Finding #2023-005 – Material Weakness and Other Noncompliance. Applicable federal program: U. S. Department of Health and Human Services, Passed through U. S. Committee for Refugee and Immigrants, 93.567, Refugee and Entrant Assistance – Matching Grant Program, Contract period and grant #: 10/01/21...
Finding #2023-005 – Material Weakness and Other Noncompliance. Applicable federal program: U. S. Department of Health and Human Services, Passed through U. S. Committee for Refugee and Immigrants, 93.567, Refugee and Entrant Assistance – Matching Grant Program, Contract period and grant #: 10/01/21 – 09/30/23 2202VARVMG. Criteria: Matching, Level of Effort and Earmarking 45 CFR 75 306 stipulates that matching funds must meet the following criteria: 1) verifiable from organization’s records, 2) not included as contributions for any other federal award, 3) are necessary and reasonable for accomplishment of project or program objectives, 4) are allowable under Uniform Guidance Subpart E, 5) are not paid by the federal government under another federal award except where federal statute allows, and 6) are included in approved budget when required by HHS award agency. Additionally, donated goods and services should be valued at fair value, must be documented, and to the extent feasible supported by the same methods used internally by the organization. Condition and context: During our testing of 15 transactions reported as matching grant costs, we identified the following exceptions: 1. For 1 transaction, the basis for the valuation was not documented and there was no documentation of the distribution to clients within the match grant program. 2. For 1 transaction, the YMCA received a discount from the vendor so they did not incur any costs. This transaction does not meet the definition of an in-kind contribution and should not be recorded as an in-kind match. 3. For 2 transactions, federal commodities were used for match that were received from another federal program. Recommendation: Provide additional training and emphasize adherence to established policies and procedures to ensure maintenance of documentation for valuation, distribution and documentation of matching grant funds. Planned corrective action: Finance and programmatic staff assigned to programs with matching requirements will communicate and review activity monthly to ensure eligibility and adherence with program requirements. Increased documentation of valuation and allocation of items included in match reporting will be maintained. Responsible officer: Jennifer Garcia, Chief Financial Officer and Jeff Watkins, Chief International Initiatives Officer. Estimated completion date: April 2024.
Finance staff will review grant budget simultaneously as costs are invoiced for reimbursement. Additionally, Finance staff will receive training on grant budgeting including federal grant regulations and requirements. Expected completion date: July 2024
Finance staff will review grant budget simultaneously as costs are invoiced for reimbursement. Additionally, Finance staff will receive training on grant budgeting including federal grant regulations and requirements. Expected completion date: July 2024
View Audit 308093 Questioned Costs: $1
The Council disputes this finding and did have a system in place to document program participant enrollment and received services participant's file records and sign-in sheets. Due to the number of various kinds of services an individual received in a month, services and activities sign-in sheets...
The Council disputes this finding and did have a system in place to document program participant enrollment and received services participant's file records and sign-in sheets. Due to the number of various kinds of services an individual received in a month, services and activities sign-in sheets had to be used to prevent duplication of counting for program reports Regarding reports, the organization does use its email system involving multiple employees to prepare, review, approve, and submit reports which involves the Executive Director or Grants Manager submitting final reports. A new form was created to include a final sign-off by the Executive Director to indicate approval of reports. However, this was not accepted as sufficient by the auditor. Per new grant reporting regulations, at the recommendation of the auditor, staff will establish a shared Adobe document system to allow for the collection of staff signatures and approvals at all levels before each report is submitted. These signatures and approval document will be attached to submitted reports for review. Expected completion date: July 2024
Special Tests and Provisions Finding 2023-005 Federal Agency Name: U.S. Department of Agriculture Assistance Listing Number: 10.766 Program Name: Community Facilities Loans and Grants Cluster Finding Summary: While deposits were made during the year to the debt reserve fund, certain payments were no...
Special Tests and Provisions Finding 2023-005 Federal Agency Name: U.S. Department of Agriculture Assistance Listing Number: 10.766 Program Name: Community Facilities Loans and Grants Cluster Finding Summary: While deposits were made during the year to the debt reserve fund, certain payments were not considered to be made timely. In addition, as of June 30, 2023, the debt reserve fund was required to have a balance of $36,450, however, the balance was $36,041. Corrective Action Plan: The Authority is in the process of revising controls to ensure deposits are made timely and they are establishing controls to aid with the monitoring the debt service requirements are being met. Responsible Individual: Priacilla Leatherman, VP of Finance Anticipated Completion Date: May 2024
Finding 399870 (2023-001)
Material Weakness 2023
Name of Contact Person: Vickie K. Smith, DSS Director Income Maintenance Medicaid Supervisors will complete monthly second party reviews for application approvals/recertifications/denials/withdrawals for applications and ongoing cases. Based on findings from the monthly second party review of appl...
Name of Contact Person: Vickie K. Smith, DSS Director Income Maintenance Medicaid Supervisors will complete monthly second party reviews for application approvals/recertifications/denials/withdrawals for applications and ongoing cases. Based on findings from the monthly second party review of applications/recertifications individual meetings will be held with the responsible Income Maintenance Caseworker to discuss the errors found and ways to improve the work performance. The individual counseling will assist in assuring that the worker understands the error and what they need to do for improvements. Monthly a spreadsheet is created from each individual score, from each Income Maintenance Caseworkers audit. The spreadsheet is reviewed monthly and presented quarterly at the Bladen County Health and Human Service Advisory Committee meeting. In addition to the above ongoing process a meeting was held with the Medicaid staff on February 20, 2024 and the following manual sections were addressed (handouts given): DMA Admin Letter 02-19 The Work Number Procedures, Job Aid: The Work Number, Job Aid: Online Verifications; Manual calculations of Income MA 2250; Resources and verifications MA 2230; Job Aid: Evidence Dashboard Relationships; Approved Uses of Forced Eligibility last update 03/01/2023. Bladen County has shown significant improvement with the use of the Work Number for the purpose of application and ongoing case work. DMA Administrative Letter No. 02-19 (The Work Number Procedures). Proposed Completion Date: July 1, 2024 (Improvements from 06/01/2022 – 07/ 01/2023)
inding 2023-007: lnterfund Balance Corrective Action: The software conversion to PHA-Web caused tremendous confusion and along with the inexperience of the prior fee accountants. This will be researched and corrected during FY 2024. Date Due: 6/30/2024 Person Responsible: Angela Farrish
inding 2023-007: lnterfund Balance Corrective Action: The software conversion to PHA-Web caused tremendous confusion and along with the inexperience of the prior fee accountants. This will be researched and corrected during FY 2024. Date Due: 6/30/2024 Person Responsible: Angela Farrish
View Audit 307928 Questioned Costs: $1
VIEWS OF RESPONSIBLE OFFICIALS We implemented the procedures to report first-tier subawards of $30,000 or more to the Federal Funding Accountability and Transparency Act Subaward Reporting System (FSRS) on July 13, 2023. Accordingly, we expect to be in full compliance with the Single Audit for the f...
VIEWS OF RESPONSIBLE OFFICIALS We implemented the procedures to report first-tier subawards of $30,000 or more to the Federal Funding Accountability and Transparency Act Subaward Reporting System (FSRS) on July 13, 2023. Accordingly, we expect to be in full compliance with the Single Audit for the fiscal year 2024. IMPLEMENTATION DATE Single Audit for fiscal year 2023-24 RESPONSIBLE PERSON Félix Hernández Cabán Director of Disaster Recovery for CDBG-DR and Juan R. Rivera Carrillo Assistance Secretary for Finance and Administration
VIEWS OF RESPONSIBLE OFFICIALS During the fiscal year we implemented the Yardi Software to improve the efficiency of the accounting system and the related procedures and ensure that the required financial statements are submitted in compliance with 2 CFR § 200.512 for the Single Audit for fiscal yea...
VIEWS OF RESPONSIBLE OFFICIALS During the fiscal year we implemented the Yardi Software to improve the efficiency of the accounting system and the related procedures and ensure that the required financial statements are submitted in compliance with 2 CFR § 200.512 for the Single Audit for fiscal year 2024. IMPLEMENTATION DATE March 31, 2025 RESPONSIBLE PERSON Juan R. Rivera Carrillo Assistance Secretary for Finance and Administration
Finding 399379 (2023-001)
Significant Deficiency 2023
The County will implement additional review procedures.
The County will implement additional review procedures.
The original preparer will provide the report prior to submission to the United States Department of Treasury each quarter to another employee in the Administration office to cross reference totals from New World financial software system and information provided from the Auditor's Office. A written...
The original preparer will provide the report prior to submission to the United States Department of Treasury each quarter to another employee in the Administration office to cross reference totals from New World financial software system and information provided from the Auditor's Office. A written report on findings of this review will be submitted to the Auditor's Office by the due date of the submission to the United States Department of the Treasury.
The District will utilize DESE's Federal & State Grant Manual document as a guide to ensure compliance with grant management.
The District will utilize DESE's Federal & State Grant Manual document as a guide to ensure compliance with grant management.
View Audit 307806 Questioned Costs: $1
To ensure compliance with the provisions of the Gramm-Leach-Bliley Act (GLBA), specifically the requirement that the District’s written Enterprise Data Governance Standard (EDGS) includes a description of the use of a data inventory that includes how the institution is identifying and managing data,...
To ensure compliance with the provisions of the Gramm-Leach-Bliley Act (GLBA), specifically the requirement that the District’s written Enterprise Data Governance Standard (EDGS) includes a description of the use of a data inventory that includes how the institution is identifying and managing data, personnel, devices, systems and facilities, management has revised the EDGS to specify that a data inventory for each functional system domain shall take place annually under the direction of the Data Owners and the procedures performed and results shall be adequately documented. Implementation Date: August 2024 Responsible Persons: Phong Banh, District Director of Information Technology Services Patrick Vrba, Controller
Finding 399075 (2023-002)
Significant Deficiency 2023
Corrective Action Plan For the Fiscal Year Ended August 31, 2023 Finding 2023-002 – Special Tests and Provisions – Enrollment Reporting Name of contact person responsible for corrective action: John Carrescia, jcarresc@wagner.edu; 718-420-4264 Corrective action: The College has been working diligen...
Corrective Action Plan For the Fiscal Year Ended August 31, 2023 Finding 2023-002 – Special Tests and Provisions – Enrollment Reporting Name of contact person responsible for corrective action: John Carrescia, jcarresc@wagner.edu; 718-420-4264 Corrective action: The College has been working diligently across multiple departments on campus to make these historical corrections. We have identified the various groupings of students that require correction, and have worked through our historical data to update the program begin date (campus level data) to be the first day of the earliest semester for which each student began attending their respective program. We have submitted the listings to the National Student Clearinghouse for revision. We currently have a process in place and are working collaboratively with our information technology system analysts to implement controls to ensure the correct program begin date is used for all future students entering the College. We are currently in the process of reviewing and updating our program level enrollment data. Proposed Completion Date: August 31, 2024
Name of Responsible Individual: Dylan Nowakowski Assistant Director of Financial Aid Corrective Action: For one of two reconciliations tested we were unable to provide documentation that the reconciliation was done. The reconciliation was done, however, there was a server error in the system that c...
Name of Responsible Individual: Dylan Nowakowski Assistant Director of Financial Aid Corrective Action: For one of two reconciliations tested we were unable to provide documentation that the reconciliation was done. The reconciliation was done, however, there was a server error in the system that caused Wheeling to lose some files. Two of the reconciliation files are missing due to this. We have a Financial Aid Office policy that has been established to ensure that reconciliations are made once a month. Since the loss of the backup system, the files are both saved and printed to avoid any more loss of files. During this period, we were using a now-defunct backup system. We have now moved to multiple backup systems and a new storage server. Our storage server is now a virtual machine with a high availability setup where we have 2 large drive systems continually being mirrored. The backup system has 2 servers with large drive systems. We continually alternate file backups each day as needed. As the backups finish, they are moved up to the cloud each time. Also, we have in place a 30-day non-overwrite policy on the files backed up to the cloud. Anticipated Completion Date: July 2022
Name of Responsible Individual: Tracy Jenkins, Student Accounts Corrective Action: We recognized that students were not receiving the Right to Cancel notifications in a timely manner. We also understood the need for students to receive this information to make an important educational/fiscal decisi...
Name of Responsible Individual: Tracy Jenkins, Student Accounts Corrective Action: We recognized that students were not receiving the Right to Cancel notifications in a timely manner. We also understood the need for students to receive this information to make an important educational/fiscal decision. As of September 2023, on a monthly basis, notifications were sent to student University emails and parent’s personal email (Plus Loan recipients) informing them of their Right to Cancel. Anticipated Completion Date: September 2023
Name of Responsible Individual: Shelia Yates-Mattingly, Registrar Corrective Action: In response to Finding 2023-005, Wheeling University will continue the enrollment reporting process that was implemented in October 2023, which was in response to Finding 2022-005. With the stability of staffing in...
Name of Responsible Individual: Shelia Yates-Mattingly, Registrar Corrective Action: In response to Finding 2023-005, Wheeling University will continue the enrollment reporting process that was implemented in October 2023, which was in response to Finding 2022-005. With the stability of staffing in the Registrar’s Office and Financial Aid Office and the level of experience and competence of this staff, enrollment reporting has been completed within the parameters of regulatory guidelines. The Registrar’s Office submits enrollment reports as scheduled and subsequent error resolution reports as appropriate. The Financial Aid Office reviews identified NSLDS errors, corrects and resubmits them timely. Regularly scheduled meetings, including the Registrar’s and Financial Aid Offices, continue as noted in corrective action for Finding 2022-005. These meetings serve as the platform to discuss and address identified enrollment reporting concerns/issues timely, resulting in improved accuracy in enrollment reporting and timeliness in error resolution. Anticipated Completion Date: The current process has been in place since October 2023 and is ongoing.
Name of Responsible Individual: Tracy Jenkins, Student Accounts Corrective Action: Wheeling University worked with ECSI regarding Perkins information. With the Perkins program ending, we realized that we needed to move in the direction of closing out Perkins files/information. The University is ...
Name of Responsible Individual: Tracy Jenkins, Student Accounts Corrective Action: Wheeling University worked with ECSI regarding Perkins information. With the Perkins program ending, we realized that we needed to move in the direction of closing out Perkins files/information. The University is currently working with ECSI so that we are able to submit Perkins information/files to the Department of Education. We are gathering information (promissory notes, bankruptcy details, payment information, etc.) to assist ECSI with the process. Anticipated Completion Date: May 2024
Name of Responsible Individual: Dylan Nowakowski, Assistant Director of Financial Aid Corrective Action: In the past, Colleague was not used to calculate return to title IV. Once Colleague was properly set up for Financial Aid, the Associate Director discovered that the calendars did not match the ...
Name of Responsible Individual: Dylan Nowakowski, Assistant Director of Financial Aid Corrective Action: In the past, Colleague was not used to calculate return to title IV. Once Colleague was properly set up for Financial Aid, the Associate Director discovered that the calendars did not match the actual publicized academic calendar. Had the calendar been accurate with the correct dates of breaks of 5 days or more, Colleague would not have accepted a withdrawal date during the break. This error within the system should not be counted as a finding. The calendar in Colleague is now correct. All breaks that are five days or more are accurate. At Wheeling, we have a comprehensive R2T4 policy. This policy outlines how to count calendar days in a semester and provides clear instructions on what to do when a student withdraws during a break. Anticipated Completion Date: July 2023
View Audit 307647 Questioned Costs: $1
Name of Responsible Individual: Tyler Hosey, Senior Accountant Corrective Action: The University acknowledges that the internal controls surrounding the cash management of the Federal Research and Development Programs was not in compliance for federal standards. The University is in the process of ...
Name of Responsible Individual: Tyler Hosey, Senior Accountant Corrective Action: The University acknowledges that the internal controls surrounding the cash management of the Federal Research and Development Programs was not in compliance for federal standards. The University is in the process of enhancing the internal controls and cash management procedures to prevent this from happening in the future. Going forward all federal grant funds that are allocated for the Challenger Learning Center will go directly into the appropriate bank account and will be drawn down and spent in the correct time frame. When operating expenses are incurred for the Challenger Learning Center the payment will be processed from the University’s general checking and the federal grant funds will reimburse the University that day. The same is also true for the payroll expenses incurred by the Challenger Learning Center. Wages will be paid out of the university’s general checking account and then reimbursed to the university from the bank account that hold the federal grant funds. Anticipated Completion Date: June 2024
In order to address this audit finding, CMN financial aid staff plans to seek continual improvement in the areas relating to Pell calculations. Through both Federal Student Aid and National Association of Financial Aid Administrators (NASFAA), staff will complete trainings to understand all aspects ...
In order to address this audit finding, CMN financial aid staff plans to seek continual improvement in the areas relating to Pell calculations. Through both Federal Student Aid and National Association of Financial Aid Administrators (NASFAA), staff will complete trainings to understand all aspects of calculating awards, as well as staying up to date on regulatory changes through our student information system. In addition to more training in this area, priority will be placed on rechecking and auditing Pell awards so that they are reviewed during the award year. Staff has already begun reviewing fall 2023 Pell awards for accuracy and will continue to review awards as terms move forward.
During the year, the Board utilized an approved procurement method for these services.
During the year, the Board utilized an approved procurement method for these services.
During the year, the Board utilized an approved procurement method for these services.
During the year, the Board utilized an approved procurement method for these services.
Special Tests and Provisions: Return of Title IV funds for withdrawn students (Repeat finding 2021-004, 2020-002, 2019-003, 2018-005, 2017-004, 2016-003, 2015-004, 2014-011) Name of contact person responsible for corrective action plan: Rhett R. Vertrees, Assistant Chief Financial Officer 2601 Ent...
Special Tests and Provisions: Return of Title IV funds for withdrawn students (Repeat finding 2021-004, 2020-002, 2019-003, 2018-005, 2017-004, 2016-003, 2015-004, 2014-011) Name of contact person responsible for corrective action plan: Rhett R. Vertrees, Assistant Chief Financial Officer 2601 Enterprise Road, Reno NV 89512-1666 Phone: (775)784-3409, Fax: (775)784-1127 Email: rvertrees@nshe.nevada.edu Responses CSN agrees with the findings. • Detailed corrective action taken, including what will be done to avoid the identified issues in the future, and when these measures will be in place; CSN has started to select additional team members to cross train with seasoned R2T4 team members on the processing of R2T4 files. This will ensure that files are processed in a timely manner and meet compliance requirements. Additionally, training opportunities will be assessed and offered to the team members who are processing R2T4 records on an ongoing basis. Additionally, CSN is currently assessing a potential 3rd party vendor to assist with the processing of R2T4s as needed on an ongoing basis. • How compliance and performance will be measured and documented for future audit, management and performance review. Cross training and workshop opportunities will be provided to ensure knowledge and compliance for the R2T4 team and any staff member assisting with processing of R2T4 records. Queries will be utilized to track R2T4 files to ensure timely processing. • Who will be responsible and may be held accountable in the future if repeat or similar observations are noted. The Assistant Director of Financial Aid will be responsible and may be held accountable.
Internal Control over Compliance (Repeat Finding 2022-001, 2021-003, 2020-001, 2019-002, 2018-003, 2017-002, 2015-002, 2014-008) Name of contact person responsible for corrective action plan: Rhett R. Vertrees, Assistant Chief Financial Officer 2601 Enterprise Road, Reno NV 89512-1666 Phone: (775)...
Internal Control over Compliance (Repeat Finding 2022-001, 2021-003, 2020-001, 2019-002, 2018-003, 2017-002, 2015-002, 2014-008) Name of contact person responsible for corrective action plan: Rhett R. Vertrees, Assistant Chief Financial Officer 2601 Enterprise Road, Reno NV 89512-1666 Phone: (775)784-3409, Fax: (775)784-1127 Email: rvertrees@nshe.nevada.edu Responses UNR agrees with the findings • Detailed corrective action taken, including what will be done to avoid the identified issues in the future, and when these measures will be in place; The technical staff can only have the PeopleSoft Administrator (PSA) role in either development or production, but not both. There is an approval process in place to ensure that access is removed from either development or production when a PSA needs to be moved across to the other environment. This process became effective March 1, 2023. There is a quarterly security review of the PeopleSoft Administrator role in PeopleSoft. The first quarterly review was performed in FY16 Q1 and has been performed each quarter since. The reviews are documented and approved. There is a quarterly security review of the PeopleSoft Administrator activities in PeopleSoft. The first quarterly review was performed in FY22 Q4 and has been performed each quarter since. The reviews are documented and approved. There is a quarterly security review of the PeopleSoft Oracle database and user access. The first quarterly review was performed in FY20 Q2 and has been performed each quarter since. The reviews are documented and approved. • How compliance and performance will be measured and documented for future audit, management and performance review. Compliance and performance can be measured by the documented quarterly reviews. • Who will be responsible and may be held accountable in the future if repeat or similar observations are noted. The PeopleSoft Manager will be responsible for ensuring the corrective actions plans are implemented and followed. The Vice President of Information Technology will be accountable for the department’s compliance. UNLV agrees with the finding. • Detailed corrective action taken, including what will be done to avoid the identified issues in the future, and when these measures will be in place; UNLV understands the importance of adequate segregation of duties within the PeopleSoft environments and applications. The PeopleSoft Administrator (PSA) position that is the subject of the finding is responsible for the installation, configuration, upgrades, and troubleshooting of all the application environments. The PeopleSoft Administrators are not programmers/developers, and their access to the production environments is periodically required to perform the needed activities required to provide timely support of the application within the scope of their job duties. UNLV has implemented the following controls to mitigate the risks associated with the elevated access required for the administrators to perform their required support activities. 1. UNLV has removed all persistent assignment of the PeopleSoft Administrator role from all PSAs in all environments. 2. The PeopleSoft Administrator role is temporarily assigned only when elevated actions are required. All assignments are of a limited duration and include a justification detailing the need and actions to be performed. All assignments trigger the follow actions: a. An immediate notification to the Director of Business Continuity & Resiliency and the Interim Senior Associate Vice Provost for Digital Strategy and Transformation. b. Removal is automatic but can be initiated by PSA if work is completed sooner than expected. c. All details around the assignment are captured in a tracking table. d. A review of all assignments and activities is performed monthly. 3. UNLV will continue to review access, activities, and assigned privileges monthly for the PeopleSoft Administrators. 4. UNLV will continue researching and implementing other control methods that may strengthen the segregation of duties or the monitoring capabilities that are available. • How compliance and performance will be measured and documented for future audit, management and performance review. The PeopleSoft Administrator role is no longer persistently assigned to the PSA position. It is only assigned upon request with the knowledge and approval of approving authorities. UNLV performs monthly reviews of the access and activities to determine if the PeopleSoft Administrators' activities align with the necessary support. Additionally, UNLV will continue to research other control methods that will address the segregation of duties while providing appropriate service and support. • Who will be responsible and may be held accountable in the future if repeat or similar observations are noted. The Director of Business Continuity & Resiliency will be responsible for performing the activity reviews and access needs of the PeopleSoft Administrators. The Director will complete the reviews and is also accountable if repeat or similar observations are noted. The Chief Information Security Officer will verify that reviews are conducted on a monthly basis per audit practices. SCS agrees with the findings • Detailed corrective action taken, including what will be done to avoid the identified issues in the future, and when these measures will be in place; In addition to the compensating controls (a) to (d), that have been operating since prior to FY23 the segregation of PeopleSoft Administrators (PSA) is enforced through a “locked account” process. Only two employees have PSA access in both the Production and Development environment. Each employee can only have access to the Production or Development environment at any one time, i.e., the PSA account in the other environment remains locked. A JIRA ticket must be opened for an account to be unlocked. The request is approved by management and the account is unlocked by a member of the IT Security Team. The controls listed below should also mitigate the segregation of duties risk and support a review of “user activities” in the absence of an appropriate user activities audit log function. (a) STAT for PeopleSoft – Code control and internal modification tracking provides visibility over PSA activities that are processed via this tool. These object changes are reviewed and approved by the Director of Information and Application Services. (b) JIRA ‐ Change control management and project tracking software. Change requests and projects related to the PeopleSoft shared instance are tracked and approved. This would include user access modifications and system updates for example. (c) Security e‐mail alerts – The SCS security team are alerted via automated e‐mails when key events are triggered. For example, an elevated role is assigned to a user. (d) User Access Reviews – On an annual basis an independent user access review is performed incorporating SCS/SA privileged users and all shared instance security coordinators. • How compliance and performance will be measured and documented for future audit, management and performance review. The PeopleSoft Administrators will have persistent unlocked access to either the Production or Development environments only. Their corresponding account in the other environment will remain locked. In the event that access is needed to the locked environment, a ticket will be created requesting access which will document the rationale and approvals. In addition, PSA activities are monitored via the change control process through STAT for PeopleSoft. Object changes within the Production environment for example, are approved along with the associated workflows. • Who will be responsible and may be held accountable in the future if repeat or similar observations are noted. The SCS Director of Information and Application Services, and SCS Security Group are responsible for locking/unlocking PSA accounts. The SCS Security Group monitor PeopleSoft e-mail alerts. The IT Audit Manager is performing annual SCS/SA privileged user access reviews.
CORRECTIVE ACTION PLAN FOR FINDINGS REPORTED UNDER UNIFORM GUIDANCE Lyle School District No. 406 September 1, 2022 through August 31, 2023 This schedule presents the corrective action the District is planning to take for findings included in this report in accordance with Title 2 U.S. Code of Feder...
CORRECTIVE ACTION PLAN FOR FINDINGS REPORTED UNDER UNIFORM GUIDANCE Lyle School District No. 406 September 1, 2022 through August 31, 2023 This schedule presents the corrective action the District is planning to take for findings included in this report in accordance with Title 2 U.S. Code of Federal Regulations (CFR) Part 200, Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards (Uniform Guidance). Finding ref number: 2023-001 Finding caption: The District did not have adequate internal controls for ensuring compliance with federal wage rate requirements. Name, address, and telephone of District contact person: Susan Carabin, Business Manager PO Box 368 Lyle, WA 98635 (509) 365-2191 Corrective action the auditee plans to take in response to the finding: Since learning of the requirement regarding payroll reports, the District immediately asked our contractor to build a shared file that contains the certified weekly payroll reports. We now download and document the reports once per week. Anticipated date to complete the corrective action: 3/28/2024