Audit 47342

FY End
2022-06-30
Total Expended
$6.38M
Findings
20
Programs
20
Organization: Western School Corporation (IN)
Year: 2022 Accepted: 2023-02-04

Organization Exclusion Status:

Checking exclusion status...

Findings

ID Ref Severity Repeat Requirement
46891 2022-003 Material Weakness - F
46892 2022-004 Material Weakness - L
46893 2022-005 Material Weakness - N
46894 2022-003 Material Weakness - F
46895 2022-004 Material Weakness - L
46896 2022-005 Material Weakness - N
46897 2022-003 Material Weakness - F
46898 2022-005 Material Weakness - N
46899 2022-003 Material Weakness - F
46900 2022-005 Material Weakness - N
623333 2022-003 Material Weakness - F
623334 2022-004 Material Weakness - L
623335 2022-005 Material Weakness - N
623336 2022-003 Material Weakness - F
623337 2022-004 Material Weakness - L
623338 2022-005 Material Weakness - N
623339 2022-003 Material Weakness - F
623340 2022-005 Material Weakness - N
623341 2022-003 Material Weakness - F
623342 2022-005 Material Weakness - N

Contacts

Name Title Type
LGQNW7JZGQH7 Kyle Zahn Auditee
7658835576 Beth Kelley, CPA Auditor
No contacts on file

Notes to SEFA

Title: Note 3. Kokomo Area Special Education Cooperative Accounting Policies: Note 1. Summary of Significant Accounting PoliciesA. Basis of PresentationThe accompanying Schedule of Expenditures of Federal Awards (SEFA) includes the federalgrant activity of the School Corporation under programs of the federal government for theyears ended June 30, 2021 and 2022. The information in the SEFA is presented in accordancewith the requirements of Title 2 U.S. Code of Federal Regulations Part 200, UniformAdministrative Requirements, Cost Principles, and Audit Requirements for Federal Awards(Uniform Guidance). Because the SEFA presents only a select portion of the operations ofthe School Corporation, it is not intended to and does not present the financial position of theSchool Corporation.The Uniform Guidance requires an annual audit of nonfederal entities expending a totalamount of federal awards equal to or in excess of $750,000, in any fiscal year unless byconstitution or statute a less frequent audit is required. In accordance with Indiana Code(IC 5-11-1-25), audits of school corporations shall be conducted biennially. Such audits shallinclude both years within the biennial period.B. Other Significant Accounting PoliciesExpenditures reported on the SEFA are reported on the cash basis of accounting. Suchexpenditures are recognized following, as applicable, either the cost principles in OMBCircular A-87, Cost Principles for State, Local, and Indian Tribal Governments, or the costprinciples contained in Uniform Guidance, wherein certain types of expenditures are not allowedor are limited as to reimbursement. When federal grants are received on a reimbursementbasis, the federal awards are considered expended when the reimbursement is received. De Minimis Rate Used: N Rate Explanation: The auditee did not use the de minimis cost rate. The School Corporation is a member of the Kokomo Area Special Education Cooperative andserves as the fiscal agent. As a result, some of the activity for the Special Education Cluster (IDEA) that is presented as receipts and disbursements in the financial statement is not presented on the Schedule of Expenditures of Federal Awards (SEFA) for the School Corporation. This activity is reported on the SEFA's of the member school corporations as appropriate.

Finding Details

FINDING 2022-003 Subject: COVID-19 - Education Stabilization Fund - Equipment and Real Property Management Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Number: 84.425 Federal Award Numbers or Years (or Other Identifying Numbers): S425D200013, S425D2100013, S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Equipment and Real Property Management Audit Findings: Material Weakness, Modified Opinion Condition and Context An effective internal control system was not in place at the School Corporation to ensure compliance with requirements related to the grant agreement and the Equipment and Real Property Management compliance requirement. The School Corporation hired a third-party to complete capital asset records every two years. The third-party updated the capital assets records through the school year ended June 30, 2021; however, neither the third-party, nor the School Corporation maintained the records beyond that year. During fiscal year 2021-2022, the School Corporation purchased $1,081,254 of equipment for the boiler/chiller project with Elementary and Secondary School Emergency Relief (ESSER) III funds. The boiler/chiller project was not added to the property record which would include a description of the property, a serial number or other identification number, the source of funding for the property (including the federal award identification number), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sales price of the property . The lack of internal controls and noncompliance were isolated to the property records for 2021-2022. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 2 CFR 200.313(d)(1) states: "Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, and cost of the property, percentage of Federal participation in the project costs for the Federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sale price of the property." Cause Management had not developed a system of internal controls that would have ensured compliance with the Equipment and Real Property Management compliance requirement. Effect The failure to establish an effective internal control system enabled material noncompliance to go undetected. Noncompliance with the grant agreement and the Equipment and Real Property Management compliance requirement could have resulted in the loss of federal funds to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish internal controls to ensure compliance and comply with the grant agreement and the Equipment and Real Property Management compliance requirement. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2022-004 Subject: COVID-19 - Education Stabilization Fund - Reporting Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Number: 84.425 Federal Award Number or Year (or Other Identifying Number): S425D200013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Reporting Audit Findings: Material Weakness, Other Matters Condition and Context An effective internal control system was not designed, or implemented at the School Corporation to ensure compliance with requirements related to the grant agreement and the Reporting compliance requirement. The School Corporation had not designed, or implemented a system of internal control to ensure that the annual Elementary and Secondary School Emergency Relief (ESSER) annual data reports were complete and accurately submitted. The reports were prepared by one employee without an oversight or review process in place to prevent, or detect and correct, errors. Additionally, for one of seven key line items tested, the School Corporation could not provide supporting documentation. The lack of supporting documentation for the Full Time Equivalent (FTE) key line item on the ESSER I, Year 1, annual report prevented us from verifying the accuracy of the line item. The lack of internal controls was a systemic issue throughout the audit period. The noncompliance was isolated to the ESSER I, Year 1 report. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 2 CFR 200.302(b) states in part: "The financial management system of each non-Federal entity must provide for the following . . . (2) Accurate, current, and complete disclosure of the financial results of each Federal award or program in accordance with the reporting requirements set forth in ?? 200.328 and 200.329. . . ." 34 CFR 76.722 states: "A State may require a subgrantee to submit reports in a manner and format that assists the State in complying with the requirements under 34 CFR 76.720 and in carrying out other responsibilities under the program." Cause Management had not developed or implemented a system of internal control that would have ensured compliance with the grant agreement and the Reporting compliance requirement. Effect The failure to establish an effective internal control system enabled material noncompliance to go undetected. Noncompliance with the grant agreement and the Reporting compliance requirement could result in the loss of future federal funds to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish internal controls to ensure compliance and comply with the grant agreement and the Reporting compliance requirement. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2022-005 Subject: COVID-19 - Education Stabilization Fund - Special Tests and Provisions - Wage Rate Requirements Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Number: 84.425 Federal Award Numbers or Years (or Other Identifying Numbers): S425D200013, S425D2100013, S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Special Tests and Provisions - Wage Rate Requirements Audit Finding: Material Weakness Condition and Context An effective internal control system was not designed or implemented at the School Corporation to ensure compliance with requirements related to the grant agreement and the Special Tests and Provisions - Wage Rate Requirements compliance requirement. Construction contracts in excess of $2,000 financed by federal assistance funds must pay wages not less than those established for the locality of the project (prevailing wage rates) by the Department of Labor (DOL) to their laborers and mechanics. Nonfederal entities are to include in their construction contracts subject to the Wage Rate Requirements a provision that the contractor or subcontractor comply with these requirements and the DOL regulations. This would include a requirement to submit a copy of the payroll and statement of compliance to the entity for each week in which contract work was performed. The School Corporation had the required clause in the contract and received the payroll; however, the School Corporation did not have adequate policies or procedures to ensure that the required payrolls were submitted and reviewed for each week in which contract work was performed. The lack of internal controls was systemic throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." Cause Management had not developed or implemented a system of internal control that would have ensured compliance with the grant agreement and the Special Tests and Provisions - Wage Rate Requirements compliance requirement. Effect The failure to establish an effective internal control system could have enabled material noncompliance to go undetected. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish internal controls to ensure compliance with the grant agreement and the Special Tests and Provisions - Wage Rate Requirements compliance requirement. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2022-003 Subject: COVID-19 - Education Stabilization Fund - Equipment and Real Property Management Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Number: 84.425 Federal Award Numbers or Years (or Other Identifying Numbers): S425D200013, S425D2100013, S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Equipment and Real Property Management Audit Findings: Material Weakness, Modified Opinion Condition and Context An effective internal control system was not in place at the School Corporation to ensure compliance with requirements related to the grant agreement and the Equipment and Real Property Management compliance requirement. The School Corporation hired a third-party to complete capital asset records every two years. The third-party updated the capital assets records through the school year ended June 30, 2021; however, neither the third-party, nor the School Corporation maintained the records beyond that year. During fiscal year 2021-2022, the School Corporation purchased $1,081,254 of equipment for the boiler/chiller project with Elementary and Secondary School Emergency Relief (ESSER) III funds. The boiler/chiller project was not added to the property record which would include a description of the property, a serial number or other identification number, the source of funding for the property (including the federal award identification number), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sales price of the property . The lack of internal controls and noncompliance were isolated to the property records for 2021-2022. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 2 CFR 200.313(d)(1) states: "Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, and cost of the property, percentage of Federal participation in the project costs for the Federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sale price of the property." Cause Management had not developed a system of internal controls that would have ensured compliance with the Equipment and Real Property Management compliance requirement. Effect The failure to establish an effective internal control system enabled material noncompliance to go undetected. Noncompliance with the grant agreement and the Equipment and Real Property Management compliance requirement could have resulted in the loss of federal funds to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish internal controls to ensure compliance and comply with the grant agreement and the Equipment and Real Property Management compliance requirement. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2022-004 Subject: COVID-19 - Education Stabilization Fund - Reporting Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Number: 84.425 Federal Award Number or Year (or Other Identifying Number): S425D200013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Reporting Audit Findings: Material Weakness, Other Matters Condition and Context An effective internal control system was not designed, or implemented at the School Corporation to ensure compliance with requirements related to the grant agreement and the Reporting compliance requirement. The School Corporation had not designed, or implemented a system of internal control to ensure that the annual Elementary and Secondary School Emergency Relief (ESSER) annual data reports were complete and accurately submitted. The reports were prepared by one employee without an oversight or review process in place to prevent, or detect and correct, errors. Additionally, for one of seven key line items tested, the School Corporation could not provide supporting documentation. The lack of supporting documentation for the Full Time Equivalent (FTE) key line item on the ESSER I, Year 1, annual report prevented us from verifying the accuracy of the line item. The lack of internal controls was a systemic issue throughout the audit period. The noncompliance was isolated to the ESSER I, Year 1 report. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 2 CFR 200.302(b) states in part: "The financial management system of each non-Federal entity must provide for the following . . . (2) Accurate, current, and complete disclosure of the financial results of each Federal award or program in accordance with the reporting requirements set forth in ?? 200.328 and 200.329. . . ." 34 CFR 76.722 states: "A State may require a subgrantee to submit reports in a manner and format that assists the State in complying with the requirements under 34 CFR 76.720 and in carrying out other responsibilities under the program." Cause Management had not developed or implemented a system of internal control that would have ensured compliance with the grant agreement and the Reporting compliance requirement. Effect The failure to establish an effective internal control system enabled material noncompliance to go undetected. Noncompliance with the grant agreement and the Reporting compliance requirement could result in the loss of future federal funds to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish internal controls to ensure compliance and comply with the grant agreement and the Reporting compliance requirement. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2022-005 Subject: COVID-19 - Education Stabilization Fund - Special Tests and Provisions - Wage Rate Requirements Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Number: 84.425 Federal Award Numbers or Years (or Other Identifying Numbers): S425D200013, S425D2100013, S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Special Tests and Provisions - Wage Rate Requirements Audit Finding: Material Weakness Condition and Context An effective internal control system was not designed or implemented at the School Corporation to ensure compliance with requirements related to the grant agreement and the Special Tests and Provisions - Wage Rate Requirements compliance requirement. Construction contracts in excess of $2,000 financed by federal assistance funds must pay wages not less than those established for the locality of the project (prevailing wage rates) by the Department of Labor (DOL) to their laborers and mechanics. Nonfederal entities are to include in their construction contracts subject to the Wage Rate Requirements a provision that the contractor or subcontractor comply with these requirements and the DOL regulations. This would include a requirement to submit a copy of the payroll and statement of compliance to the entity for each week in which contract work was performed. The School Corporation had the required clause in the contract and received the payroll; however, the School Corporation did not have adequate policies or procedures to ensure that the required payrolls were submitted and reviewed for each week in which contract work was performed. The lack of internal controls was systemic throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." Cause Management had not developed or implemented a system of internal control that would have ensured compliance with the grant agreement and the Special Tests and Provisions - Wage Rate Requirements compliance requirement. Effect The failure to establish an effective internal control system could have enabled material noncompliance to go undetected. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish internal controls to ensure compliance with the grant agreement and the Special Tests and Provisions - Wage Rate Requirements compliance requirement. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2022-003 Subject: COVID-19 - Education Stabilization Fund - Equipment and Real Property Management Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Number: 84.425 Federal Award Numbers or Years (or Other Identifying Numbers): S425D200013, S425D2100013, S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Equipment and Real Property Management Audit Findings: Material Weakness, Modified Opinion Condition and Context An effective internal control system was not in place at the School Corporation to ensure compliance with requirements related to the grant agreement and the Equipment and Real Property Management compliance requirement. The School Corporation hired a third-party to complete capital asset records every two years. The third-party updated the capital assets records through the school year ended June 30, 2021; however, neither the third-party, nor the School Corporation maintained the records beyond that year. During fiscal year 2021-2022, the School Corporation purchased $1,081,254 of equipment for the boiler/chiller project with Elementary and Secondary School Emergency Relief (ESSER) III funds. The boiler/chiller project was not added to the property record which would include a description of the property, a serial number or other identification number, the source of funding for the property (including the federal award identification number), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sales price of the property . The lack of internal controls and noncompliance were isolated to the property records for 2021-2022. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 2 CFR 200.313(d)(1) states: "Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, and cost of the property, percentage of Federal participation in the project costs for the Federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sale price of the property." Cause Management had not developed a system of internal controls that would have ensured compliance with the Equipment and Real Property Management compliance requirement. Effect The failure to establish an effective internal control system enabled material noncompliance to go undetected. Noncompliance with the grant agreement and the Equipment and Real Property Management compliance requirement could have resulted in the loss of federal funds to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish internal controls to ensure compliance and comply with the grant agreement and the Equipment and Real Property Management compliance requirement. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2022-005 Subject: COVID-19 - Education Stabilization Fund - Special Tests and Provisions - Wage Rate Requirements Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Number: 84.425 Federal Award Numbers or Years (or Other Identifying Numbers): S425D200013, S425D2100013, S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Special Tests and Provisions - Wage Rate Requirements Audit Finding: Material Weakness Condition and Context An effective internal control system was not designed or implemented at the School Corporation to ensure compliance with requirements related to the grant agreement and the Special Tests and Provisions - Wage Rate Requirements compliance requirement. Construction contracts in excess of $2,000 financed by federal assistance funds must pay wages not less than those established for the locality of the project (prevailing wage rates) by the Department of Labor (DOL) to their laborers and mechanics. Nonfederal entities are to include in their construction contracts subject to the Wage Rate Requirements a provision that the contractor or subcontractor comply with these requirements and the DOL regulations. This would include a requirement to submit a copy of the payroll and statement of compliance to the entity for each week in which contract work was performed. The School Corporation had the required clause in the contract and received the payroll; however, the School Corporation did not have adequate policies or procedures to ensure that the required payrolls were submitted and reviewed for each week in which contract work was performed. The lack of internal controls was systemic throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." Cause Management had not developed or implemented a system of internal control that would have ensured compliance with the grant agreement and the Special Tests and Provisions - Wage Rate Requirements compliance requirement. Effect The failure to establish an effective internal control system could have enabled material noncompliance to go undetected. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish internal controls to ensure compliance with the grant agreement and the Special Tests and Provisions - Wage Rate Requirements compliance requirement. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2022-003 Subject: COVID-19 - Education Stabilization Fund - Equipment and Real Property Management Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Number: 84.425 Federal Award Numbers or Years (or Other Identifying Numbers): S425D200013, S425D2100013, S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Equipment and Real Property Management Audit Findings: Material Weakness, Modified Opinion Condition and Context An effective internal control system was not in place at the School Corporation to ensure compliance with requirements related to the grant agreement and the Equipment and Real Property Management compliance requirement. The School Corporation hired a third-party to complete capital asset records every two years. The third-party updated the capital assets records through the school year ended June 30, 2021; however, neither the third-party, nor the School Corporation maintained the records beyond that year. During fiscal year 2021-2022, the School Corporation purchased $1,081,254 of equipment for the boiler/chiller project with Elementary and Secondary School Emergency Relief (ESSER) III funds. The boiler/chiller project was not added to the property record which would include a description of the property, a serial number or other identification number, the source of funding for the property (including the federal award identification number), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sales price of the property . The lack of internal controls and noncompliance were isolated to the property records for 2021-2022. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 2 CFR 200.313(d)(1) states: "Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, and cost of the property, percentage of Federal participation in the project costs for the Federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sale price of the property." Cause Management had not developed a system of internal controls that would have ensured compliance with the Equipment and Real Property Management compliance requirement. Effect The failure to establish an effective internal control system enabled material noncompliance to go undetected. Noncompliance with the grant agreement and the Equipment and Real Property Management compliance requirement could have resulted in the loss of federal funds to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish internal controls to ensure compliance and comply with the grant agreement and the Equipment and Real Property Management compliance requirement. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2022-005 Subject: COVID-19 - Education Stabilization Fund - Special Tests and Provisions - Wage Rate Requirements Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Number: 84.425 Federal Award Numbers or Years (or Other Identifying Numbers): S425D200013, S425D2100013, S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Special Tests and Provisions - Wage Rate Requirements Audit Finding: Material Weakness Condition and Context An effective internal control system was not designed or implemented at the School Corporation to ensure compliance with requirements related to the grant agreement and the Special Tests and Provisions - Wage Rate Requirements compliance requirement. Construction contracts in excess of $2,000 financed by federal assistance funds must pay wages not less than those established for the locality of the project (prevailing wage rates) by the Department of Labor (DOL) to their laborers and mechanics. Nonfederal entities are to include in their construction contracts subject to the Wage Rate Requirements a provision that the contractor or subcontractor comply with these requirements and the DOL regulations. This would include a requirement to submit a copy of the payroll and statement of compliance to the entity for each week in which contract work was performed. The School Corporation had the required clause in the contract and received the payroll; however, the School Corporation did not have adequate policies or procedures to ensure that the required payrolls were submitted and reviewed for each week in which contract work was performed. The lack of internal controls was systemic throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." Cause Management had not developed or implemented a system of internal control that would have ensured compliance with the grant agreement and the Special Tests and Provisions - Wage Rate Requirements compliance requirement. Effect The failure to establish an effective internal control system could have enabled material noncompliance to go undetected. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish internal controls to ensure compliance with the grant agreement and the Special Tests and Provisions - Wage Rate Requirements compliance requirement. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2022-003 Subject: COVID-19 - Education Stabilization Fund - Equipment and Real Property Management Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Number: 84.425 Federal Award Numbers or Years (or Other Identifying Numbers): S425D200013, S425D2100013, S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Equipment and Real Property Management Audit Findings: Material Weakness, Modified Opinion Condition and Context An effective internal control system was not in place at the School Corporation to ensure compliance with requirements related to the grant agreement and the Equipment and Real Property Management compliance requirement. The School Corporation hired a third-party to complete capital asset records every two years. The third-party updated the capital assets records through the school year ended June 30, 2021; however, neither the third-party, nor the School Corporation maintained the records beyond that year. During fiscal year 2021-2022, the School Corporation purchased $1,081,254 of equipment for the boiler/chiller project with Elementary and Secondary School Emergency Relief (ESSER) III funds. The boiler/chiller project was not added to the property record which would include a description of the property, a serial number or other identification number, the source of funding for the property (including the federal award identification number), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sales price of the property . The lack of internal controls and noncompliance were isolated to the property records for 2021-2022. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 2 CFR 200.313(d)(1) states: "Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, and cost of the property, percentage of Federal participation in the project costs for the Federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sale price of the property." Cause Management had not developed a system of internal controls that would have ensured compliance with the Equipment and Real Property Management compliance requirement. Effect The failure to establish an effective internal control system enabled material noncompliance to go undetected. Noncompliance with the grant agreement and the Equipment and Real Property Management compliance requirement could have resulted in the loss of federal funds to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish internal controls to ensure compliance and comply with the grant agreement and the Equipment and Real Property Management compliance requirement. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2022-004 Subject: COVID-19 - Education Stabilization Fund - Reporting Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Number: 84.425 Federal Award Number or Year (or Other Identifying Number): S425D200013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Reporting Audit Findings: Material Weakness, Other Matters Condition and Context An effective internal control system was not designed, or implemented at the School Corporation to ensure compliance with requirements related to the grant agreement and the Reporting compliance requirement. The School Corporation had not designed, or implemented a system of internal control to ensure that the annual Elementary and Secondary School Emergency Relief (ESSER) annual data reports were complete and accurately submitted. The reports were prepared by one employee without an oversight or review process in place to prevent, or detect and correct, errors. Additionally, for one of seven key line items tested, the School Corporation could not provide supporting documentation. The lack of supporting documentation for the Full Time Equivalent (FTE) key line item on the ESSER I, Year 1, annual report prevented us from verifying the accuracy of the line item. The lack of internal controls was a systemic issue throughout the audit period. The noncompliance was isolated to the ESSER I, Year 1 report. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 2 CFR 200.302(b) states in part: "The financial management system of each non-Federal entity must provide for the following . . . (2) Accurate, current, and complete disclosure of the financial results of each Federal award or program in accordance with the reporting requirements set forth in ?? 200.328 and 200.329. . . ." 34 CFR 76.722 states: "A State may require a subgrantee to submit reports in a manner and format that assists the State in complying with the requirements under 34 CFR 76.720 and in carrying out other responsibilities under the program." Cause Management had not developed or implemented a system of internal control that would have ensured compliance with the grant agreement and the Reporting compliance requirement. Effect The failure to establish an effective internal control system enabled material noncompliance to go undetected. Noncompliance with the grant agreement and the Reporting compliance requirement could result in the loss of future federal funds to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish internal controls to ensure compliance and comply with the grant agreement and the Reporting compliance requirement. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2022-005 Subject: COVID-19 - Education Stabilization Fund - Special Tests and Provisions - Wage Rate Requirements Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Number: 84.425 Federal Award Numbers or Years (or Other Identifying Numbers): S425D200013, S425D2100013, S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Special Tests and Provisions - Wage Rate Requirements Audit Finding: Material Weakness Condition and Context An effective internal control system was not designed or implemented at the School Corporation to ensure compliance with requirements related to the grant agreement and the Special Tests and Provisions - Wage Rate Requirements compliance requirement. Construction contracts in excess of $2,000 financed by federal assistance funds must pay wages not less than those established for the locality of the project (prevailing wage rates) by the Department of Labor (DOL) to their laborers and mechanics. Nonfederal entities are to include in their construction contracts subject to the Wage Rate Requirements a provision that the contractor or subcontractor comply with these requirements and the DOL regulations. This would include a requirement to submit a copy of the payroll and statement of compliance to the entity for each week in which contract work was performed. The School Corporation had the required clause in the contract and received the payroll; however, the School Corporation did not have adequate policies or procedures to ensure that the required payrolls were submitted and reviewed for each week in which contract work was performed. The lack of internal controls was systemic throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." Cause Management had not developed or implemented a system of internal control that would have ensured compliance with the grant agreement and the Special Tests and Provisions - Wage Rate Requirements compliance requirement. Effect The failure to establish an effective internal control system could have enabled material noncompliance to go undetected. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish internal controls to ensure compliance with the grant agreement and the Special Tests and Provisions - Wage Rate Requirements compliance requirement. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2022-003 Subject: COVID-19 - Education Stabilization Fund - Equipment and Real Property Management Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Number: 84.425 Federal Award Numbers or Years (or Other Identifying Numbers): S425D200013, S425D2100013, S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Equipment and Real Property Management Audit Findings: Material Weakness, Modified Opinion Condition and Context An effective internal control system was not in place at the School Corporation to ensure compliance with requirements related to the grant agreement and the Equipment and Real Property Management compliance requirement. The School Corporation hired a third-party to complete capital asset records every two years. The third-party updated the capital assets records through the school year ended June 30, 2021; however, neither the third-party, nor the School Corporation maintained the records beyond that year. During fiscal year 2021-2022, the School Corporation purchased $1,081,254 of equipment for the boiler/chiller project with Elementary and Secondary School Emergency Relief (ESSER) III funds. The boiler/chiller project was not added to the property record which would include a description of the property, a serial number or other identification number, the source of funding for the property (including the federal award identification number), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sales price of the property . The lack of internal controls and noncompliance were isolated to the property records for 2021-2022. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 2 CFR 200.313(d)(1) states: "Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, and cost of the property, percentage of Federal participation in the project costs for the Federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sale price of the property." Cause Management had not developed a system of internal controls that would have ensured compliance with the Equipment and Real Property Management compliance requirement. Effect The failure to establish an effective internal control system enabled material noncompliance to go undetected. Noncompliance with the grant agreement and the Equipment and Real Property Management compliance requirement could have resulted in the loss of federal funds to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish internal controls to ensure compliance and comply with the grant agreement and the Equipment and Real Property Management compliance requirement. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2022-004 Subject: COVID-19 - Education Stabilization Fund - Reporting Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Number: 84.425 Federal Award Number or Year (or Other Identifying Number): S425D200013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Reporting Audit Findings: Material Weakness, Other Matters Condition and Context An effective internal control system was not designed, or implemented at the School Corporation to ensure compliance with requirements related to the grant agreement and the Reporting compliance requirement. The School Corporation had not designed, or implemented a system of internal control to ensure that the annual Elementary and Secondary School Emergency Relief (ESSER) annual data reports were complete and accurately submitted. The reports were prepared by one employee without an oversight or review process in place to prevent, or detect and correct, errors. Additionally, for one of seven key line items tested, the School Corporation could not provide supporting documentation. The lack of supporting documentation for the Full Time Equivalent (FTE) key line item on the ESSER I, Year 1, annual report prevented us from verifying the accuracy of the line item. The lack of internal controls was a systemic issue throughout the audit period. The noncompliance was isolated to the ESSER I, Year 1 report. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 2 CFR 200.302(b) states in part: "The financial management system of each non-Federal entity must provide for the following . . . (2) Accurate, current, and complete disclosure of the financial results of each Federal award or program in accordance with the reporting requirements set forth in ?? 200.328 and 200.329. . . ." 34 CFR 76.722 states: "A State may require a subgrantee to submit reports in a manner and format that assists the State in complying with the requirements under 34 CFR 76.720 and in carrying out other responsibilities under the program." Cause Management had not developed or implemented a system of internal control that would have ensured compliance with the grant agreement and the Reporting compliance requirement. Effect The failure to establish an effective internal control system enabled material noncompliance to go undetected. Noncompliance with the grant agreement and the Reporting compliance requirement could result in the loss of future federal funds to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish internal controls to ensure compliance and comply with the grant agreement and the Reporting compliance requirement. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2022-005 Subject: COVID-19 - Education Stabilization Fund - Special Tests and Provisions - Wage Rate Requirements Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Number: 84.425 Federal Award Numbers or Years (or Other Identifying Numbers): S425D200013, S425D2100013, S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Special Tests and Provisions - Wage Rate Requirements Audit Finding: Material Weakness Condition and Context An effective internal control system was not designed or implemented at the School Corporation to ensure compliance with requirements related to the grant agreement and the Special Tests and Provisions - Wage Rate Requirements compliance requirement. Construction contracts in excess of $2,000 financed by federal assistance funds must pay wages not less than those established for the locality of the project (prevailing wage rates) by the Department of Labor (DOL) to their laborers and mechanics. Nonfederal entities are to include in their construction contracts subject to the Wage Rate Requirements a provision that the contractor or subcontractor comply with these requirements and the DOL regulations. This would include a requirement to submit a copy of the payroll and statement of compliance to the entity for each week in which contract work was performed. The School Corporation had the required clause in the contract and received the payroll; however, the School Corporation did not have adequate policies or procedures to ensure that the required payrolls were submitted and reviewed for each week in which contract work was performed. The lack of internal controls was systemic throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." Cause Management had not developed or implemented a system of internal control that would have ensured compliance with the grant agreement and the Special Tests and Provisions - Wage Rate Requirements compliance requirement. Effect The failure to establish an effective internal control system could have enabled material noncompliance to go undetected. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish internal controls to ensure compliance with the grant agreement and the Special Tests and Provisions - Wage Rate Requirements compliance requirement. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2022-003 Subject: COVID-19 - Education Stabilization Fund - Equipment and Real Property Management Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Number: 84.425 Federal Award Numbers or Years (or Other Identifying Numbers): S425D200013, S425D2100013, S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Equipment and Real Property Management Audit Findings: Material Weakness, Modified Opinion Condition and Context An effective internal control system was not in place at the School Corporation to ensure compliance with requirements related to the grant agreement and the Equipment and Real Property Management compliance requirement. The School Corporation hired a third-party to complete capital asset records every two years. The third-party updated the capital assets records through the school year ended June 30, 2021; however, neither the third-party, nor the School Corporation maintained the records beyond that year. During fiscal year 2021-2022, the School Corporation purchased $1,081,254 of equipment for the boiler/chiller project with Elementary and Secondary School Emergency Relief (ESSER) III funds. The boiler/chiller project was not added to the property record which would include a description of the property, a serial number or other identification number, the source of funding for the property (including the federal award identification number), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sales price of the property . The lack of internal controls and noncompliance were isolated to the property records for 2021-2022. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 2 CFR 200.313(d)(1) states: "Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, and cost of the property, percentage of Federal participation in the project costs for the Federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sale price of the property." Cause Management had not developed a system of internal controls that would have ensured compliance with the Equipment and Real Property Management compliance requirement. Effect The failure to establish an effective internal control system enabled material noncompliance to go undetected. Noncompliance with the grant agreement and the Equipment and Real Property Management compliance requirement could have resulted in the loss of federal funds to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish internal controls to ensure compliance and comply with the grant agreement and the Equipment and Real Property Management compliance requirement. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2022-005 Subject: COVID-19 - Education Stabilization Fund - Special Tests and Provisions - Wage Rate Requirements Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Number: 84.425 Federal Award Numbers or Years (or Other Identifying Numbers): S425D200013, S425D2100013, S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Special Tests and Provisions - Wage Rate Requirements Audit Finding: Material Weakness Condition and Context An effective internal control system was not designed or implemented at the School Corporation to ensure compliance with requirements related to the grant agreement and the Special Tests and Provisions - Wage Rate Requirements compliance requirement. Construction contracts in excess of $2,000 financed by federal assistance funds must pay wages not less than those established for the locality of the project (prevailing wage rates) by the Department of Labor (DOL) to their laborers and mechanics. Nonfederal entities are to include in their construction contracts subject to the Wage Rate Requirements a provision that the contractor or subcontractor comply with these requirements and the DOL regulations. This would include a requirement to submit a copy of the payroll and statement of compliance to the entity for each week in which contract work was performed. The School Corporation had the required clause in the contract and received the payroll; however, the School Corporation did not have adequate policies or procedures to ensure that the required payrolls were submitted and reviewed for each week in which contract work was performed. The lack of internal controls was systemic throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." Cause Management had not developed or implemented a system of internal control that would have ensured compliance with the grant agreement and the Special Tests and Provisions - Wage Rate Requirements compliance requirement. Effect The failure to establish an effective internal control system could have enabled material noncompliance to go undetected. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish internal controls to ensure compliance with the grant agreement and the Special Tests and Provisions - Wage Rate Requirements compliance requirement. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2022-003 Subject: COVID-19 - Education Stabilization Fund - Equipment and Real Property Management Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Number: 84.425 Federal Award Numbers or Years (or Other Identifying Numbers): S425D200013, S425D2100013, S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Equipment and Real Property Management Audit Findings: Material Weakness, Modified Opinion Condition and Context An effective internal control system was not in place at the School Corporation to ensure compliance with requirements related to the grant agreement and the Equipment and Real Property Management compliance requirement. The School Corporation hired a third-party to complete capital asset records every two years. The third-party updated the capital assets records through the school year ended June 30, 2021; however, neither the third-party, nor the School Corporation maintained the records beyond that year. During fiscal year 2021-2022, the School Corporation purchased $1,081,254 of equipment for the boiler/chiller project with Elementary and Secondary School Emergency Relief (ESSER) III funds. The boiler/chiller project was not added to the property record which would include a description of the property, a serial number or other identification number, the source of funding for the property (including the federal award identification number), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sales price of the property . The lack of internal controls and noncompliance were isolated to the property records for 2021-2022. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 2 CFR 200.313(d)(1) states: "Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, and cost of the property, percentage of Federal participation in the project costs for the Federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sale price of the property." Cause Management had not developed a system of internal controls that would have ensured compliance with the Equipment and Real Property Management compliance requirement. Effect The failure to establish an effective internal control system enabled material noncompliance to go undetected. Noncompliance with the grant agreement and the Equipment and Real Property Management compliance requirement could have resulted in the loss of federal funds to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish internal controls to ensure compliance and comply with the grant agreement and the Equipment and Real Property Management compliance requirement. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2022-005 Subject: COVID-19 - Education Stabilization Fund - Special Tests and Provisions - Wage Rate Requirements Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Number: 84.425 Federal Award Numbers or Years (or Other Identifying Numbers): S425D200013, S425D2100013, S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Special Tests and Provisions - Wage Rate Requirements Audit Finding: Material Weakness Condition and Context An effective internal control system was not designed or implemented at the School Corporation to ensure compliance with requirements related to the grant agreement and the Special Tests and Provisions - Wage Rate Requirements compliance requirement. Construction contracts in excess of $2,000 financed by federal assistance funds must pay wages not less than those established for the locality of the project (prevailing wage rates) by the Department of Labor (DOL) to their laborers and mechanics. Nonfederal entities are to include in their construction contracts subject to the Wage Rate Requirements a provision that the contractor or subcontractor comply with these requirements and the DOL regulations. This would include a requirement to submit a copy of the payroll and statement of compliance to the entity for each week in which contract work was performed. The School Corporation had the required clause in the contract and received the payroll; however, the School Corporation did not have adequate policies or procedures to ensure that the required payrolls were submitted and reviewed for each week in which contract work was performed. The lack of internal controls was systemic throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." Cause Management had not developed or implemented a system of internal control that would have ensured compliance with the grant agreement and the Special Tests and Provisions - Wage Rate Requirements compliance requirement. Effect The failure to establish an effective internal control system could have enabled material noncompliance to go undetected. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish internal controls to ensure compliance with the grant agreement and the Special Tests and Provisions - Wage Rate Requirements compliance requirement. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.