Audit 359962

FY End
2024-09-30
Total Expended
$430.36M
Findings
4
Programs
26
Year: 2024 Accepted: 2025-06-25

Organization Exclusion Status:

Checking exclusion status...

Findings

ID Ref Severity Repeat Requirement
567102 2024-001 Significant Deficiency - I
567103 2024-001 Significant Deficiency - I
1143544 2024-001 Significant Deficiency - I
1143545 2024-001 Significant Deficiency - I

Programs

ALN Program Spent Major Findings
43.RD1 James Webb Space Telescope $104.20M Yes 0
43.RD1 Hubble Space Telescope $46.90M Yes 0
43.RD1 Hubble Space Telescope Grant Program $34.04M Yes 0
43.RD1 Nancy Grace Roman Space Telescope $28.88M Yes 0
43.RD1 James Webb Space Telescope Grant Program $24.72M Yes 0
81.RD1 Operations of the Mayall Telescope for the Desi Survey $3.94M Yes 0
81.RD1 Lsst Commissioning Services Slac (doe) $2.13M Yes 1
43.RD1 Transiting Exoplanet Survey Satellite (tess) $414,554 Yes 0
43.RD1 Star-Formation Efficiencies in Nearby, Optically Luminous Quasars $199,985 Yes 0
43.RD1 Ipa Alexander Lockwood $120,258 Yes 0
47.050 Geosciences $104,167 Yes 0
43.RD1 Pulsation and Dust in Galactic Carbon Stars $49,132 Yes 0
47.076 Stem Education (formerly Education and Human Resources) $37,615 Yes 0
43.RD1 Exep Coronograph Technology Roadmap Working Group (ctr Wg) Leadership $37,427 Yes 0
81.RD1 Lsst Dark Energy Science Collaboration $29,485 Yes 0
47.070 Computer and Information Science and Engineering $26,990 Yes 0
43.RD1 Chandra Spike Software $24,356 Yes 0
43.RD1 Ultra-Stable Telescope Research and Analysis - Technology Maturation (ultra-Tm) $21,967 Yes 0
81.RD1 Slac Desc Pipeline Scientist $21,371 Yes 0
43.RD1 Sofia & Hst Multi-Wavelengths Study of Symbiotic Mira Hm Sge $17,719 Yes 0
43.RD1 The Long-Term Evolution of Silicates in Symbiotic Mira Systems $15,412 Yes 0
47.049 Mathematical and Physical Sciences $7,072 Yes 0
43.001 Science $609 Yes 0
12.300 Basic and Applied Scientific Research $-216 Yes 0
43.000 Expo (extragalactic Potential Observations Science Investigation Team $-247 Yes 0
43.RD1 Lauer Services - New Horizons $-1,227 Yes 0

Contacts

Name Title Type
LFDKLGTB62C4 Jack W. Tade Auditee
2024832101 Marie Caputo Auditor
No contacts on file

Notes to SEFA

Accounting Policies: SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES Basis of Presentation The accompanying schedule of expenditures of federal awards (the Schedule) presents the expenditures of the Association of Universities for Research in Astronomy, Inc. (AURA) under programs of the federal government and is presented on the accrual basis of accounting. The information in this Schedule is presented in accordance with the requirements of the 2 CFR Part 200, Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards (Uniform Guidance), wherein certain types of expenditures are not allowable or are limited as to reimbursements. Program income is reported at gross in the schedule. Negative amounts shown on the Schedule represent adjustments or credits made in the normal course of business to amounts reported as expenditures in prior years. Because the Schedule presents only a portion of the operation of AURA, it is not intended to and does not present the financial position, changes in net assets, and cash flows of AURA. For purposes of the Schedule, federal awards include all grants, contracts, and similar agreements entered into directly between AURA and agencies and departments of the federal government and all sub-awards made to AURA by nonfederal organizations pursuant to federal grants, contracts, and similar agreements. Subrecipients Certain funds received under federal awards are paid to subrecipient organizations by AURA; these expenditures are presented in the “Passed-Through to Subrecipients” column within the Schedule and are related primarily to research and development awards received from the National Science Foundation (NSF) and National Aeronautics and Space Administration (NASA). De Minimis Rate Used: N Rate Explanation: AURA has not elected to use the 10% de minimis indirect cost rate as allowed under the Uniform Guidance.

Finding Details

2024 – 001 Suspension and Debarment Federal Agency: National Science Foundation (NSF) and Department of Energy (DOE) Federal Program Name: Mathematical and Physical Sciences (Construction of the Vera C. Rubin Observatory under the MREFC and Management, Operations and Maintenance of Vera C. Rubin) and LSST Commissioning Services for SLAC (DOE) Assistance Listing Number: 47.049 and 81.RD Federal Award Identification Number and Year: CSA AST-1202910 (July 2014 – December 2024), CSA AST-2211468 (October 2022 – September 2027), and DE-AC02-76SF00515 (April 2019 – September 2025) Pass-Through Agency: SLAC National Accelerator Laboratory Pass-Through Number(s): 194609 Award Period: October 1, 2023 – September 30, 2024 Type of Finding: Significant Deficiency in Internal Control over Compliance Criteria or specific requirement: 2 CFR Part 200 Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Award (UG) requires compliance with the provisions of procurement, suspension, and debarment. The Organization should have internal controls designed to ensure compliance with those provisions. Condition: During our testing, we noted the Organization did not have documentation to support that internal controls were performed to ensure vendors were not suspended or debarred prior to entering into the contract. Questioned costs: None. Context: During our testing, it was noted that the Organization did not maintain documentation that it had reviewed vendors prior to entering into a contract with a vendor to ensure the vendor was not on the suspended or debarred vendor list maintained by the General Services Administration. This exception was noted for 3 of 40 items tested, however, we were able to verify that the selected vendors were not suspended or debarred. Cause: The Organization was unable to locate documentation to support the performance of procedures to ensure vendors were not suspended or debarred. Effect: The auditor noted no instances of noncompliance with the provisions of procurement, suspension, and debarment; however, the lack of internal controls over these compliance requirements provides an opportunity for noncompliance. Repeat Finding: No. Recommendation: We recommend AURA enhance controls to ensure an adequate process is in place to review potential vendors to determine they are not suspended or debarred and to ensure documentation to support this is maintained. Views of responsible officials: There is no disagreement with the audit finding.
2024 – 001 Suspension and Debarment Federal Agency: National Science Foundation (NSF) and Department of Energy (DOE) Federal Program Name: Mathematical and Physical Sciences (Construction of the Vera C. Rubin Observatory under the MREFC and Management, Operations and Maintenance of Vera C. Rubin) and LSST Commissioning Services for SLAC (DOE) Assistance Listing Number: 47.049 and 81.RD Federal Award Identification Number and Year: CSA AST-1202910 (July 2014 – December 2024), CSA AST-2211468 (October 2022 – September 2027), and DE-AC02-76SF00515 (April 2019 – September 2025) Pass-Through Agency: SLAC National Accelerator Laboratory Pass-Through Number(s): 194609 Award Period: October 1, 2023 – September 30, 2024 Type of Finding: Significant Deficiency in Internal Control over Compliance Criteria or specific requirement: 2 CFR Part 200 Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Award (UG) requires compliance with the provisions of procurement, suspension, and debarment. The Organization should have internal controls designed to ensure compliance with those provisions. Condition: During our testing, we noted the Organization did not have documentation to support that internal controls were performed to ensure vendors were not suspended or debarred prior to entering into the contract. Questioned costs: None. Context: During our testing, it was noted that the Organization did not maintain documentation that it had reviewed vendors prior to entering into a contract with a vendor to ensure the vendor was not on the suspended or debarred vendor list maintained by the General Services Administration. This exception was noted for 3 of 40 items tested, however, we were able to verify that the selected vendors were not suspended or debarred. Cause: The Organization was unable to locate documentation to support the performance of procedures to ensure vendors were not suspended or debarred. Effect: The auditor noted no instances of noncompliance with the provisions of procurement, suspension, and debarment; however, the lack of internal controls over these compliance requirements provides an opportunity for noncompliance. Repeat Finding: No. Recommendation: We recommend AURA enhance controls to ensure an adequate process is in place to review potential vendors to determine they are not suspended or debarred and to ensure documentation to support this is maintained. Views of responsible officials: There is no disagreement with the audit finding.
2024 – 001 Suspension and Debarment Federal Agency: National Science Foundation (NSF) and Department of Energy (DOE) Federal Program Name: Mathematical and Physical Sciences (Construction of the Vera C. Rubin Observatory under the MREFC and Management, Operations and Maintenance of Vera C. Rubin) and LSST Commissioning Services for SLAC (DOE) Assistance Listing Number: 47.049 and 81.RD Federal Award Identification Number and Year: CSA AST-1202910 (July 2014 – December 2024), CSA AST-2211468 (October 2022 – September 2027), and DE-AC02-76SF00515 (April 2019 – September 2025) Pass-Through Agency: SLAC National Accelerator Laboratory Pass-Through Number(s): 194609 Award Period: October 1, 2023 – September 30, 2024 Type of Finding: Significant Deficiency in Internal Control over Compliance Criteria or specific requirement: 2 CFR Part 200 Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Award (UG) requires compliance with the provisions of procurement, suspension, and debarment. The Organization should have internal controls designed to ensure compliance with those provisions. Condition: During our testing, we noted the Organization did not have documentation to support that internal controls were performed to ensure vendors were not suspended or debarred prior to entering into the contract. Questioned costs: None. Context: During our testing, it was noted that the Organization did not maintain documentation that it had reviewed vendors prior to entering into a contract with a vendor to ensure the vendor was not on the suspended or debarred vendor list maintained by the General Services Administration. This exception was noted for 3 of 40 items tested, however, we were able to verify that the selected vendors were not suspended or debarred. Cause: The Organization was unable to locate documentation to support the performance of procedures to ensure vendors were not suspended or debarred. Effect: The auditor noted no instances of noncompliance with the provisions of procurement, suspension, and debarment; however, the lack of internal controls over these compliance requirements provides an opportunity for noncompliance. Repeat Finding: No. Recommendation: We recommend AURA enhance controls to ensure an adequate process is in place to review potential vendors to determine they are not suspended or debarred and to ensure documentation to support this is maintained. Views of responsible officials: There is no disagreement with the audit finding.
2024 – 001 Suspension and Debarment Federal Agency: National Science Foundation (NSF) and Department of Energy (DOE) Federal Program Name: Mathematical and Physical Sciences (Construction of the Vera C. Rubin Observatory under the MREFC and Management, Operations and Maintenance of Vera C. Rubin) and LSST Commissioning Services for SLAC (DOE) Assistance Listing Number: 47.049 and 81.RD Federal Award Identification Number and Year: CSA AST-1202910 (July 2014 – December 2024), CSA AST-2211468 (October 2022 – September 2027), and DE-AC02-76SF00515 (April 2019 – September 2025) Pass-Through Agency: SLAC National Accelerator Laboratory Pass-Through Number(s): 194609 Award Period: October 1, 2023 – September 30, 2024 Type of Finding: Significant Deficiency in Internal Control over Compliance Criteria or specific requirement: 2 CFR Part 200 Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Award (UG) requires compliance with the provisions of procurement, suspension, and debarment. The Organization should have internal controls designed to ensure compliance with those provisions. Condition: During our testing, we noted the Organization did not have documentation to support that internal controls were performed to ensure vendors were not suspended or debarred prior to entering into the contract. Questioned costs: None. Context: During our testing, it was noted that the Organization did not maintain documentation that it had reviewed vendors prior to entering into a contract with a vendor to ensure the vendor was not on the suspended or debarred vendor list maintained by the General Services Administration. This exception was noted for 3 of 40 items tested, however, we were able to verify that the selected vendors were not suspended or debarred. Cause: The Organization was unable to locate documentation to support the performance of procedures to ensure vendors were not suspended or debarred. Effect: The auditor noted no instances of noncompliance with the provisions of procurement, suspension, and debarment; however, the lack of internal controls over these compliance requirements provides an opportunity for noncompliance. Repeat Finding: No. Recommendation: We recommend AURA enhance controls to ensure an adequate process is in place to review potential vendors to determine they are not suspended or debarred and to ensure documentation to support this is maintained. Views of responsible officials: There is no disagreement with the audit finding.