whether expenditures from pass-through entities are related to federal or st...
Individuals Responsible for Corrective Action Plan: Jason Penegar, BGCA Vice President ? Controller Shelby Mahoney, Accounting Manager - State Alliances Corrective Action: Management will review grant agreements to confirm whether expenditures from pass-through entities are related to federal or state grants, and appropriately include applicable federal grants in the SEFA. Anticipated Completion Date: December 31, 2023
Finding 37765 (2022-018)
Significant Deficiency 2022
Corrective Action Plan: The Agency has recognized the need to improve our SEFA compilation process and has begun using a quarterly reconciliation process with all agencies and departments. We are currently reconciling data from VISION to the data submitted to the U.S. Treasury for ARPA-SLFRF Quart...
Corrective Action Plan: The Agency has recognized the need to improve our SEFA compilation process and has begun using a quarterly reconciliation process with all agencies and departments. We are currently reconciling data from VISION to the data submitted to the U.S. Treasury for ARPA-SLFRF Quarterly Reporting. We are using this new quarterly reconciliation process as a starting point to check Subrecipient expenditures against total expenditures, as well as reviewing Grant Accounts and reviewing Class Codes. We are checking all of our programs and looking at Beneficiaries vs. Subrecipients to ensure we are categorizing correctly at the macro level. There will be an enhanced collaboration internal to the Agency between the Department of Finance & Management and the Financial Services Division that will occur after agencies and departments submit their ACFR-9s used in the SEFA consolidation process to provide greater review and oversight. Scheduled Completion Date of Corrective Action Plan: Completed: February, 2023: Quarterly Reconciliation Process (VISION to Treasury) Expected: June, 2023: Subrecipient vs. Beneficiary classification review Expected: September, 2023: Collaboration between DFM and FSD for SEFA preparation
Audit Period: Fiscal year ended June 30, 2022 The findings from the June 30, 2022 schedule of findings and questioned costs are discussed below. The findings are numbered consistently with the numbers assigned in the schedule of findings and questioned costs. Findings - Financial Statement Audit M...
Audit Period: Fiscal year ended June 30, 2022 The findings from the June 30, 2022 schedule of findings and questioned costs are discussed below. The findings are numbered consistently with the numbers assigned in the schedule of findings and questioned costs. Findings - Financial Statement Audit MATERIAL WEAKNESS None Reported SIGNIFICANT DEFICIENCY None Reported Findings - Federal Award Programs Audit MATERIAL WEAKNESS None Reported SIGNIFICANT DEFICIENCY None Reported Water and Waste Systems -ALN: 10.760 Finding: Schedule of Expenditures of Federal Awards Preparation Recommendation: Procedures should be implemented to ensure completion of an entry to the Schedule of Federal Expenditures of Federal Awards to achieve a reliable reporting of total expenditures for an audit period. Action Taken: We acknowledge our responsibility to present the Schedule of Expenditures of Federal Awards and related notes in accordance with Uniform Guidance requirements. To ensure future implementation of this requirement, the City of Cave Spring will record all expenditures on the schedule of federal expenditures.
Finding 37079 (2022-002)
Material Weakness 2022
CORRECTIVE ACTION PLAN YEAR ENDED DECEMBER 31, 2022 Finding No. 2022-002: Incomplete Schedule of Expenditures of Federal Awards- Material Weakness and Material Noncompliance Finding: During our audit, we identified a grant that is required to comply with the applicable requirements of 2 CFR Part...
CORRECTIVE ACTION PLAN YEAR ENDED DECEMBER 31, 2022 Finding No. 2022-002: Incomplete Schedule of Expenditures of Federal Awards- Material Weakness and Material Noncompliance Finding: During our audit, we identified a grant that is required to comply with the applicable requirements of 2 CFR Part 200 and thus should have been included in the Schedule of Expenditures of Federal Awards. Once this grant was properly included, the Organization exceeded $750,000 in qualifying federal expenditures thus meeting the requirement for a Uniform Guidance audit to be conducted. Corrective Actions Taken or Planned: Management has hired a Director of Grants Financial Management who is heading a team to ensure effective management and compliance with all awards in the agency. In addition, management has acquired an award management system and implemented new processes to identify Federal awards. These processes consist of (1) clearly identifying Federal awards on the new Grant Code Form, (2) conducting new award kick-off meetings within the Awards Management, Budget, and Compliance team, and (3) tracking all awards on an award and contracts matrix, as well as in the new awards management software system. For each new award, a Grant Code Form is created. The form allows the Awards Management, Budget, and Compliance team to direct the Accounting team to create a grant code for tracking purposes in the accounting financial system. When the Awards Management and Budget team complete the form, the grant will be clearly identified as a federal grant. In addition, when KIND receives a new award, the Awards Management, Budget, and Compliance team conduct kick-off meetings within the team to discuss award financial, programmatic and compliance requirements. During this meeting the team completes an awards summary template that clearly identifies an award as a Federal award and any related compliance and other requirements. In addition to the processes mentioned, the Awards Management, Budget and Compliance team has created a new contracts and awards tracking matrix. The awards tracking matrix identifies Federal grants, along with any related award requirements and other identifying information. This matrix is maintained and updated by the Awards Management, Contracts and Compliance Officer and reviewed by the Director, Grants Financial Management on a regular basis. The review includes existing procedures related to awards management and monitoring of processes. This is on-going and already in progress. In addition to the above-mentioned processes KIND will do the following: continuously review existing processes around clearly identifying Federal awards and make adjustments to strengthen internal controls as needed; review and discuss with the awards management software vendor, additional improvements that can be made to the system to better identify and report Federal awards and review the current awards matrix and make additional improvements that will better identify and track Federal awards. Name and Person Responsible: Rochelle Quillman, Director of Grants Financial Management Expected Completion Date: October 31, 2023
Corrective Action Plan Finding 2022-001 In response to the reported deficiency of internal controls over compliance with the preparation of the Schedule of Expenditures of Federal Awards (SEFA), Riverside is implementing the following Corrective Action Plan: 1. Upon notification from the Contracts ...
Corrective Action Plan Finding 2022-001 In response to the reported deficiency of internal controls over compliance with the preparation of the Schedule of Expenditures of Federal Awards (SEFA), Riverside is implementing the following Corrective Action Plan: 1. Upon notification from the Contracts Department of new awards or modifications, the Program Controller will review the Project Setup with an emphasis on ensuring the Project Type is correctly assigned. 2. Prior to approving the Project Setup in Cost Point by the Contracts Department, the Contracts Manager will ensure the Project Setup is accurate. 3. Riverside will perform a rigorous review of the SEFA in advance of submitting the document to our external auditors. This will include reviewing the Project Type of each project identified as required to be reported in the SEFA. Individual(s) Responsible for the Corrective Action Plan: Vivian Arthur, Controller, (703) 908-2135, Gary Van Gorder, (937) 427-7009. Anticipated Completion Date: December 2023
Community Development Block Grants ? Assistance Listing No. 14.228 Recommendation: We recommend that the Council record federal expenditures on the SEFA under the program in the year upon which the loan disbursement occurs. Explanation of disagreement with audit finding: There is no disagreement wit...
Community Development Block Grants ? Assistance Listing No. 14.228 Recommendation: We recommend that the Council record federal expenditures on the SEFA under the program in the year upon which the loan disbursement occurs. Explanation of disagreement with audit finding: There is no disagreement with the audit finding. Action taken in response to finding: The Council has revised their procedures so that loan disbursements will be recorded on the SEFA in the year in which they are disbursed. Name(s) of the contact person(s) responsible for corrective action: Anita Cameron, NLF Director, and Becky Walter, Fiscal Manager Planned completion date for corrective action plan: December 31, 2023
Name of Responsible Individual(s): Jason Penegar, BGCA Vice President ? Controller Shelby Mahoney, Accounting Manager - State Alliances Corrective Action: Management will review grant agreements to confirm whether funding received from private entities are federal funds that should be reported on th...
Name of Responsible Individual(s): Jason Penegar, BGCA Vice President ? Controller Shelby Mahoney, Accounting Manager - State Alliances Corrective Action: Management will review grant agreements to confirm whether funding received from private entities are federal funds that should be reported on the SEFA. Anticipated Completion Date: December 31, 2023
Finding 34277 (2022-001)
Significant Deficiency 2022
Individuals Responsible for Corrective Action Plan Jeff Scaccia, CPA (Vice President for Finance and Administration) Libby Shull, CPA (Controller) April Baur, (Director of Student Financial Aid) The SEFA as prepared by management did not originally include one federal grant with federal expenditure...
Individuals Responsible for Corrective Action Plan Jeff Scaccia, CPA (Vice President for Finance and Administration) Libby Shull, CPA (Controller) April Baur, (Director of Student Financial Aid) The SEFA as prepared by management did not originally include one federal grant with federal expenditures to be reported with the 2022 SEFA. Corrective Action Plan: The grant included in the finding was received from a local government entity which did not communicate any reporting requirements associated with the grant. The College will be more vigilant in future years in assessing any grants received for inclusion on the SEFA. Anticipated Completion Date: March 1, 2023.
Federal Grantor: U.S. Department of Health and Human Services, Family Violence Prevention and Services/State Domestic Violence Coalitions, State Coalition Technical Assistance and Training Program, Director Program, Federal Assistance List Number 93.591 Condition: Expenditures reported on the Schedu...
Federal Grantor: U.S. Department of Health and Human Services, Family Violence Prevention and Services/State Domestic Violence Coalitions, State Coalition Technical Assistance and Training Program, Director Program, Federal Assistance List Number 93.591 Condition: Expenditures reported on the Schedule of Expenditures of Federal Awards (SEFA) were revised during the single audit. Auditor Recommendation: The Partnership should work with its external accounting firm to ensure the SEFA is complete and accurate and expenses agree to federal revenues reported and ensure revenues and expenses for each federal grant are included in the appropriate grouping code for the grant so revenues and expenses claimed are accounted for separately in the general ledger. Partnership Contact Person Responsible for the Corrective Action: Aleese Moore-Orbih, Executive Director Management Response and Corrective Action Plan: The Partnership concurs with the finding and recommendation. We have begun the process of increasing the capacity of our finance department to include an Associate Director, who, like the Senior Director, will be familiar with Uniform Guidance and nonprofit grants management and accounting. They will work in collaboration with our accounting consultants to ensure the SEFA is complete and accurate and agrees to recorded revenue. The target date for hiring is September 1, 2023.
Finding 2022-002 ? Significant Deficiency Award No.: 97.083, Staffing for Adequate Fire and Emergency Response Federal Grantor: U.S. Department of Homeland Security, Federal Emergency Management Agency Compliance Requirement: Other compliance requirements. Condition: The schedule of Expenditur...
Finding 2022-002 ? Significant Deficiency Award No.: 97.083, Staffing for Adequate Fire and Emergency Response Federal Grantor: U.S. Department of Homeland Security, Federal Emergency Management Agency Compliance Requirement: Other compliance requirements. Condition: The schedule of Expenditures of Federal Awards (SEFA) was not complete, and expenditures reported on the SEFA were revised during the single audit. Recommendation: We recommend additional review procedures be implemented to ensure the SEFA is complete and accurate when the single audit begins. Management Response and Corrective Action Plan: The Finance division will work with other departments to ensure that data provided in the SEFA are complete and accounted for on an accrual basis. We will also implement efficiencies in our accounting systems to ensure expenditures are captured correctly to prevent errors and omissions. Additional review will be completed by the Finance Director for completeness.
Finding Number: 2022-005 Condition: The schedule of expenditures of federal awards (SEFA) for the year ended June 30, 2022 includes expenditures incurred during the prior fiscal year. Planned Corrective Action: The Organization acknowledges this finding. Going forward the Organization will implem...
Finding Number: 2022-005 Condition: The schedule of expenditures of federal awards (SEFA) for the year ended June 30, 2022 includes expenditures incurred during the prior fiscal year. Planned Corrective Action: The Organization acknowledges this finding. Going forward the Organization will implement a review process of the Schedule of Expenditures of Federal Awards. Contact person responsible for corrective action: Bregeita Jefferson, President of FEED International Anticipated Completion Date: January 31, 2023
Condition: During the audit, significant adjustments were identified and proprosed (which were approved and posted by management) to adjust the College's general ledger to the appropriate balances. Planned Corrective Action: A detailed business procedure will be written and implemented that expre...
Condition: During the audit, significant adjustments were identified and proprosed (which were approved and posted by management) to adjust the College's general ledger to the appropriate balances. Planned Corrective Action: A detailed business procedure will be written and implemented that expressly lists how to handle year-end audit as it relates to both the Annual Financial Audit and teh Single Audit. The procedure will include processes for quarterly balancing and review, at a minimum. The procedure will include the creation of the annual SEFA document to be used by auditors in determining what programs the College has been awarded and what expenditures have been made. It will also include who is to handle all pieces of the audit and preparation in the absence of the Director of Financial Services. Contact person responsible for corrective actions: Dana Blair, Director of Financial Services Anticipated Completion Date: January 15, 2023
2022-008 ? Completeness and accuracy of certain COVID-19 programs on the Prior Year Schedule of Expenditures of Federal Awards (SEFA) - (Significant Deficiency) Cluster: Not applicable Sponsoring Agency: Department of Health and Human Services (HHS) - Health Resources and Services Administration (H...
2022-008 ? Completeness and accuracy of certain COVID-19 programs on the Prior Year Schedule of Expenditures of Federal Awards (SEFA) - (Significant Deficiency) Cluster: Not applicable Sponsoring Agency: Department of Health and Human Services (HHS) - Health Resources and Services Administration (HRSA) and Department of Education Award Names: COVID-19 Provider Relief Fund (PRF) and COVID-19 Higher Education Emergency Relief Fund (HEERF) Institutional Portion Award Numbers: Not applicable and P425F202269 Assistance Listing Titles: COVID-19 Provider Relief Fund and American Rescue Plan (ARP) Rural Distribution and COVID-19 HEERF Institutional Portion Assistance Listing Number: 93.498 and 84.425F Award Year: 2020-2021 and 2020-2022 Pass-through entity: Not applicable Management agrees that additional controls should be implemented to ensure the accuracy and completeness of the SEFA. As a result of the prior year omissions discovered during the current year SEFA preparation and Single Audit, the University performed a reconciliation (prior to issuance of the audit report) of the PRF payments reflected in the HRSA reporting portal systemwide. The reconciliation did not identify any misstatements other than those described in the finding. The University of California Office of the President (UCOP) will work with campuses to fully reconcile PRF for the fiscal year 2023. Also beginning in 2023, campuses and medical centers will be assigned responsibility for reviewing and signing off on their respective final SEFAs, inclusive of HEERF, PRF, and any other atypical federal programs that are not captured in the campuses? financial system (e.g., those for which there is not expense recognition in a federal fund). The Systemwide Controller will also be included in the review process and signoff on the final SEFA reports. Beginning in FY 2024, the University will implement more comprehensive financial reporting controls as follows: ? Interim SEFA reports, inclusive of atypical programs, will be prepared centrally and distributed to campuses for review and alignment with campus records. Campus management will be tasked with the responsibility for overall review and signoff for both interim and final SEFA reports. ? The Systemwide Controller will also be included in the review process by performing an overall review and signoff for the final SEFA report. For inquiries regarding this finding, please contact Barbara Cevallos at (510) 987-0013 who is responsible for the corrective action.
When CSC provided the 2022 SEFA to the Auditor, it contained errors, which resulted in this finding. The errors resulted from us not fully understanding the fields on the SEFA. We completed the SEFA thinking that it was only meant for 2022 transactions only. We shall continue to increase our familia...
When CSC provided the 2022 SEFA to the Auditor, it contained errors, which resulted in this finding. The errors resulted from us not fully understanding the fields on the SEFA. We completed the SEFA thinking that it was only meant for 2022 transactions only. We shall continue to increase our familiarity with this one-page report, required only for single audits.
Finding 28054 (2022-034)
Significant Deficiency 2022
Department: Education Administrative and Financial Services Title: Internal control over the submission of CNC Schedule of Expenditures of Federal Awards information needs improvement Questioned Costs: None Status: Corrective action in progress Corrective Action: The Department will report expenditu...
Department: Education Administrative and Financial Services Title: Internal control over the submission of CNC Schedule of Expenditures of Federal Awards information needs improvement Questioned Costs: None Status: Corrective action in progress Corrective Action: The Department will report expenditures for the School Breakfast Program and Special Milk Program under the individual ALNs rather than including those expenditures in the broader ALN 10.555. The Department will report noncash assistance at the amount actually used rather than the amount authorized for use. The Department will add a note to the SEFA report indicating any COVID-19 expenditures that cannot be isolated due to waivers. Completion Date: June 30, 2023 Agency Contact: Nicole Denis, Director of Finance, DOE, 207-530-2161
We agree with the finding, This was due to the modification of assistance listing number for two awards. We will strengthen our controls for review of all grant documents before issuing the SEFA report.
We agree with the finding, This was due to the modification of assistance listing number for two awards. We will strengthen our controls for review of all grant documents before issuing the SEFA report.