Internal Controls over Preparation of the Schedule of Expenditures of Federal Awards (Significant Deficiency)
Federal Award Program: All Awards
Criteria: 2 CFR 200, Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards, £200.508(b) The auditee must prepare appropriate statements including an accurate Schedule of Expenditures of Federal Awards (SEFA) in accordance with £200.510, Financial Statements.
Condition and Context: Audit procedures noted several errors in the client provided SEFA.
Cause: Insufficient training and internal controls over the preparation and review process for the SEFA.
Effect: The following errors were noted and corrected as a result of auditing procedures on the SEFA:
• The Intermediary Relending Program and Rural Microentrepreneur Assistance Relending Program awards loan expenditures were calculated incorrectly by including the repayments and excluding the loan service income.
• The CFDA #11.037 and #11.419 were not grouped with the correct Federal Grantor.
• The STEM Education award had 2 CFDA #’s provided on one line.
• There were multiple Federal Grantor and Program Titles that were mislabeled.
Questioned Costs: None
Recommendation: Management should seek appropriate training for the fiscal department on preparation of the SEFA standards. In addition, review processes over the SEFA should be strengthened. Management should consider contracting with an experienced accounting consultant should they identify areas that require additional expertise and review after the drafting of the SEFA and prior to the submission for audit. Management should also ensure that they obtain the complete and full agreements from grantors that are signed by all parties and that clearly identify the funding source.
Views of Responsible Officials and Planned Corrective Actions: Management attempted to contract with multiple accounting consultants for creating the SEFA but they were already at full capacity and were not available to assist with the creation of the report. When the relevant contract or grant award did not include the necessary information, SCEC management and program staff reached out to our contracting agencies to confirm whether federal funds were part of each award and to find out CFDA numbers and other contract information necessary to complete the form. Nevertheless, there were several errors that in the SEFA submitted to our auditors for review. For the two IRP and RMAP lending programs, the prior year balances were carried over into the FY 24 SEFA through a clerical error. The errors in item 11.037 and 11.419 are related to information we received from the contracting agency. In particular, 11.037 was listed under US Economic Development Administration according to the contracting agency and we were given the description of Economic Adjustment Assistance. The description for 11.419 was given to SCEC by the contracting agency as CDS – Congressionally Directed Spending. Finally, we provided two CFDA’s for the STEM Education award with the submission of the SEFA as we were waiting for confirmation from Program Managers about the correct CDFA numbers. The auditors were informed that we were waiting for these numbers when the SEFA was submitted.
In FY24, SCEC had 29 different federal funding sources, from 14 different agencies. We are working to improve our capacity to report these awards without error before the review of our auditors.
Internal Controls over Preparation of the Schedule of Expenditures of Federal Awards (Significant Deficiency)
Federal Award Program: All Awards
Criteria: 2 CFR 200, Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards, £200.508(b) The auditee must prepare appropriate statements including an accurate Schedule of Expenditures of Federal Awards (SEFA) in accordance with £200.510, Financial Statements.
Condition and Context: Audit procedures noted several errors in the client provided SEFA.
Cause: Insufficient training and internal controls over the preparation and review process for the SEFA.
Effect: The following errors were noted and corrected as a result of auditing procedures on the SEFA:
• The Intermediary Relending Program and Rural Microentrepreneur Assistance Relending Program awards loan expenditures were calculated incorrectly by including the repayments and excluding the loan service income.
• The CFDA #11.037 and #11.419 were not grouped with the correct Federal Grantor.
• The STEM Education award had 2 CFDA #’s provided on one line.
• There were multiple Federal Grantor and Program Titles that were mislabeled.
Questioned Costs: None
Recommendation: Management should seek appropriate training for the fiscal department on preparation of the SEFA standards. In addition, review processes over the SEFA should be strengthened. Management should consider contracting with an experienced accounting consultant should they identify areas that require additional expertise and review after the drafting of the SEFA and prior to the submission for audit. Management should also ensure that they obtain the complete and full agreements from grantors that are signed by all parties and that clearly identify the funding source.
Views of Responsible Officials and Planned Corrective Actions: Management attempted to contract with multiple accounting consultants for creating the SEFA but they were already at full capacity and were not available to assist with the creation of the report. When the relevant contract or grant award did not include the necessary information, SCEC management and program staff reached out to our contracting agencies to confirm whether federal funds were part of each award and to find out CFDA numbers and other contract information necessary to complete the form. Nevertheless, there were several errors that in the SEFA submitted to our auditors for review. For the two IRP and RMAP lending programs, the prior year balances were carried over into the FY 24 SEFA through a clerical error. The errors in item 11.037 and 11.419 are related to information we received from the contracting agency. In particular, 11.037 was listed under US Economic Development Administration according to the contracting agency and we were given the description of Economic Adjustment Assistance. The description for 11.419 was given to SCEC by the contracting agency as CDS – Congressionally Directed Spending. Finally, we provided two CFDA’s for the STEM Education award with the submission of the SEFA as we were waiting for confirmation from Program Managers about the correct CDFA numbers. The auditors were informed that we were waiting for these numbers when the SEFA was submitted.
In FY24, SCEC had 29 different federal funding sources, from 14 different agencies. We are working to improve our capacity to report these awards without error before the review of our auditors.
Internal Controls over Preparation of the Schedule of Expenditures of Federal Awards (Significant Deficiency)
Federal Award Program: All Awards
Criteria: 2 CFR 200, Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards, £200.508(b) The auditee must prepare appropriate statements including an accurate Schedule of Expenditures of Federal Awards (SEFA) in accordance with £200.510, Financial Statements.
Condition and Context: Audit procedures noted several errors in the client provided SEFA.
Cause: Insufficient training and internal controls over the preparation and review process for the SEFA.
Effect: The following errors were noted and corrected as a result of auditing procedures on the SEFA:
• The Intermediary Relending Program and Rural Microentrepreneur Assistance Relending Program awards loan expenditures were calculated incorrectly by including the repayments and excluding the loan service income.
• The CFDA #11.037 and #11.419 were not grouped with the correct Federal Grantor.
• The STEM Education award had 2 CFDA #’s provided on one line.
• There were multiple Federal Grantor and Program Titles that were mislabeled.
Questioned Costs: None
Recommendation: Management should seek appropriate training for the fiscal department on preparation of the SEFA standards. In addition, review processes over the SEFA should be strengthened. Management should consider contracting with an experienced accounting consultant should they identify areas that require additional expertise and review after the drafting of the SEFA and prior to the submission for audit. Management should also ensure that they obtain the complete and full agreements from grantors that are signed by all parties and that clearly identify the funding source.
Views of Responsible Officials and Planned Corrective Actions: Management attempted to contract with multiple accounting consultants for creating the SEFA but they were already at full capacity and were not available to assist with the creation of the report. When the relevant contract or grant award did not include the necessary information, SCEC management and program staff reached out to our contracting agencies to confirm whether federal funds were part of each award and to find out CFDA numbers and other contract information necessary to complete the form. Nevertheless, there were several errors that in the SEFA submitted to our auditors for review. For the two IRP and RMAP lending programs, the prior year balances were carried over into the FY 24 SEFA through a clerical error. The errors in item 11.037 and 11.419 are related to information we received from the contracting agency. In particular, 11.037 was listed under US Economic Development Administration according to the contracting agency and we were given the description of Economic Adjustment Assistance. The description for 11.419 was given to SCEC by the contracting agency as CDS – Congressionally Directed Spending. Finally, we provided two CFDA’s for the STEM Education award with the submission of the SEFA as we were waiting for confirmation from Program Managers about the correct CDFA numbers. The auditors were informed that we were waiting for these numbers when the SEFA was submitted.
In FY24, SCEC had 29 different federal funding sources, from 14 different agencies. We are working to improve our capacity to report these awards without error before the review of our auditors.
Internal Controls over Preparation of the Schedule of Expenditures of Federal Awards (Significant Deficiency)
Federal Award Program: All Awards
Criteria: 2 CFR 200, Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards, £200.508(b) The auditee must prepare appropriate statements including an accurate Schedule of Expenditures of Federal Awards (SEFA) in accordance with £200.510, Financial Statements.
Condition and Context: Audit procedures noted several errors in the client provided SEFA.
Cause: Insufficient training and internal controls over the preparation and review process for the SEFA.
Effect: The following errors were noted and corrected as a result of auditing procedures on the SEFA:
• The Intermediary Relending Program and Rural Microentrepreneur Assistance Relending Program awards loan expenditures were calculated incorrectly by including the repayments and excluding the loan service income.
• The CFDA #11.037 and #11.419 were not grouped with the correct Federal Grantor.
• The STEM Education award had 2 CFDA #’s provided on one line.
• There were multiple Federal Grantor and Program Titles that were mislabeled.
Questioned Costs: None
Recommendation: Management should seek appropriate training for the fiscal department on preparation of the SEFA standards. In addition, review processes over the SEFA should be strengthened. Management should consider contracting with an experienced accounting consultant should they identify areas that require additional expertise and review after the drafting of the SEFA and prior to the submission for audit. Management should also ensure that they obtain the complete and full agreements from grantors that are signed by all parties and that clearly identify the funding source.
Views of Responsible Officials and Planned Corrective Actions: Management attempted to contract with multiple accounting consultants for creating the SEFA but they were already at full capacity and were not available to assist with the creation of the report. When the relevant contract or grant award did not include the necessary information, SCEC management and program staff reached out to our contracting agencies to confirm whether federal funds were part of each award and to find out CFDA numbers and other contract information necessary to complete the form. Nevertheless, there were several errors that in the SEFA submitted to our auditors for review. For the two IRP and RMAP lending programs, the prior year balances were carried over into the FY 24 SEFA through a clerical error. The errors in item 11.037 and 11.419 are related to information we received from the contracting agency. In particular, 11.037 was listed under US Economic Development Administration according to the contracting agency and we were given the description of Economic Adjustment Assistance. The description for 11.419 was given to SCEC by the contracting agency as CDS – Congressionally Directed Spending. Finally, we provided two CFDA’s for the STEM Education award with the submission of the SEFA as we were waiting for confirmation from Program Managers about the correct CDFA numbers. The auditors were informed that we were waiting for these numbers when the SEFA was submitted.
In FY24, SCEC had 29 different federal funding sources, from 14 different agencies. We are working to improve our capacity to report these awards without error before the review of our auditors.
Internal Controls over Preparation of the Schedule of Expenditures of Federal Awards (Significant Deficiency)
Federal Award Program: All Awards
Criteria: 2 CFR 200, Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards, £200.508(b) The auditee must prepare appropriate statements including an accurate Schedule of Expenditures of Federal Awards (SEFA) in accordance with £200.510, Financial Statements.
Condition and Context: Audit procedures noted several errors in the client provided SEFA.
Cause: Insufficient training and internal controls over the preparation and review process for the SEFA.
Effect: The following errors were noted and corrected as a result of auditing procedures on the SEFA:
• The Intermediary Relending Program and Rural Microentrepreneur Assistance Relending Program awards loan expenditures were calculated incorrectly by including the repayments and excluding the loan service income.
• The CFDA #11.037 and #11.419 were not grouped with the correct Federal Grantor.
• The STEM Education award had 2 CFDA #’s provided on one line.
• There were multiple Federal Grantor and Program Titles that were mislabeled.
Questioned Costs: None
Recommendation: Management should seek appropriate training for the fiscal department on preparation of the SEFA standards. In addition, review processes over the SEFA should be strengthened. Management should consider contracting with an experienced accounting consultant should they identify areas that require additional expertise and review after the drafting of the SEFA and prior to the submission for audit. Management should also ensure that they obtain the complete and full agreements from grantors that are signed by all parties and that clearly identify the funding source.
Views of Responsible Officials and Planned Corrective Actions: Management attempted to contract with multiple accounting consultants for creating the SEFA but they were already at full capacity and were not available to assist with the creation of the report. When the relevant contract or grant award did not include the necessary information, SCEC management and program staff reached out to our contracting agencies to confirm whether federal funds were part of each award and to find out CFDA numbers and other contract information necessary to complete the form. Nevertheless, there were several errors that in the SEFA submitted to our auditors for review. For the two IRP and RMAP lending programs, the prior year balances were carried over into the FY 24 SEFA through a clerical error. The errors in item 11.037 and 11.419 are related to information we received from the contracting agency. In particular, 11.037 was listed under US Economic Development Administration according to the contracting agency and we were given the description of Economic Adjustment Assistance. The description for 11.419 was given to SCEC by the contracting agency as CDS – Congressionally Directed Spending. Finally, we provided two CFDA’s for the STEM Education award with the submission of the SEFA as we were waiting for confirmation from Program Managers about the correct CDFA numbers. The auditors were informed that we were waiting for these numbers when the SEFA was submitted.
In FY24, SCEC had 29 different federal funding sources, from 14 different agencies. We are working to improve our capacity to report these awards without error before the review of our auditors.
Internal Controls over Preparation of the Schedule of Expenditures of Federal Awards (Significant Deficiency)
Federal Award Program: All Awards
Criteria: 2 CFR 200, Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards, £200.508(b) The auditee must prepare appropriate statements including an accurate Schedule of Expenditures of Federal Awards (SEFA) in accordance with £200.510, Financial Statements.
Condition and Context: Audit procedures noted several errors in the client provided SEFA.
Cause: Insufficient training and internal controls over the preparation and review process for the SEFA.
Effect: The following errors were noted and corrected as a result of auditing procedures on the SEFA:
• The Intermediary Relending Program and Rural Microentrepreneur Assistance Relending Program awards loan expenditures were calculated incorrectly by including the repayments and excluding the loan service income.
• The CFDA #11.037 and #11.419 were not grouped with the correct Federal Grantor.
• The STEM Education award had 2 CFDA #’s provided on one line.
• There were multiple Federal Grantor and Program Titles that were mislabeled.
Questioned Costs: None
Recommendation: Management should seek appropriate training for the fiscal department on preparation of the SEFA standards. In addition, review processes over the SEFA should be strengthened. Management should consider contracting with an experienced accounting consultant should they identify areas that require additional expertise and review after the drafting of the SEFA and prior to the submission for audit. Management should also ensure that they obtain the complete and full agreements from grantors that are signed by all parties and that clearly identify the funding source.
Views of Responsible Officials and Planned Corrective Actions: Management attempted to contract with multiple accounting consultants for creating the SEFA but they were already at full capacity and were not available to assist with the creation of the report. When the relevant contract or grant award did not include the necessary information, SCEC management and program staff reached out to our contracting agencies to confirm whether federal funds were part of each award and to find out CFDA numbers and other contract information necessary to complete the form. Nevertheless, there were several errors that in the SEFA submitted to our auditors for review. For the two IRP and RMAP lending programs, the prior year balances were carried over into the FY 24 SEFA through a clerical error. The errors in item 11.037 and 11.419 are related to information we received from the contracting agency. In particular, 11.037 was listed under US Economic Development Administration according to the contracting agency and we were given the description of Economic Adjustment Assistance. The description for 11.419 was given to SCEC by the contracting agency as CDS – Congressionally Directed Spending. Finally, we provided two CFDA’s for the STEM Education award with the submission of the SEFA as we were waiting for confirmation from Program Managers about the correct CDFA numbers. The auditors were informed that we were waiting for these numbers when the SEFA was submitted.
In FY24, SCEC had 29 different federal funding sources, from 14 different agencies. We are working to improve our capacity to report these awards without error before the review of our auditors.
Internal Controls over Preparation of the Schedule of Expenditures of Federal Awards (Significant Deficiency)
Federal Award Program: All Awards
Criteria: 2 CFR 200, Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards, £200.508(b) The auditee must prepare appropriate statements including an accurate Schedule of Expenditures of Federal Awards (SEFA) in accordance with £200.510, Financial Statements.
Condition and Context: Audit procedures noted several errors in the client provided SEFA.
Cause: Insufficient training and internal controls over the preparation and review process for the SEFA.
Effect: The following errors were noted and corrected as a result of auditing procedures on the SEFA:
• The Intermediary Relending Program and Rural Microentrepreneur Assistance Relending Program awards loan expenditures were calculated incorrectly by including the repayments and excluding the loan service income.
• The CFDA #11.037 and #11.419 were not grouped with the correct Federal Grantor.
• The STEM Education award had 2 CFDA #’s provided on one line.
• There were multiple Federal Grantor and Program Titles that were mislabeled.
Questioned Costs: None
Recommendation: Management should seek appropriate training for the fiscal department on preparation of the SEFA standards. In addition, review processes over the SEFA should be strengthened. Management should consider contracting with an experienced accounting consultant should they identify areas that require additional expertise and review after the drafting of the SEFA and prior to the submission for audit. Management should also ensure that they obtain the complete and full agreements from grantors that are signed by all parties and that clearly identify the funding source.
Views of Responsible Officials and Planned Corrective Actions: Management attempted to contract with multiple accounting consultants for creating the SEFA but they were already at full capacity and were not available to assist with the creation of the report. When the relevant contract or grant award did not include the necessary information, SCEC management and program staff reached out to our contracting agencies to confirm whether federal funds were part of each award and to find out CFDA numbers and other contract information necessary to complete the form. Nevertheless, there were several errors that in the SEFA submitted to our auditors for review. For the two IRP and RMAP lending programs, the prior year balances were carried over into the FY 24 SEFA through a clerical error. The errors in item 11.037 and 11.419 are related to information we received from the contracting agency. In particular, 11.037 was listed under US Economic Development Administration according to the contracting agency and we were given the description of Economic Adjustment Assistance. The description for 11.419 was given to SCEC by the contracting agency as CDS – Congressionally Directed Spending. Finally, we provided two CFDA’s for the STEM Education award with the submission of the SEFA as we were waiting for confirmation from Program Managers about the correct CDFA numbers. The auditors were informed that we were waiting for these numbers when the SEFA was submitted.
In FY24, SCEC had 29 different federal funding sources, from 14 different agencies. We are working to improve our capacity to report these awards without error before the review of our auditors.
Internal Controls over Preparation of the Schedule of Expenditures of Federal Awards (Significant Deficiency)
Federal Award Program: All Awards
Criteria: 2 CFR 200, Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards, £200.508(b) The auditee must prepare appropriate statements including an accurate Schedule of Expenditures of Federal Awards (SEFA) in accordance with £200.510, Financial Statements.
Condition and Context: Audit procedures noted several errors in the client provided SEFA.
Cause: Insufficient training and internal controls over the preparation and review process for the SEFA.
Effect: The following errors were noted and corrected as a result of auditing procedures on the SEFA:
• The Intermediary Relending Program and Rural Microentrepreneur Assistance Relending Program awards loan expenditures were calculated incorrectly by including the repayments and excluding the loan service income.
• The CFDA #11.037 and #11.419 were not grouped with the correct Federal Grantor.
• The STEM Education award had 2 CFDA #’s provided on one line.
• There were multiple Federal Grantor and Program Titles that were mislabeled.
Questioned Costs: None
Recommendation: Management should seek appropriate training for the fiscal department on preparation of the SEFA standards. In addition, review processes over the SEFA should be strengthened. Management should consider contracting with an experienced accounting consultant should they identify areas that require additional expertise and review after the drafting of the SEFA and prior to the submission for audit. Management should also ensure that they obtain the complete and full agreements from grantors that are signed by all parties and that clearly identify the funding source.
Views of Responsible Officials and Planned Corrective Actions: Management attempted to contract with multiple accounting consultants for creating the SEFA but they were already at full capacity and were not available to assist with the creation of the report. When the relevant contract or grant award did not include the necessary information, SCEC management and program staff reached out to our contracting agencies to confirm whether federal funds were part of each award and to find out CFDA numbers and other contract information necessary to complete the form. Nevertheless, there were several errors that in the SEFA submitted to our auditors for review. For the two IRP and RMAP lending programs, the prior year balances were carried over into the FY 24 SEFA through a clerical error. The errors in item 11.037 and 11.419 are related to information we received from the contracting agency. In particular, 11.037 was listed under US Economic Development Administration according to the contracting agency and we were given the description of Economic Adjustment Assistance. The description for 11.419 was given to SCEC by the contracting agency as CDS – Congressionally Directed Spending. Finally, we provided two CFDA’s for the STEM Education award with the submission of the SEFA as we were waiting for confirmation from Program Managers about the correct CDFA numbers. The auditors were informed that we were waiting for these numbers when the SEFA was submitted.
In FY24, SCEC had 29 different federal funding sources, from 14 different agencies. We are working to improve our capacity to report these awards without error before the review of our auditors.
Internal Controls over Preparation of the Schedule of Expenditures of Federal Awards (Significant Deficiency)
Federal Award Program: All Awards
Criteria: 2 CFR 200, Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards, £200.508(b) The auditee must prepare appropriate statements including an accurate Schedule of Expenditures of Federal Awards (SEFA) in accordance with £200.510, Financial Statements.
Condition and Context: Audit procedures noted several errors in the client provided SEFA.
Cause: Insufficient training and internal controls over the preparation and review process for the SEFA.
Effect: The following errors were noted and corrected as a result of auditing procedures on the SEFA:
• The Intermediary Relending Program and Rural Microentrepreneur Assistance Relending Program awards loan expenditures were calculated incorrectly by including the repayments and excluding the loan service income.
• The CFDA #11.037 and #11.419 were not grouped with the correct Federal Grantor.
• The STEM Education award had 2 CFDA #’s provided on one line.
• There were multiple Federal Grantor and Program Titles that were mislabeled.
Questioned Costs: None
Recommendation: Management should seek appropriate training for the fiscal department on preparation of the SEFA standards. In addition, review processes over the SEFA should be strengthened. Management should consider contracting with an experienced accounting consultant should they identify areas that require additional expertise and review after the drafting of the SEFA and prior to the submission for audit. Management should also ensure that they obtain the complete and full agreements from grantors that are signed by all parties and that clearly identify the funding source.
Views of Responsible Officials and Planned Corrective Actions: Management attempted to contract with multiple accounting consultants for creating the SEFA but they were already at full capacity and were not available to assist with the creation of the report. When the relevant contract or grant award did not include the necessary information, SCEC management and program staff reached out to our contracting agencies to confirm whether federal funds were part of each award and to find out CFDA numbers and other contract information necessary to complete the form. Nevertheless, there were several errors that in the SEFA submitted to our auditors for review. For the two IRP and RMAP lending programs, the prior year balances were carried over into the FY 24 SEFA through a clerical error. The errors in item 11.037 and 11.419 are related to information we received from the contracting agency. In particular, 11.037 was listed under US Economic Development Administration according to the contracting agency and we were given the description of Economic Adjustment Assistance. The description for 11.419 was given to SCEC by the contracting agency as CDS – Congressionally Directed Spending. Finally, we provided two CFDA’s for the STEM Education award with the submission of the SEFA as we were waiting for confirmation from Program Managers about the correct CDFA numbers. The auditors were informed that we were waiting for these numbers when the SEFA was submitted.
In FY24, SCEC had 29 different federal funding sources, from 14 different agencies. We are working to improve our capacity to report these awards without error before the review of our auditors.
Internal Controls over Preparation of the Schedule of Expenditures of Federal Awards (Significant Deficiency)
Federal Award Program: All Awards
Criteria: 2 CFR 200, Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards, £200.508(b) The auditee must prepare appropriate statements including an accurate Schedule of Expenditures of Federal Awards (SEFA) in accordance with £200.510, Financial Statements.
Condition and Context: Audit procedures noted several errors in the client provided SEFA.
Cause: Insufficient training and internal controls over the preparation and review process for the SEFA.
Effect: The following errors were noted and corrected as a result of auditing procedures on the SEFA:
• The Intermediary Relending Program and Rural Microentrepreneur Assistance Relending Program awards loan expenditures were calculated incorrectly by including the repayments and excluding the loan service income.
• The CFDA #11.037 and #11.419 were not grouped with the correct Federal Grantor.
• The STEM Education award had 2 CFDA #’s provided on one line.
• There were multiple Federal Grantor and Program Titles that were mislabeled.
Questioned Costs: None
Recommendation: Management should seek appropriate training for the fiscal department on preparation of the SEFA standards. In addition, review processes over the SEFA should be strengthened. Management should consider contracting with an experienced accounting consultant should they identify areas that require additional expertise and review after the drafting of the SEFA and prior to the submission for audit. Management should also ensure that they obtain the complete and full agreements from grantors that are signed by all parties and that clearly identify the funding source.
Views of Responsible Officials and Planned Corrective Actions: Management attempted to contract with multiple accounting consultants for creating the SEFA but they were already at full capacity and were not available to assist with the creation of the report. When the relevant contract or grant award did not include the necessary information, SCEC management and program staff reached out to our contracting agencies to confirm whether federal funds were part of each award and to find out CFDA numbers and other contract information necessary to complete the form. Nevertheless, there were several errors that in the SEFA submitted to our auditors for review. For the two IRP and RMAP lending programs, the prior year balances were carried over into the FY 24 SEFA through a clerical error. The errors in item 11.037 and 11.419 are related to information we received from the contracting agency. In particular, 11.037 was listed under US Economic Development Administration according to the contracting agency and we were given the description of Economic Adjustment Assistance. The description for 11.419 was given to SCEC by the contracting agency as CDS – Congressionally Directed Spending. Finally, we provided two CFDA’s for the STEM Education award with the submission of the SEFA as we were waiting for confirmation from Program Managers about the correct CDFA numbers. The auditors were informed that we were waiting for these numbers when the SEFA was submitted.
In FY24, SCEC had 29 different federal funding sources, from 14 different agencies. We are working to improve our capacity to report these awards without error before the review of our auditors.
Internal Controls over Preparation of the Schedule of Expenditures of Federal Awards (Significant Deficiency)
Federal Award Program: All Awards
Criteria: 2 CFR 200, Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards, £200.508(b) The auditee must prepare appropriate statements including an accurate Schedule of Expenditures of Federal Awards (SEFA) in accordance with £200.510, Financial Statements.
Condition and Context: Audit procedures noted several errors in the client provided SEFA.
Cause: Insufficient training and internal controls over the preparation and review process for the SEFA.
Effect: The following errors were noted and corrected as a result of auditing procedures on the SEFA:
• The Intermediary Relending Program and Rural Microentrepreneur Assistance Relending Program awards loan expenditures were calculated incorrectly by including the repayments and excluding the loan service income.
• The CFDA #11.037 and #11.419 were not grouped with the correct Federal Grantor.
• The STEM Education award had 2 CFDA #’s provided on one line.
• There were multiple Federal Grantor and Program Titles that were mislabeled.
Questioned Costs: None
Recommendation: Management should seek appropriate training for the fiscal department on preparation of the SEFA standards. In addition, review processes over the SEFA should be strengthened. Management should consider contracting with an experienced accounting consultant should they identify areas that require additional expertise and review after the drafting of the SEFA and prior to the submission for audit. Management should also ensure that they obtain the complete and full agreements from grantors that are signed by all parties and that clearly identify the funding source.
Views of Responsible Officials and Planned Corrective Actions: Management attempted to contract with multiple accounting consultants for creating the SEFA but they were already at full capacity and were not available to assist with the creation of the report. When the relevant contract or grant award did not include the necessary information, SCEC management and program staff reached out to our contracting agencies to confirm whether federal funds were part of each award and to find out CFDA numbers and other contract information necessary to complete the form. Nevertheless, there were several errors that in the SEFA submitted to our auditors for review. For the two IRP and RMAP lending programs, the prior year balances were carried over into the FY 24 SEFA through a clerical error. The errors in item 11.037 and 11.419 are related to information we received from the contracting agency. In particular, 11.037 was listed under US Economic Development Administration according to the contracting agency and we were given the description of Economic Adjustment Assistance. The description for 11.419 was given to SCEC by the contracting agency as CDS – Congressionally Directed Spending. Finally, we provided two CFDA’s for the STEM Education award with the submission of the SEFA as we were waiting for confirmation from Program Managers about the correct CDFA numbers. The auditors were informed that we were waiting for these numbers when the SEFA was submitted.
In FY24, SCEC had 29 different federal funding sources, from 14 different agencies. We are working to improve our capacity to report these awards without error before the review of our auditors.
Internal Controls over Preparation of the Schedule of Expenditures of Federal Awards (Significant Deficiency)
Federal Award Program: All Awards
Criteria: 2 CFR 200, Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards, £200.508(b) The auditee must prepare appropriate statements including an accurate Schedule of Expenditures of Federal Awards (SEFA) in accordance with £200.510, Financial Statements.
Condition and Context: Audit procedures noted several errors in the client provided SEFA.
Cause: Insufficient training and internal controls over the preparation and review process for the SEFA.
Effect: The following errors were noted and corrected as a result of auditing procedures on the SEFA:
• The Intermediary Relending Program and Rural Microentrepreneur Assistance Relending Program awards loan expenditures were calculated incorrectly by including the repayments and excluding the loan service income.
• The CFDA #11.037 and #11.419 were not grouped with the correct Federal Grantor.
• The STEM Education award had 2 CFDA #’s provided on one line.
• There were multiple Federal Grantor and Program Titles that were mislabeled.
Questioned Costs: None
Recommendation: Management should seek appropriate training for the fiscal department on preparation of the SEFA standards. In addition, review processes over the SEFA should be strengthened. Management should consider contracting with an experienced accounting consultant should they identify areas that require additional expertise and review after the drafting of the SEFA and prior to the submission for audit. Management should also ensure that they obtain the complete and full agreements from grantors that are signed by all parties and that clearly identify the funding source.
Views of Responsible Officials and Planned Corrective Actions: Management attempted to contract with multiple accounting consultants for creating the SEFA but they were already at full capacity and were not available to assist with the creation of the report. When the relevant contract or grant award did not include the necessary information, SCEC management and program staff reached out to our contracting agencies to confirm whether federal funds were part of each award and to find out CFDA numbers and other contract information necessary to complete the form. Nevertheless, there were several errors that in the SEFA submitted to our auditors for review. For the two IRP and RMAP lending programs, the prior year balances were carried over into the FY 24 SEFA through a clerical error. The errors in item 11.037 and 11.419 are related to information we received from the contracting agency. In particular, 11.037 was listed under US Economic Development Administration according to the contracting agency and we were given the description of Economic Adjustment Assistance. The description for 11.419 was given to SCEC by the contracting agency as CDS – Congressionally Directed Spending. Finally, we provided two CFDA’s for the STEM Education award with the submission of the SEFA as we were waiting for confirmation from Program Managers about the correct CDFA numbers. The auditors were informed that we were waiting for these numbers when the SEFA was submitted.
In FY24, SCEC had 29 different federal funding sources, from 14 different agencies. We are working to improve our capacity to report these awards without error before the review of our auditors.
Internal Controls over Preparation of the Schedule of Expenditures of Federal Awards (Significant Deficiency)
Federal Award Program: All Awards
Criteria: 2 CFR 200, Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards, £200.508(b) The auditee must prepare appropriate statements including an accurate Schedule of Expenditures of Federal Awards (SEFA) in accordance with £200.510, Financial Statements.
Condition and Context: Audit procedures noted several errors in the client provided SEFA.
Cause: Insufficient training and internal controls over the preparation and review process for the SEFA.
Effect: The following errors were noted and corrected as a result of auditing procedures on the SEFA:
• The Intermediary Relending Program and Rural Microentrepreneur Assistance Relending Program awards loan expenditures were calculated incorrectly by including the repayments and excluding the loan service income.
• The CFDA #11.037 and #11.419 were not grouped with the correct Federal Grantor.
• The STEM Education award had 2 CFDA #’s provided on one line.
• There were multiple Federal Grantor and Program Titles that were mislabeled.
Questioned Costs: None
Recommendation: Management should seek appropriate training for the fiscal department on preparation of the SEFA standards. In addition, review processes over the SEFA should be strengthened. Management should consider contracting with an experienced accounting consultant should they identify areas that require additional expertise and review after the drafting of the SEFA and prior to the submission for audit. Management should also ensure that they obtain the complete and full agreements from grantors that are signed by all parties and that clearly identify the funding source.
Views of Responsible Officials and Planned Corrective Actions: Management attempted to contract with multiple accounting consultants for creating the SEFA but they were already at full capacity and were not available to assist with the creation of the report. When the relevant contract or grant award did not include the necessary information, SCEC management and program staff reached out to our contracting agencies to confirm whether federal funds were part of each award and to find out CFDA numbers and other contract information necessary to complete the form. Nevertheless, there were several errors that in the SEFA submitted to our auditors for review. For the two IRP and RMAP lending programs, the prior year balances were carried over into the FY 24 SEFA through a clerical error. The errors in item 11.037 and 11.419 are related to information we received from the contracting agency. In particular, 11.037 was listed under US Economic Development Administration according to the contracting agency and we were given the description of Economic Adjustment Assistance. The description for 11.419 was given to SCEC by the contracting agency as CDS – Congressionally Directed Spending. Finally, we provided two CFDA’s for the STEM Education award with the submission of the SEFA as we were waiting for confirmation from Program Managers about the correct CDFA numbers. The auditors were informed that we were waiting for these numbers when the SEFA was submitted.
In FY24, SCEC had 29 different federal funding sources, from 14 different agencies. We are working to improve our capacity to report these awards without error before the review of our auditors.
Internal Controls over Preparation of the Schedule of Expenditures of Federal Awards (Significant Deficiency)
Federal Award Program: All Awards
Criteria: 2 CFR 200, Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards, £200.508(b) The auditee must prepare appropriate statements including an accurate Schedule of Expenditures of Federal Awards (SEFA) in accordance with £200.510, Financial Statements.
Condition and Context: Audit procedures noted several errors in the client provided SEFA.
Cause: Insufficient training and internal controls over the preparation and review process for the SEFA.
Effect: The following errors were noted and corrected as a result of auditing procedures on the SEFA:
• The Intermediary Relending Program and Rural Microentrepreneur Assistance Relending Program awards loan expenditures were calculated incorrectly by including the repayments and excluding the loan service income.
• The CFDA #11.037 and #11.419 were not grouped with the correct Federal Grantor.
• The STEM Education award had 2 CFDA #’s provided on one line.
• There were multiple Federal Grantor and Program Titles that were mislabeled.
Questioned Costs: None
Recommendation: Management should seek appropriate training for the fiscal department on preparation of the SEFA standards. In addition, review processes over the SEFA should be strengthened. Management should consider contracting with an experienced accounting consultant should they identify areas that require additional expertise and review after the drafting of the SEFA and prior to the submission for audit. Management should also ensure that they obtain the complete and full agreements from grantors that are signed by all parties and that clearly identify the funding source.
Views of Responsible Officials and Planned Corrective Actions: Management attempted to contract with multiple accounting consultants for creating the SEFA but they were already at full capacity and were not available to assist with the creation of the report. When the relevant contract or grant award did not include the necessary information, SCEC management and program staff reached out to our contracting agencies to confirm whether federal funds were part of each award and to find out CFDA numbers and other contract information necessary to complete the form. Nevertheless, there were several errors that in the SEFA submitted to our auditors for review. For the two IRP and RMAP lending programs, the prior year balances were carried over into the FY 24 SEFA through a clerical error. The errors in item 11.037 and 11.419 are related to information we received from the contracting agency. In particular, 11.037 was listed under US Economic Development Administration according to the contracting agency and we were given the description of Economic Adjustment Assistance. The description for 11.419 was given to SCEC by the contracting agency as CDS – Congressionally Directed Spending. Finally, we provided two CFDA’s for the STEM Education award with the submission of the SEFA as we were waiting for confirmation from Program Managers about the correct CDFA numbers. The auditors were informed that we were waiting for these numbers when the SEFA was submitted.
In FY24, SCEC had 29 different federal funding sources, from 14 different agencies. We are working to improve our capacity to report these awards without error before the review of our auditors.
Internal Controls over Preparation of the Schedule of Expenditures of Federal Awards (Significant Deficiency)
Federal Award Program: All Awards
Criteria: 2 CFR 200, Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards, £200.508(b) The auditee must prepare appropriate statements including an accurate Schedule of Expenditures of Federal Awards (SEFA) in accordance with £200.510, Financial Statements.
Condition and Context: Audit procedures noted several errors in the client provided SEFA.
Cause: Insufficient training and internal controls over the preparation and review process for the SEFA.
Effect: The following errors were noted and corrected as a result of auditing procedures on the SEFA:
• The Intermediary Relending Program and Rural Microentrepreneur Assistance Relending Program awards loan expenditures were calculated incorrectly by including the repayments and excluding the loan service income.
• The CFDA #11.037 and #11.419 were not grouped with the correct Federal Grantor.
• The STEM Education award had 2 CFDA #’s provided on one line.
• There were multiple Federal Grantor and Program Titles that were mislabeled.
Questioned Costs: None
Recommendation: Management should seek appropriate training for the fiscal department on preparation of the SEFA standards. In addition, review processes over the SEFA should be strengthened. Management should consider contracting with an experienced accounting consultant should they identify areas that require additional expertise and review after the drafting of the SEFA and prior to the submission for audit. Management should also ensure that they obtain the complete and full agreements from grantors that are signed by all parties and that clearly identify the funding source.
Views of Responsible Officials and Planned Corrective Actions: Management attempted to contract with multiple accounting consultants for creating the SEFA but they were already at full capacity and were not available to assist with the creation of the report. When the relevant contract or grant award did not include the necessary information, SCEC management and program staff reached out to our contracting agencies to confirm whether federal funds were part of each award and to find out CFDA numbers and other contract information necessary to complete the form. Nevertheless, there were several errors that in the SEFA submitted to our auditors for review. For the two IRP and RMAP lending programs, the prior year balances were carried over into the FY 24 SEFA through a clerical error. The errors in item 11.037 and 11.419 are related to information we received from the contracting agency. In particular, 11.037 was listed under US Economic Development Administration according to the contracting agency and we were given the description of Economic Adjustment Assistance. The description for 11.419 was given to SCEC by the contracting agency as CDS – Congressionally Directed Spending. Finally, we provided two CFDA’s for the STEM Education award with the submission of the SEFA as we were waiting for confirmation from Program Managers about the correct CDFA numbers. The auditors were informed that we were waiting for these numbers when the SEFA was submitted.
In FY24, SCEC had 29 different federal funding sources, from 14 different agencies. We are working to improve our capacity to report these awards without error before the review of our auditors.
Internal Controls over Preparation of the Schedule of Expenditures of Federal Awards (Significant Deficiency)
Federal Award Program: All Awards
Criteria: 2 CFR 200, Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards, £200.508(b) The auditee must prepare appropriate statements including an accurate Schedule of Expenditures of Federal Awards (SEFA) in accordance with £200.510, Financial Statements.
Condition and Context: Audit procedures noted several errors in the client provided SEFA.
Cause: Insufficient training and internal controls over the preparation and review process for the SEFA.
Effect: The following errors were noted and corrected as a result of auditing procedures on the SEFA:
• The Intermediary Relending Program and Rural Microentrepreneur Assistance Relending Program awards loan expenditures were calculated incorrectly by including the repayments and excluding the loan service income.
• The CFDA #11.037 and #11.419 were not grouped with the correct Federal Grantor.
• The STEM Education award had 2 CFDA #’s provided on one line.
• There were multiple Federal Grantor and Program Titles that were mislabeled.
Questioned Costs: None
Recommendation: Management should seek appropriate training for the fiscal department on preparation of the SEFA standards. In addition, review processes over the SEFA should be strengthened. Management should consider contracting with an experienced accounting consultant should they identify areas that require additional expertise and review after the drafting of the SEFA and prior to the submission for audit. Management should also ensure that they obtain the complete and full agreements from grantors that are signed by all parties and that clearly identify the funding source.
Views of Responsible Officials and Planned Corrective Actions: Management attempted to contract with multiple accounting consultants for creating the SEFA but they were already at full capacity and were not available to assist with the creation of the report. When the relevant contract or grant award did not include the necessary information, SCEC management and program staff reached out to our contracting agencies to confirm whether federal funds were part of each award and to find out CFDA numbers and other contract information necessary to complete the form. Nevertheless, there were several errors that in the SEFA submitted to our auditors for review. For the two IRP and RMAP lending programs, the prior year balances were carried over into the FY 24 SEFA through a clerical error. The errors in item 11.037 and 11.419 are related to information we received from the contracting agency. In particular, 11.037 was listed under US Economic Development Administration according to the contracting agency and we were given the description of Economic Adjustment Assistance. The description for 11.419 was given to SCEC by the contracting agency as CDS – Congressionally Directed Spending. Finally, we provided two CFDA’s for the STEM Education award with the submission of the SEFA as we were waiting for confirmation from Program Managers about the correct CDFA numbers. The auditors were informed that we were waiting for these numbers when the SEFA was submitted.
In FY24, SCEC had 29 different federal funding sources, from 14 different agencies. We are working to improve our capacity to report these awards without error before the review of our auditors.
Internal Controls over Preparation of the Schedule of Expenditures of Federal Awards (Significant Deficiency)
Federal Award Program: All Awards
Criteria: 2 CFR 200, Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards, £200.508(b) The auditee must prepare appropriate statements including an accurate Schedule of Expenditures of Federal Awards (SEFA) in accordance with £200.510, Financial Statements.
Condition and Context: Audit procedures noted several errors in the client provided SEFA.
Cause: Insufficient training and internal controls over the preparation and review process for the SEFA.
Effect: The following errors were noted and corrected as a result of auditing procedures on the SEFA:
• The Intermediary Relending Program and Rural Microentrepreneur Assistance Relending Program awards loan expenditures were calculated incorrectly by including the repayments and excluding the loan service income.
• The CFDA #11.037 and #11.419 were not grouped with the correct Federal Grantor.
• The STEM Education award had 2 CFDA #’s provided on one line.
• There were multiple Federal Grantor and Program Titles that were mislabeled.
Questioned Costs: None
Recommendation: Management should seek appropriate training for the fiscal department on preparation of the SEFA standards. In addition, review processes over the SEFA should be strengthened. Management should consider contracting with an experienced accounting consultant should they identify areas that require additional expertise and review after the drafting of the SEFA and prior to the submission for audit. Management should also ensure that they obtain the complete and full agreements from grantors that are signed by all parties and that clearly identify the funding source.
Views of Responsible Officials and Planned Corrective Actions: Management attempted to contract with multiple accounting consultants for creating the SEFA but they were already at full capacity and were not available to assist with the creation of the report. When the relevant contract or grant award did not include the necessary information, SCEC management and program staff reached out to our contracting agencies to confirm whether federal funds were part of each award and to find out CFDA numbers and other contract information necessary to complete the form. Nevertheless, there were several errors that in the SEFA submitted to our auditors for review. For the two IRP and RMAP lending programs, the prior year balances were carried over into the FY 24 SEFA through a clerical error. The errors in item 11.037 and 11.419 are related to information we received from the contracting agency. In particular, 11.037 was listed under US Economic Development Administration according to the contracting agency and we were given the description of Economic Adjustment Assistance. The description for 11.419 was given to SCEC by the contracting agency as CDS – Congressionally Directed Spending. Finally, we provided two CFDA’s for the STEM Education award with the submission of the SEFA as we were waiting for confirmation from Program Managers about the correct CDFA numbers. The auditors were informed that we were waiting for these numbers when the SEFA was submitted.
In FY24, SCEC had 29 different federal funding sources, from 14 different agencies. We are working to improve our capacity to report these awards without error before the review of our auditors.
Internal Controls over Preparation of the Schedule of Expenditures of Federal Awards (Significant Deficiency)
Federal Award Program: All Awards
Criteria: 2 CFR 200, Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards, £200.508(b) The auditee must prepare appropriate statements including an accurate Schedule of Expenditures of Federal Awards (SEFA) in accordance with £200.510, Financial Statements.
Condition and Context: Audit procedures noted several errors in the client provided SEFA.
Cause: Insufficient training and internal controls over the preparation and review process for the SEFA.
Effect: The following errors were noted and corrected as a result of auditing procedures on the SEFA:
• The Intermediary Relending Program and Rural Microentrepreneur Assistance Relending Program awards loan expenditures were calculated incorrectly by including the repayments and excluding the loan service income.
• The CFDA #11.037 and #11.419 were not grouped with the correct Federal Grantor.
• The STEM Education award had 2 CFDA #’s provided on one line.
• There were multiple Federal Grantor and Program Titles that were mislabeled.
Questioned Costs: None
Recommendation: Management should seek appropriate training for the fiscal department on preparation of the SEFA standards. In addition, review processes over the SEFA should be strengthened. Management should consider contracting with an experienced accounting consultant should they identify areas that require additional expertise and review after the drafting of the SEFA and prior to the submission for audit. Management should also ensure that they obtain the complete and full agreements from grantors that are signed by all parties and that clearly identify the funding source.
Views of Responsible Officials and Planned Corrective Actions: Management attempted to contract with multiple accounting consultants for creating the SEFA but they were already at full capacity and were not available to assist with the creation of the report. When the relevant contract or grant award did not include the necessary information, SCEC management and program staff reached out to our contracting agencies to confirm whether federal funds were part of each award and to find out CFDA numbers and other contract information necessary to complete the form. Nevertheless, there were several errors that in the SEFA submitted to our auditors for review. For the two IRP and RMAP lending programs, the prior year balances were carried over into the FY 24 SEFA through a clerical error. The errors in item 11.037 and 11.419 are related to information we received from the contracting agency. In particular, 11.037 was listed under US Economic Development Administration according to the contracting agency and we were given the description of Economic Adjustment Assistance. The description for 11.419 was given to SCEC by the contracting agency as CDS – Congressionally Directed Spending. Finally, we provided two CFDA’s for the STEM Education award with the submission of the SEFA as we were waiting for confirmation from Program Managers about the correct CDFA numbers. The auditors were informed that we were waiting for these numbers when the SEFA was submitted.
In FY24, SCEC had 29 different federal funding sources, from 14 different agencies. We are working to improve our capacity to report these awards without error before the review of our auditors.
Internal Controls over Preparation of the Schedule of Expenditures of Federal Awards (Significant Deficiency)
Federal Award Program: All Awards
Criteria: 2 CFR 200, Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards, £200.508(b) The auditee must prepare appropriate statements including an accurate Schedule of Expenditures of Federal Awards (SEFA) in accordance with £200.510, Financial Statements.
Condition and Context: Audit procedures noted several errors in the client provided SEFA.
Cause: Insufficient training and internal controls over the preparation and review process for the SEFA.
Effect: The following errors were noted and corrected as a result of auditing procedures on the SEFA:
• The Intermediary Relending Program and Rural Microentrepreneur Assistance Relending Program awards loan expenditures were calculated incorrectly by including the repayments and excluding the loan service income.
• The CFDA #11.037 and #11.419 were not grouped with the correct Federal Grantor.
• The STEM Education award had 2 CFDA #’s provided on one line.
• There were multiple Federal Grantor and Program Titles that were mislabeled.
Questioned Costs: None
Recommendation: Management should seek appropriate training for the fiscal department on preparation of the SEFA standards. In addition, review processes over the SEFA should be strengthened. Management should consider contracting with an experienced accounting consultant should they identify areas that require additional expertise and review after the drafting of the SEFA and prior to the submission for audit. Management should also ensure that they obtain the complete and full agreements from grantors that are signed by all parties and that clearly identify the funding source.
Views of Responsible Officials and Planned Corrective Actions: Management attempted to contract with multiple accounting consultants for creating the SEFA but they were already at full capacity and were not available to assist with the creation of the report. When the relevant contract or grant award did not include the necessary information, SCEC management and program staff reached out to our contracting agencies to confirm whether federal funds were part of each award and to find out CFDA numbers and other contract information necessary to complete the form. Nevertheless, there were several errors that in the SEFA submitted to our auditors for review. For the two IRP and RMAP lending programs, the prior year balances were carried over into the FY 24 SEFA through a clerical error. The errors in item 11.037 and 11.419 are related to information we received from the contracting agency. In particular, 11.037 was listed under US Economic Development Administration according to the contracting agency and we were given the description of Economic Adjustment Assistance. The description for 11.419 was given to SCEC by the contracting agency as CDS – Congressionally Directed Spending. Finally, we provided two CFDA’s for the STEM Education award with the submission of the SEFA as we were waiting for confirmation from Program Managers about the correct CDFA numbers. The auditors were informed that we were waiting for these numbers when the SEFA was submitted.
In FY24, SCEC had 29 different federal funding sources, from 14 different agencies. We are working to improve our capacity to report these awards without error before the review of our auditors.
Internal Controls over Preparation of the Schedule of Expenditures of Federal Awards (Significant Deficiency)
Federal Award Program: All Awards
Criteria: 2 CFR 200, Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards, £200.508(b) The auditee must prepare appropriate statements including an accurate Schedule of Expenditures of Federal Awards (SEFA) in accordance with £200.510, Financial Statements.
Condition and Context: Audit procedures noted several errors in the client provided SEFA.
Cause: Insufficient training and internal controls over the preparation and review process for the SEFA.
Effect: The following errors were noted and corrected as a result of auditing procedures on the SEFA:
• The Intermediary Relending Program and Rural Microentrepreneur Assistance Relending Program awards loan expenditures were calculated incorrectly by including the repayments and excluding the loan service income.
• The CFDA #11.037 and #11.419 were not grouped with the correct Federal Grantor.
• The STEM Education award had 2 CFDA #’s provided on one line.
• There were multiple Federal Grantor and Program Titles that were mislabeled.
Questioned Costs: None
Recommendation: Management should seek appropriate training for the fiscal department on preparation of the SEFA standards. In addition, review processes over the SEFA should be strengthened. Management should consider contracting with an experienced accounting consultant should they identify areas that require additional expertise and review after the drafting of the SEFA and prior to the submission for audit. Management should also ensure that they obtain the complete and full agreements from grantors that are signed by all parties and that clearly identify the funding source.
Views of Responsible Officials and Planned Corrective Actions: Management attempted to contract with multiple accounting consultants for creating the SEFA but they were already at full capacity and were not available to assist with the creation of the report. When the relevant contract or grant award did not include the necessary information, SCEC management and program staff reached out to our contracting agencies to confirm whether federal funds were part of each award and to find out CFDA numbers and other contract information necessary to complete the form. Nevertheless, there were several errors that in the SEFA submitted to our auditors for review. For the two IRP and RMAP lending programs, the prior year balances were carried over into the FY 24 SEFA through a clerical error. The errors in item 11.037 and 11.419 are related to information we received from the contracting agency. In particular, 11.037 was listed under US Economic Development Administration according to the contracting agency and we were given the description of Economic Adjustment Assistance. The description for 11.419 was given to SCEC by the contracting agency as CDS – Congressionally Directed Spending. Finally, we provided two CFDA’s for the STEM Education award with the submission of the SEFA as we were waiting for confirmation from Program Managers about the correct CDFA numbers. The auditors were informed that we were waiting for these numbers when the SEFA was submitted.
In FY24, SCEC had 29 different federal funding sources, from 14 different agencies. We are working to improve our capacity to report these awards without error before the review of our auditors.
Internal Controls over Preparation of the Schedule of Expenditures of Federal Awards (Significant Deficiency)
Federal Award Program: All Awards
Criteria: 2 CFR 200, Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards, £200.508(b) The auditee must prepare appropriate statements including an accurate Schedule of Expenditures of Federal Awards (SEFA) in accordance with £200.510, Financial Statements.
Condition and Context: Audit procedures noted several errors in the client provided SEFA.
Cause: Insufficient training and internal controls over the preparation and review process for the SEFA.
Effect: The following errors were noted and corrected as a result of auditing procedures on the SEFA:
• The Intermediary Relending Program and Rural Microentrepreneur Assistance Relending Program awards loan expenditures were calculated incorrectly by including the repayments and excluding the loan service income.
• The CFDA #11.037 and #11.419 were not grouped with the correct Federal Grantor.
• The STEM Education award had 2 CFDA #’s provided on one line.
• There were multiple Federal Grantor and Program Titles that were mislabeled.
Questioned Costs: None
Recommendation: Management should seek appropriate training for the fiscal department on preparation of the SEFA standards. In addition, review processes over the SEFA should be strengthened. Management should consider contracting with an experienced accounting consultant should they identify areas that require additional expertise and review after the drafting of the SEFA and prior to the submission for audit. Management should also ensure that they obtain the complete and full agreements from grantors that are signed by all parties and that clearly identify the funding source.
Views of Responsible Officials and Planned Corrective Actions: Management attempted to contract with multiple accounting consultants for creating the SEFA but they were already at full capacity and were not available to assist with the creation of the report. When the relevant contract or grant award did not include the necessary information, SCEC management and program staff reached out to our contracting agencies to confirm whether federal funds were part of each award and to find out CFDA numbers and other contract information necessary to complete the form. Nevertheless, there were several errors that in the SEFA submitted to our auditors for review. For the two IRP and RMAP lending programs, the prior year balances were carried over into the FY 24 SEFA through a clerical error. The errors in item 11.037 and 11.419 are related to information we received from the contracting agency. In particular, 11.037 was listed under US Economic Development Administration according to the contracting agency and we were given the description of Economic Adjustment Assistance. The description for 11.419 was given to SCEC by the contracting agency as CDS – Congressionally Directed Spending. Finally, we provided two CFDA’s for the STEM Education award with the submission of the SEFA as we were waiting for confirmation from Program Managers about the correct CDFA numbers. The auditors were informed that we were waiting for these numbers when the SEFA was submitted.
In FY24, SCEC had 29 different federal funding sources, from 14 different agencies. We are working to improve our capacity to report these awards without error before the review of our auditors.
Internal Controls over Preparation of the Schedule of Expenditures of Federal Awards (Significant Deficiency)
Federal Award Program: All Awards
Criteria: 2 CFR 200, Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards, £200.508(b) The auditee must prepare appropriate statements including an accurate Schedule of Expenditures of Federal Awards (SEFA) in accordance with £200.510, Financial Statements.
Condition and Context: Audit procedures noted several errors in the client provided SEFA.
Cause: Insufficient training and internal controls over the preparation and review process for the SEFA.
Effect: The following errors were noted and corrected as a result of auditing procedures on the SEFA:
• The Intermediary Relending Program and Rural Microentrepreneur Assistance Relending Program awards loan expenditures were calculated incorrectly by including the repayments and excluding the loan service income.
• The CFDA #11.037 and #11.419 were not grouped with the correct Federal Grantor.
• The STEM Education award had 2 CFDA #’s provided on one line.
• There were multiple Federal Grantor and Program Titles that were mislabeled.
Questioned Costs: None
Recommendation: Management should seek appropriate training for the fiscal department on preparation of the SEFA standards. In addition, review processes over the SEFA should be strengthened. Management should consider contracting with an experienced accounting consultant should they identify areas that require additional expertise and review after the drafting of the SEFA and prior to the submission for audit. Management should also ensure that they obtain the complete and full agreements from grantors that are signed by all parties and that clearly identify the funding source.
Views of Responsible Officials and Planned Corrective Actions: Management attempted to contract with multiple accounting consultants for creating the SEFA but they were already at full capacity and were not available to assist with the creation of the report. When the relevant contract or grant award did not include the necessary information, SCEC management and program staff reached out to our contracting agencies to confirm whether federal funds were part of each award and to find out CFDA numbers and other contract information necessary to complete the form. Nevertheless, there were several errors that in the SEFA submitted to our auditors for review. For the two IRP and RMAP lending programs, the prior year balances were carried over into the FY 24 SEFA through a clerical error. The errors in item 11.037 and 11.419 are related to information we received from the contracting agency. In particular, 11.037 was listed under US Economic Development Administration according to the contracting agency and we were given the description of Economic Adjustment Assistance. The description for 11.419 was given to SCEC by the contracting agency as CDS – Congressionally Directed Spending. Finally, we provided two CFDA’s for the STEM Education award with the submission of the SEFA as we were waiting for confirmation from Program Managers about the correct CDFA numbers. The auditors were informed that we were waiting for these numbers when the SEFA was submitted.
In FY24, SCEC had 29 different federal funding sources, from 14 different agencies. We are working to improve our capacity to report these awards without error before the review of our auditors.
Internal Controls over Preparation of the Schedule of Expenditures of Federal Awards (Significant Deficiency)
Federal Award Program: All Awards
Criteria: 2 CFR 200, Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards, £200.508(b) The auditee must prepare appropriate statements including an accurate Schedule of Expenditures of Federal Awards (SEFA) in accordance with £200.510, Financial Statements.
Condition and Context: Audit procedures noted several errors in the client provided SEFA.
Cause: Insufficient training and internal controls over the preparation and review process for the SEFA.
Effect: The following errors were noted and corrected as a result of auditing procedures on the SEFA:
• The Intermediary Relending Program and Rural Microentrepreneur Assistance Relending Program awards loan expenditures were calculated incorrectly by including the repayments and excluding the loan service income.
• The CFDA #11.037 and #11.419 were not grouped with the correct Federal Grantor.
• The STEM Education award had 2 CFDA #’s provided on one line.
• There were multiple Federal Grantor and Program Titles that were mislabeled.
Questioned Costs: None
Recommendation: Management should seek appropriate training for the fiscal department on preparation of the SEFA standards. In addition, review processes over the SEFA should be strengthened. Management should consider contracting with an experienced accounting consultant should they identify areas that require additional expertise and review after the drafting of the SEFA and prior to the submission for audit. Management should also ensure that they obtain the complete and full agreements from grantors that are signed by all parties and that clearly identify the funding source.
Views of Responsible Officials and Planned Corrective Actions: Management attempted to contract with multiple accounting consultants for creating the SEFA but they were already at full capacity and were not available to assist with the creation of the report. When the relevant contract or grant award did not include the necessary information, SCEC management and program staff reached out to our contracting agencies to confirm whether federal funds were part of each award and to find out CFDA numbers and other contract information necessary to complete the form. Nevertheless, there were several errors that in the SEFA submitted to our auditors for review. For the two IRP and RMAP lending programs, the prior year balances were carried over into the FY 24 SEFA through a clerical error. The errors in item 11.037 and 11.419 are related to information we received from the contracting agency. In particular, 11.037 was listed under US Economic Development Administration according to the contracting agency and we were given the description of Economic Adjustment Assistance. The description for 11.419 was given to SCEC by the contracting agency as CDS – Congressionally Directed Spending. Finally, we provided two CFDA’s for the STEM Education award with the submission of the SEFA as we were waiting for confirmation from Program Managers about the correct CDFA numbers. The auditors were informed that we were waiting for these numbers when the SEFA was submitted.
In FY24, SCEC had 29 different federal funding sources, from 14 different agencies. We are working to improve our capacity to report these awards without error before the review of our auditors.
Internal Controls over Preparation of the Schedule of Expenditures of Federal Awards (Significant Deficiency)
Federal Award Program: All Awards
Criteria: 2 CFR 200, Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards, £200.508(b) The auditee must prepare appropriate statements including an accurate Schedule of Expenditures of Federal Awards (SEFA) in accordance with £200.510, Financial Statements.
Condition and Context: Audit procedures noted several errors in the client provided SEFA.
Cause: Insufficient training and internal controls over the preparation and review process for the SEFA.
Effect: The following errors were noted and corrected as a result of auditing procedures on the SEFA:
• The Intermediary Relending Program and Rural Microentrepreneur Assistance Relending Program awards loan expenditures were calculated incorrectly by including the repayments and excluding the loan service income.
• The CFDA #11.037 and #11.419 were not grouped with the correct Federal Grantor.
• The STEM Education award had 2 CFDA #’s provided on one line.
• There were multiple Federal Grantor and Program Titles that were mislabeled.
Questioned Costs: None
Recommendation: Management should seek appropriate training for the fiscal department on preparation of the SEFA standards. In addition, review processes over the SEFA should be strengthened. Management should consider contracting with an experienced accounting consultant should they identify areas that require additional expertise and review after the drafting of the SEFA and prior to the submission for audit. Management should also ensure that they obtain the complete and full agreements from grantors that are signed by all parties and that clearly identify the funding source.
Views of Responsible Officials and Planned Corrective Actions: Management attempted to contract with multiple accounting consultants for creating the SEFA but they were already at full capacity and were not available to assist with the creation of the report. When the relevant contract or grant award did not include the necessary information, SCEC management and program staff reached out to our contracting agencies to confirm whether federal funds were part of each award and to find out CFDA numbers and other contract information necessary to complete the form. Nevertheless, there were several errors that in the SEFA submitted to our auditors for review. For the two IRP and RMAP lending programs, the prior year balances were carried over into the FY 24 SEFA through a clerical error. The errors in item 11.037 and 11.419 are related to information we received from the contracting agency. In particular, 11.037 was listed under US Economic Development Administration according to the contracting agency and we were given the description of Economic Adjustment Assistance. The description for 11.419 was given to SCEC by the contracting agency as CDS – Congressionally Directed Spending. Finally, we provided two CFDA’s for the STEM Education award with the submission of the SEFA as we were waiting for confirmation from Program Managers about the correct CDFA numbers. The auditors were informed that we were waiting for these numbers when the SEFA was submitted.
In FY24, SCEC had 29 different federal funding sources, from 14 different agencies. We are working to improve our capacity to report these awards without error before the review of our auditors.
Internal Controls over Preparation of the Schedule of Expenditures of Federal Awards (Significant Deficiency)
Federal Award Program: All Awards
Criteria: 2 CFR 200, Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards, £200.508(b) The auditee must prepare appropriate statements including an accurate Schedule of Expenditures of Federal Awards (SEFA) in accordance with £200.510, Financial Statements.
Condition and Context: Audit procedures noted several errors in the client provided SEFA.
Cause: Insufficient training and internal controls over the preparation and review process for the SEFA.
Effect: The following errors were noted and corrected as a result of auditing procedures on the SEFA:
• The Intermediary Relending Program and Rural Microentrepreneur Assistance Relending Program awards loan expenditures were calculated incorrectly by including the repayments and excluding the loan service income.
• The CFDA #11.037 and #11.419 were not grouped with the correct Federal Grantor.
• The STEM Education award had 2 CFDA #’s provided on one line.
• There were multiple Federal Grantor and Program Titles that were mislabeled.
Questioned Costs: None
Recommendation: Management should seek appropriate training for the fiscal department on preparation of the SEFA standards. In addition, review processes over the SEFA should be strengthened. Management should consider contracting with an experienced accounting consultant should they identify areas that require additional expertise and review after the drafting of the SEFA and prior to the submission for audit. Management should also ensure that they obtain the complete and full agreements from grantors that are signed by all parties and that clearly identify the funding source.
Views of Responsible Officials and Planned Corrective Actions: Management attempted to contract with multiple accounting consultants for creating the SEFA but they were already at full capacity and were not available to assist with the creation of the report. When the relevant contract or grant award did not include the necessary information, SCEC management and program staff reached out to our contracting agencies to confirm whether federal funds were part of each award and to find out CFDA numbers and other contract information necessary to complete the form. Nevertheless, there were several errors that in the SEFA submitted to our auditors for review. For the two IRP and RMAP lending programs, the prior year balances were carried over into the FY 24 SEFA through a clerical error. The errors in item 11.037 and 11.419 are related to information we received from the contracting agency. In particular, 11.037 was listed under US Economic Development Administration according to the contracting agency and we were given the description of Economic Adjustment Assistance. The description for 11.419 was given to SCEC by the contracting agency as CDS – Congressionally Directed Spending. Finally, we provided two CFDA’s for the STEM Education award with the submission of the SEFA as we were waiting for confirmation from Program Managers about the correct CDFA numbers. The auditors were informed that we were waiting for these numbers when the SEFA was submitted.
In FY24, SCEC had 29 different federal funding sources, from 14 different agencies. We are working to improve our capacity to report these awards without error before the review of our auditors.
Internal Controls over Preparation of the Schedule of Expenditures of Federal Awards (Significant Deficiency)
Federal Award Program: All Awards
Criteria: 2 CFR 200, Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards, £200.508(b) The auditee must prepare appropriate statements including an accurate Schedule of Expenditures of Federal Awards (SEFA) in accordance with £200.510, Financial Statements.
Condition and Context: Audit procedures noted several errors in the client provided SEFA.
Cause: Insufficient training and internal controls over the preparation and review process for the SEFA.
Effect: The following errors were noted and corrected as a result of auditing procedures on the SEFA:
• The Intermediary Relending Program and Rural Microentrepreneur Assistance Relending Program awards loan expenditures were calculated incorrectly by including the repayments and excluding the loan service income.
• The CFDA #11.037 and #11.419 were not grouped with the correct Federal Grantor.
• The STEM Education award had 2 CFDA #’s provided on one line.
• There were multiple Federal Grantor and Program Titles that were mislabeled.
Questioned Costs: None
Recommendation: Management should seek appropriate training for the fiscal department on preparation of the SEFA standards. In addition, review processes over the SEFA should be strengthened. Management should consider contracting with an experienced accounting consultant should they identify areas that require additional expertise and review after the drafting of the SEFA and prior to the submission for audit. Management should also ensure that they obtain the complete and full agreements from grantors that are signed by all parties and that clearly identify the funding source.
Views of Responsible Officials and Planned Corrective Actions: Management attempted to contract with multiple accounting consultants for creating the SEFA but they were already at full capacity and were not available to assist with the creation of the report. When the relevant contract or grant award did not include the necessary information, SCEC management and program staff reached out to our contracting agencies to confirm whether federal funds were part of each award and to find out CFDA numbers and other contract information necessary to complete the form. Nevertheless, there were several errors that in the SEFA submitted to our auditors for review. For the two IRP and RMAP lending programs, the prior year balances were carried over into the FY 24 SEFA through a clerical error. The errors in item 11.037 and 11.419 are related to information we received from the contracting agency. In particular, 11.037 was listed under US Economic Development Administration according to the contracting agency and we were given the description of Economic Adjustment Assistance. The description for 11.419 was given to SCEC by the contracting agency as CDS – Congressionally Directed Spending. Finally, we provided two CFDA’s for the STEM Education award with the submission of the SEFA as we were waiting for confirmation from Program Managers about the correct CDFA numbers. The auditors were informed that we were waiting for these numbers when the SEFA was submitted.
In FY24, SCEC had 29 different federal funding sources, from 14 different agencies. We are working to improve our capacity to report these awards without error before the review of our auditors.
Internal Controls over Preparation of the Schedule of Expenditures of Federal Awards (Significant Deficiency)
Federal Award Program: All Awards
Criteria: 2 CFR 200, Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards, £200.508(b) The auditee must prepare appropriate statements including an accurate Schedule of Expenditures of Federal Awards (SEFA) in accordance with £200.510, Financial Statements.
Condition and Context: Audit procedures noted several errors in the client provided SEFA.
Cause: Insufficient training and internal controls over the preparation and review process for the SEFA.
Effect: The following errors were noted and corrected as a result of auditing procedures on the SEFA:
• The Intermediary Relending Program and Rural Microentrepreneur Assistance Relending Program awards loan expenditures were calculated incorrectly by including the repayments and excluding the loan service income.
• The CFDA #11.037 and #11.419 were not grouped with the correct Federal Grantor.
• The STEM Education award had 2 CFDA #’s provided on one line.
• There were multiple Federal Grantor and Program Titles that were mislabeled.
Questioned Costs: None
Recommendation: Management should seek appropriate training for the fiscal department on preparation of the SEFA standards. In addition, review processes over the SEFA should be strengthened. Management should consider contracting with an experienced accounting consultant should they identify areas that require additional expertise and review after the drafting of the SEFA and prior to the submission for audit. Management should also ensure that they obtain the complete and full agreements from grantors that are signed by all parties and that clearly identify the funding source.
Views of Responsible Officials and Planned Corrective Actions: Management attempted to contract with multiple accounting consultants for creating the SEFA but they were already at full capacity and were not available to assist with the creation of the report. When the relevant contract or grant award did not include the necessary information, SCEC management and program staff reached out to our contracting agencies to confirm whether federal funds were part of each award and to find out CFDA numbers and other contract information necessary to complete the form. Nevertheless, there were several errors that in the SEFA submitted to our auditors for review. For the two IRP and RMAP lending programs, the prior year balances were carried over into the FY 24 SEFA through a clerical error. The errors in item 11.037 and 11.419 are related to information we received from the contracting agency. In particular, 11.037 was listed under US Economic Development Administration according to the contracting agency and we were given the description of Economic Adjustment Assistance. The description for 11.419 was given to SCEC by the contracting agency as CDS – Congressionally Directed Spending. Finally, we provided two CFDA’s for the STEM Education award with the submission of the SEFA as we were waiting for confirmation from Program Managers about the correct CDFA numbers. The auditors were informed that we were waiting for these numbers when the SEFA was submitted.
In FY24, SCEC had 29 different federal funding sources, from 14 different agencies. We are working to improve our capacity to report these awards without error before the review of our auditors.
Internal Controls over Preparation of the Schedule of Expenditures of Federal Awards (Significant Deficiency)
Federal Award Program: All Awards
Criteria: 2 CFR 200, Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards, £200.508(b) The auditee must prepare appropriate statements including an accurate Schedule of Expenditures of Federal Awards (SEFA) in accordance with £200.510, Financial Statements.
Condition and Context: Audit procedures noted several errors in the client provided SEFA.
Cause: Insufficient training and internal controls over the preparation and review process for the SEFA.
Effect: The following errors were noted and corrected as a result of auditing procedures on the SEFA:
• The Intermediary Relending Program and Rural Microentrepreneur Assistance Relending Program awards loan expenditures were calculated incorrectly by including the repayments and excluding the loan service income.
• The CFDA #11.037 and #11.419 were not grouped with the correct Federal Grantor.
• The STEM Education award had 2 CFDA #’s provided on one line.
• There were multiple Federal Grantor and Program Titles that were mislabeled.
Questioned Costs: None
Recommendation: Management should seek appropriate training for the fiscal department on preparation of the SEFA standards. In addition, review processes over the SEFA should be strengthened. Management should consider contracting with an experienced accounting consultant should they identify areas that require additional expertise and review after the drafting of the SEFA and prior to the submission for audit. Management should also ensure that they obtain the complete and full agreements from grantors that are signed by all parties and that clearly identify the funding source.
Views of Responsible Officials and Planned Corrective Actions: Management attempted to contract with multiple accounting consultants for creating the SEFA but they were already at full capacity and were not available to assist with the creation of the report. When the relevant contract or grant award did not include the necessary information, SCEC management and program staff reached out to our contracting agencies to confirm whether federal funds were part of each award and to find out CFDA numbers and other contract information necessary to complete the form. Nevertheless, there were several errors that in the SEFA submitted to our auditors for review. For the two IRP and RMAP lending programs, the prior year balances were carried over into the FY 24 SEFA through a clerical error. The errors in item 11.037 and 11.419 are related to information we received from the contracting agency. In particular, 11.037 was listed under US Economic Development Administration according to the contracting agency and we were given the description of Economic Adjustment Assistance. The description for 11.419 was given to SCEC by the contracting agency as CDS – Congressionally Directed Spending. Finally, we provided two CFDA’s for the STEM Education award with the submission of the SEFA as we were waiting for confirmation from Program Managers about the correct CDFA numbers. The auditors were informed that we were waiting for these numbers when the SEFA was submitted.
In FY24, SCEC had 29 different federal funding sources, from 14 different agencies. We are working to improve our capacity to report these awards without error before the review of our auditors.
Internal Controls over Preparation of the Schedule of Expenditures of Federal Awards (Significant Deficiency)
Federal Award Program: All Awards
Criteria: 2 CFR 200, Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards, £200.508(b) The auditee must prepare appropriate statements including an accurate Schedule of Expenditures of Federal Awards (SEFA) in accordance with £200.510, Financial Statements.
Condition and Context: Audit procedures noted several errors in the client provided SEFA.
Cause: Insufficient training and internal controls over the preparation and review process for the SEFA.
Effect: The following errors were noted and corrected as a result of auditing procedures on the SEFA:
• The Intermediary Relending Program and Rural Microentrepreneur Assistance Relending Program awards loan expenditures were calculated incorrectly by including the repayments and excluding the loan service income.
• The CFDA #11.037 and #11.419 were not grouped with the correct Federal Grantor.
• The STEM Education award had 2 CFDA #’s provided on one line.
• There were multiple Federal Grantor and Program Titles that were mislabeled.
Questioned Costs: None
Recommendation: Management should seek appropriate training for the fiscal department on preparation of the SEFA standards. In addition, review processes over the SEFA should be strengthened. Management should consider contracting with an experienced accounting consultant should they identify areas that require additional expertise and review after the drafting of the SEFA and prior to the submission for audit. Management should also ensure that they obtain the complete and full agreements from grantors that are signed by all parties and that clearly identify the funding source.
Views of Responsible Officials and Planned Corrective Actions: Management attempted to contract with multiple accounting consultants for creating the SEFA but they were already at full capacity and were not available to assist with the creation of the report. When the relevant contract or grant award did not include the necessary information, SCEC management and program staff reached out to our contracting agencies to confirm whether federal funds were part of each award and to find out CFDA numbers and other contract information necessary to complete the form. Nevertheless, there were several errors that in the SEFA submitted to our auditors for review. For the two IRP and RMAP lending programs, the prior year balances were carried over into the FY 24 SEFA through a clerical error. The errors in item 11.037 and 11.419 are related to information we received from the contracting agency. In particular, 11.037 was listed under US Economic Development Administration according to the contracting agency and we were given the description of Economic Adjustment Assistance. The description for 11.419 was given to SCEC by the contracting agency as CDS – Congressionally Directed Spending. Finally, we provided two CFDA’s for the STEM Education award with the submission of the SEFA as we were waiting for confirmation from Program Managers about the correct CDFA numbers. The auditors were informed that we were waiting for these numbers when the SEFA was submitted.
In FY24, SCEC had 29 different federal funding sources, from 14 different agencies. We are working to improve our capacity to report these awards without error before the review of our auditors.
Noncompliance with Procurement, Suspension, & Debarment Standard (Significant Deficiency)
Federal Award Program: 21.027 COVID-19: Coronavirus State and Local Fiscal Recovery Funds
Criteria: 2 CFR 200, Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards, §200.214 prohibits non-federal entities from contracting with parties that are suspended or debarred under covered transactions.
Condition and Context: Audit procedures revealed that there was not a policy or process in place to formally document the review of the contracted entity for suspension and debarment prior to entering into the agreement.
Cause: The Organization does not have a formal process to document suspension and debarment. Management was unaware of the requirement, though it was clear the management thoughtfully considered the contractor’s reputation and determined that the contractor was suited for the agreement.
Effect: The Organization did not perform its review of suspension and debarment for this agreement, though the contractor was found to not be on prohibited lists at annual review.
Questioned Costs: None
Recommendation: Management should strengthen their processes, controls, and review over suspension and debarment processes, and develop a written policy on such items to ensure compliance with Uniform Administrative Requirements.
Views of Responsible Officials and Planned Corrective Actions: As stated by the auditor, SCEC is selective about who to enter contracts with and has long-standing relationships with the organizations we were working with on these efforts, who also had other Federal contracts in process that we were aware of. We have instituted a finance procedure to check all contractors and sub-contractors on the Sam.gov’s verification of debarment and suspension tool before the first payment under the contract is issued and a policy that all SCEC contracts or subawards over $25,000 that utilize federal or state funds must include a suspension and debarment certification.
Internal Controls over Preparation of the Schedule of Expenditures of Federal Awards (Significant Deficiency)
Federal Award Program: All Awards
Criteria: 2 CFR 200, Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards, £200.508(b) The auditee must prepare appropriate statements including an accurate Schedule of Expenditures of Federal Awards (SEFA) in accordance with £200.510, Financial Statements.
Condition and Context: Audit procedures noted several errors in the client provided SEFA.
Cause: Insufficient training and internal controls over the preparation and review process for the SEFA.
Effect: The following errors were noted and corrected as a result of auditing procedures on the SEFA:
• The Intermediary Relending Program and Rural Microentrepreneur Assistance Relending Program awards loan expenditures were calculated incorrectly by including the repayments and excluding the loan service income.
• The CFDA #11.037 and #11.419 were not grouped with the correct Federal Grantor.
• The STEM Education award had 2 CFDA #’s provided on one line.
• There were multiple Federal Grantor and Program Titles that were mislabeled.
Questioned Costs: None
Recommendation: Management should seek appropriate training for the fiscal department on preparation of the SEFA standards. In addition, review processes over the SEFA should be strengthened. Management should consider contracting with an experienced accounting consultant should they identify areas that require additional expertise and review after the drafting of the SEFA and prior to the submission for audit. Management should also ensure that they obtain the complete and full agreements from grantors that are signed by all parties and that clearly identify the funding source.
Views of Responsible Officials and Planned Corrective Actions: Management attempted to contract with multiple accounting consultants for creating the SEFA but they were already at full capacity and were not available to assist with the creation of the report. When the relevant contract or grant award did not include the necessary information, SCEC management and program staff reached out to our contracting agencies to confirm whether federal funds were part of each award and to find out CFDA numbers and other contract information necessary to complete the form. Nevertheless, there were several errors that in the SEFA submitted to our auditors for review. For the two IRP and RMAP lending programs, the prior year balances were carried over into the FY 24 SEFA through a clerical error. The errors in item 11.037 and 11.419 are related to information we received from the contracting agency. In particular, 11.037 was listed under US Economic Development Administration according to the contracting agency and we were given the description of Economic Adjustment Assistance. The description for 11.419 was given to SCEC by the contracting agency as CDS – Congressionally Directed Spending. Finally, we provided two CFDA’s for the STEM Education award with the submission of the SEFA as we were waiting for confirmation from Program Managers about the correct CDFA numbers. The auditors were informed that we were waiting for these numbers when the SEFA was submitted.
In FY24, SCEC had 29 different federal funding sources, from 14 different agencies. We are working to improve our capacity to report these awards without error before the review of our auditors.
Internal Controls over Preparation of the Schedule of Expenditures of Federal Awards (Significant Deficiency)
Federal Award Program: All Awards
Criteria: 2 CFR 200, Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards, £200.508(b) The auditee must prepare appropriate statements including an accurate Schedule of Expenditures of Federal Awards (SEFA) in accordance with £200.510, Financial Statements.
Condition and Context: Audit procedures noted several errors in the client provided SEFA.
Cause: Insufficient training and internal controls over the preparation and review process for the SEFA.
Effect: The following errors were noted and corrected as a result of auditing procedures on the SEFA:
• The Intermediary Relending Program and Rural Microentrepreneur Assistance Relending Program awards loan expenditures were calculated incorrectly by including the repayments and excluding the loan service income.
• The CFDA #11.037 and #11.419 were not grouped with the correct Federal Grantor.
• The STEM Education award had 2 CFDA #’s provided on one line.
• There were multiple Federal Grantor and Program Titles that were mislabeled.
Questioned Costs: None
Recommendation: Management should seek appropriate training for the fiscal department on preparation of the SEFA standards. In addition, review processes over the SEFA should be strengthened. Management should consider contracting with an experienced accounting consultant should they identify areas that require additional expertise and review after the drafting of the SEFA and prior to the submission for audit. Management should also ensure that they obtain the complete and full agreements from grantors that are signed by all parties and that clearly identify the funding source.
Views of Responsible Officials and Planned Corrective Actions: Management attempted to contract with multiple accounting consultants for creating the SEFA but they were already at full capacity and were not available to assist with the creation of the report. When the relevant contract or grant award did not include the necessary information, SCEC management and program staff reached out to our contracting agencies to confirm whether federal funds were part of each award and to find out CFDA numbers and other contract information necessary to complete the form. Nevertheless, there were several errors that in the SEFA submitted to our auditors for review. For the two IRP and RMAP lending programs, the prior year balances were carried over into the FY 24 SEFA through a clerical error. The errors in item 11.037 and 11.419 are related to information we received from the contracting agency. In particular, 11.037 was listed under US Economic Development Administration according to the contracting agency and we were given the description of Economic Adjustment Assistance. The description for 11.419 was given to SCEC by the contracting agency as CDS – Congressionally Directed Spending. Finally, we provided two CFDA’s for the STEM Education award with the submission of the SEFA as we were waiting for confirmation from Program Managers about the correct CDFA numbers. The auditors were informed that we were waiting for these numbers when the SEFA was submitted.
In FY24, SCEC had 29 different federal funding sources, from 14 different agencies. We are working to improve our capacity to report these awards without error before the review of our auditors.
Internal Controls over Preparation of the Schedule of Expenditures of Federal Awards (Significant Deficiency)
Federal Award Program: All Awards
Criteria: 2 CFR 200, Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards, £200.508(b) The auditee must prepare appropriate statements including an accurate Schedule of Expenditures of Federal Awards (SEFA) in accordance with £200.510, Financial Statements.
Condition and Context: Audit procedures noted several errors in the client provided SEFA.
Cause: Insufficient training and internal controls over the preparation and review process for the SEFA.
Effect: The following errors were noted and corrected as a result of auditing procedures on the SEFA:
• The Intermediary Relending Program and Rural Microentrepreneur Assistance Relending Program awards loan expenditures were calculated incorrectly by including the repayments and excluding the loan service income.
• The CFDA #11.037 and #11.419 were not grouped with the correct Federal Grantor.
• The STEM Education award had 2 CFDA #’s provided on one line.
• There were multiple Federal Grantor and Program Titles that were mislabeled.
Questioned Costs: None
Recommendation: Management should seek appropriate training for the fiscal department on preparation of the SEFA standards. In addition, review processes over the SEFA should be strengthened. Management should consider contracting with an experienced accounting consultant should they identify areas that require additional expertise and review after the drafting of the SEFA and prior to the submission for audit. Management should also ensure that they obtain the complete and full agreements from grantors that are signed by all parties and that clearly identify the funding source.
Views of Responsible Officials and Planned Corrective Actions: Management attempted to contract with multiple accounting consultants for creating the SEFA but they were already at full capacity and were not available to assist with the creation of the report. When the relevant contract or grant award did not include the necessary information, SCEC management and program staff reached out to our contracting agencies to confirm whether federal funds were part of each award and to find out CFDA numbers and other contract information necessary to complete the form. Nevertheless, there were several errors that in the SEFA submitted to our auditors for review. For the two IRP and RMAP lending programs, the prior year balances were carried over into the FY 24 SEFA through a clerical error. The errors in item 11.037 and 11.419 are related to information we received from the contracting agency. In particular, 11.037 was listed under US Economic Development Administration according to the contracting agency and we were given the description of Economic Adjustment Assistance. The description for 11.419 was given to SCEC by the contracting agency as CDS – Congressionally Directed Spending. Finally, we provided two CFDA’s for the STEM Education award with the submission of the SEFA as we were waiting for confirmation from Program Managers about the correct CDFA numbers. The auditors were informed that we were waiting for these numbers when the SEFA was submitted.
In FY24, SCEC had 29 different federal funding sources, from 14 different agencies. We are working to improve our capacity to report these awards without error before the review of our auditors.
Internal Controls over Preparation of the Schedule of Expenditures of Federal Awards (Significant Deficiency)
Federal Award Program: All Awards
Criteria: 2 CFR 200, Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards, £200.508(b) The auditee must prepare appropriate statements including an accurate Schedule of Expenditures of Federal Awards (SEFA) in accordance with £200.510, Financial Statements.
Condition and Context: Audit procedures noted several errors in the client provided SEFA.
Cause: Insufficient training and internal controls over the preparation and review process for the SEFA.
Effect: The following errors were noted and corrected as a result of auditing procedures on the SEFA:
• The Intermediary Relending Program and Rural Microentrepreneur Assistance Relending Program awards loan expenditures were calculated incorrectly by including the repayments and excluding the loan service income.
• The CFDA #11.037 and #11.419 were not grouped with the correct Federal Grantor.
• The STEM Education award had 2 CFDA #’s provided on one line.
• There were multiple Federal Grantor and Program Titles that were mislabeled.
Questioned Costs: None
Recommendation: Management should seek appropriate training for the fiscal department on preparation of the SEFA standards. In addition, review processes over the SEFA should be strengthened. Management should consider contracting with an experienced accounting consultant should they identify areas that require additional expertise and review after the drafting of the SEFA and prior to the submission for audit. Management should also ensure that they obtain the complete and full agreements from grantors that are signed by all parties and that clearly identify the funding source.
Views of Responsible Officials and Planned Corrective Actions: Management attempted to contract with multiple accounting consultants for creating the SEFA but they were already at full capacity and were not available to assist with the creation of the report. When the relevant contract or grant award did not include the necessary information, SCEC management and program staff reached out to our contracting agencies to confirm whether federal funds were part of each award and to find out CFDA numbers and other contract information necessary to complete the form. Nevertheless, there were several errors that in the SEFA submitted to our auditors for review. For the two IRP and RMAP lending programs, the prior year balances were carried over into the FY 24 SEFA through a clerical error. The errors in item 11.037 and 11.419 are related to information we received from the contracting agency. In particular, 11.037 was listed under US Economic Development Administration according to the contracting agency and we were given the description of Economic Adjustment Assistance. The description for 11.419 was given to SCEC by the contracting agency as CDS – Congressionally Directed Spending. Finally, we provided two CFDA’s for the STEM Education award with the submission of the SEFA as we were waiting for confirmation from Program Managers about the correct CDFA numbers. The auditors were informed that we were waiting for these numbers when the SEFA was submitted.
In FY24, SCEC had 29 different federal funding sources, from 14 different agencies. We are working to improve our capacity to report these awards without error before the review of our auditors.
Internal Controls over Preparation of the Schedule of Expenditures of Federal Awards (Significant Deficiency)
Federal Award Program: All Awards
Criteria: 2 CFR 200, Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards, £200.508(b) The auditee must prepare appropriate statements including an accurate Schedule of Expenditures of Federal Awards (SEFA) in accordance with £200.510, Financial Statements.
Condition and Context: Audit procedures noted several errors in the client provided SEFA.
Cause: Insufficient training and internal controls over the preparation and review process for the SEFA.
Effect: The following errors were noted and corrected as a result of auditing procedures on the SEFA:
• The Intermediary Relending Program and Rural Microentrepreneur Assistance Relending Program awards loan expenditures were calculated incorrectly by including the repayments and excluding the loan service income.
• The CFDA #11.037 and #11.419 were not grouped with the correct Federal Grantor.
• The STEM Education award had 2 CFDA #’s provided on one line.
• There were multiple Federal Grantor and Program Titles that were mislabeled.
Questioned Costs: None
Recommendation: Management should seek appropriate training for the fiscal department on preparation of the SEFA standards. In addition, review processes over the SEFA should be strengthened. Management should consider contracting with an experienced accounting consultant should they identify areas that require additional expertise and review after the drafting of the SEFA and prior to the submission for audit. Management should also ensure that they obtain the complete and full agreements from grantors that are signed by all parties and that clearly identify the funding source.
Views of Responsible Officials and Planned Corrective Actions: Management attempted to contract with multiple accounting consultants for creating the SEFA but they were already at full capacity and were not available to assist with the creation of the report. When the relevant contract or grant award did not include the necessary information, SCEC management and program staff reached out to our contracting agencies to confirm whether federal funds were part of each award and to find out CFDA numbers and other contract information necessary to complete the form. Nevertheless, there were several errors that in the SEFA submitted to our auditors for review. For the two IRP and RMAP lending programs, the prior year balances were carried over into the FY 24 SEFA through a clerical error. The errors in item 11.037 and 11.419 are related to information we received from the contracting agency. In particular, 11.037 was listed under US Economic Development Administration according to the contracting agency and we were given the description of Economic Adjustment Assistance. The description for 11.419 was given to SCEC by the contracting agency as CDS – Congressionally Directed Spending. Finally, we provided two CFDA’s for the STEM Education award with the submission of the SEFA as we were waiting for confirmation from Program Managers about the correct CDFA numbers. The auditors were informed that we were waiting for these numbers when the SEFA was submitted.
In FY24, SCEC had 29 different federal funding sources, from 14 different agencies. We are working to improve our capacity to report these awards without error before the review of our auditors.
Internal Controls over Preparation of the Schedule of Expenditures of Federal Awards (Significant Deficiency)
Federal Award Program: All Awards
Criteria: 2 CFR 200, Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards, £200.508(b) The auditee must prepare appropriate statements including an accurate Schedule of Expenditures of Federal Awards (SEFA) in accordance with £200.510, Financial Statements.
Condition and Context: Audit procedures noted several errors in the client provided SEFA.
Cause: Insufficient training and internal controls over the preparation and review process for the SEFA.
Effect: The following errors were noted and corrected as a result of auditing procedures on the SEFA:
• The Intermediary Relending Program and Rural Microentrepreneur Assistance Relending Program awards loan expenditures were calculated incorrectly by including the repayments and excluding the loan service income.
• The CFDA #11.037 and #11.419 were not grouped with the correct Federal Grantor.
• The STEM Education award had 2 CFDA #’s provided on one line.
• There were multiple Federal Grantor and Program Titles that were mislabeled.
Questioned Costs: None
Recommendation: Management should seek appropriate training for the fiscal department on preparation of the SEFA standards. In addition, review processes over the SEFA should be strengthened. Management should consider contracting with an experienced accounting consultant should they identify areas that require additional expertise and review after the drafting of the SEFA and prior to the submission for audit. Management should also ensure that they obtain the complete and full agreements from grantors that are signed by all parties and that clearly identify the funding source.
Views of Responsible Officials and Planned Corrective Actions: Management attempted to contract with multiple accounting consultants for creating the SEFA but they were already at full capacity and were not available to assist with the creation of the report. When the relevant contract or grant award did not include the necessary information, SCEC management and program staff reached out to our contracting agencies to confirm whether federal funds were part of each award and to find out CFDA numbers and other contract information necessary to complete the form. Nevertheless, there were several errors that in the SEFA submitted to our auditors for review. For the two IRP and RMAP lending programs, the prior year balances were carried over into the FY 24 SEFA through a clerical error. The errors in item 11.037 and 11.419 are related to information we received from the contracting agency. In particular, 11.037 was listed under US Economic Development Administration according to the contracting agency and we were given the description of Economic Adjustment Assistance. The description for 11.419 was given to SCEC by the contracting agency as CDS – Congressionally Directed Spending. Finally, we provided two CFDA’s for the STEM Education award with the submission of the SEFA as we were waiting for confirmation from Program Managers about the correct CDFA numbers. The auditors were informed that we were waiting for these numbers when the SEFA was submitted.
In FY24, SCEC had 29 different federal funding sources, from 14 different agencies. We are working to improve our capacity to report these awards without error before the review of our auditors.
Internal Controls over Preparation of the Schedule of Expenditures of Federal Awards (Significant Deficiency)
Federal Award Program: All Awards
Criteria: 2 CFR 200, Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards, £200.508(b) The auditee must prepare appropriate statements including an accurate Schedule of Expenditures of Federal Awards (SEFA) in accordance with £200.510, Financial Statements.
Condition and Context: Audit procedures noted several errors in the client provided SEFA.
Cause: Insufficient training and internal controls over the preparation and review process for the SEFA.
Effect: The following errors were noted and corrected as a result of auditing procedures on the SEFA:
• The Intermediary Relending Program and Rural Microentrepreneur Assistance Relending Program awards loan expenditures were calculated incorrectly by including the repayments and excluding the loan service income.
• The CFDA #11.037 and #11.419 were not grouped with the correct Federal Grantor.
• The STEM Education award had 2 CFDA #’s provided on one line.
• There were multiple Federal Grantor and Program Titles that were mislabeled.
Questioned Costs: None
Recommendation: Management should seek appropriate training for the fiscal department on preparation of the SEFA standards. In addition, review processes over the SEFA should be strengthened. Management should consider contracting with an experienced accounting consultant should they identify areas that require additional expertise and review after the drafting of the SEFA and prior to the submission for audit. Management should also ensure that they obtain the complete and full agreements from grantors that are signed by all parties and that clearly identify the funding source.
Views of Responsible Officials and Planned Corrective Actions: Management attempted to contract with multiple accounting consultants for creating the SEFA but they were already at full capacity and were not available to assist with the creation of the report. When the relevant contract or grant award did not include the necessary information, SCEC management and program staff reached out to our contracting agencies to confirm whether federal funds were part of each award and to find out CFDA numbers and other contract information necessary to complete the form. Nevertheless, there were several errors that in the SEFA submitted to our auditors for review. For the two IRP and RMAP lending programs, the prior year balances were carried over into the FY 24 SEFA through a clerical error. The errors in item 11.037 and 11.419 are related to information we received from the contracting agency. In particular, 11.037 was listed under US Economic Development Administration according to the contracting agency and we were given the description of Economic Adjustment Assistance. The description for 11.419 was given to SCEC by the contracting agency as CDS – Congressionally Directed Spending. Finally, we provided two CFDA’s for the STEM Education award with the submission of the SEFA as we were waiting for confirmation from Program Managers about the correct CDFA numbers. The auditors were informed that we were waiting for these numbers when the SEFA was submitted.
In FY24, SCEC had 29 different federal funding sources, from 14 different agencies. We are working to improve our capacity to report these awards without error before the review of our auditors.
Internal Controls over Preparation of the Schedule of Expenditures of Federal Awards (Significant Deficiency)
Federal Award Program: All Awards
Criteria: 2 CFR 200, Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards, £200.508(b) The auditee must prepare appropriate statements including an accurate Schedule of Expenditures of Federal Awards (SEFA) in accordance with £200.510, Financial Statements.
Condition and Context: Audit procedures noted several errors in the client provided SEFA.
Cause: Insufficient training and internal controls over the preparation and review process for the SEFA.
Effect: The following errors were noted and corrected as a result of auditing procedures on the SEFA:
• The Intermediary Relending Program and Rural Microentrepreneur Assistance Relending Program awards loan expenditures were calculated incorrectly by including the repayments and excluding the loan service income.
• The CFDA #11.037 and #11.419 were not grouped with the correct Federal Grantor.
• The STEM Education award had 2 CFDA #’s provided on one line.
• There were multiple Federal Grantor and Program Titles that were mislabeled.
Questioned Costs: None
Recommendation: Management should seek appropriate training for the fiscal department on preparation of the SEFA standards. In addition, review processes over the SEFA should be strengthened. Management should consider contracting with an experienced accounting consultant should they identify areas that require additional expertise and review after the drafting of the SEFA and prior to the submission for audit. Management should also ensure that they obtain the complete and full agreements from grantors that are signed by all parties and that clearly identify the funding source.
Views of Responsible Officials and Planned Corrective Actions: Management attempted to contract with multiple accounting consultants for creating the SEFA but they were already at full capacity and were not available to assist with the creation of the report. When the relevant contract or grant award did not include the necessary information, SCEC management and program staff reached out to our contracting agencies to confirm whether federal funds were part of each award and to find out CFDA numbers and other contract information necessary to complete the form. Nevertheless, there were several errors that in the SEFA submitted to our auditors for review. For the two IRP and RMAP lending programs, the prior year balances were carried over into the FY 24 SEFA through a clerical error. The errors in item 11.037 and 11.419 are related to information we received from the contracting agency. In particular, 11.037 was listed under US Economic Development Administration according to the contracting agency and we were given the description of Economic Adjustment Assistance. The description for 11.419 was given to SCEC by the contracting agency as CDS – Congressionally Directed Spending. Finally, we provided two CFDA’s for the STEM Education award with the submission of the SEFA as we were waiting for confirmation from Program Managers about the correct CDFA numbers. The auditors were informed that we were waiting for these numbers when the SEFA was submitted.
In FY24, SCEC had 29 different federal funding sources, from 14 different agencies. We are working to improve our capacity to report these awards without error before the review of our auditors.
Internal Controls over Preparation of the Schedule of Expenditures of Federal Awards (Significant Deficiency)
Federal Award Program: All Awards
Criteria: 2 CFR 200, Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards, £200.508(b) The auditee must prepare appropriate statements including an accurate Schedule of Expenditures of Federal Awards (SEFA) in accordance with £200.510, Financial Statements.
Condition and Context: Audit procedures noted several errors in the client provided SEFA.
Cause: Insufficient training and internal controls over the preparation and review process for the SEFA.
Effect: The following errors were noted and corrected as a result of auditing procedures on the SEFA:
• The Intermediary Relending Program and Rural Microentrepreneur Assistance Relending Program awards loan expenditures were calculated incorrectly by including the repayments and excluding the loan service income.
• The CFDA #11.037 and #11.419 were not grouped with the correct Federal Grantor.
• The STEM Education award had 2 CFDA #’s provided on one line.
• There were multiple Federal Grantor and Program Titles that were mislabeled.
Questioned Costs: None
Recommendation: Management should seek appropriate training for the fiscal department on preparation of the SEFA standards. In addition, review processes over the SEFA should be strengthened. Management should consider contracting with an experienced accounting consultant should they identify areas that require additional expertise and review after the drafting of the SEFA and prior to the submission for audit. Management should also ensure that they obtain the complete and full agreements from grantors that are signed by all parties and that clearly identify the funding source.
Views of Responsible Officials and Planned Corrective Actions: Management attempted to contract with multiple accounting consultants for creating the SEFA but they were already at full capacity and were not available to assist with the creation of the report. When the relevant contract or grant award did not include the necessary information, SCEC management and program staff reached out to our contracting agencies to confirm whether federal funds were part of each award and to find out CFDA numbers and other contract information necessary to complete the form. Nevertheless, there were several errors that in the SEFA submitted to our auditors for review. For the two IRP and RMAP lending programs, the prior year balances were carried over into the FY 24 SEFA through a clerical error. The errors in item 11.037 and 11.419 are related to information we received from the contracting agency. In particular, 11.037 was listed under US Economic Development Administration according to the contracting agency and we were given the description of Economic Adjustment Assistance. The description for 11.419 was given to SCEC by the contracting agency as CDS – Congressionally Directed Spending. Finally, we provided two CFDA’s for the STEM Education award with the submission of the SEFA as we were waiting for confirmation from Program Managers about the correct CDFA numbers. The auditors were informed that we were waiting for these numbers when the SEFA was submitted.
In FY24, SCEC had 29 different federal funding sources, from 14 different agencies. We are working to improve our capacity to report these awards without error before the review of our auditors.
Internal Controls over Preparation of the Schedule of Expenditures of Federal Awards (Significant Deficiency)
Federal Award Program: All Awards
Criteria: 2 CFR 200, Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards, £200.508(b) The auditee must prepare appropriate statements including an accurate Schedule of Expenditures of Federal Awards (SEFA) in accordance with £200.510, Financial Statements.
Condition and Context: Audit procedures noted several errors in the client provided SEFA.
Cause: Insufficient training and internal controls over the preparation and review process for the SEFA.
Effect: The following errors were noted and corrected as a result of auditing procedures on the SEFA:
• The Intermediary Relending Program and Rural Microentrepreneur Assistance Relending Program awards loan expenditures were calculated incorrectly by including the repayments and excluding the loan service income.
• The CFDA #11.037 and #11.419 were not grouped with the correct Federal Grantor.
• The STEM Education award had 2 CFDA #’s provided on one line.
• There were multiple Federal Grantor and Program Titles that were mislabeled.
Questioned Costs: None
Recommendation: Management should seek appropriate training for the fiscal department on preparation of the SEFA standards. In addition, review processes over the SEFA should be strengthened. Management should consider contracting with an experienced accounting consultant should they identify areas that require additional expertise and review after the drafting of the SEFA and prior to the submission for audit. Management should also ensure that they obtain the complete and full agreements from grantors that are signed by all parties and that clearly identify the funding source.
Views of Responsible Officials and Planned Corrective Actions: Management attempted to contract with multiple accounting consultants for creating the SEFA but they were already at full capacity and were not available to assist with the creation of the report. When the relevant contract or grant award did not include the necessary information, SCEC management and program staff reached out to our contracting agencies to confirm whether federal funds were part of each award and to find out CFDA numbers and other contract information necessary to complete the form. Nevertheless, there were several errors that in the SEFA submitted to our auditors for review. For the two IRP and RMAP lending programs, the prior year balances were carried over into the FY 24 SEFA through a clerical error. The errors in item 11.037 and 11.419 are related to information we received from the contracting agency. In particular, 11.037 was listed under US Economic Development Administration according to the contracting agency and we were given the description of Economic Adjustment Assistance. The description for 11.419 was given to SCEC by the contracting agency as CDS – Congressionally Directed Spending. Finally, we provided two CFDA’s for the STEM Education award with the submission of the SEFA as we were waiting for confirmation from Program Managers about the correct CDFA numbers. The auditors were informed that we were waiting for these numbers when the SEFA was submitted.
In FY24, SCEC had 29 different federal funding sources, from 14 different agencies. We are working to improve our capacity to report these awards without error before the review of our auditors.
Internal Controls over Preparation of the Schedule of Expenditures of Federal Awards (Significant Deficiency)
Federal Award Program: All Awards
Criteria: 2 CFR 200, Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards, £200.508(b) The auditee must prepare appropriate statements including an accurate Schedule of Expenditures of Federal Awards (SEFA) in accordance with £200.510, Financial Statements.
Condition and Context: Audit procedures noted several errors in the client provided SEFA.
Cause: Insufficient training and internal controls over the preparation and review process for the SEFA.
Effect: The following errors were noted and corrected as a result of auditing procedures on the SEFA:
• The Intermediary Relending Program and Rural Microentrepreneur Assistance Relending Program awards loan expenditures were calculated incorrectly by including the repayments and excluding the loan service income.
• The CFDA #11.037 and #11.419 were not grouped with the correct Federal Grantor.
• The STEM Education award had 2 CFDA #’s provided on one line.
• There were multiple Federal Grantor and Program Titles that were mislabeled.
Questioned Costs: None
Recommendation: Management should seek appropriate training for the fiscal department on preparation of the SEFA standards. In addition, review processes over the SEFA should be strengthened. Management should consider contracting with an experienced accounting consultant should they identify areas that require additional expertise and review after the drafting of the SEFA and prior to the submission for audit. Management should also ensure that they obtain the complete and full agreements from grantors that are signed by all parties and that clearly identify the funding source.
Views of Responsible Officials and Planned Corrective Actions: Management attempted to contract with multiple accounting consultants for creating the SEFA but they were already at full capacity and were not available to assist with the creation of the report. When the relevant contract or grant award did not include the necessary information, SCEC management and program staff reached out to our contracting agencies to confirm whether federal funds were part of each award and to find out CFDA numbers and other contract information necessary to complete the form. Nevertheless, there were several errors that in the SEFA submitted to our auditors for review. For the two IRP and RMAP lending programs, the prior year balances were carried over into the FY 24 SEFA through a clerical error. The errors in item 11.037 and 11.419 are related to information we received from the contracting agency. In particular, 11.037 was listed under US Economic Development Administration according to the contracting agency and we were given the description of Economic Adjustment Assistance. The description for 11.419 was given to SCEC by the contracting agency as CDS – Congressionally Directed Spending. Finally, we provided two CFDA’s for the STEM Education award with the submission of the SEFA as we were waiting for confirmation from Program Managers about the correct CDFA numbers. The auditors were informed that we were waiting for these numbers when the SEFA was submitted.
In FY24, SCEC had 29 different federal funding sources, from 14 different agencies. We are working to improve our capacity to report these awards without error before the review of our auditors.
Internal Controls over Preparation of the Schedule of Expenditures of Federal Awards (Significant Deficiency)
Federal Award Program: All Awards
Criteria: 2 CFR 200, Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards, £200.508(b) The auditee must prepare appropriate statements including an accurate Schedule of Expenditures of Federal Awards (SEFA) in accordance with £200.510, Financial Statements.
Condition and Context: Audit procedures noted several errors in the client provided SEFA.
Cause: Insufficient training and internal controls over the preparation and review process for the SEFA.
Effect: The following errors were noted and corrected as a result of auditing procedures on the SEFA:
• The Intermediary Relending Program and Rural Microentrepreneur Assistance Relending Program awards loan expenditures were calculated incorrectly by including the repayments and excluding the loan service income.
• The CFDA #11.037 and #11.419 were not grouped with the correct Federal Grantor.
• The STEM Education award had 2 CFDA #’s provided on one line.
• There were multiple Federal Grantor and Program Titles that were mislabeled.
Questioned Costs: None
Recommendation: Management should seek appropriate training for the fiscal department on preparation of the SEFA standards. In addition, review processes over the SEFA should be strengthened. Management should consider contracting with an experienced accounting consultant should they identify areas that require additional expertise and review after the drafting of the SEFA and prior to the submission for audit. Management should also ensure that they obtain the complete and full agreements from grantors that are signed by all parties and that clearly identify the funding source.
Views of Responsible Officials and Planned Corrective Actions: Management attempted to contract with multiple accounting consultants for creating the SEFA but they were already at full capacity and were not available to assist with the creation of the report. When the relevant contract or grant award did not include the necessary information, SCEC management and program staff reached out to our contracting agencies to confirm whether federal funds were part of each award and to find out CFDA numbers and other contract information necessary to complete the form. Nevertheless, there were several errors that in the SEFA submitted to our auditors for review. For the two IRP and RMAP lending programs, the prior year balances were carried over into the FY 24 SEFA through a clerical error. The errors in item 11.037 and 11.419 are related to information we received from the contracting agency. In particular, 11.037 was listed under US Economic Development Administration according to the contracting agency and we were given the description of Economic Adjustment Assistance. The description for 11.419 was given to SCEC by the contracting agency as CDS – Congressionally Directed Spending. Finally, we provided two CFDA’s for the STEM Education award with the submission of the SEFA as we were waiting for confirmation from Program Managers about the correct CDFA numbers. The auditors were informed that we were waiting for these numbers when the SEFA was submitted.
In FY24, SCEC had 29 different federal funding sources, from 14 different agencies. We are working to improve our capacity to report these awards without error before the review of our auditors.
Internal Controls over Preparation of the Schedule of Expenditures of Federal Awards (Significant Deficiency)
Federal Award Program: All Awards
Criteria: 2 CFR 200, Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards, £200.508(b) The auditee must prepare appropriate statements including an accurate Schedule of Expenditures of Federal Awards (SEFA) in accordance with £200.510, Financial Statements.
Condition and Context: Audit procedures noted several errors in the client provided SEFA.
Cause: Insufficient training and internal controls over the preparation and review process for the SEFA.
Effect: The following errors were noted and corrected as a result of auditing procedures on the SEFA:
• The Intermediary Relending Program and Rural Microentrepreneur Assistance Relending Program awards loan expenditures were calculated incorrectly by including the repayments and excluding the loan service income.
• The CFDA #11.037 and #11.419 were not grouped with the correct Federal Grantor.
• The STEM Education award had 2 CFDA #’s provided on one line.
• There were multiple Federal Grantor and Program Titles that were mislabeled.
Questioned Costs: None
Recommendation: Management should seek appropriate training for the fiscal department on preparation of the SEFA standards. In addition, review processes over the SEFA should be strengthened. Management should consider contracting with an experienced accounting consultant should they identify areas that require additional expertise and review after the drafting of the SEFA and prior to the submission for audit. Management should also ensure that they obtain the complete and full agreements from grantors that are signed by all parties and that clearly identify the funding source.
Views of Responsible Officials and Planned Corrective Actions: Management attempted to contract with multiple accounting consultants for creating the SEFA but they were already at full capacity and were not available to assist with the creation of the report. When the relevant contract or grant award did not include the necessary information, SCEC management and program staff reached out to our contracting agencies to confirm whether federal funds were part of each award and to find out CFDA numbers and other contract information necessary to complete the form. Nevertheless, there were several errors that in the SEFA submitted to our auditors for review. For the two IRP and RMAP lending programs, the prior year balances were carried over into the FY 24 SEFA through a clerical error. The errors in item 11.037 and 11.419 are related to information we received from the contracting agency. In particular, 11.037 was listed under US Economic Development Administration according to the contracting agency and we were given the description of Economic Adjustment Assistance. The description for 11.419 was given to SCEC by the contracting agency as CDS – Congressionally Directed Spending. Finally, we provided two CFDA’s for the STEM Education award with the submission of the SEFA as we were waiting for confirmation from Program Managers about the correct CDFA numbers. The auditors were informed that we were waiting for these numbers when the SEFA was submitted.
In FY24, SCEC had 29 different federal funding sources, from 14 different agencies. We are working to improve our capacity to report these awards without error before the review of our auditors.
Internal Controls over Preparation of the Schedule of Expenditures of Federal Awards (Significant Deficiency)
Federal Award Program: All Awards
Criteria: 2 CFR 200, Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards, £200.508(b) The auditee must prepare appropriate statements including an accurate Schedule of Expenditures of Federal Awards (SEFA) in accordance with £200.510, Financial Statements.
Condition and Context: Audit procedures noted several errors in the client provided SEFA.
Cause: Insufficient training and internal controls over the preparation and review process for the SEFA.
Effect: The following errors were noted and corrected as a result of auditing procedures on the SEFA:
• The Intermediary Relending Program and Rural Microentrepreneur Assistance Relending Program awards loan expenditures were calculated incorrectly by including the repayments and excluding the loan service income.
• The CFDA #11.037 and #11.419 were not grouped with the correct Federal Grantor.
• The STEM Education award had 2 CFDA #’s provided on one line.
• There were multiple Federal Grantor and Program Titles that were mislabeled.
Questioned Costs: None
Recommendation: Management should seek appropriate training for the fiscal department on preparation of the SEFA standards. In addition, review processes over the SEFA should be strengthened. Management should consider contracting with an experienced accounting consultant should they identify areas that require additional expertise and review after the drafting of the SEFA and prior to the submission for audit. Management should also ensure that they obtain the complete and full agreements from grantors that are signed by all parties and that clearly identify the funding source.
Views of Responsible Officials and Planned Corrective Actions: Management attempted to contract with multiple accounting consultants for creating the SEFA but they were already at full capacity and were not available to assist with the creation of the report. When the relevant contract or grant award did not include the necessary information, SCEC management and program staff reached out to our contracting agencies to confirm whether federal funds were part of each award and to find out CFDA numbers and other contract information necessary to complete the form. Nevertheless, there were several errors that in the SEFA submitted to our auditors for review. For the two IRP and RMAP lending programs, the prior year balances were carried over into the FY 24 SEFA through a clerical error. The errors in item 11.037 and 11.419 are related to information we received from the contracting agency. In particular, 11.037 was listed under US Economic Development Administration according to the contracting agency and we were given the description of Economic Adjustment Assistance. The description for 11.419 was given to SCEC by the contracting agency as CDS – Congressionally Directed Spending. Finally, we provided two CFDA’s for the STEM Education award with the submission of the SEFA as we were waiting for confirmation from Program Managers about the correct CDFA numbers. The auditors were informed that we were waiting for these numbers when the SEFA was submitted.
In FY24, SCEC had 29 different federal funding sources, from 14 different agencies. We are working to improve our capacity to report these awards without error before the review of our auditors.
Internal Controls over Preparation of the Schedule of Expenditures of Federal Awards (Significant Deficiency)
Federal Award Program: All Awards
Criteria: 2 CFR 200, Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards, £200.508(b) The auditee must prepare appropriate statements including an accurate Schedule of Expenditures of Federal Awards (SEFA) in accordance with £200.510, Financial Statements.
Condition and Context: Audit procedures noted several errors in the client provided SEFA.
Cause: Insufficient training and internal controls over the preparation and review process for the SEFA.
Effect: The following errors were noted and corrected as a result of auditing procedures on the SEFA:
• The Intermediary Relending Program and Rural Microentrepreneur Assistance Relending Program awards loan expenditures were calculated incorrectly by including the repayments and excluding the loan service income.
• The CFDA #11.037 and #11.419 were not grouped with the correct Federal Grantor.
• The STEM Education award had 2 CFDA #’s provided on one line.
• There were multiple Federal Grantor and Program Titles that were mislabeled.
Questioned Costs: None
Recommendation: Management should seek appropriate training for the fiscal department on preparation of the SEFA standards. In addition, review processes over the SEFA should be strengthened. Management should consider contracting with an experienced accounting consultant should they identify areas that require additional expertise and review after the drafting of the SEFA and prior to the submission for audit. Management should also ensure that they obtain the complete and full agreements from grantors that are signed by all parties and that clearly identify the funding source.
Views of Responsible Officials and Planned Corrective Actions: Management attempted to contract with multiple accounting consultants for creating the SEFA but they were already at full capacity and were not available to assist with the creation of the report. When the relevant contract or grant award did not include the necessary information, SCEC management and program staff reached out to our contracting agencies to confirm whether federal funds were part of each award and to find out CFDA numbers and other contract information necessary to complete the form. Nevertheless, there were several errors that in the SEFA submitted to our auditors for review. For the two IRP and RMAP lending programs, the prior year balances were carried over into the FY 24 SEFA through a clerical error. The errors in item 11.037 and 11.419 are related to information we received from the contracting agency. In particular, 11.037 was listed under US Economic Development Administration according to the contracting agency and we were given the description of Economic Adjustment Assistance. The description for 11.419 was given to SCEC by the contracting agency as CDS – Congressionally Directed Spending. Finally, we provided two CFDA’s for the STEM Education award with the submission of the SEFA as we were waiting for confirmation from Program Managers about the correct CDFA numbers. The auditors were informed that we were waiting for these numbers when the SEFA was submitted.
In FY24, SCEC had 29 different federal funding sources, from 14 different agencies. We are working to improve our capacity to report these awards without error before the review of our auditors.
Internal Controls over Preparation of the Schedule of Expenditures of Federal Awards (Significant Deficiency)
Federal Award Program: All Awards
Criteria: 2 CFR 200, Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards, £200.508(b) The auditee must prepare appropriate statements including an accurate Schedule of Expenditures of Federal Awards (SEFA) in accordance with £200.510, Financial Statements.
Condition and Context: Audit procedures noted several errors in the client provided SEFA.
Cause: Insufficient training and internal controls over the preparation and review process for the SEFA.
Effect: The following errors were noted and corrected as a result of auditing procedures on the SEFA:
• The Intermediary Relending Program and Rural Microentrepreneur Assistance Relending Program awards loan expenditures were calculated incorrectly by including the repayments and excluding the loan service income.
• The CFDA #11.037 and #11.419 were not grouped with the correct Federal Grantor.
• The STEM Education award had 2 CFDA #’s provided on one line.
• There were multiple Federal Grantor and Program Titles that were mislabeled.
Questioned Costs: None
Recommendation: Management should seek appropriate training for the fiscal department on preparation of the SEFA standards. In addition, review processes over the SEFA should be strengthened. Management should consider contracting with an experienced accounting consultant should they identify areas that require additional expertise and review after the drafting of the SEFA and prior to the submission for audit. Management should also ensure that they obtain the complete and full agreements from grantors that are signed by all parties and that clearly identify the funding source.
Views of Responsible Officials and Planned Corrective Actions: Management attempted to contract with multiple accounting consultants for creating the SEFA but they were already at full capacity and were not available to assist with the creation of the report. When the relevant contract or grant award did not include the necessary information, SCEC management and program staff reached out to our contracting agencies to confirm whether federal funds were part of each award and to find out CFDA numbers and other contract information necessary to complete the form. Nevertheless, there were several errors that in the SEFA submitted to our auditors for review. For the two IRP and RMAP lending programs, the prior year balances were carried over into the FY 24 SEFA through a clerical error. The errors in item 11.037 and 11.419 are related to information we received from the contracting agency. In particular, 11.037 was listed under US Economic Development Administration according to the contracting agency and we were given the description of Economic Adjustment Assistance. The description for 11.419 was given to SCEC by the contracting agency as CDS – Congressionally Directed Spending. Finally, we provided two CFDA’s for the STEM Education award with the submission of the SEFA as we were waiting for confirmation from Program Managers about the correct CDFA numbers. The auditors were informed that we were waiting for these numbers when the SEFA was submitted.
In FY24, SCEC had 29 different federal funding sources, from 14 different agencies. We are working to improve our capacity to report these awards without error before the review of our auditors.
Internal Controls over Preparation of the Schedule of Expenditures of Federal Awards (Significant Deficiency)
Federal Award Program: All Awards
Criteria: 2 CFR 200, Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards, £200.508(b) The auditee must prepare appropriate statements including an accurate Schedule of Expenditures of Federal Awards (SEFA) in accordance with £200.510, Financial Statements.
Condition and Context: Audit procedures noted several errors in the client provided SEFA.
Cause: Insufficient training and internal controls over the preparation and review process for the SEFA.
Effect: The following errors were noted and corrected as a result of auditing procedures on the SEFA:
• The Intermediary Relending Program and Rural Microentrepreneur Assistance Relending Program awards loan expenditures were calculated incorrectly by including the repayments and excluding the loan service income.
• The CFDA #11.037 and #11.419 were not grouped with the correct Federal Grantor.
• The STEM Education award had 2 CFDA #’s provided on one line.
• There were multiple Federal Grantor and Program Titles that were mislabeled.
Questioned Costs: None
Recommendation: Management should seek appropriate training for the fiscal department on preparation of the SEFA standards. In addition, review processes over the SEFA should be strengthened. Management should consider contracting with an experienced accounting consultant should they identify areas that require additional expertise and review after the drafting of the SEFA and prior to the submission for audit. Management should also ensure that they obtain the complete and full agreements from grantors that are signed by all parties and that clearly identify the funding source.
Views of Responsible Officials and Planned Corrective Actions: Management attempted to contract with multiple accounting consultants for creating the SEFA but they were already at full capacity and were not available to assist with the creation of the report. When the relevant contract or grant award did not include the necessary information, SCEC management and program staff reached out to our contracting agencies to confirm whether federal funds were part of each award and to find out CFDA numbers and other contract information necessary to complete the form. Nevertheless, there were several errors that in the SEFA submitted to our auditors for review. For the two IRP and RMAP lending programs, the prior year balances were carried over into the FY 24 SEFA through a clerical error. The errors in item 11.037 and 11.419 are related to information we received from the contracting agency. In particular, 11.037 was listed under US Economic Development Administration according to the contracting agency and we were given the description of Economic Adjustment Assistance. The description for 11.419 was given to SCEC by the contracting agency as CDS – Congressionally Directed Spending. Finally, we provided two CFDA’s for the STEM Education award with the submission of the SEFA as we were waiting for confirmation from Program Managers about the correct CDFA numbers. The auditors were informed that we were waiting for these numbers when the SEFA was submitted.
In FY24, SCEC had 29 different federal funding sources, from 14 different agencies. We are working to improve our capacity to report these awards without error before the review of our auditors.
Internal Controls over Preparation of the Schedule of Expenditures of Federal Awards (Significant Deficiency)
Federal Award Program: All Awards
Criteria: 2 CFR 200, Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards, £200.508(b) The auditee must prepare appropriate statements including an accurate Schedule of Expenditures of Federal Awards (SEFA) in accordance with £200.510, Financial Statements.
Condition and Context: Audit procedures noted several errors in the client provided SEFA.
Cause: Insufficient training and internal controls over the preparation and review process for the SEFA.
Effect: The following errors were noted and corrected as a result of auditing procedures on the SEFA:
• The Intermediary Relending Program and Rural Microentrepreneur Assistance Relending Program awards loan expenditures were calculated incorrectly by including the repayments and excluding the loan service income.
• The CFDA #11.037 and #11.419 were not grouped with the correct Federal Grantor.
• The STEM Education award had 2 CFDA #’s provided on one line.
• There were multiple Federal Grantor and Program Titles that were mislabeled.
Questioned Costs: None
Recommendation: Management should seek appropriate training for the fiscal department on preparation of the SEFA standards. In addition, review processes over the SEFA should be strengthened. Management should consider contracting with an experienced accounting consultant should they identify areas that require additional expertise and review after the drafting of the SEFA and prior to the submission for audit. Management should also ensure that they obtain the complete and full agreements from grantors that are signed by all parties and that clearly identify the funding source.
Views of Responsible Officials and Planned Corrective Actions: Management attempted to contract with multiple accounting consultants for creating the SEFA but they were already at full capacity and were not available to assist with the creation of the report. When the relevant contract or grant award did not include the necessary information, SCEC management and program staff reached out to our contracting agencies to confirm whether federal funds were part of each award and to find out CFDA numbers and other contract information necessary to complete the form. Nevertheless, there were several errors that in the SEFA submitted to our auditors for review. For the two IRP and RMAP lending programs, the prior year balances were carried over into the FY 24 SEFA through a clerical error. The errors in item 11.037 and 11.419 are related to information we received from the contracting agency. In particular, 11.037 was listed under US Economic Development Administration according to the contracting agency and we were given the description of Economic Adjustment Assistance. The description for 11.419 was given to SCEC by the contracting agency as CDS – Congressionally Directed Spending. Finally, we provided two CFDA’s for the STEM Education award with the submission of the SEFA as we were waiting for confirmation from Program Managers about the correct CDFA numbers. The auditors were informed that we were waiting for these numbers when the SEFA was submitted.
In FY24, SCEC had 29 different federal funding sources, from 14 different agencies. We are working to improve our capacity to report these awards without error before the review of our auditors.
Internal Controls over Preparation of the Schedule of Expenditures of Federal Awards (Significant Deficiency)
Federal Award Program: All Awards
Criteria: 2 CFR 200, Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards, £200.508(b) The auditee must prepare appropriate statements including an accurate Schedule of Expenditures of Federal Awards (SEFA) in accordance with £200.510, Financial Statements.
Condition and Context: Audit procedures noted several errors in the client provided SEFA.
Cause: Insufficient training and internal controls over the preparation and review process for the SEFA.
Effect: The following errors were noted and corrected as a result of auditing procedures on the SEFA:
• The Intermediary Relending Program and Rural Microentrepreneur Assistance Relending Program awards loan expenditures were calculated incorrectly by including the repayments and excluding the loan service income.
• The CFDA #11.037 and #11.419 were not grouped with the correct Federal Grantor.
• The STEM Education award had 2 CFDA #’s provided on one line.
• There were multiple Federal Grantor and Program Titles that were mislabeled.
Questioned Costs: None
Recommendation: Management should seek appropriate training for the fiscal department on preparation of the SEFA standards. In addition, review processes over the SEFA should be strengthened. Management should consider contracting with an experienced accounting consultant should they identify areas that require additional expertise and review after the drafting of the SEFA and prior to the submission for audit. Management should also ensure that they obtain the complete and full agreements from grantors that are signed by all parties and that clearly identify the funding source.
Views of Responsible Officials and Planned Corrective Actions: Management attempted to contract with multiple accounting consultants for creating the SEFA but they were already at full capacity and were not available to assist with the creation of the report. When the relevant contract or grant award did not include the necessary information, SCEC management and program staff reached out to our contracting agencies to confirm whether federal funds were part of each award and to find out CFDA numbers and other contract information necessary to complete the form. Nevertheless, there were several errors that in the SEFA submitted to our auditors for review. For the two IRP and RMAP lending programs, the prior year balances were carried over into the FY 24 SEFA through a clerical error. The errors in item 11.037 and 11.419 are related to information we received from the contracting agency. In particular, 11.037 was listed under US Economic Development Administration according to the contracting agency and we were given the description of Economic Adjustment Assistance. The description for 11.419 was given to SCEC by the contracting agency as CDS – Congressionally Directed Spending. Finally, we provided two CFDA’s for the STEM Education award with the submission of the SEFA as we were waiting for confirmation from Program Managers about the correct CDFA numbers. The auditors were informed that we were waiting for these numbers when the SEFA was submitted.
In FY24, SCEC had 29 different federal funding sources, from 14 different agencies. We are working to improve our capacity to report these awards without error before the review of our auditors.
Internal Controls over Preparation of the Schedule of Expenditures of Federal Awards (Significant Deficiency)
Federal Award Program: All Awards
Criteria: 2 CFR 200, Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards, £200.508(b) The auditee must prepare appropriate statements including an accurate Schedule of Expenditures of Federal Awards (SEFA) in accordance with £200.510, Financial Statements.
Condition and Context: Audit procedures noted several errors in the client provided SEFA.
Cause: Insufficient training and internal controls over the preparation and review process for the SEFA.
Effect: The following errors were noted and corrected as a result of auditing procedures on the SEFA:
• The Intermediary Relending Program and Rural Microentrepreneur Assistance Relending Program awards loan expenditures were calculated incorrectly by including the repayments and excluding the loan service income.
• The CFDA #11.037 and #11.419 were not grouped with the correct Federal Grantor.
• The STEM Education award had 2 CFDA #’s provided on one line.
• There were multiple Federal Grantor and Program Titles that were mislabeled.
Questioned Costs: None
Recommendation: Management should seek appropriate training for the fiscal department on preparation of the SEFA standards. In addition, review processes over the SEFA should be strengthened. Management should consider contracting with an experienced accounting consultant should they identify areas that require additional expertise and review after the drafting of the SEFA and prior to the submission for audit. Management should also ensure that they obtain the complete and full agreements from grantors that are signed by all parties and that clearly identify the funding source.
Views of Responsible Officials and Planned Corrective Actions: Management attempted to contract with multiple accounting consultants for creating the SEFA but they were already at full capacity and were not available to assist with the creation of the report. When the relevant contract or grant award did not include the necessary information, SCEC management and program staff reached out to our contracting agencies to confirm whether federal funds were part of each award and to find out CFDA numbers and other contract information necessary to complete the form. Nevertheless, there were several errors that in the SEFA submitted to our auditors for review. For the two IRP and RMAP lending programs, the prior year balances were carried over into the FY 24 SEFA through a clerical error. The errors in item 11.037 and 11.419 are related to information we received from the contracting agency. In particular, 11.037 was listed under US Economic Development Administration according to the contracting agency and we were given the description of Economic Adjustment Assistance. The description for 11.419 was given to SCEC by the contracting agency as CDS – Congressionally Directed Spending. Finally, we provided two CFDA’s for the STEM Education award with the submission of the SEFA as we were waiting for confirmation from Program Managers about the correct CDFA numbers. The auditors were informed that we were waiting for these numbers when the SEFA was submitted.
In FY24, SCEC had 29 different federal funding sources, from 14 different agencies. We are working to improve our capacity to report these awards without error before the review of our auditors.
Internal Controls over Preparation of the Schedule of Expenditures of Federal Awards (Significant Deficiency)
Federal Award Program: All Awards
Criteria: 2 CFR 200, Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards, £200.508(b) The auditee must prepare appropriate statements including an accurate Schedule of Expenditures of Federal Awards (SEFA) in accordance with £200.510, Financial Statements.
Condition and Context: Audit procedures noted several errors in the client provided SEFA.
Cause: Insufficient training and internal controls over the preparation and review process for the SEFA.
Effect: The following errors were noted and corrected as a result of auditing procedures on the SEFA:
• The Intermediary Relending Program and Rural Microentrepreneur Assistance Relending Program awards loan expenditures were calculated incorrectly by including the repayments and excluding the loan service income.
• The CFDA #11.037 and #11.419 were not grouped with the correct Federal Grantor.
• The STEM Education award had 2 CFDA #’s provided on one line.
• There were multiple Federal Grantor and Program Titles that were mislabeled.
Questioned Costs: None
Recommendation: Management should seek appropriate training for the fiscal department on preparation of the SEFA standards. In addition, review processes over the SEFA should be strengthened. Management should consider contracting with an experienced accounting consultant should they identify areas that require additional expertise and review after the drafting of the SEFA and prior to the submission for audit. Management should also ensure that they obtain the complete and full agreements from grantors that are signed by all parties and that clearly identify the funding source.
Views of Responsible Officials and Planned Corrective Actions: Management attempted to contract with multiple accounting consultants for creating the SEFA but they were already at full capacity and were not available to assist with the creation of the report. When the relevant contract or grant award did not include the necessary information, SCEC management and program staff reached out to our contracting agencies to confirm whether federal funds were part of each award and to find out CFDA numbers and other contract information necessary to complete the form. Nevertheless, there were several errors that in the SEFA submitted to our auditors for review. For the two IRP and RMAP lending programs, the prior year balances were carried over into the FY 24 SEFA through a clerical error. The errors in item 11.037 and 11.419 are related to information we received from the contracting agency. In particular, 11.037 was listed under US Economic Development Administration according to the contracting agency and we were given the description of Economic Adjustment Assistance. The description for 11.419 was given to SCEC by the contracting agency as CDS – Congressionally Directed Spending. Finally, we provided two CFDA’s for the STEM Education award with the submission of the SEFA as we were waiting for confirmation from Program Managers about the correct CDFA numbers. The auditors were informed that we were waiting for these numbers when the SEFA was submitted.
In FY24, SCEC had 29 different federal funding sources, from 14 different agencies. We are working to improve our capacity to report these awards without error before the review of our auditors.
Internal Controls over Preparation of the Schedule of Expenditures of Federal Awards (Significant Deficiency)
Federal Award Program: All Awards
Criteria: 2 CFR 200, Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards, £200.508(b) The auditee must prepare appropriate statements including an accurate Schedule of Expenditures of Federal Awards (SEFA) in accordance with £200.510, Financial Statements.
Condition and Context: Audit procedures noted several errors in the client provided SEFA.
Cause: Insufficient training and internal controls over the preparation and review process for the SEFA.
Effect: The following errors were noted and corrected as a result of auditing procedures on the SEFA:
• The Intermediary Relending Program and Rural Microentrepreneur Assistance Relending Program awards loan expenditures were calculated incorrectly by including the repayments and excluding the loan service income.
• The CFDA #11.037 and #11.419 were not grouped with the correct Federal Grantor.
• The STEM Education award had 2 CFDA #’s provided on one line.
• There were multiple Federal Grantor and Program Titles that were mislabeled.
Questioned Costs: None
Recommendation: Management should seek appropriate training for the fiscal department on preparation of the SEFA standards. In addition, review processes over the SEFA should be strengthened. Management should consider contracting with an experienced accounting consultant should they identify areas that require additional expertise and review after the drafting of the SEFA and prior to the submission for audit. Management should also ensure that they obtain the complete and full agreements from grantors that are signed by all parties and that clearly identify the funding source.
Views of Responsible Officials and Planned Corrective Actions: Management attempted to contract with multiple accounting consultants for creating the SEFA but they were already at full capacity and were not available to assist with the creation of the report. When the relevant contract or grant award did not include the necessary information, SCEC management and program staff reached out to our contracting agencies to confirm whether federal funds were part of each award and to find out CFDA numbers and other contract information necessary to complete the form. Nevertheless, there were several errors that in the SEFA submitted to our auditors for review. For the two IRP and RMAP lending programs, the prior year balances were carried over into the FY 24 SEFA through a clerical error. The errors in item 11.037 and 11.419 are related to information we received from the contracting agency. In particular, 11.037 was listed under US Economic Development Administration according to the contracting agency and we were given the description of Economic Adjustment Assistance. The description for 11.419 was given to SCEC by the contracting agency as CDS – Congressionally Directed Spending. Finally, we provided two CFDA’s for the STEM Education award with the submission of the SEFA as we were waiting for confirmation from Program Managers about the correct CDFA numbers. The auditors were informed that we were waiting for these numbers when the SEFA was submitted.
In FY24, SCEC had 29 different federal funding sources, from 14 different agencies. We are working to improve our capacity to report these awards without error before the review of our auditors.
Internal Controls over Preparation of the Schedule of Expenditures of Federal Awards (Significant Deficiency)
Federal Award Program: All Awards
Criteria: 2 CFR 200, Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards, £200.508(b) The auditee must prepare appropriate statements including an accurate Schedule of Expenditures of Federal Awards (SEFA) in accordance with £200.510, Financial Statements.
Condition and Context: Audit procedures noted several errors in the client provided SEFA.
Cause: Insufficient training and internal controls over the preparation and review process for the SEFA.
Effect: The following errors were noted and corrected as a result of auditing procedures on the SEFA:
• The Intermediary Relending Program and Rural Microentrepreneur Assistance Relending Program awards loan expenditures were calculated incorrectly by including the repayments and excluding the loan service income.
• The CFDA #11.037 and #11.419 were not grouped with the correct Federal Grantor.
• The STEM Education award had 2 CFDA #’s provided on one line.
• There were multiple Federal Grantor and Program Titles that were mislabeled.
Questioned Costs: None
Recommendation: Management should seek appropriate training for the fiscal department on preparation of the SEFA standards. In addition, review processes over the SEFA should be strengthened. Management should consider contracting with an experienced accounting consultant should they identify areas that require additional expertise and review after the drafting of the SEFA and prior to the submission for audit. Management should also ensure that they obtain the complete and full agreements from grantors that are signed by all parties and that clearly identify the funding source.
Views of Responsible Officials and Planned Corrective Actions: Management attempted to contract with multiple accounting consultants for creating the SEFA but they were already at full capacity and were not available to assist with the creation of the report. When the relevant contract or grant award did not include the necessary information, SCEC management and program staff reached out to our contracting agencies to confirm whether federal funds were part of each award and to find out CFDA numbers and other contract information necessary to complete the form. Nevertheless, there were several errors that in the SEFA submitted to our auditors for review. For the two IRP and RMAP lending programs, the prior year balances were carried over into the FY 24 SEFA through a clerical error. The errors in item 11.037 and 11.419 are related to information we received from the contracting agency. In particular, 11.037 was listed under US Economic Development Administration according to the contracting agency and we were given the description of Economic Adjustment Assistance. The description for 11.419 was given to SCEC by the contracting agency as CDS – Congressionally Directed Spending. Finally, we provided two CFDA’s for the STEM Education award with the submission of the SEFA as we were waiting for confirmation from Program Managers about the correct CDFA numbers. The auditors were informed that we were waiting for these numbers when the SEFA was submitted.
In FY24, SCEC had 29 different federal funding sources, from 14 different agencies. We are working to improve our capacity to report these awards without error before the review of our auditors.
Internal Controls over Preparation of the Schedule of Expenditures of Federal Awards (Significant Deficiency)
Federal Award Program: All Awards
Criteria: 2 CFR 200, Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards, £200.508(b) The auditee must prepare appropriate statements including an accurate Schedule of Expenditures of Federal Awards (SEFA) in accordance with £200.510, Financial Statements.
Condition and Context: Audit procedures noted several errors in the client provided SEFA.
Cause: Insufficient training and internal controls over the preparation and review process for the SEFA.
Effect: The following errors were noted and corrected as a result of auditing procedures on the SEFA:
• The Intermediary Relending Program and Rural Microentrepreneur Assistance Relending Program awards loan expenditures were calculated incorrectly by including the repayments and excluding the loan service income.
• The CFDA #11.037 and #11.419 were not grouped with the correct Federal Grantor.
• The STEM Education award had 2 CFDA #’s provided on one line.
• There were multiple Federal Grantor and Program Titles that were mislabeled.
Questioned Costs: None
Recommendation: Management should seek appropriate training for the fiscal department on preparation of the SEFA standards. In addition, review processes over the SEFA should be strengthened. Management should consider contracting with an experienced accounting consultant should they identify areas that require additional expertise and review after the drafting of the SEFA and prior to the submission for audit. Management should also ensure that they obtain the complete and full agreements from grantors that are signed by all parties and that clearly identify the funding source.
Views of Responsible Officials and Planned Corrective Actions: Management attempted to contract with multiple accounting consultants for creating the SEFA but they were already at full capacity and were not available to assist with the creation of the report. When the relevant contract or grant award did not include the necessary information, SCEC management and program staff reached out to our contracting agencies to confirm whether federal funds were part of each award and to find out CFDA numbers and other contract information necessary to complete the form. Nevertheless, there were several errors that in the SEFA submitted to our auditors for review. For the two IRP and RMAP lending programs, the prior year balances were carried over into the FY 24 SEFA through a clerical error. The errors in item 11.037 and 11.419 are related to information we received from the contracting agency. In particular, 11.037 was listed under US Economic Development Administration according to the contracting agency and we were given the description of Economic Adjustment Assistance. The description for 11.419 was given to SCEC by the contracting agency as CDS – Congressionally Directed Spending. Finally, we provided two CFDA’s for the STEM Education award with the submission of the SEFA as we were waiting for confirmation from Program Managers about the correct CDFA numbers. The auditors were informed that we were waiting for these numbers when the SEFA was submitted.
In FY24, SCEC had 29 different federal funding sources, from 14 different agencies. We are working to improve our capacity to report these awards without error before the review of our auditors.
Internal Controls over Preparation of the Schedule of Expenditures of Federal Awards (Significant Deficiency)
Federal Award Program: All Awards
Criteria: 2 CFR 200, Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards, £200.508(b) The auditee must prepare appropriate statements including an accurate Schedule of Expenditures of Federal Awards (SEFA) in accordance with £200.510, Financial Statements.
Condition and Context: Audit procedures noted several errors in the client provided SEFA.
Cause: Insufficient training and internal controls over the preparation and review process for the SEFA.
Effect: The following errors were noted and corrected as a result of auditing procedures on the SEFA:
• The Intermediary Relending Program and Rural Microentrepreneur Assistance Relending Program awards loan expenditures were calculated incorrectly by including the repayments and excluding the loan service income.
• The CFDA #11.037 and #11.419 were not grouped with the correct Federal Grantor.
• The STEM Education award had 2 CFDA #’s provided on one line.
• There were multiple Federal Grantor and Program Titles that were mislabeled.
Questioned Costs: None
Recommendation: Management should seek appropriate training for the fiscal department on preparation of the SEFA standards. In addition, review processes over the SEFA should be strengthened. Management should consider contracting with an experienced accounting consultant should they identify areas that require additional expertise and review after the drafting of the SEFA and prior to the submission for audit. Management should also ensure that they obtain the complete and full agreements from grantors that are signed by all parties and that clearly identify the funding source.
Views of Responsible Officials and Planned Corrective Actions: Management attempted to contract with multiple accounting consultants for creating the SEFA but they were already at full capacity and were not available to assist with the creation of the report. When the relevant contract or grant award did not include the necessary information, SCEC management and program staff reached out to our contracting agencies to confirm whether federal funds were part of each award and to find out CFDA numbers and other contract information necessary to complete the form. Nevertheless, there were several errors that in the SEFA submitted to our auditors for review. For the two IRP and RMAP lending programs, the prior year balances were carried over into the FY 24 SEFA through a clerical error. The errors in item 11.037 and 11.419 are related to information we received from the contracting agency. In particular, 11.037 was listed under US Economic Development Administration according to the contracting agency and we were given the description of Economic Adjustment Assistance. The description for 11.419 was given to SCEC by the contracting agency as CDS – Congressionally Directed Spending. Finally, we provided two CFDA’s for the STEM Education award with the submission of the SEFA as we were waiting for confirmation from Program Managers about the correct CDFA numbers. The auditors were informed that we were waiting for these numbers when the SEFA was submitted.
In FY24, SCEC had 29 different federal funding sources, from 14 different agencies. We are working to improve our capacity to report these awards without error before the review of our auditors.
Internal Controls over Preparation of the Schedule of Expenditures of Federal Awards (Significant Deficiency)
Federal Award Program: All Awards
Criteria: 2 CFR 200, Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards, £200.508(b) The auditee must prepare appropriate statements including an accurate Schedule of Expenditures of Federal Awards (SEFA) in accordance with £200.510, Financial Statements.
Condition and Context: Audit procedures noted several errors in the client provided SEFA.
Cause: Insufficient training and internal controls over the preparation and review process for the SEFA.
Effect: The following errors were noted and corrected as a result of auditing procedures on the SEFA:
• The Intermediary Relending Program and Rural Microentrepreneur Assistance Relending Program awards loan expenditures were calculated incorrectly by including the repayments and excluding the loan service income.
• The CFDA #11.037 and #11.419 were not grouped with the correct Federal Grantor.
• The STEM Education award had 2 CFDA #’s provided on one line.
• There were multiple Federal Grantor and Program Titles that were mislabeled.
Questioned Costs: None
Recommendation: Management should seek appropriate training for the fiscal department on preparation of the SEFA standards. In addition, review processes over the SEFA should be strengthened. Management should consider contracting with an experienced accounting consultant should they identify areas that require additional expertise and review after the drafting of the SEFA and prior to the submission for audit. Management should also ensure that they obtain the complete and full agreements from grantors that are signed by all parties and that clearly identify the funding source.
Views of Responsible Officials and Planned Corrective Actions: Management attempted to contract with multiple accounting consultants for creating the SEFA but they were already at full capacity and were not available to assist with the creation of the report. When the relevant contract or grant award did not include the necessary information, SCEC management and program staff reached out to our contracting agencies to confirm whether federal funds were part of each award and to find out CFDA numbers and other contract information necessary to complete the form. Nevertheless, there were several errors that in the SEFA submitted to our auditors for review. For the two IRP and RMAP lending programs, the prior year balances were carried over into the FY 24 SEFA through a clerical error. The errors in item 11.037 and 11.419 are related to information we received from the contracting agency. In particular, 11.037 was listed under US Economic Development Administration according to the contracting agency and we were given the description of Economic Adjustment Assistance. The description for 11.419 was given to SCEC by the contracting agency as CDS – Congressionally Directed Spending. Finally, we provided two CFDA’s for the STEM Education award with the submission of the SEFA as we were waiting for confirmation from Program Managers about the correct CDFA numbers. The auditors were informed that we were waiting for these numbers when the SEFA was submitted.
In FY24, SCEC had 29 different federal funding sources, from 14 different agencies. We are working to improve our capacity to report these awards without error before the review of our auditors.
Internal Controls over Preparation of the Schedule of Expenditures of Federal Awards (Significant Deficiency)
Federal Award Program: All Awards
Criteria: 2 CFR 200, Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards, £200.508(b) The auditee must prepare appropriate statements including an accurate Schedule of Expenditures of Federal Awards (SEFA) in accordance with £200.510, Financial Statements.
Condition and Context: Audit procedures noted several errors in the client provided SEFA.
Cause: Insufficient training and internal controls over the preparation and review process for the SEFA.
Effect: The following errors were noted and corrected as a result of auditing procedures on the SEFA:
• The Intermediary Relending Program and Rural Microentrepreneur Assistance Relending Program awards loan expenditures were calculated incorrectly by including the repayments and excluding the loan service income.
• The CFDA #11.037 and #11.419 were not grouped with the correct Federal Grantor.
• The STEM Education award had 2 CFDA #’s provided on one line.
• There were multiple Federal Grantor and Program Titles that were mislabeled.
Questioned Costs: None
Recommendation: Management should seek appropriate training for the fiscal department on preparation of the SEFA standards. In addition, review processes over the SEFA should be strengthened. Management should consider contracting with an experienced accounting consultant should they identify areas that require additional expertise and review after the drafting of the SEFA and prior to the submission for audit. Management should also ensure that they obtain the complete and full agreements from grantors that are signed by all parties and that clearly identify the funding source.
Views of Responsible Officials and Planned Corrective Actions: Management attempted to contract with multiple accounting consultants for creating the SEFA but they were already at full capacity and were not available to assist with the creation of the report. When the relevant contract or grant award did not include the necessary information, SCEC management and program staff reached out to our contracting agencies to confirm whether federal funds were part of each award and to find out CFDA numbers and other contract information necessary to complete the form. Nevertheless, there were several errors that in the SEFA submitted to our auditors for review. For the two IRP and RMAP lending programs, the prior year balances were carried over into the FY 24 SEFA through a clerical error. The errors in item 11.037 and 11.419 are related to information we received from the contracting agency. In particular, 11.037 was listed under US Economic Development Administration according to the contracting agency and we were given the description of Economic Adjustment Assistance. The description for 11.419 was given to SCEC by the contracting agency as CDS – Congressionally Directed Spending. Finally, we provided two CFDA’s for the STEM Education award with the submission of the SEFA as we were waiting for confirmation from Program Managers about the correct CDFA numbers. The auditors were informed that we were waiting for these numbers when the SEFA was submitted.
In FY24, SCEC had 29 different federal funding sources, from 14 different agencies. We are working to improve our capacity to report these awards without error before the review of our auditors.
Internal Controls over Preparation of the Schedule of Expenditures of Federal Awards (Significant Deficiency)
Federal Award Program: All Awards
Criteria: 2 CFR 200, Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards, £200.508(b) The auditee must prepare appropriate statements including an accurate Schedule of Expenditures of Federal Awards (SEFA) in accordance with £200.510, Financial Statements.
Condition and Context: Audit procedures noted several errors in the client provided SEFA.
Cause: Insufficient training and internal controls over the preparation and review process for the SEFA.
Effect: The following errors were noted and corrected as a result of auditing procedures on the SEFA:
• The Intermediary Relending Program and Rural Microentrepreneur Assistance Relending Program awards loan expenditures were calculated incorrectly by including the repayments and excluding the loan service income.
• The CFDA #11.037 and #11.419 were not grouped with the correct Federal Grantor.
• The STEM Education award had 2 CFDA #’s provided on one line.
• There were multiple Federal Grantor and Program Titles that were mislabeled.
Questioned Costs: None
Recommendation: Management should seek appropriate training for the fiscal department on preparation of the SEFA standards. In addition, review processes over the SEFA should be strengthened. Management should consider contracting with an experienced accounting consultant should they identify areas that require additional expertise and review after the drafting of the SEFA and prior to the submission for audit. Management should also ensure that they obtain the complete and full agreements from grantors that are signed by all parties and that clearly identify the funding source.
Views of Responsible Officials and Planned Corrective Actions: Management attempted to contract with multiple accounting consultants for creating the SEFA but they were already at full capacity and were not available to assist with the creation of the report. When the relevant contract or grant award did not include the necessary information, SCEC management and program staff reached out to our contracting agencies to confirm whether federal funds were part of each award and to find out CFDA numbers and other contract information necessary to complete the form. Nevertheless, there were several errors that in the SEFA submitted to our auditors for review. For the two IRP and RMAP lending programs, the prior year balances were carried over into the FY 24 SEFA through a clerical error. The errors in item 11.037 and 11.419 are related to information we received from the contracting agency. In particular, 11.037 was listed under US Economic Development Administration according to the contracting agency and we were given the description of Economic Adjustment Assistance. The description for 11.419 was given to SCEC by the contracting agency as CDS – Congressionally Directed Spending. Finally, we provided two CFDA’s for the STEM Education award with the submission of the SEFA as we were waiting for confirmation from Program Managers about the correct CDFA numbers. The auditors were informed that we were waiting for these numbers when the SEFA was submitted.
In FY24, SCEC had 29 different federal funding sources, from 14 different agencies. We are working to improve our capacity to report these awards without error before the review of our auditors.
Internal Controls over Preparation of the Schedule of Expenditures of Federal Awards (Significant Deficiency)
Federal Award Program: All Awards
Criteria: 2 CFR 200, Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards, £200.508(b) The auditee must prepare appropriate statements including an accurate Schedule of Expenditures of Federal Awards (SEFA) in accordance with £200.510, Financial Statements.
Condition and Context: Audit procedures noted several errors in the client provided SEFA.
Cause: Insufficient training and internal controls over the preparation and review process for the SEFA.
Effect: The following errors were noted and corrected as a result of auditing procedures on the SEFA:
• The Intermediary Relending Program and Rural Microentrepreneur Assistance Relending Program awards loan expenditures were calculated incorrectly by including the repayments and excluding the loan service income.
• The CFDA #11.037 and #11.419 were not grouped with the correct Federal Grantor.
• The STEM Education award had 2 CFDA #’s provided on one line.
• There were multiple Federal Grantor and Program Titles that were mislabeled.
Questioned Costs: None
Recommendation: Management should seek appropriate training for the fiscal department on preparation of the SEFA standards. In addition, review processes over the SEFA should be strengthened. Management should consider contracting with an experienced accounting consultant should they identify areas that require additional expertise and review after the drafting of the SEFA and prior to the submission for audit. Management should also ensure that they obtain the complete and full agreements from grantors that are signed by all parties and that clearly identify the funding source.
Views of Responsible Officials and Planned Corrective Actions: Management attempted to contract with multiple accounting consultants for creating the SEFA but they were already at full capacity and were not available to assist with the creation of the report. When the relevant contract or grant award did not include the necessary information, SCEC management and program staff reached out to our contracting agencies to confirm whether federal funds were part of each award and to find out CFDA numbers and other contract information necessary to complete the form. Nevertheless, there were several errors that in the SEFA submitted to our auditors for review. For the two IRP and RMAP lending programs, the prior year balances were carried over into the FY 24 SEFA through a clerical error. The errors in item 11.037 and 11.419 are related to information we received from the contracting agency. In particular, 11.037 was listed under US Economic Development Administration according to the contracting agency and we were given the description of Economic Adjustment Assistance. The description for 11.419 was given to SCEC by the contracting agency as CDS – Congressionally Directed Spending. Finally, we provided two CFDA’s for the STEM Education award with the submission of the SEFA as we were waiting for confirmation from Program Managers about the correct CDFA numbers. The auditors were informed that we were waiting for these numbers when the SEFA was submitted.
In FY24, SCEC had 29 different federal funding sources, from 14 different agencies. We are working to improve our capacity to report these awards without error before the review of our auditors.
Noncompliance with Procurement, Suspension, & Debarment Standard (Significant Deficiency)
Federal Award Program: 21.027 COVID-19: Coronavirus State and Local Fiscal Recovery Funds
Criteria: 2 CFR 200, Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards, §200.214 prohibits non-federal entities from contracting with parties that are suspended or debarred under covered transactions.
Condition and Context: Audit procedures revealed that there was not a policy or process in place to formally document the review of the contracted entity for suspension and debarment prior to entering into the agreement.
Cause: The Organization does not have a formal process to document suspension and debarment. Management was unaware of the requirement, though it was clear the management thoughtfully considered the contractor’s reputation and determined that the contractor was suited for the agreement.
Effect: The Organization did not perform its review of suspension and debarment for this agreement, though the contractor was found to not be on prohibited lists at annual review.
Questioned Costs: None
Recommendation: Management should strengthen their processes, controls, and review over suspension and debarment processes, and develop a written policy on such items to ensure compliance with Uniform Administrative Requirements.
Views of Responsible Officials and Planned Corrective Actions: As stated by the auditor, SCEC is selective about who to enter contracts with and has long-standing relationships with the organizations we were working with on these efforts, who also had other Federal contracts in process that we were aware of. We have instituted a finance procedure to check all contractors and sub-contractors on the Sam.gov’s verification of debarment and suspension tool before the first payment under the contract is issued and a policy that all SCEC contracts or subawards over $25,000 that utilize federal or state funds must include a suspension and debarment certification.