Audit 46473

FY End
2022-06-30
Total Expended
$3.34M
Findings
32
Programs
11
Organization: North Newton School Corporation (IN)
Year: 2022 Accepted: 2023-03-30
Auditor: Crowe LLP

Organization Exclusion Status:

Checking exclusion status...

Findings

ID Ref Severity Repeat Requirement
39068 2022-001 Material Weakness - I
39069 2022-001 Material Weakness - I
39070 2022-001 Material Weakness - I
39071 2022-001 Material Weakness - I
39072 2022-001 Material Weakness - I
39073 2022-001 Material Weakness - I
39074 2022-001 Material Weakness - I
39075 2022-001 Material Weakness - I
39076 2022-004 Significant Deficiency - L
39077 2022-002 Material Weakness - N
39078 2022-003 Material Weakness - F
39079 2022-004 Significant Deficiency - L
39080 2022-002 Material Weakness - N
39081 2022-003 Material Weakness - F
39082 2022-004 Significant Deficiency - L
39083 2022-004 Significant Deficiency - L
615510 2022-001 Material Weakness - I
615511 2022-001 Material Weakness - I
615512 2022-001 Material Weakness - I
615513 2022-001 Material Weakness - I
615514 2022-001 Material Weakness - I
615515 2022-001 Material Weakness - I
615516 2022-001 Material Weakness - I
615517 2022-001 Material Weakness - I
615518 2022-004 Significant Deficiency - L
615519 2022-002 Material Weakness - N
615520 2022-003 Material Weakness - F
615521 2022-004 Significant Deficiency - L
615522 2022-002 Material Weakness - N
615523 2022-003 Material Weakness - F
615524 2022-004 Significant Deficiency - L
615525 2022-004 Significant Deficiency - L

Contacts

Name Title Type
PDQSLCELPKC5 Karen Zackfia Auditee
2192852228 Scott Nickerson Auditor
No contacts on file

Notes to SEFA

Title: NOTE 3 - OTHER INFORMATION Accounting Policies: NOTE 1 - BASIS OF PRESENTATIONA. Basis of Presentation The accompanying Schedule of Expenditures of Federal Awards (SEFA) includes the federal grant activity of the School Corporation under programs of the federal government for the period of July 1, 2020 to June 30, 2022. The information in the SEFA is presented in accordance with the requirements of Title 2 U.S. Code of Federal Regulations Part 200, Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards (Uniform Guidance). Because the SEFA presents only a select portion of the operations of the School Corporation, it is not intended to and does not present the financial position of the School Corporation. The Uniform Guidance requires an annual audit of nonfederal entities expending a total amount of federal awards equal to or in excess of $750,000 in any fiscal year unless by constitution or statute a less frequent audit is required. In accordance with Indiana Code (IC 5-11-1-25), audits of school corporations shall be conducted biennially. Such audits shall include both years within the biennial period. B. Other Significant Accounting Policies Expenditures reported on the SEFA are reported on the cash basis of accounting. Such expenditures are recognized following the cost principles contained in Uniform Guidance, wherein certain types of expenditures are not allowed or are limited as to reimbursement. When federal grants are received on a reimbursement basis, the federal awards are considered expended when the reimbursement is received. De Minimis Rate Used: N Rate Explanation: NOTE 2 - INDIRECT COST RATEThe School Corporation has elected not to use the 10-percent de minimis indirect cost rate as allowed under the Uniform Guidance The School Corporation did not have any subrecipient activity for the period July 1, 2020 to June 30, 2022.
Title: NOTE 4 - SPECIAL EDUCATION COOPERATIVE (ALN: 84.027, 84.173) Accounting Policies: NOTE 1 - BASIS OF PRESENTATIONA. Basis of Presentation The accompanying Schedule of Expenditures of Federal Awards (SEFA) includes the federal grant activity of the School Corporation under programs of the federal government for the period of July 1, 2020 to June 30, 2022. The information in the SEFA is presented in accordance with the requirements of Title 2 U.S. Code of Federal Regulations Part 200, Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards (Uniform Guidance). Because the SEFA presents only a select portion of the operations of the School Corporation, it is not intended to and does not present the financial position of the School Corporation. The Uniform Guidance requires an annual audit of nonfederal entities expending a total amount of federal awards equal to or in excess of $750,000 in any fiscal year unless by constitution or statute a less frequent audit is required. In accordance with Indiana Code (IC 5-11-1-25), audits of school corporations shall be conducted biennially. Such audits shall include both years within the biennial period. B. Other Significant Accounting Policies Expenditures reported on the SEFA are reported on the cash basis of accounting. Such expenditures are recognized following the cost principles contained in Uniform Guidance, wherein certain types of expenditures are not allowed or are limited as to reimbursement. When federal grants are received on a reimbursement basis, the federal awards are considered expended when the reimbursement is received. De Minimis Rate Used: N Rate Explanation: NOTE 2 - INDIRECT COST RATEThe School Corporation has elected not to use the 10-percent de minimis indirect cost rate as allowed under the Uniform Guidance The School Corporation is a member of the Northern Indiana Educational Services Center (Cooperative), which operates the special education program for the School Corporation. As a result, some activity for the Special Education Cluster (IDEA) that is presented on the SEFA is not presented as receipts and disbursements in the financial statement for the School Corporation. This activity is reported on the financial statement of the Cooperative.

Finding Details

FINDING 2022-001 Subject: Special Education Cluster ? Procurement and Suspension and Debarment Federal Agency: Department of Education Federal Programs: Special Education Grants to States, Special Education Preschool Grants Assistance Listing Numbers: 84.027, 84.173 Federal Award Numbers and Years (or Other Identifying Numbers): 19611-049-PN01, 20611-047-PN01, 19619-49-PN01, 20619-047-PN01, 20611-049-PN01, 21611-047-PN01, 20619-49-PN01, 21619-047- PN01 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Procurement and Suspension and Debarment Audit Finding: Material Weakness, Other Matters Criteria: 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal awards in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO) " 2 CFR 200.303 states: ?When you enter into a covered transaction with another person at the next lower tier, you must verify that the person with whom you intend to do business is not excluded or disqualified. You do this by: 1. Checking SAM Exclusions; or 2. Collecting a certification from that person; or 3. Adding a clause or condition to the covered transaction with that person.? 2 CFR 200.320 states in part: "The non-Federal Entity must use one of the following methods of procurement? ?(c) Procurement by sealed bids (formal advertising). Bids are publicly solicited, and a firm fixed price contract (lump sum or unit price) is awarded to the responsible bidder whose bid, conforming with all the material terms and conditions of the invitation for bids, is the lowest in price. The sealed bid method is the preferred method for procuring construction, if the conditions in paragraph (c)(1) of this section apply " Condition: The School Corporation is a member of the Cooperative School Services (Cooperative). The Cooperative operated the special education programs on behalf of the School Corporation and managed the special education grant funds. As the grant agreement was between the Indiana Department of Education and the School Corporation, the School Corporation was responsible for compliance with the grant agreement and the Procurement and Suspension and Debarment compliance requirement. Procurement ? Simplified Acquisition The School Corporation did not have adequate internal controls in place to ensure the Cooperative complied with the procurement requirements for simplified acquisitions. The Cooperative did not have adequate procedures in place to ensure procurements for simplified acquisitions were properly advertised and bids accepted. There were two vendors who met the Simplified Acquisition threshold during the audit period; neither were properly procured. Suspension and Debarment The School Corporation did not have adequate internal controls in place to ensure the Cooperative complied with the Suspension and Debarment requirements. During school year 2020, the Cooperative did not have adequate procedures in place to ensure that applicable vendors who received federal funds were not suspended or debarred from participation in federal awards programs. There were three contracted vendors during the audit period; the unit did not perform procedures to ensure the vendors were not excluded or disqualified. During the 2021 school year, The School Corporation did not have adequate internal controls in place to ensure the Cooperative complied with the suspension and debarment requirements. The Special Education Director obtained suspension and debarment certifications for contracted vendors over $25,000 without an oversight or review process. The lack of controls and noncompliance related to procurement were isolated to school year 2020-2021. The lack of controls related to suspension and debarment were systemic throughout the audit period; however, the noncompliance was isolated to school year 2020-2021. Cause: Management had not developed a system of internal controls that would have ensured compliance with the grant agreement and the Procurement and Suspension and Debarment compliance requirement. Effect: The failure to establish an effective internal control system enabled material noncompliance to go undetected. Noncompliance with the grant agreement and the Procurement and Suspension and Debarment requirement could result in the loss of future federal funds to the School Corporation. Questioned Costs: There were no questioned costs identified. Context: The School Corporation did not have adequate internal controls in place to ensure the Cooperative complied with the procurement requirements for simplified acquisitions or suspension and debarment requirements for all contracts. Identification as a repeat finding, if applicable: No. Recommendation: We recommended that the School Corporation's management establish internal controls to ensure compliance and comply with the grant agreement and the Procurement and Suspension and Debarment compliance requirement. Views of Responsible Officials and Planned Corrective Actions: Management agrees with the finding and has prepared a corrective action plan.
FINDING 2022-001 Subject: Special Education Cluster ? Procurement and Suspension and Debarment Federal Agency: Department of Education Federal Programs: Special Education Grants to States, Special Education Preschool Grants Assistance Listing Numbers: 84.027, 84.173 Federal Award Numbers and Years (or Other Identifying Numbers): 19611-049-PN01, 20611-047-PN01, 19619-49-PN01, 20619-047-PN01, 20611-049-PN01, 21611-047-PN01, 20619-49-PN01, 21619-047- PN01 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Procurement and Suspension and Debarment Audit Finding: Material Weakness, Other Matters Criteria: 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal awards in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO) " 2 CFR 200.303 states: ?When you enter into a covered transaction with another person at the next lower tier, you must verify that the person with whom you intend to do business is not excluded or disqualified. You do this by: 1. Checking SAM Exclusions; or 2. Collecting a certification from that person; or 3. Adding a clause or condition to the covered transaction with that person.? 2 CFR 200.320 states in part: "The non-Federal Entity must use one of the following methods of procurement? ?(c) Procurement by sealed bids (formal advertising). Bids are publicly solicited, and a firm fixed price contract (lump sum or unit price) is awarded to the responsible bidder whose bid, conforming with all the material terms and conditions of the invitation for bids, is the lowest in price. The sealed bid method is the preferred method for procuring construction, if the conditions in paragraph (c)(1) of this section apply " Condition: The School Corporation is a member of the Cooperative School Services (Cooperative). The Cooperative operated the special education programs on behalf of the School Corporation and managed the special education grant funds. As the grant agreement was between the Indiana Department of Education and the School Corporation, the School Corporation was responsible for compliance with the grant agreement and the Procurement and Suspension and Debarment compliance requirement. Procurement ? Simplified Acquisition The School Corporation did not have adequate internal controls in place to ensure the Cooperative complied with the procurement requirements for simplified acquisitions. The Cooperative did not have adequate procedures in place to ensure procurements for simplified acquisitions were properly advertised and bids accepted. There were two vendors who met the Simplified Acquisition threshold during the audit period; neither were properly procured. Suspension and Debarment The School Corporation did not have adequate internal controls in place to ensure the Cooperative complied with the Suspension and Debarment requirements. During school year 2020, the Cooperative did not have adequate procedures in place to ensure that applicable vendors who received federal funds were not suspended or debarred from participation in federal awards programs. There were three contracted vendors during the audit period; the unit did not perform procedures to ensure the vendors were not excluded or disqualified. During the 2021 school year, The School Corporation did not have adequate internal controls in place to ensure the Cooperative complied with the suspension and debarment requirements. The Special Education Director obtained suspension and debarment certifications for contracted vendors over $25,000 without an oversight or review process. The lack of controls and noncompliance related to procurement were isolated to school year 2020-2021. The lack of controls related to suspension and debarment were systemic throughout the audit period; however, the noncompliance was isolated to school year 2020-2021. Cause: Management had not developed a system of internal controls that would have ensured compliance with the grant agreement and the Procurement and Suspension and Debarment compliance requirement. Effect: The failure to establish an effective internal control system enabled material noncompliance to go undetected. Noncompliance with the grant agreement and the Procurement and Suspension and Debarment requirement could result in the loss of future federal funds to the School Corporation. Questioned Costs: There were no questioned costs identified. Context: The School Corporation did not have adequate internal controls in place to ensure the Cooperative complied with the procurement requirements for simplified acquisitions or suspension and debarment requirements for all contracts. Identification as a repeat finding, if applicable: No. Recommendation: We recommended that the School Corporation's management establish internal controls to ensure compliance and comply with the grant agreement and the Procurement and Suspension and Debarment compliance requirement. Views of Responsible Officials and Planned Corrective Actions: Management agrees with the finding and has prepared a corrective action plan.
FINDING 2022-001 Subject: Special Education Cluster ? Procurement and Suspension and Debarment Federal Agency: Department of Education Federal Programs: Special Education Grants to States, Special Education Preschool Grants Assistance Listing Numbers: 84.027, 84.173 Federal Award Numbers and Years (or Other Identifying Numbers): 19611-049-PN01, 20611-047-PN01, 19619-49-PN01, 20619-047-PN01, 20611-049-PN01, 21611-047-PN01, 20619-49-PN01, 21619-047- PN01 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Procurement and Suspension and Debarment Audit Finding: Material Weakness, Other Matters Criteria: 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal awards in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO) " 2 CFR 200.303 states: ?When you enter into a covered transaction with another person at the next lower tier, you must verify that the person with whom you intend to do business is not excluded or disqualified. You do this by: 1. Checking SAM Exclusions; or 2. Collecting a certification from that person; or 3. Adding a clause or condition to the covered transaction with that person.? 2 CFR 200.320 states in part: "The non-Federal Entity must use one of the following methods of procurement? ?(c) Procurement by sealed bids (formal advertising). Bids are publicly solicited, and a firm fixed price contract (lump sum or unit price) is awarded to the responsible bidder whose bid, conforming with all the material terms and conditions of the invitation for bids, is the lowest in price. The sealed bid method is the preferred method for procuring construction, if the conditions in paragraph (c)(1) of this section apply " Condition: The School Corporation is a member of the Cooperative School Services (Cooperative). The Cooperative operated the special education programs on behalf of the School Corporation and managed the special education grant funds. As the grant agreement was between the Indiana Department of Education and the School Corporation, the School Corporation was responsible for compliance with the grant agreement and the Procurement and Suspension and Debarment compliance requirement. Procurement ? Simplified Acquisition The School Corporation did not have adequate internal controls in place to ensure the Cooperative complied with the procurement requirements for simplified acquisitions. The Cooperative did not have adequate procedures in place to ensure procurements for simplified acquisitions were properly advertised and bids accepted. There were two vendors who met the Simplified Acquisition threshold during the audit period; neither were properly procured. Suspension and Debarment The School Corporation did not have adequate internal controls in place to ensure the Cooperative complied with the Suspension and Debarment requirements. During school year 2020, the Cooperative did not have adequate procedures in place to ensure that applicable vendors who received federal funds were not suspended or debarred from participation in federal awards programs. There were three contracted vendors during the audit period; the unit did not perform procedures to ensure the vendors were not excluded or disqualified. During the 2021 school year, The School Corporation did not have adequate internal controls in place to ensure the Cooperative complied with the suspension and debarment requirements. The Special Education Director obtained suspension and debarment certifications for contracted vendors over $25,000 without an oversight or review process. The lack of controls and noncompliance related to procurement were isolated to school year 2020-2021. The lack of controls related to suspension and debarment were systemic throughout the audit period; however, the noncompliance was isolated to school year 2020-2021. Cause: Management had not developed a system of internal controls that would have ensured compliance with the grant agreement and the Procurement and Suspension and Debarment compliance requirement. Effect: The failure to establish an effective internal control system enabled material noncompliance to go undetected. Noncompliance with the grant agreement and the Procurement and Suspension and Debarment requirement could result in the loss of future federal funds to the School Corporation. Questioned Costs: There were no questioned costs identified. Context: The School Corporation did not have adequate internal controls in place to ensure the Cooperative complied with the procurement requirements for simplified acquisitions or suspension and debarment requirements for all contracts. Identification as a repeat finding, if applicable: No. Recommendation: We recommended that the School Corporation's management establish internal controls to ensure compliance and comply with the grant agreement and the Procurement and Suspension and Debarment compliance requirement. Views of Responsible Officials and Planned Corrective Actions: Management agrees with the finding and has prepared a corrective action plan.
FINDING 2022-001 Subject: Special Education Cluster ? Procurement and Suspension and Debarment Federal Agency: Department of Education Federal Programs: Special Education Grants to States, Special Education Preschool Grants Assistance Listing Numbers: 84.027, 84.173 Federal Award Numbers and Years (or Other Identifying Numbers): 19611-049-PN01, 20611-047-PN01, 19619-49-PN01, 20619-047-PN01, 20611-049-PN01, 21611-047-PN01, 20619-49-PN01, 21619-047- PN01 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Procurement and Suspension and Debarment Audit Finding: Material Weakness, Other Matters Criteria: 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal awards in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO) " 2 CFR 200.303 states: ?When you enter into a covered transaction with another person at the next lower tier, you must verify that the person with whom you intend to do business is not excluded or disqualified. You do this by: 1. Checking SAM Exclusions; or 2. Collecting a certification from that person; or 3. Adding a clause or condition to the covered transaction with that person.? 2 CFR 200.320 states in part: "The non-Federal Entity must use one of the following methods of procurement? ?(c) Procurement by sealed bids (formal advertising). Bids are publicly solicited, and a firm fixed price contract (lump sum or unit price) is awarded to the responsible bidder whose bid, conforming with all the material terms and conditions of the invitation for bids, is the lowest in price. The sealed bid method is the preferred method for procuring construction, if the conditions in paragraph (c)(1) of this section apply " Condition: The School Corporation is a member of the Cooperative School Services (Cooperative). The Cooperative operated the special education programs on behalf of the School Corporation and managed the special education grant funds. As the grant agreement was between the Indiana Department of Education and the School Corporation, the School Corporation was responsible for compliance with the grant agreement and the Procurement and Suspension and Debarment compliance requirement. Procurement ? Simplified Acquisition The School Corporation did not have adequate internal controls in place to ensure the Cooperative complied with the procurement requirements for simplified acquisitions. The Cooperative did not have adequate procedures in place to ensure procurements for simplified acquisitions were properly advertised and bids accepted. There were two vendors who met the Simplified Acquisition threshold during the audit period; neither were properly procured. Suspension and Debarment The School Corporation did not have adequate internal controls in place to ensure the Cooperative complied with the Suspension and Debarment requirements. During school year 2020, the Cooperative did not have adequate procedures in place to ensure that applicable vendors who received federal funds were not suspended or debarred from participation in federal awards programs. There were three contracted vendors during the audit period; the unit did not perform procedures to ensure the vendors were not excluded or disqualified. During the 2021 school year, The School Corporation did not have adequate internal controls in place to ensure the Cooperative complied with the suspension and debarment requirements. The Special Education Director obtained suspension and debarment certifications for contracted vendors over $25,000 without an oversight or review process. The lack of controls and noncompliance related to procurement were isolated to school year 2020-2021. The lack of controls related to suspension and debarment were systemic throughout the audit period; however, the noncompliance was isolated to school year 2020-2021. Cause: Management had not developed a system of internal controls that would have ensured compliance with the grant agreement and the Procurement and Suspension and Debarment compliance requirement. Effect: The failure to establish an effective internal control system enabled material noncompliance to go undetected. Noncompliance with the grant agreement and the Procurement and Suspension and Debarment requirement could result in the loss of future federal funds to the School Corporation. Questioned Costs: There were no questioned costs identified. Context: The School Corporation did not have adequate internal controls in place to ensure the Cooperative complied with the procurement requirements for simplified acquisitions or suspension and debarment requirements for all contracts. Identification as a repeat finding, if applicable: No. Recommendation: We recommended that the School Corporation's management establish internal controls to ensure compliance and comply with the grant agreement and the Procurement and Suspension and Debarment compliance requirement. Views of Responsible Officials and Planned Corrective Actions: Management agrees with the finding and has prepared a corrective action plan.
FINDING 2022-001 Subject: Special Education Cluster ? Procurement and Suspension and Debarment Federal Agency: Department of Education Federal Programs: Special Education Grants to States, Special Education Preschool Grants Assistance Listing Numbers: 84.027, 84.173 Federal Award Numbers and Years (or Other Identifying Numbers): 19611-049-PN01, 20611-047-PN01, 19619-49-PN01, 20619-047-PN01, 20611-049-PN01, 21611-047-PN01, 20619-49-PN01, 21619-047- PN01 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Procurement and Suspension and Debarment Audit Finding: Material Weakness, Other Matters Criteria: 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal awards in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO) " 2 CFR 200.303 states: ?When you enter into a covered transaction with another person at the next lower tier, you must verify that the person with whom you intend to do business is not excluded or disqualified. You do this by: 1. Checking SAM Exclusions; or 2. Collecting a certification from that person; or 3. Adding a clause or condition to the covered transaction with that person.? 2 CFR 200.320 states in part: "The non-Federal Entity must use one of the following methods of procurement? ?(c) Procurement by sealed bids (formal advertising). Bids are publicly solicited, and a firm fixed price contract (lump sum or unit price) is awarded to the responsible bidder whose bid, conforming with all the material terms and conditions of the invitation for bids, is the lowest in price. The sealed bid method is the preferred method for procuring construction, if the conditions in paragraph (c)(1) of this section apply " Condition: The School Corporation is a member of the Cooperative School Services (Cooperative). The Cooperative operated the special education programs on behalf of the School Corporation and managed the special education grant funds. As the grant agreement was between the Indiana Department of Education and the School Corporation, the School Corporation was responsible for compliance with the grant agreement and the Procurement and Suspension and Debarment compliance requirement. Procurement ? Simplified Acquisition The School Corporation did not have adequate internal controls in place to ensure the Cooperative complied with the procurement requirements for simplified acquisitions. The Cooperative did not have adequate procedures in place to ensure procurements for simplified acquisitions were properly advertised and bids accepted. There were two vendors who met the Simplified Acquisition threshold during the audit period; neither were properly procured. Suspension and Debarment The School Corporation did not have adequate internal controls in place to ensure the Cooperative complied with the Suspension and Debarment requirements. During school year 2020, the Cooperative did not have adequate procedures in place to ensure that applicable vendors who received federal funds were not suspended or debarred from participation in federal awards programs. There were three contracted vendors during the audit period; the unit did not perform procedures to ensure the vendors were not excluded or disqualified. During the 2021 school year, The School Corporation did not have adequate internal controls in place to ensure the Cooperative complied with the suspension and debarment requirements. The Special Education Director obtained suspension and debarment certifications for contracted vendors over $25,000 without an oversight or review process. The lack of controls and noncompliance related to procurement were isolated to school year 2020-2021. The lack of controls related to suspension and debarment were systemic throughout the audit period; however, the noncompliance was isolated to school year 2020-2021. Cause: Management had not developed a system of internal controls that would have ensured compliance with the grant agreement and the Procurement and Suspension and Debarment compliance requirement. Effect: The failure to establish an effective internal control system enabled material noncompliance to go undetected. Noncompliance with the grant agreement and the Procurement and Suspension and Debarment requirement could result in the loss of future federal funds to the School Corporation. Questioned Costs: There were no questioned costs identified. Context: The School Corporation did not have adequate internal controls in place to ensure the Cooperative complied with the procurement requirements for simplified acquisitions or suspension and debarment requirements for all contracts. Identification as a repeat finding, if applicable: No. Recommendation: We recommended that the School Corporation's management establish internal controls to ensure compliance and comply with the grant agreement and the Procurement and Suspension and Debarment compliance requirement. Views of Responsible Officials and Planned Corrective Actions: Management agrees with the finding and has prepared a corrective action plan.
FINDING 2022-001 Subject: Special Education Cluster ? Procurement and Suspension and Debarment Federal Agency: Department of Education Federal Programs: Special Education Grants to States, Special Education Preschool Grants Assistance Listing Numbers: 84.027, 84.173 Federal Award Numbers and Years (or Other Identifying Numbers): 19611-049-PN01, 20611-047-PN01, 19619-49-PN01, 20619-047-PN01, 20611-049-PN01, 21611-047-PN01, 20619-49-PN01, 21619-047- PN01 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Procurement and Suspension and Debarment Audit Finding: Material Weakness, Other Matters Criteria: 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal awards in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO) " 2 CFR 200.303 states: ?When you enter into a covered transaction with another person at the next lower tier, you must verify that the person with whom you intend to do business is not excluded or disqualified. You do this by: 1. Checking SAM Exclusions; or 2. Collecting a certification from that person; or 3. Adding a clause or condition to the covered transaction with that person.? 2 CFR 200.320 states in part: "The non-Federal Entity must use one of the following methods of procurement? ?(c) Procurement by sealed bids (formal advertising). Bids are publicly solicited, and a firm fixed price contract (lump sum or unit price) is awarded to the responsible bidder whose bid, conforming with all the material terms and conditions of the invitation for bids, is the lowest in price. The sealed bid method is the preferred method for procuring construction, if the conditions in paragraph (c)(1) of this section apply " Condition: The School Corporation is a member of the Cooperative School Services (Cooperative). The Cooperative operated the special education programs on behalf of the School Corporation and managed the special education grant funds. As the grant agreement was between the Indiana Department of Education and the School Corporation, the School Corporation was responsible for compliance with the grant agreement and the Procurement and Suspension and Debarment compliance requirement. Procurement ? Simplified Acquisition The School Corporation did not have adequate internal controls in place to ensure the Cooperative complied with the procurement requirements for simplified acquisitions. The Cooperative did not have adequate procedures in place to ensure procurements for simplified acquisitions were properly advertised and bids accepted. There were two vendors who met the Simplified Acquisition threshold during the audit period; neither were properly procured. Suspension and Debarment The School Corporation did not have adequate internal controls in place to ensure the Cooperative complied with the Suspension and Debarment requirements. During school year 2020, the Cooperative did not have adequate procedures in place to ensure that applicable vendors who received federal funds were not suspended or debarred from participation in federal awards programs. There were three contracted vendors during the audit period; the unit did not perform procedures to ensure the vendors were not excluded or disqualified. During the 2021 school year, The School Corporation did not have adequate internal controls in place to ensure the Cooperative complied with the suspension and debarment requirements. The Special Education Director obtained suspension and debarment certifications for contracted vendors over $25,000 without an oversight or review process. The lack of controls and noncompliance related to procurement were isolated to school year 2020-2021. The lack of controls related to suspension and debarment were systemic throughout the audit period; however, the noncompliance was isolated to school year 2020-2021. Cause: Management had not developed a system of internal controls that would have ensured compliance with the grant agreement and the Procurement and Suspension and Debarment compliance requirement. Effect: The failure to establish an effective internal control system enabled material noncompliance to go undetected. Noncompliance with the grant agreement and the Procurement and Suspension and Debarment requirement could result in the loss of future federal funds to the School Corporation. Questioned Costs: There were no questioned costs identified. Context: The School Corporation did not have adequate internal controls in place to ensure the Cooperative complied with the procurement requirements for simplified acquisitions or suspension and debarment requirements for all contracts. Identification as a repeat finding, if applicable: No. Recommendation: We recommended that the School Corporation's management establish internal controls to ensure compliance and comply with the grant agreement and the Procurement and Suspension and Debarment compliance requirement. Views of Responsible Officials and Planned Corrective Actions: Management agrees with the finding and has prepared a corrective action plan.
FINDING 2022-001 Subject: Special Education Cluster ? Procurement and Suspension and Debarment Federal Agency: Department of Education Federal Programs: Special Education Grants to States, Special Education Preschool Grants Assistance Listing Numbers: 84.027, 84.173 Federal Award Numbers and Years (or Other Identifying Numbers): 19611-049-PN01, 20611-047-PN01, 19619-49-PN01, 20619-047-PN01, 20611-049-PN01, 21611-047-PN01, 20619-49-PN01, 21619-047- PN01 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Procurement and Suspension and Debarment Audit Finding: Material Weakness, Other Matters Criteria: 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal awards in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO) " 2 CFR 200.303 states: ?When you enter into a covered transaction with another person at the next lower tier, you must verify that the person with whom you intend to do business is not excluded or disqualified. You do this by: 1. Checking SAM Exclusions; or 2. Collecting a certification from that person; or 3. Adding a clause or condition to the covered transaction with that person.? 2 CFR 200.320 states in part: "The non-Federal Entity must use one of the following methods of procurement? ?(c) Procurement by sealed bids (formal advertising). Bids are publicly solicited, and a firm fixed price contract (lump sum or unit price) is awarded to the responsible bidder whose bid, conforming with all the material terms and conditions of the invitation for bids, is the lowest in price. The sealed bid method is the preferred method for procuring construction, if the conditions in paragraph (c)(1) of this section apply " Condition: The School Corporation is a member of the Cooperative School Services (Cooperative). The Cooperative operated the special education programs on behalf of the School Corporation and managed the special education grant funds. As the grant agreement was between the Indiana Department of Education and the School Corporation, the School Corporation was responsible for compliance with the grant agreement and the Procurement and Suspension and Debarment compliance requirement. Procurement ? Simplified Acquisition The School Corporation did not have adequate internal controls in place to ensure the Cooperative complied with the procurement requirements for simplified acquisitions. The Cooperative did not have adequate procedures in place to ensure procurements for simplified acquisitions were properly advertised and bids accepted. There were two vendors who met the Simplified Acquisition threshold during the audit period; neither were properly procured. Suspension and Debarment The School Corporation did not have adequate internal controls in place to ensure the Cooperative complied with the Suspension and Debarment requirements. During school year 2020, the Cooperative did not have adequate procedures in place to ensure that applicable vendors who received federal funds were not suspended or debarred from participation in federal awards programs. There were three contracted vendors during the audit period; the unit did not perform procedures to ensure the vendors were not excluded or disqualified. During the 2021 school year, The School Corporation did not have adequate internal controls in place to ensure the Cooperative complied with the suspension and debarment requirements. The Special Education Director obtained suspension and debarment certifications for contracted vendors over $25,000 without an oversight or review process. The lack of controls and noncompliance related to procurement were isolated to school year 2020-2021. The lack of controls related to suspension and debarment were systemic throughout the audit period; however, the noncompliance was isolated to school year 2020-2021. Cause: Management had not developed a system of internal controls that would have ensured compliance with the grant agreement and the Procurement and Suspension and Debarment compliance requirement. Effect: The failure to establish an effective internal control system enabled material noncompliance to go undetected. Noncompliance with the grant agreement and the Procurement and Suspension and Debarment requirement could result in the loss of future federal funds to the School Corporation. Questioned Costs: There were no questioned costs identified. Context: The School Corporation did not have adequate internal controls in place to ensure the Cooperative complied with the procurement requirements for simplified acquisitions or suspension and debarment requirements for all contracts. Identification as a repeat finding, if applicable: No. Recommendation: We recommended that the School Corporation's management establish internal controls to ensure compliance and comply with the grant agreement and the Procurement and Suspension and Debarment compliance requirement. Views of Responsible Officials and Planned Corrective Actions: Management agrees with the finding and has prepared a corrective action plan.
FINDING 2022-001 Subject: Special Education Cluster ? Procurement and Suspension and Debarment Federal Agency: Department of Education Federal Programs: Special Education Grants to States, Special Education Preschool Grants Assistance Listing Numbers: 84.027, 84.173 Federal Award Numbers and Years (or Other Identifying Numbers): 19611-049-PN01, 20611-047-PN01, 19619-49-PN01, 20619-047-PN01, 20611-049-PN01, 21611-047-PN01, 20619-49-PN01, 21619-047- PN01 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Procurement and Suspension and Debarment Audit Finding: Material Weakness, Other Matters Criteria: 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal awards in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO) " 2 CFR 200.303 states: ?When you enter into a covered transaction with another person at the next lower tier, you must verify that the person with whom you intend to do business is not excluded or disqualified. You do this by: 1. Checking SAM Exclusions; or 2. Collecting a certification from that person; or 3. Adding a clause or condition to the covered transaction with that person.? 2 CFR 200.320 states in part: "The non-Federal Entity must use one of the following methods of procurement? ?(c) Procurement by sealed bids (formal advertising). Bids are publicly solicited, and a firm fixed price contract (lump sum or unit price) is awarded to the responsible bidder whose bid, conforming with all the material terms and conditions of the invitation for bids, is the lowest in price. The sealed bid method is the preferred method for procuring construction, if the conditions in paragraph (c)(1) of this section apply " Condition: The School Corporation is a member of the Cooperative School Services (Cooperative). The Cooperative operated the special education programs on behalf of the School Corporation and managed the special education grant funds. As the grant agreement was between the Indiana Department of Education and the School Corporation, the School Corporation was responsible for compliance with the grant agreement and the Procurement and Suspension and Debarment compliance requirement. Procurement ? Simplified Acquisition The School Corporation did not have adequate internal controls in place to ensure the Cooperative complied with the procurement requirements for simplified acquisitions. The Cooperative did not have adequate procedures in place to ensure procurements for simplified acquisitions were properly advertised and bids accepted. There were two vendors who met the Simplified Acquisition threshold during the audit period; neither were properly procured. Suspension and Debarment The School Corporation did not have adequate internal controls in place to ensure the Cooperative complied with the Suspension and Debarment requirements. During school year 2020, the Cooperative did not have adequate procedures in place to ensure that applicable vendors who received federal funds were not suspended or debarred from participation in federal awards programs. There were three contracted vendors during the audit period; the unit did not perform procedures to ensure the vendors were not excluded or disqualified. During the 2021 school year, The School Corporation did not have adequate internal controls in place to ensure the Cooperative complied with the suspension and debarment requirements. The Special Education Director obtained suspension and debarment certifications for contracted vendors over $25,000 without an oversight or review process. The lack of controls and noncompliance related to procurement were isolated to school year 2020-2021. The lack of controls related to suspension and debarment were systemic throughout the audit period; however, the noncompliance was isolated to school year 2020-2021. Cause: Management had not developed a system of internal controls that would have ensured compliance with the grant agreement and the Procurement and Suspension and Debarment compliance requirement. Effect: The failure to establish an effective internal control system enabled material noncompliance to go undetected. Noncompliance with the grant agreement and the Procurement and Suspension and Debarment requirement could result in the loss of future federal funds to the School Corporation. Questioned Costs: There were no questioned costs identified. Context: The School Corporation did not have adequate internal controls in place to ensure the Cooperative complied with the procurement requirements for simplified acquisitions or suspension and debarment requirements for all contracts. Identification as a repeat finding, if applicable: No. Recommendation: We recommended that the School Corporation's management establish internal controls to ensure compliance and comply with the grant agreement and the Procurement and Suspension and Debarment compliance requirement. Views of Responsible Officials and Planned Corrective Actions: Management agrees with the finding and has prepared a corrective action plan.
FINDING 2022-004 Subject: COVID-19 - Education Stabilization Fund - Reporting Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Numbers: 84.425C, 84.425D, 84.425U Federal Award Numbers and Years (or Other Identifying Numbers): S425C200018, S425D200013, S425D210013, S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Reporting Audit Findings: Significant Deficiency Criteria: 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal awards in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO) " Condition: An effective internal control system was not in place at the School Corporation to ensure compliance with requirements related to the grant agreement and the Reporting compliance requirement. The School Corporation had not designed, nor implemented, a documented system of internal control to ensure that the annual Elementary and Secondary School Emergency Relief (ESSER) and the Governor's Emergency Education Relief (GEER) annual data collection reports (Reports) were complete and accurately submitted. The Reports were prepared by one employee without a documented oversight or review process in place to prevent, or detect and correct, errors. The lack of internal controls was systemic throughout the audit period. Cause: Management had not developed a system of internal controls that would have ensured compliance with the Reporting compliance requirement. Effect: The failure to design and implement an effective internal control system could have enabled noncompliance with the grant agreement and the Reporting compliance requirement. Questioned Costs: There were no questioned costs identified. Context: An effective internal control system was not in place at the School Corporation to ensure compliance with requirements related to the grant agreement and the Reporting compliance requirement. Identification as a repeat finding: No. Recommendation: We recommended that the School Corporation's management establish internal controls to ensure compliance and comply with the grant agreement and the Reporting compliance requirement. Views of Responsible Officials and Planned Corrective Actions: Management agrees with the finding and has prepared a corrective action plan.
FINDING 2022-002 Subject: COVID-19 - Education Stabilization Fund - Special Tests and Provisions - Wage Rate Requirements Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listing Number:84.425D Federal Award Number and Year (or Other Identifying Number): S425D210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Special Tests and Provisions - Wage Rate Requirements Audit Findings: Material Weakness, Modified Opinion Criteria: 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal awards in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO) " 29 CFR 5.5 states in part: ?(a) The Agency head shall cause or require the contracting officer to insert in full in any contract in excess of $2,000 which is entered into for the actual construction, alteration and/or repair, including painting and decorating, of a public building or public work, or building or work financed in whole or in part from Federal funds or in accordance with guarantees of a Federal agency or financed from funds obtained by pledge of any contract of a Federal agency to make a loan, grant or annual contribution (except where a different meaning is expressly indicated), and which is subject to the labor standards provisions of any of the acts listed in ?5.1, the following clauses? (1) Minimum wages. (i) All laborers and mechanics employed or working upon the site of the work (or under the United States Housing Act of 1937 or under the Housing Act of 1949 in the construction or development of the project), will be paid unconditionally and not less often than once a week, and without subsequent deduction or rebate on any account (except such payroll deductions as are permitted by regulations issued by the Secretary of Labor under the Copeland Act (29 CFR part 3)), the full amount of wages and bona fide fringe benefits (or cash equivalents thereof) due at time of payment computed at rates not less than those contained in the wage determination of the Secretary of Labor which is attached hereto and made a part hereof, regardless of any contractual relationship which may be alleged to exist between the contractor and such laborers and mechanics? (3)(ii)(A) The contractor shall submit weekly for each week in which any contract work is performed a copy of all payrolls to the (write in name of appropriate federal agency) if the agency is a party to the contract, but if the agency is not such a party, the contractor will submit the payrolls to the applicant, sponsor, or owner, as the case may be, for transmission to the (write in name of agency). . . .? 2 CFR 200 Appendix II states in part: In addition to other provisions required by the Federal agency or non-Federal entity; all contracts made by the non-Federal entity under the Federal award must contain provisions covering the following, as applicable. . . . (D) Davis-Bacon Act, as amended (40 U.S.C. 3141-3148). When required by Federal program legislation, all prime construction contracts in excess of $2,000 awarded by non-Federal entities must include a provision for compliance with the Davis-Bacon Act (40 U.S.C. 3141-3144, and 3146-3148) as supplemented by Department of Labor regulations (29 CFR Part 5, ?Labor Standards Provisions Applicable to Contracts Covering Federally Financed and Assisted Construction?). In accordance with the statute, contractors must be required to pay wages to laborers and mechanics at a rate not less than the prevailing wages specified in a wage determination made by the Secretary of Labor. In addition, contractors must be required to pay wages not less than once a week ? Condition: An effective internal control system was not designed, nor implemented at the School Corporation in order to ensure compliance with requirements related to the grant agreement and the Special Tests and Provisions - Wage Rate Requirements compliance requirement. Construction contracts in excess of $2,000 financed by federal assistance funds must pay wages not less than those established for the locality of the project (prevailing wage rates) by the Department of Labor (DOL) to their laborers and mechanics. Nonfederal entities are to include in their construction contracts subject to the Wage Rate Requirements a provision that the contractor or subcontractor comply with these requirements and the DOL regulations. This would include a requirement to submit a copy of the payroll and statement of compliance to the entity for each week in which contract work was performed. The School Corporation did not have adequate policies or procedures to ensure that construction contracts in excess of $2,000 paid from federal grant funds included a prevailing wage rate clause. Two constructions contract during the audit period were subject to the wage rate requirements; however, the contracts did not have the required prevailing wage rate clause included in the contract, nor were certified payrolls submitted by the contractor. The lack of internal controls and failure to maintain and provide adequate supporting documentation were systemic issues throughout the audit period. Cause: Management had not developed nor implemented a system of internal control that would have ensured compliance with the grant agreement and the Special Tests and Provisions - Wage Rate Requirements compliance requirement. Effect: The failure to establish an effective internal control system and to retain and provide appropriate supporting documentation prevented the determination of the School Corporation?s compliance with the Special Tests and Provisions - Wage Rate Requirements. Questioned Costs: There were no questioned costs identified. Context: An effective internal control system was not designed, nor implemented at the School Corporation in order to ensure compliance with requirements related to the grant agreement and the Special Tests and Provisions - Wage Rate Requirements compliance requirement. Identification as a repeat finding: No. Recommendation: We recommended that the School Corporation's management establish internal controls, as well as retain appropriate supporting documentation, to ensure compliance and comply with the grant agreement and the Special Tests and Provisions - Wage Rate Requirements compliance requirement. Views of Responsible Officials and Planned Corrective Actions: Management agrees with the finding and has prepared a corrective action plan.
FINDING 2022-003 Subject: COVID-19 - Education Stabilization Fund - Equipment and Real Property Management Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listing Number: 84.425D Federal Award Number and Year (or Other Identifying Number): S425D210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Equipment and Real Property Management Audit Findings: Material Weakness, Modified Opinion Criteria: 2 CFR 200.303 states in part: ?The non-Federal entity must: ?Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in `Standards for Internal Control in the Federal Government? issued by the Comptroller General of the United States or the `Internal Control Integrated Framework?, issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO)??." 2 CFR 200.313(d) states in part: "(1) Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the federal award identification number), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sales price of the property. (2) A physical inventory of the property must be taken and the results reconciled with the property records at lease once every two years. (3) A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated. ? Condition: An effective internal control system was not in place at the School Corporation in order to ensure compliance with requirements related to the grant agreement and Equipment and Real Property Management compliance requirement. The School Corporation paid $154,279 for water tank improvements at two locations. These capital improvements were not added to a detailed listing of capital assets that would include a description of the property, a serial number or other identification number, the source of funding for the property (including the federal award identification number), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, and the use and condition of the property. In addition, a physical inventory had not been taken in the past two years. Assets were not properly safeguarded and maintained. The lack of internal controls and noncompliance were systemic issues throughout the audit period. Cause: Management had not developed a system of internal controls that would have ensured compliance with the Equipment and Real Property Management compliance requirement. Effect: The failure to establish an effective internal control system enabled material noncompliance to go undetected. Noncompliance with the grant agreement and the Equipment and Real Property Management compliance requirement could have resulted in the loss of federal funds to the School Corporation. Questioned Costs: There were no questioned costs identified. Context: An effective internal control system was not in place at the School Corporation in order to ensure compliance with requirements related to the grant agreement and Equipment and Real Property Management compliance requirement. Identification as a repeat finding: No. Recommendation: We recommended that the School Corporation's management establish internal controls to ensure compliance and comply with the grant agreement and the Equipment and Real Property Management compliance requirement. Views of Responsible Officials and Planned Corrective Actions: Management agrees with the finding and has prepared a corrective action plan.
FINDING 2022-004 Subject: COVID-19 - Education Stabilization Fund - Reporting Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Numbers: 84.425C, 84.425D, 84.425U Federal Award Numbers and Years (or Other Identifying Numbers): S425C200018, S425D200013, S425D210013, S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Reporting Audit Findings: Significant Deficiency Criteria: 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal awards in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO) " Condition: An effective internal control system was not in place at the School Corporation to ensure compliance with requirements related to the grant agreement and the Reporting compliance requirement. The School Corporation had not designed, nor implemented, a documented system of internal control to ensure that the annual Elementary and Secondary School Emergency Relief (ESSER) and the Governor's Emergency Education Relief (GEER) annual data collection reports (Reports) were complete and accurately submitted. The Reports were prepared by one employee without a documented oversight or review process in place to prevent, or detect and correct, errors. The lack of internal controls was systemic throughout the audit period. Cause: Management had not developed a system of internal controls that would have ensured compliance with the Reporting compliance requirement. Effect: The failure to design and implement an effective internal control system could have enabled noncompliance with the grant agreement and the Reporting compliance requirement. Questioned Costs: There were no questioned costs identified. Context: An effective internal control system was not in place at the School Corporation to ensure compliance with requirements related to the grant agreement and the Reporting compliance requirement. Identification as a repeat finding: No. Recommendation: We recommended that the School Corporation's management establish internal controls to ensure compliance and comply with the grant agreement and the Reporting compliance requirement. Views of Responsible Officials and Planned Corrective Actions: Management agrees with the finding and has prepared a corrective action plan.
FINDING 2022-002 Subject: COVID-19 - Education Stabilization Fund - Special Tests and Provisions - Wage Rate Requirements Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listing Number:84.425D Federal Award Number and Year (or Other Identifying Number): S425D210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Special Tests and Provisions - Wage Rate Requirements Audit Findings: Material Weakness, Modified Opinion Criteria: 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal awards in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO) " 29 CFR 5.5 states in part: ?(a) The Agency head shall cause or require the contracting officer to insert in full in any contract in excess of $2,000 which is entered into for the actual construction, alteration and/or repair, including painting and decorating, of a public building or public work, or building or work financed in whole or in part from Federal funds or in accordance with guarantees of a Federal agency or financed from funds obtained by pledge of any contract of a Federal agency to make a loan, grant or annual contribution (except where a different meaning is expressly indicated), and which is subject to the labor standards provisions of any of the acts listed in ?5.1, the following clauses? (1) Minimum wages. (i) All laborers and mechanics employed or working upon the site of the work (or under the United States Housing Act of 1937 or under the Housing Act of 1949 in the construction or development of the project), will be paid unconditionally and not less often than once a week, and without subsequent deduction or rebate on any account (except such payroll deductions as are permitted by regulations issued by the Secretary of Labor under the Copeland Act (29 CFR part 3)), the full amount of wages and bona fide fringe benefits (or cash equivalents thereof) due at time of payment computed at rates not less than those contained in the wage determination of the Secretary of Labor which is attached hereto and made a part hereof, regardless of any contractual relationship which may be alleged to exist between the contractor and such laborers and mechanics? (3)(ii)(A) The contractor shall submit weekly for each week in which any contract work is performed a copy of all payrolls to the (write in name of appropriate federal agency) if the agency is a party to the contract, but if the agency is not such a party, the contractor will submit the payrolls to the applicant, sponsor, or owner, as the case may be, for transmission to the (write in name of agency). . . .? 2 CFR 200 Appendix II states in part: In addition to other provisions required by the Federal agency or non-Federal entity; all contracts made by the non-Federal entity under the Federal award must contain provisions covering the following, as applicable. . . . (D) Davis-Bacon Act, as amended (40 U.S.C. 3141-3148). When required by Federal program legislation, all prime construction contracts in excess of $2,000 awarded by non-Federal entities must include a provision for compliance with the Davis-Bacon Act (40 U.S.C. 3141-3144, and 3146-3148) as supplemented by Department of Labor regulations (29 CFR Part 5, ?Labor Standards Provisions Applicable to Contracts Covering Federally Financed and Assisted Construction?). In accordance with the statute, contractors must be required to pay wages to laborers and mechanics at a rate not less than the prevailing wages specified in a wage determination made by the Secretary of Labor. In addition, contractors must be required to pay wages not less than once a week ? Condition: An effective internal control system was not designed, nor implemented at the School Corporation in order to ensure compliance with requirements related to the grant agreement and the Special Tests and Provisions - Wage Rate Requirements compliance requirement. Construction contracts in excess of $2,000 financed by federal assistance funds must pay wages not less than those established for the locality of the project (prevailing wage rates) by the Department of Labor (DOL) to their laborers and mechanics. Nonfederal entities are to include in their construction contracts subject to the Wage Rate Requirements a provision that the contractor or subcontractor comply with these requirements and the DOL regulations. This would include a requirement to submit a copy of the payroll and statement of compliance to the entity for each week in which contract work was performed. The School Corporation did not have adequate policies or procedures to ensure that construction contracts in excess of $2,000 paid from federal grant funds included a prevailing wage rate clause. Two constructions contract during the audit period were subject to the wage rate requirements; however, the contracts did not have the required prevailing wage rate clause included in the contract, nor were certified payrolls submitted by the contractor. The lack of internal controls and failure to maintain and provide adequate supporting documentation were systemic issues throughout the audit period. Cause: Management had not developed nor implemented a system of internal control that would have ensured compliance with the grant agreement and the Special Tests and Provisions - Wage Rate Requirements compliance requirement. Effect: The failure to establish an effective internal control system and to retain and provide appropriate supporting documentation prevented the determination of the School Corporation?s compliance with the Special Tests and Provisions - Wage Rate Requirements. Questioned Costs: There were no questioned costs identified. Context: An effective internal control system was not designed, nor implemented at the School Corporation in order to ensure compliance with requirements related to the grant agreement and the Special Tests and Provisions - Wage Rate Requirements compliance requirement. Identification as a repeat finding: No. Recommendation: We recommended that the School Corporation's management establish internal controls, as well as retain appropriate supporting documentation, to ensure compliance and comply with the grant agreement and the Special Tests and Provisions - Wage Rate Requirements compliance requirement. Views of Responsible Officials and Planned Corrective Actions: Management agrees with the finding and has prepared a corrective action plan.
FINDING 2022-003 Subject: COVID-19 - Education Stabilization Fund - Equipment and Real Property Management Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listing Number: 84.425D Federal Award Number and Year (or Other Identifying Number): S425D210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Equipment and Real Property Management Audit Findings: Material Weakness, Modified Opinion Criteria: 2 CFR 200.303 states in part: ?The non-Federal entity must: ?Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in `Standards for Internal Control in the Federal Government? issued by the Comptroller General of the United States or the `Internal Control Integrated Framework?, issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO)??." 2 CFR 200.313(d) states in part: "(1) Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the federal award identification number), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sales price of the property. (2) A physical inventory of the property must be taken and the results reconciled with the property records at lease once every two years. (3) A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated. ? Condition: An effective internal control system was not in place at the School Corporation in order to ensure compliance with requirements related to the grant agreement and Equipment and Real Property Management compliance requirement. The School Corporation paid $154,279 for water tank improvements at two locations. These capital improvements were not added to a detailed listing of capital assets that would include a description of the property, a serial number or other identification number, the source of funding for the property (including the federal award identification number), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, and the use and condition of the property. In addition, a physical inventory had not been taken in the past two years. Assets were not properly safeguarded and maintained. The lack of internal controls and noncompliance were systemic issues throughout the audit period. Cause: Management had not developed a system of internal controls that would have ensured compliance with the Equipment and Real Property Management compliance requirement. Effect: The failure to establish an effective internal control system enabled material noncompliance to go undetected. Noncompliance with the grant agreement and the Equipment and Real Property Management compliance requirement could have resulted in the loss of federal funds to the School Corporation. Questioned Costs: There were no questioned costs identified. Context: An effective internal control system was not in place at the School Corporation in order to ensure compliance with requirements related to the grant agreement and Equipment and Real Property Management compliance requirement. Identification as a repeat finding: No. Recommendation: We recommended that the School Corporation's management establish internal controls to ensure compliance and comply with the grant agreement and the Equipment and Real Property Management compliance requirement. Views of Responsible Officials and Planned Corrective Actions: Management agrees with the finding and has prepared a corrective action plan.
FINDING 2022-004 Subject: COVID-19 - Education Stabilization Fund - Reporting Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Numbers: 84.425C, 84.425D, 84.425U Federal Award Numbers and Years (or Other Identifying Numbers): S425C200018, S425D200013, S425D210013, S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Reporting Audit Findings: Significant Deficiency Criteria: 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal awards in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO) " Condition: An effective internal control system was not in place at the School Corporation to ensure compliance with requirements related to the grant agreement and the Reporting compliance requirement. The School Corporation had not designed, nor implemented, a documented system of internal control to ensure that the annual Elementary and Secondary School Emergency Relief (ESSER) and the Governor's Emergency Education Relief (GEER) annual data collection reports (Reports) were complete and accurately submitted. The Reports were prepared by one employee without a documented oversight or review process in place to prevent, or detect and correct, errors. The lack of internal controls was systemic throughout the audit period. Cause: Management had not developed a system of internal controls that would have ensured compliance with the Reporting compliance requirement. Effect: The failure to design and implement an effective internal control system could have enabled noncompliance with the grant agreement and the Reporting compliance requirement. Questioned Costs: There were no questioned costs identified. Context: An effective internal control system was not in place at the School Corporation to ensure compliance with requirements related to the grant agreement and the Reporting compliance requirement. Identification as a repeat finding: No. Recommendation: We recommended that the School Corporation's management establish internal controls to ensure compliance and comply with the grant agreement and the Reporting compliance requirement. Views of Responsible Officials and Planned Corrective Actions: Management agrees with the finding and has prepared a corrective action plan.
FINDING 2022-004 Subject: COVID-19 - Education Stabilization Fund - Reporting Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Numbers: 84.425C, 84.425D, 84.425U Federal Award Numbers and Years (or Other Identifying Numbers): S425C200018, S425D200013, S425D210013, S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Reporting Audit Findings: Significant Deficiency Criteria: 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal awards in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO) " Condition: An effective internal control system was not in place at the School Corporation to ensure compliance with requirements related to the grant agreement and the Reporting compliance requirement. The School Corporation had not designed, nor implemented, a documented system of internal control to ensure that the annual Elementary and Secondary School Emergency Relief (ESSER) and the Governor's Emergency Education Relief (GEER) annual data collection reports (Reports) were complete and accurately submitted. The Reports were prepared by one employee without a documented oversight or review process in place to prevent, or detect and correct, errors. The lack of internal controls was systemic throughout the audit period. Cause: Management had not developed a system of internal controls that would have ensured compliance with the Reporting compliance requirement. Effect: The failure to design and implement an effective internal control system could have enabled noncompliance with the grant agreement and the Reporting compliance requirement. Questioned Costs: There were no questioned costs identified. Context: An effective internal control system was not in place at the School Corporation to ensure compliance with requirements related to the grant agreement and the Reporting compliance requirement. Identification as a repeat finding: No. Recommendation: We recommended that the School Corporation's management establish internal controls to ensure compliance and comply with the grant agreement and the Reporting compliance requirement. Views of Responsible Officials and Planned Corrective Actions: Management agrees with the finding and has prepared a corrective action plan.
FINDING 2022-001 Subject: Special Education Cluster ? Procurement and Suspension and Debarment Federal Agency: Department of Education Federal Programs: Special Education Grants to States, Special Education Preschool Grants Assistance Listing Numbers: 84.027, 84.173 Federal Award Numbers and Years (or Other Identifying Numbers): 19611-049-PN01, 20611-047-PN01, 19619-49-PN01, 20619-047-PN01, 20611-049-PN01, 21611-047-PN01, 20619-49-PN01, 21619-047- PN01 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Procurement and Suspension and Debarment Audit Finding: Material Weakness, Other Matters Criteria: 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal awards in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO) " 2 CFR 200.303 states: ?When you enter into a covered transaction with another person at the next lower tier, you must verify that the person with whom you intend to do business is not excluded or disqualified. You do this by: 1. Checking SAM Exclusions; or 2. Collecting a certification from that person; or 3. Adding a clause or condition to the covered transaction with that person.? 2 CFR 200.320 states in part: "The non-Federal Entity must use one of the following methods of procurement? ?(c) Procurement by sealed bids (formal advertising). Bids are publicly solicited, and a firm fixed price contract (lump sum or unit price) is awarded to the responsible bidder whose bid, conforming with all the material terms and conditions of the invitation for bids, is the lowest in price. The sealed bid method is the preferred method for procuring construction, if the conditions in paragraph (c)(1) of this section apply " Condition: The School Corporation is a member of the Cooperative School Services (Cooperative). The Cooperative operated the special education programs on behalf of the School Corporation and managed the special education grant funds. As the grant agreement was between the Indiana Department of Education and the School Corporation, the School Corporation was responsible for compliance with the grant agreement and the Procurement and Suspension and Debarment compliance requirement. Procurement ? Simplified Acquisition The School Corporation did not have adequate internal controls in place to ensure the Cooperative complied with the procurement requirements for simplified acquisitions. The Cooperative did not have adequate procedures in place to ensure procurements for simplified acquisitions were properly advertised and bids accepted. There were two vendors who met the Simplified Acquisition threshold during the audit period; neither were properly procured. Suspension and Debarment The School Corporation did not have adequate internal controls in place to ensure the Cooperative complied with the Suspension and Debarment requirements. During school year 2020, the Cooperative did not have adequate procedures in place to ensure that applicable vendors who received federal funds were not suspended or debarred from participation in federal awards programs. There were three contracted vendors during the audit period; the unit did not perform procedures to ensure the vendors were not excluded or disqualified. During the 2021 school year, The School Corporation did not have adequate internal controls in place to ensure the Cooperative complied with the suspension and debarment requirements. The Special Education Director obtained suspension and debarment certifications for contracted vendors over $25,000 without an oversight or review process. The lack of controls and noncompliance related to procurement were isolated to school year 2020-2021. The lack of controls related to suspension and debarment were systemic throughout the audit period; however, the noncompliance was isolated to school year 2020-2021. Cause: Management had not developed a system of internal controls that would have ensured compliance with the grant agreement and the Procurement and Suspension and Debarment compliance requirement. Effect: The failure to establish an effective internal control system enabled material noncompliance to go undetected. Noncompliance with the grant agreement and the Procurement and Suspension and Debarment requirement could result in the loss of future federal funds to the School Corporation. Questioned Costs: There were no questioned costs identified. Context: The School Corporation did not have adequate internal controls in place to ensure the Cooperative complied with the procurement requirements for simplified acquisitions or suspension and debarment requirements for all contracts. Identification as a repeat finding, if applicable: No. Recommendation: We recommended that the School Corporation's management establish internal controls to ensure compliance and comply with the grant agreement and the Procurement and Suspension and Debarment compliance requirement. Views of Responsible Officials and Planned Corrective Actions: Management agrees with the finding and has prepared a corrective action plan.
FINDING 2022-001 Subject: Special Education Cluster ? Procurement and Suspension and Debarment Federal Agency: Department of Education Federal Programs: Special Education Grants to States, Special Education Preschool Grants Assistance Listing Numbers: 84.027, 84.173 Federal Award Numbers and Years (or Other Identifying Numbers): 19611-049-PN01, 20611-047-PN01, 19619-49-PN01, 20619-047-PN01, 20611-049-PN01, 21611-047-PN01, 20619-49-PN01, 21619-047- PN01 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Procurement and Suspension and Debarment Audit Finding: Material Weakness, Other Matters Criteria: 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal awards in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO) " 2 CFR 200.303 states: ?When you enter into a covered transaction with another person at the next lower tier, you must verify that the person with whom you intend to do business is not excluded or disqualified. You do this by: 1. Checking SAM Exclusions; or 2. Collecting a certification from that person; or 3. Adding a clause or condition to the covered transaction with that person.? 2 CFR 200.320 states in part: "The non-Federal Entity must use one of the following methods of procurement? ?(c) Procurement by sealed bids (formal advertising). Bids are publicly solicited, and a firm fixed price contract (lump sum or unit price) is awarded to the responsible bidder whose bid, conforming with all the material terms and conditions of the invitation for bids, is the lowest in price. The sealed bid method is the preferred method for procuring construction, if the conditions in paragraph (c)(1) of this section apply " Condition: The School Corporation is a member of the Cooperative School Services (Cooperative). The Cooperative operated the special education programs on behalf of the School Corporation and managed the special education grant funds. As the grant agreement was between the Indiana Department of Education and the School Corporation, the School Corporation was responsible for compliance with the grant agreement and the Procurement and Suspension and Debarment compliance requirement. Procurement ? Simplified Acquisition The School Corporation did not have adequate internal controls in place to ensure the Cooperative complied with the procurement requirements for simplified acquisitions. The Cooperative did not have adequate procedures in place to ensure procurements for simplified acquisitions were properly advertised and bids accepted. There were two vendors who met the Simplified Acquisition threshold during the audit period; neither were properly procured. Suspension and Debarment The School Corporation did not have adequate internal controls in place to ensure the Cooperative complied with the Suspension and Debarment requirements. During school year 2020, the Cooperative did not have adequate procedures in place to ensure that applicable vendors who received federal funds were not suspended or debarred from participation in federal awards programs. There were three contracted vendors during the audit period; the unit did not perform procedures to ensure the vendors were not excluded or disqualified. During the 2021 school year, The School Corporation did not have adequate internal controls in place to ensure the Cooperative complied with the suspension and debarment requirements. The Special Education Director obtained suspension and debarment certifications for contracted vendors over $25,000 without an oversight or review process. The lack of controls and noncompliance related to procurement were isolated to school year 2020-2021. The lack of controls related to suspension and debarment were systemic throughout the audit period; however, the noncompliance was isolated to school year 2020-2021. Cause: Management had not developed a system of internal controls that would have ensured compliance with the grant agreement and the Procurement and Suspension and Debarment compliance requirement. Effect: The failure to establish an effective internal control system enabled material noncompliance to go undetected. Noncompliance with the grant agreement and the Procurement and Suspension and Debarment requirement could result in the loss of future federal funds to the School Corporation. Questioned Costs: There were no questioned costs identified. Context: The School Corporation did not have adequate internal controls in place to ensure the Cooperative complied with the procurement requirements for simplified acquisitions or suspension and debarment requirements for all contracts. Identification as a repeat finding, if applicable: No. Recommendation: We recommended that the School Corporation's management establish internal controls to ensure compliance and comply with the grant agreement and the Procurement and Suspension and Debarment compliance requirement. Views of Responsible Officials and Planned Corrective Actions: Management agrees with the finding and has prepared a corrective action plan.
FINDING 2022-001 Subject: Special Education Cluster ? Procurement and Suspension and Debarment Federal Agency: Department of Education Federal Programs: Special Education Grants to States, Special Education Preschool Grants Assistance Listing Numbers: 84.027, 84.173 Federal Award Numbers and Years (or Other Identifying Numbers): 19611-049-PN01, 20611-047-PN01, 19619-49-PN01, 20619-047-PN01, 20611-049-PN01, 21611-047-PN01, 20619-49-PN01, 21619-047- PN01 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Procurement and Suspension and Debarment Audit Finding: Material Weakness, Other Matters Criteria: 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal awards in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO) " 2 CFR 200.303 states: ?When you enter into a covered transaction with another person at the next lower tier, you must verify that the person with whom you intend to do business is not excluded or disqualified. You do this by: 1. Checking SAM Exclusions; or 2. Collecting a certification from that person; or 3. Adding a clause or condition to the covered transaction with that person.? 2 CFR 200.320 states in part: "The non-Federal Entity must use one of the following methods of procurement? ?(c) Procurement by sealed bids (formal advertising). Bids are publicly solicited, and a firm fixed price contract (lump sum or unit price) is awarded to the responsible bidder whose bid, conforming with all the material terms and conditions of the invitation for bids, is the lowest in price. The sealed bid method is the preferred method for procuring construction, if the conditions in paragraph (c)(1) of this section apply " Condition: The School Corporation is a member of the Cooperative School Services (Cooperative). The Cooperative operated the special education programs on behalf of the School Corporation and managed the special education grant funds. As the grant agreement was between the Indiana Department of Education and the School Corporation, the School Corporation was responsible for compliance with the grant agreement and the Procurement and Suspension and Debarment compliance requirement. Procurement ? Simplified Acquisition The School Corporation did not have adequate internal controls in place to ensure the Cooperative complied with the procurement requirements for simplified acquisitions. The Cooperative did not have adequate procedures in place to ensure procurements for simplified acquisitions were properly advertised and bids accepted. There were two vendors who met the Simplified Acquisition threshold during the audit period; neither were properly procured. Suspension and Debarment The School Corporation did not have adequate internal controls in place to ensure the Cooperative complied with the Suspension and Debarment requirements. During school year 2020, the Cooperative did not have adequate procedures in place to ensure that applicable vendors who received federal funds were not suspended or debarred from participation in federal awards programs. There were three contracted vendors during the audit period; the unit did not perform procedures to ensure the vendors were not excluded or disqualified. During the 2021 school year, The School Corporation did not have adequate internal controls in place to ensure the Cooperative complied with the suspension and debarment requirements. The Special Education Director obtained suspension and debarment certifications for contracted vendors over $25,000 without an oversight or review process. The lack of controls and noncompliance related to procurement were isolated to school year 2020-2021. The lack of controls related to suspension and debarment were systemic throughout the audit period; however, the noncompliance was isolated to school year 2020-2021. Cause: Management had not developed a system of internal controls that would have ensured compliance with the grant agreement and the Procurement and Suspension and Debarment compliance requirement. Effect: The failure to establish an effective internal control system enabled material noncompliance to go undetected. Noncompliance with the grant agreement and the Procurement and Suspension and Debarment requirement could result in the loss of future federal funds to the School Corporation. Questioned Costs: There were no questioned costs identified. Context: The School Corporation did not have adequate internal controls in place to ensure the Cooperative complied with the procurement requirements for simplified acquisitions or suspension and debarment requirements for all contracts. Identification as a repeat finding, if applicable: No. Recommendation: We recommended that the School Corporation's management establish internal controls to ensure compliance and comply with the grant agreement and the Procurement and Suspension and Debarment compliance requirement. Views of Responsible Officials and Planned Corrective Actions: Management agrees with the finding and has prepared a corrective action plan.
FINDING 2022-001 Subject: Special Education Cluster ? Procurement and Suspension and Debarment Federal Agency: Department of Education Federal Programs: Special Education Grants to States, Special Education Preschool Grants Assistance Listing Numbers: 84.027, 84.173 Federal Award Numbers and Years (or Other Identifying Numbers): 19611-049-PN01, 20611-047-PN01, 19619-49-PN01, 20619-047-PN01, 20611-049-PN01, 21611-047-PN01, 20619-49-PN01, 21619-047- PN01 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Procurement and Suspension and Debarment Audit Finding: Material Weakness, Other Matters Criteria: 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal awards in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO) " 2 CFR 200.303 states: ?When you enter into a covered transaction with another person at the next lower tier, you must verify that the person with whom you intend to do business is not excluded or disqualified. You do this by: 1. Checking SAM Exclusions; or 2. Collecting a certification from that person; or 3. Adding a clause or condition to the covered transaction with that person.? 2 CFR 200.320 states in part: "The non-Federal Entity must use one of the following methods of procurement? ?(c) Procurement by sealed bids (formal advertising). Bids are publicly solicited, and a firm fixed price contract (lump sum or unit price) is awarded to the responsible bidder whose bid, conforming with all the material terms and conditions of the invitation for bids, is the lowest in price. The sealed bid method is the preferred method for procuring construction, if the conditions in paragraph (c)(1) of this section apply " Condition: The School Corporation is a member of the Cooperative School Services (Cooperative). The Cooperative operated the special education programs on behalf of the School Corporation and managed the special education grant funds. As the grant agreement was between the Indiana Department of Education and the School Corporation, the School Corporation was responsible for compliance with the grant agreement and the Procurement and Suspension and Debarment compliance requirement. Procurement ? Simplified Acquisition The School Corporation did not have adequate internal controls in place to ensure the Cooperative complied with the procurement requirements for simplified acquisitions. The Cooperative did not have adequate procedures in place to ensure procurements for simplified acquisitions were properly advertised and bids accepted. There were two vendors who met the Simplified Acquisition threshold during the audit period; neither were properly procured. Suspension and Debarment The School Corporation did not have adequate internal controls in place to ensure the Cooperative complied with the Suspension and Debarment requirements. During school year 2020, the Cooperative did not have adequate procedures in place to ensure that applicable vendors who received federal funds were not suspended or debarred from participation in federal awards programs. There were three contracted vendors during the audit period; the unit did not perform procedures to ensure the vendors were not excluded or disqualified. During the 2021 school year, The School Corporation did not have adequate internal controls in place to ensure the Cooperative complied with the suspension and debarment requirements. The Special Education Director obtained suspension and debarment certifications for contracted vendors over $25,000 without an oversight or review process. The lack of controls and noncompliance related to procurement were isolated to school year 2020-2021. The lack of controls related to suspension and debarment were systemic throughout the audit period; however, the noncompliance was isolated to school year 2020-2021. Cause: Management had not developed a system of internal controls that would have ensured compliance with the grant agreement and the Procurement and Suspension and Debarment compliance requirement. Effect: The failure to establish an effective internal control system enabled material noncompliance to go undetected. Noncompliance with the grant agreement and the Procurement and Suspension and Debarment requirement could result in the loss of future federal funds to the School Corporation. Questioned Costs: There were no questioned costs identified. Context: The School Corporation did not have adequate internal controls in place to ensure the Cooperative complied with the procurement requirements for simplified acquisitions or suspension and debarment requirements for all contracts. Identification as a repeat finding, if applicable: No. Recommendation: We recommended that the School Corporation's management establish internal controls to ensure compliance and comply with the grant agreement and the Procurement and Suspension and Debarment compliance requirement. Views of Responsible Officials and Planned Corrective Actions: Management agrees with the finding and has prepared a corrective action plan.
FINDING 2022-001 Subject: Special Education Cluster ? Procurement and Suspension and Debarment Federal Agency: Department of Education Federal Programs: Special Education Grants to States, Special Education Preschool Grants Assistance Listing Numbers: 84.027, 84.173 Federal Award Numbers and Years (or Other Identifying Numbers): 19611-049-PN01, 20611-047-PN01, 19619-49-PN01, 20619-047-PN01, 20611-049-PN01, 21611-047-PN01, 20619-49-PN01, 21619-047- PN01 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Procurement and Suspension and Debarment Audit Finding: Material Weakness, Other Matters Criteria: 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal awards in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO) " 2 CFR 200.303 states: ?When you enter into a covered transaction with another person at the next lower tier, you must verify that the person with whom you intend to do business is not excluded or disqualified. You do this by: 1. Checking SAM Exclusions; or 2. Collecting a certification from that person; or 3. Adding a clause or condition to the covered transaction with that person.? 2 CFR 200.320 states in part: "The non-Federal Entity must use one of the following methods of procurement? ?(c) Procurement by sealed bids (formal advertising). Bids are publicly solicited, and a firm fixed price contract (lump sum or unit price) is awarded to the responsible bidder whose bid, conforming with all the material terms and conditions of the invitation for bids, is the lowest in price. The sealed bid method is the preferred method for procuring construction, if the conditions in paragraph (c)(1) of this section apply " Condition: The School Corporation is a member of the Cooperative School Services (Cooperative). The Cooperative operated the special education programs on behalf of the School Corporation and managed the special education grant funds. As the grant agreement was between the Indiana Department of Education and the School Corporation, the School Corporation was responsible for compliance with the grant agreement and the Procurement and Suspension and Debarment compliance requirement. Procurement ? Simplified Acquisition The School Corporation did not have adequate internal controls in place to ensure the Cooperative complied with the procurement requirements for simplified acquisitions. The Cooperative did not have adequate procedures in place to ensure procurements for simplified acquisitions were properly advertised and bids accepted. There were two vendors who met the Simplified Acquisition threshold during the audit period; neither were properly procured. Suspension and Debarment The School Corporation did not have adequate internal controls in place to ensure the Cooperative complied with the Suspension and Debarment requirements. During school year 2020, the Cooperative did not have adequate procedures in place to ensure that applicable vendors who received federal funds were not suspended or debarred from participation in federal awards programs. There were three contracted vendors during the audit period; the unit did not perform procedures to ensure the vendors were not excluded or disqualified. During the 2021 school year, The School Corporation did not have adequate internal controls in place to ensure the Cooperative complied with the suspension and debarment requirements. The Special Education Director obtained suspension and debarment certifications for contracted vendors over $25,000 without an oversight or review process. The lack of controls and noncompliance related to procurement were isolated to school year 2020-2021. The lack of controls related to suspension and debarment were systemic throughout the audit period; however, the noncompliance was isolated to school year 2020-2021. Cause: Management had not developed a system of internal controls that would have ensured compliance with the grant agreement and the Procurement and Suspension and Debarment compliance requirement. Effect: The failure to establish an effective internal control system enabled material noncompliance to go undetected. Noncompliance with the grant agreement and the Procurement and Suspension and Debarment requirement could result in the loss of future federal funds to the School Corporation. Questioned Costs: There were no questioned costs identified. Context: The School Corporation did not have adequate internal controls in place to ensure the Cooperative complied with the procurement requirements for simplified acquisitions or suspension and debarment requirements for all contracts. Identification as a repeat finding, if applicable: No. Recommendation: We recommended that the School Corporation's management establish internal controls to ensure compliance and comply with the grant agreement and the Procurement and Suspension and Debarment compliance requirement. Views of Responsible Officials and Planned Corrective Actions: Management agrees with the finding and has prepared a corrective action plan.
FINDING 2022-001 Subject: Special Education Cluster ? Procurement and Suspension and Debarment Federal Agency: Department of Education Federal Programs: Special Education Grants to States, Special Education Preschool Grants Assistance Listing Numbers: 84.027, 84.173 Federal Award Numbers and Years (or Other Identifying Numbers): 19611-049-PN01, 20611-047-PN01, 19619-49-PN01, 20619-047-PN01, 20611-049-PN01, 21611-047-PN01, 20619-49-PN01, 21619-047- PN01 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Procurement and Suspension and Debarment Audit Finding: Material Weakness, Other Matters Criteria: 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal awards in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO) " 2 CFR 200.303 states: ?When you enter into a covered transaction with another person at the next lower tier, you must verify that the person with whom you intend to do business is not excluded or disqualified. You do this by: 1. Checking SAM Exclusions; or 2. Collecting a certification from that person; or 3. Adding a clause or condition to the covered transaction with that person.? 2 CFR 200.320 states in part: "The non-Federal Entity must use one of the following methods of procurement? ?(c) Procurement by sealed bids (formal advertising). Bids are publicly solicited, and a firm fixed price contract (lump sum or unit price) is awarded to the responsible bidder whose bid, conforming with all the material terms and conditions of the invitation for bids, is the lowest in price. The sealed bid method is the preferred method for procuring construction, if the conditions in paragraph (c)(1) of this section apply " Condition: The School Corporation is a member of the Cooperative School Services (Cooperative). The Cooperative operated the special education programs on behalf of the School Corporation and managed the special education grant funds. As the grant agreement was between the Indiana Department of Education and the School Corporation, the School Corporation was responsible for compliance with the grant agreement and the Procurement and Suspension and Debarment compliance requirement. Procurement ? Simplified Acquisition The School Corporation did not have adequate internal controls in place to ensure the Cooperative complied with the procurement requirements for simplified acquisitions. The Cooperative did not have adequate procedures in place to ensure procurements for simplified acquisitions were properly advertised and bids accepted. There were two vendors who met the Simplified Acquisition threshold during the audit period; neither were properly procured. Suspension and Debarment The School Corporation did not have adequate internal controls in place to ensure the Cooperative complied with the Suspension and Debarment requirements. During school year 2020, the Cooperative did not have adequate procedures in place to ensure that applicable vendors who received federal funds were not suspended or debarred from participation in federal awards programs. There were three contracted vendors during the audit period; the unit did not perform procedures to ensure the vendors were not excluded or disqualified. During the 2021 school year, The School Corporation did not have adequate internal controls in place to ensure the Cooperative complied with the suspension and debarment requirements. The Special Education Director obtained suspension and debarment certifications for contracted vendors over $25,000 without an oversight or review process. The lack of controls and noncompliance related to procurement were isolated to school year 2020-2021. The lack of controls related to suspension and debarment were systemic throughout the audit period; however, the noncompliance was isolated to school year 2020-2021. Cause: Management had not developed a system of internal controls that would have ensured compliance with the grant agreement and the Procurement and Suspension and Debarment compliance requirement. Effect: The failure to establish an effective internal control system enabled material noncompliance to go undetected. Noncompliance with the grant agreement and the Procurement and Suspension and Debarment requirement could result in the loss of future federal funds to the School Corporation. Questioned Costs: There were no questioned costs identified. Context: The School Corporation did not have adequate internal controls in place to ensure the Cooperative complied with the procurement requirements for simplified acquisitions or suspension and debarment requirements for all contracts. Identification as a repeat finding, if applicable: No. Recommendation: We recommended that the School Corporation's management establish internal controls to ensure compliance and comply with the grant agreement and the Procurement and Suspension and Debarment compliance requirement. Views of Responsible Officials and Planned Corrective Actions: Management agrees with the finding and has prepared a corrective action plan.
FINDING 2022-001 Subject: Special Education Cluster ? Procurement and Suspension and Debarment Federal Agency: Department of Education Federal Programs: Special Education Grants to States, Special Education Preschool Grants Assistance Listing Numbers: 84.027, 84.173 Federal Award Numbers and Years (or Other Identifying Numbers): 19611-049-PN01, 20611-047-PN01, 19619-49-PN01, 20619-047-PN01, 20611-049-PN01, 21611-047-PN01, 20619-49-PN01, 21619-047- PN01 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Procurement and Suspension and Debarment Audit Finding: Material Weakness, Other Matters Criteria: 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal awards in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO) " 2 CFR 200.303 states: ?When you enter into a covered transaction with another person at the next lower tier, you must verify that the person with whom you intend to do business is not excluded or disqualified. You do this by: 1. Checking SAM Exclusions; or 2. Collecting a certification from that person; or 3. Adding a clause or condition to the covered transaction with that person.? 2 CFR 200.320 states in part: "The non-Federal Entity must use one of the following methods of procurement? ?(c) Procurement by sealed bids (formal advertising). Bids are publicly solicited, and a firm fixed price contract (lump sum or unit price) is awarded to the responsible bidder whose bid, conforming with all the material terms and conditions of the invitation for bids, is the lowest in price. The sealed bid method is the preferred method for procuring construction, if the conditions in paragraph (c)(1) of this section apply " Condition: The School Corporation is a member of the Cooperative School Services (Cooperative). The Cooperative operated the special education programs on behalf of the School Corporation and managed the special education grant funds. As the grant agreement was between the Indiana Department of Education and the School Corporation, the School Corporation was responsible for compliance with the grant agreement and the Procurement and Suspension and Debarment compliance requirement. Procurement ? Simplified Acquisition The School Corporation did not have adequate internal controls in place to ensure the Cooperative complied with the procurement requirements for simplified acquisitions. The Cooperative did not have adequate procedures in place to ensure procurements for simplified acquisitions were properly advertised and bids accepted. There were two vendors who met the Simplified Acquisition threshold during the audit period; neither were properly procured. Suspension and Debarment The School Corporation did not have adequate internal controls in place to ensure the Cooperative complied with the Suspension and Debarment requirements. During school year 2020, the Cooperative did not have adequate procedures in place to ensure that applicable vendors who received federal funds were not suspended or debarred from participation in federal awards programs. There were three contracted vendors during the audit period; the unit did not perform procedures to ensure the vendors were not excluded or disqualified. During the 2021 school year, The School Corporation did not have adequate internal controls in place to ensure the Cooperative complied with the suspension and debarment requirements. The Special Education Director obtained suspension and debarment certifications for contracted vendors over $25,000 without an oversight or review process. The lack of controls and noncompliance related to procurement were isolated to school year 2020-2021. The lack of controls related to suspension and debarment were systemic throughout the audit period; however, the noncompliance was isolated to school year 2020-2021. Cause: Management had not developed a system of internal controls that would have ensured compliance with the grant agreement and the Procurement and Suspension and Debarment compliance requirement. Effect: The failure to establish an effective internal control system enabled material noncompliance to go undetected. Noncompliance with the grant agreement and the Procurement and Suspension and Debarment requirement could result in the loss of future federal funds to the School Corporation. Questioned Costs: There were no questioned costs identified. Context: The School Corporation did not have adequate internal controls in place to ensure the Cooperative complied with the procurement requirements for simplified acquisitions or suspension and debarment requirements for all contracts. Identification as a repeat finding, if applicable: No. Recommendation: We recommended that the School Corporation's management establish internal controls to ensure compliance and comply with the grant agreement and the Procurement and Suspension and Debarment compliance requirement. Views of Responsible Officials and Planned Corrective Actions: Management agrees with the finding and has prepared a corrective action plan.
FINDING 2022-001 Subject: Special Education Cluster ? Procurement and Suspension and Debarment Federal Agency: Department of Education Federal Programs: Special Education Grants to States, Special Education Preschool Grants Assistance Listing Numbers: 84.027, 84.173 Federal Award Numbers and Years (or Other Identifying Numbers): 19611-049-PN01, 20611-047-PN01, 19619-49-PN01, 20619-047-PN01, 20611-049-PN01, 21611-047-PN01, 20619-49-PN01, 21619-047- PN01 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Procurement and Suspension and Debarment Audit Finding: Material Weakness, Other Matters Criteria: 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal awards in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO) " 2 CFR 200.303 states: ?When you enter into a covered transaction with another person at the next lower tier, you must verify that the person with whom you intend to do business is not excluded or disqualified. You do this by: 1. Checking SAM Exclusions; or 2. Collecting a certification from that person; or 3. Adding a clause or condition to the covered transaction with that person.? 2 CFR 200.320 states in part: "The non-Federal Entity must use one of the following methods of procurement? ?(c) Procurement by sealed bids (formal advertising). Bids are publicly solicited, and a firm fixed price contract (lump sum or unit price) is awarded to the responsible bidder whose bid, conforming with all the material terms and conditions of the invitation for bids, is the lowest in price. The sealed bid method is the preferred method for procuring construction, if the conditions in paragraph (c)(1) of this section apply " Condition: The School Corporation is a member of the Cooperative School Services (Cooperative). The Cooperative operated the special education programs on behalf of the School Corporation and managed the special education grant funds. As the grant agreement was between the Indiana Department of Education and the School Corporation, the School Corporation was responsible for compliance with the grant agreement and the Procurement and Suspension and Debarment compliance requirement. Procurement ? Simplified Acquisition The School Corporation did not have adequate internal controls in place to ensure the Cooperative complied with the procurement requirements for simplified acquisitions. The Cooperative did not have adequate procedures in place to ensure procurements for simplified acquisitions were properly advertised and bids accepted. There were two vendors who met the Simplified Acquisition threshold during the audit period; neither were properly procured. Suspension and Debarment The School Corporation did not have adequate internal controls in place to ensure the Cooperative complied with the Suspension and Debarment requirements. During school year 2020, the Cooperative did not have adequate procedures in place to ensure that applicable vendors who received federal funds were not suspended or debarred from participation in federal awards programs. There were three contracted vendors during the audit period; the unit did not perform procedures to ensure the vendors were not excluded or disqualified. During the 2021 school year, The School Corporation did not have adequate internal controls in place to ensure the Cooperative complied with the suspension and debarment requirements. The Special Education Director obtained suspension and debarment certifications for contracted vendors over $25,000 without an oversight or review process. The lack of controls and noncompliance related to procurement were isolated to school year 2020-2021. The lack of controls related to suspension and debarment were systemic throughout the audit period; however, the noncompliance was isolated to school year 2020-2021. Cause: Management had not developed a system of internal controls that would have ensured compliance with the grant agreement and the Procurement and Suspension and Debarment compliance requirement. Effect: The failure to establish an effective internal control system enabled material noncompliance to go undetected. Noncompliance with the grant agreement and the Procurement and Suspension and Debarment requirement could result in the loss of future federal funds to the School Corporation. Questioned Costs: There were no questioned costs identified. Context: The School Corporation did not have adequate internal controls in place to ensure the Cooperative complied with the procurement requirements for simplified acquisitions or suspension and debarment requirements for all contracts. Identification as a repeat finding, if applicable: No. Recommendation: We recommended that the School Corporation's management establish internal controls to ensure compliance and comply with the grant agreement and the Procurement and Suspension and Debarment compliance requirement. Views of Responsible Officials and Planned Corrective Actions: Management agrees with the finding and has prepared a corrective action plan.
FINDING 2022-004 Subject: COVID-19 - Education Stabilization Fund - Reporting Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Numbers: 84.425C, 84.425D, 84.425U Federal Award Numbers and Years (or Other Identifying Numbers): S425C200018, S425D200013, S425D210013, S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Reporting Audit Findings: Significant Deficiency Criteria: 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal awards in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO) " Condition: An effective internal control system was not in place at the School Corporation to ensure compliance with requirements related to the grant agreement and the Reporting compliance requirement. The School Corporation had not designed, nor implemented, a documented system of internal control to ensure that the annual Elementary and Secondary School Emergency Relief (ESSER) and the Governor's Emergency Education Relief (GEER) annual data collection reports (Reports) were complete and accurately submitted. The Reports were prepared by one employee without a documented oversight or review process in place to prevent, or detect and correct, errors. The lack of internal controls was systemic throughout the audit period. Cause: Management had not developed a system of internal controls that would have ensured compliance with the Reporting compliance requirement. Effect: The failure to design and implement an effective internal control system could have enabled noncompliance with the grant agreement and the Reporting compliance requirement. Questioned Costs: There were no questioned costs identified. Context: An effective internal control system was not in place at the School Corporation to ensure compliance with requirements related to the grant agreement and the Reporting compliance requirement. Identification as a repeat finding: No. Recommendation: We recommended that the School Corporation's management establish internal controls to ensure compliance and comply with the grant agreement and the Reporting compliance requirement. Views of Responsible Officials and Planned Corrective Actions: Management agrees with the finding and has prepared a corrective action plan.
FINDING 2022-002 Subject: COVID-19 - Education Stabilization Fund - Special Tests and Provisions - Wage Rate Requirements Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listing Number:84.425D Federal Award Number and Year (or Other Identifying Number): S425D210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Special Tests and Provisions - Wage Rate Requirements Audit Findings: Material Weakness, Modified Opinion Criteria: 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal awards in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO) " 29 CFR 5.5 states in part: ?(a) The Agency head shall cause or require the contracting officer to insert in full in any contract in excess of $2,000 which is entered into for the actual construction, alteration and/or repair, including painting and decorating, of a public building or public work, or building or work financed in whole or in part from Federal funds or in accordance with guarantees of a Federal agency or financed from funds obtained by pledge of any contract of a Federal agency to make a loan, grant or annual contribution (except where a different meaning is expressly indicated), and which is subject to the labor standards provisions of any of the acts listed in ?5.1, the following clauses? (1) Minimum wages. (i) All laborers and mechanics employed or working upon the site of the work (or under the United States Housing Act of 1937 or under the Housing Act of 1949 in the construction or development of the project), will be paid unconditionally and not less often than once a week, and without subsequent deduction or rebate on any account (except such payroll deductions as are permitted by regulations issued by the Secretary of Labor under the Copeland Act (29 CFR part 3)), the full amount of wages and bona fide fringe benefits (or cash equivalents thereof) due at time of payment computed at rates not less than those contained in the wage determination of the Secretary of Labor which is attached hereto and made a part hereof, regardless of any contractual relationship which may be alleged to exist between the contractor and such laborers and mechanics? (3)(ii)(A) The contractor shall submit weekly for each week in which any contract work is performed a copy of all payrolls to the (write in name of appropriate federal agency) if the agency is a party to the contract, but if the agency is not such a party, the contractor will submit the payrolls to the applicant, sponsor, or owner, as the case may be, for transmission to the (write in name of agency). . . .? 2 CFR 200 Appendix II states in part: In addition to other provisions required by the Federal agency or non-Federal entity; all contracts made by the non-Federal entity under the Federal award must contain provisions covering the following, as applicable. . . . (D) Davis-Bacon Act, as amended (40 U.S.C. 3141-3148). When required by Federal program legislation, all prime construction contracts in excess of $2,000 awarded by non-Federal entities must include a provision for compliance with the Davis-Bacon Act (40 U.S.C. 3141-3144, and 3146-3148) as supplemented by Department of Labor regulations (29 CFR Part 5, ?Labor Standards Provisions Applicable to Contracts Covering Federally Financed and Assisted Construction?). In accordance with the statute, contractors must be required to pay wages to laborers and mechanics at a rate not less than the prevailing wages specified in a wage determination made by the Secretary of Labor. In addition, contractors must be required to pay wages not less than once a week ? Condition: An effective internal control system was not designed, nor implemented at the School Corporation in order to ensure compliance with requirements related to the grant agreement and the Special Tests and Provisions - Wage Rate Requirements compliance requirement. Construction contracts in excess of $2,000 financed by federal assistance funds must pay wages not less than those established for the locality of the project (prevailing wage rates) by the Department of Labor (DOL) to their laborers and mechanics. Nonfederal entities are to include in their construction contracts subject to the Wage Rate Requirements a provision that the contractor or subcontractor comply with these requirements and the DOL regulations. This would include a requirement to submit a copy of the payroll and statement of compliance to the entity for each week in which contract work was performed. The School Corporation did not have adequate policies or procedures to ensure that construction contracts in excess of $2,000 paid from federal grant funds included a prevailing wage rate clause. Two constructions contract during the audit period were subject to the wage rate requirements; however, the contracts did not have the required prevailing wage rate clause included in the contract, nor were certified payrolls submitted by the contractor. The lack of internal controls and failure to maintain and provide adequate supporting documentation were systemic issues throughout the audit period. Cause: Management had not developed nor implemented a system of internal control that would have ensured compliance with the grant agreement and the Special Tests and Provisions - Wage Rate Requirements compliance requirement. Effect: The failure to establish an effective internal control system and to retain and provide appropriate supporting documentation prevented the determination of the School Corporation?s compliance with the Special Tests and Provisions - Wage Rate Requirements. Questioned Costs: There were no questioned costs identified. Context: An effective internal control system was not designed, nor implemented at the School Corporation in order to ensure compliance with requirements related to the grant agreement and the Special Tests and Provisions - Wage Rate Requirements compliance requirement. Identification as a repeat finding: No. Recommendation: We recommended that the School Corporation's management establish internal controls, as well as retain appropriate supporting documentation, to ensure compliance and comply with the grant agreement and the Special Tests and Provisions - Wage Rate Requirements compliance requirement. Views of Responsible Officials and Planned Corrective Actions: Management agrees with the finding and has prepared a corrective action plan.
FINDING 2022-003 Subject: COVID-19 - Education Stabilization Fund - Equipment and Real Property Management Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listing Number: 84.425D Federal Award Number and Year (or Other Identifying Number): S425D210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Equipment and Real Property Management Audit Findings: Material Weakness, Modified Opinion Criteria: 2 CFR 200.303 states in part: ?The non-Federal entity must: ?Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in `Standards for Internal Control in the Federal Government? issued by the Comptroller General of the United States or the `Internal Control Integrated Framework?, issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO)??." 2 CFR 200.313(d) states in part: "(1) Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the federal award identification number), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sales price of the property. (2) A physical inventory of the property must be taken and the results reconciled with the property records at lease once every two years. (3) A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated. ? Condition: An effective internal control system was not in place at the School Corporation in order to ensure compliance with requirements related to the grant agreement and Equipment and Real Property Management compliance requirement. The School Corporation paid $154,279 for water tank improvements at two locations. These capital improvements were not added to a detailed listing of capital assets that would include a description of the property, a serial number or other identification number, the source of funding for the property (including the federal award identification number), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, and the use and condition of the property. In addition, a physical inventory had not been taken in the past two years. Assets were not properly safeguarded and maintained. The lack of internal controls and noncompliance were systemic issues throughout the audit period. Cause: Management had not developed a system of internal controls that would have ensured compliance with the Equipment and Real Property Management compliance requirement. Effect: The failure to establish an effective internal control system enabled material noncompliance to go undetected. Noncompliance with the grant agreement and the Equipment and Real Property Management compliance requirement could have resulted in the loss of federal funds to the School Corporation. Questioned Costs: There were no questioned costs identified. Context: An effective internal control system was not in place at the School Corporation in order to ensure compliance with requirements related to the grant agreement and Equipment and Real Property Management compliance requirement. Identification as a repeat finding: No. Recommendation: We recommended that the School Corporation's management establish internal controls to ensure compliance and comply with the grant agreement and the Equipment and Real Property Management compliance requirement. Views of Responsible Officials and Planned Corrective Actions: Management agrees with the finding and has prepared a corrective action plan.
FINDING 2022-004 Subject: COVID-19 - Education Stabilization Fund - Reporting Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Numbers: 84.425C, 84.425D, 84.425U Federal Award Numbers and Years (or Other Identifying Numbers): S425C200018, S425D200013, S425D210013, S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Reporting Audit Findings: Significant Deficiency Criteria: 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal awards in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO) " Condition: An effective internal control system was not in place at the School Corporation to ensure compliance with requirements related to the grant agreement and the Reporting compliance requirement. The School Corporation had not designed, nor implemented, a documented system of internal control to ensure that the annual Elementary and Secondary School Emergency Relief (ESSER) and the Governor's Emergency Education Relief (GEER) annual data collection reports (Reports) were complete and accurately submitted. The Reports were prepared by one employee without a documented oversight or review process in place to prevent, or detect and correct, errors. The lack of internal controls was systemic throughout the audit period. Cause: Management had not developed a system of internal controls that would have ensured compliance with the Reporting compliance requirement. Effect: The failure to design and implement an effective internal control system could have enabled noncompliance with the grant agreement and the Reporting compliance requirement. Questioned Costs: There were no questioned costs identified. Context: An effective internal control system was not in place at the School Corporation to ensure compliance with requirements related to the grant agreement and the Reporting compliance requirement. Identification as a repeat finding: No. Recommendation: We recommended that the School Corporation's management establish internal controls to ensure compliance and comply with the grant agreement and the Reporting compliance requirement. Views of Responsible Officials and Planned Corrective Actions: Management agrees with the finding and has prepared a corrective action plan.
FINDING 2022-002 Subject: COVID-19 - Education Stabilization Fund - Special Tests and Provisions - Wage Rate Requirements Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listing Number:84.425D Federal Award Number and Year (or Other Identifying Number): S425D210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Special Tests and Provisions - Wage Rate Requirements Audit Findings: Material Weakness, Modified Opinion Criteria: 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal awards in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO) " 29 CFR 5.5 states in part: ?(a) The Agency head shall cause or require the contracting officer to insert in full in any contract in excess of $2,000 which is entered into for the actual construction, alteration and/or repair, including painting and decorating, of a public building or public work, or building or work financed in whole or in part from Federal funds or in accordance with guarantees of a Federal agency or financed from funds obtained by pledge of any contract of a Federal agency to make a loan, grant or annual contribution (except where a different meaning is expressly indicated), and which is subject to the labor standards provisions of any of the acts listed in ?5.1, the following clauses? (1) Minimum wages. (i) All laborers and mechanics employed or working upon the site of the work (or under the United States Housing Act of 1937 or under the Housing Act of 1949 in the construction or development of the project), will be paid unconditionally and not less often than once a week, and without subsequent deduction or rebate on any account (except such payroll deductions as are permitted by regulations issued by the Secretary of Labor under the Copeland Act (29 CFR part 3)), the full amount of wages and bona fide fringe benefits (or cash equivalents thereof) due at time of payment computed at rates not less than those contained in the wage determination of the Secretary of Labor which is attached hereto and made a part hereof, regardless of any contractual relationship which may be alleged to exist between the contractor and such laborers and mechanics? (3)(ii)(A) The contractor shall submit weekly for each week in which any contract work is performed a copy of all payrolls to the (write in name of appropriate federal agency) if the agency is a party to the contract, but if the agency is not such a party, the contractor will submit the payrolls to the applicant, sponsor, or owner, as the case may be, for transmission to the (write in name of agency). . . .? 2 CFR 200 Appendix II states in part: In addition to other provisions required by the Federal agency or non-Federal entity; all contracts made by the non-Federal entity under the Federal award must contain provisions covering the following, as applicable. . . . (D) Davis-Bacon Act, as amended (40 U.S.C. 3141-3148). When required by Federal program legislation, all prime construction contracts in excess of $2,000 awarded by non-Federal entities must include a provision for compliance with the Davis-Bacon Act (40 U.S.C. 3141-3144, and 3146-3148) as supplemented by Department of Labor regulations (29 CFR Part 5, ?Labor Standards Provisions Applicable to Contracts Covering Federally Financed and Assisted Construction?). In accordance with the statute, contractors must be required to pay wages to laborers and mechanics at a rate not less than the prevailing wages specified in a wage determination made by the Secretary of Labor. In addition, contractors must be required to pay wages not less than once a week ? Condition: An effective internal control system was not designed, nor implemented at the School Corporation in order to ensure compliance with requirements related to the grant agreement and the Special Tests and Provisions - Wage Rate Requirements compliance requirement. Construction contracts in excess of $2,000 financed by federal assistance funds must pay wages not less than those established for the locality of the project (prevailing wage rates) by the Department of Labor (DOL) to their laborers and mechanics. Nonfederal entities are to include in their construction contracts subject to the Wage Rate Requirements a provision that the contractor or subcontractor comply with these requirements and the DOL regulations. This would include a requirement to submit a copy of the payroll and statement of compliance to the entity for each week in which contract work was performed. The School Corporation did not have adequate policies or procedures to ensure that construction contracts in excess of $2,000 paid from federal grant funds included a prevailing wage rate clause. Two constructions contract during the audit period were subject to the wage rate requirements; however, the contracts did not have the required prevailing wage rate clause included in the contract, nor were certified payrolls submitted by the contractor. The lack of internal controls and failure to maintain and provide adequate supporting documentation were systemic issues throughout the audit period. Cause: Management had not developed nor implemented a system of internal control that would have ensured compliance with the grant agreement and the Special Tests and Provisions - Wage Rate Requirements compliance requirement. Effect: The failure to establish an effective internal control system and to retain and provide appropriate supporting documentation prevented the determination of the School Corporation?s compliance with the Special Tests and Provisions - Wage Rate Requirements. Questioned Costs: There were no questioned costs identified. Context: An effective internal control system was not designed, nor implemented at the School Corporation in order to ensure compliance with requirements related to the grant agreement and the Special Tests and Provisions - Wage Rate Requirements compliance requirement. Identification as a repeat finding: No. Recommendation: We recommended that the School Corporation's management establish internal controls, as well as retain appropriate supporting documentation, to ensure compliance and comply with the grant agreement and the Special Tests and Provisions - Wage Rate Requirements compliance requirement. Views of Responsible Officials and Planned Corrective Actions: Management agrees with the finding and has prepared a corrective action plan.
FINDING 2022-003 Subject: COVID-19 - Education Stabilization Fund - Equipment and Real Property Management Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listing Number: 84.425D Federal Award Number and Year (or Other Identifying Number): S425D210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Equipment and Real Property Management Audit Findings: Material Weakness, Modified Opinion Criteria: 2 CFR 200.303 states in part: ?The non-Federal entity must: ?Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in `Standards for Internal Control in the Federal Government? issued by the Comptroller General of the United States or the `Internal Control Integrated Framework?, issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO)??." 2 CFR 200.313(d) states in part: "(1) Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the federal award identification number), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sales price of the property. (2) A physical inventory of the property must be taken and the results reconciled with the property records at lease once every two years. (3) A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated. ? Condition: An effective internal control system was not in place at the School Corporation in order to ensure compliance with requirements related to the grant agreement and Equipment and Real Property Management compliance requirement. The School Corporation paid $154,279 for water tank improvements at two locations. These capital improvements were not added to a detailed listing of capital assets that would include a description of the property, a serial number or other identification number, the source of funding for the property (including the federal award identification number), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, and the use and condition of the property. In addition, a physical inventory had not been taken in the past two years. Assets were not properly safeguarded and maintained. The lack of internal controls and noncompliance were systemic issues throughout the audit period. Cause: Management had not developed a system of internal controls that would have ensured compliance with the Equipment and Real Property Management compliance requirement. Effect: The failure to establish an effective internal control system enabled material noncompliance to go undetected. Noncompliance with the grant agreement and the Equipment and Real Property Management compliance requirement could have resulted in the loss of federal funds to the School Corporation. Questioned Costs: There were no questioned costs identified. Context: An effective internal control system was not in place at the School Corporation in order to ensure compliance with requirements related to the grant agreement and Equipment and Real Property Management compliance requirement. Identification as a repeat finding: No. Recommendation: We recommended that the School Corporation's management establish internal controls to ensure compliance and comply with the grant agreement and the Equipment and Real Property Management compliance requirement. Views of Responsible Officials and Planned Corrective Actions: Management agrees with the finding and has prepared a corrective action plan.
FINDING 2022-004 Subject: COVID-19 - Education Stabilization Fund - Reporting Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Numbers: 84.425C, 84.425D, 84.425U Federal Award Numbers and Years (or Other Identifying Numbers): S425C200018, S425D200013, S425D210013, S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Reporting Audit Findings: Significant Deficiency Criteria: 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal awards in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO) " Condition: An effective internal control system was not in place at the School Corporation to ensure compliance with requirements related to the grant agreement and the Reporting compliance requirement. The School Corporation had not designed, nor implemented, a documented system of internal control to ensure that the annual Elementary and Secondary School Emergency Relief (ESSER) and the Governor's Emergency Education Relief (GEER) annual data collection reports (Reports) were complete and accurately submitted. The Reports were prepared by one employee without a documented oversight or review process in place to prevent, or detect and correct, errors. The lack of internal controls was systemic throughout the audit period. Cause: Management had not developed a system of internal controls that would have ensured compliance with the Reporting compliance requirement. Effect: The failure to design and implement an effective internal control system could have enabled noncompliance with the grant agreement and the Reporting compliance requirement. Questioned Costs: There were no questioned costs identified. Context: An effective internal control system was not in place at the School Corporation to ensure compliance with requirements related to the grant agreement and the Reporting compliance requirement. Identification as a repeat finding: No. Recommendation: We recommended that the School Corporation's management establish internal controls to ensure compliance and comply with the grant agreement and the Reporting compliance requirement. Views of Responsible Officials and Planned Corrective Actions: Management agrees with the finding and has prepared a corrective action plan.
FINDING 2022-004 Subject: COVID-19 - Education Stabilization Fund - Reporting Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Numbers: 84.425C, 84.425D, 84.425U Federal Award Numbers and Years (or Other Identifying Numbers): S425C200018, S425D200013, S425D210013, S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Reporting Audit Findings: Significant Deficiency Criteria: 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal awards in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO) " Condition: An effective internal control system was not in place at the School Corporation to ensure compliance with requirements related to the grant agreement and the Reporting compliance requirement. The School Corporation had not designed, nor implemented, a documented system of internal control to ensure that the annual Elementary and Secondary School Emergency Relief (ESSER) and the Governor's Emergency Education Relief (GEER) annual data collection reports (Reports) were complete and accurately submitted. The Reports were prepared by one employee without a documented oversight or review process in place to prevent, or detect and correct, errors. The lack of internal controls was systemic throughout the audit period. Cause: Management had not developed a system of internal controls that would have ensured compliance with the Reporting compliance requirement. Effect: The failure to design and implement an effective internal control system could have enabled noncompliance with the grant agreement and the Reporting compliance requirement. Questioned Costs: There were no questioned costs identified. Context: An effective internal control system was not in place at the School Corporation to ensure compliance with requirements related to the grant agreement and the Reporting compliance requirement. Identification as a repeat finding: No. Recommendation: We recommended that the School Corporation's management establish internal controls to ensure compliance and comply with the grant agreement and the Reporting compliance requirement. Views of Responsible Officials and Planned Corrective Actions: Management agrees with the finding and has prepared a corrective action plan.