Information on the federal program:
Subject: Education Stabilization Fund – Internal Controls
Federal Agency: Department of Education
Federal Program: COVID-19 – Education Stabilization Fund
Assistance Listing Number: 84.425D, 84.425U
Federal Award Numbers: S425D210013, S425U210013
Pass-Through Entity: Indiana Department of Education
Compliance Requirement: Equipment and Real Property Management
Audit Findings: Material Weakness
Criteria: 2 CFR 200.313(d) states in part:
"Management requirements. Procedures for managing equipment (including replacement equipment),
whether acquired in whole or in part under a Federal award, until disposition takes place will, as a minimum,
meet the following requirements:
(1) Property records must be maintained that include a description of the property, a serial number
or other identification number, the source of funding for the property (including the FAIN), who
holds title, the acquisition date, and cost of the property, percentage of Federal participation in
the project costs for the Federal award under which the property was acquired, the location,
use and condition of the property, and any ultimate disposition data including the date of
disposal and sale price of the property.
(2) A physical inventory of the property must be taken and the results reconciled with the property
records at least once every two years.
(3) A control system must be developed to ensure adequate safeguards to prevent loss, damage,
or theft of the property. Any loss, damage, or theft must be investigated.
(4) Adequate maintenance procedures must be developed to keep the property in good condition.
. . ."
Condition: An effective internal control system was not in place at the School Corporation in order to
ensure compliance with requirements related to the grant agreement and the Equipment and Real Property
Management Requirements compliance requirements.
Cause: The School Corporation's management had not developed a system of internal controls to ensure
compliance with the compliance requirements listed above.
Effect: The failure to establish an effective internal control system placed the School Corporation at risk of
noncompliance with the grant agreement and the compliance requirements. A lack of segregation of duties
within an internal control system could have also allowed noncompliance with the compliance requirements
and allowed the misuse and mismanagement of federal funds and assets by not having proper oversight, reviews, and approvals over the activities of the programs. Questioned Costs: There were no questioned costs identified. Context: The School Corporation expended a total of $499,689 for HVAC replacement in the elementary
school gymnasium, which was funded with ESSER II (84.425D) and ESSER III (84.425U) grant awards. It
was noted these capital asset acquisitions were not reported on the capital asset listing for the School
Corporation as of June 30, 2024. Management noted the project had not yet been completed as of June 30,
2024, however the costs incurred up to that date should have been reported as construction in progress on
the capital asset listing.
Additionally, the School Corporation last performed a physical inventory in fall of 2021, which does not meet
the federal compliance requirement to take a physical inventory at least once every two years.
Identification as a repeat finding: No.
Recommendation: We recommend the School Corporation update the capital asset listing at least
annually to include all equipment and real property acquisitions, including construction in progress, and
review for potential capital asset dispositions. The capital asset listing should include all required
information to track capital asset acquisitions purchased with federal funding.
Additionally, we recommend the School Corporation conduct a physical inventory at least once every two
years to meet the federal compliance requirement.
Views of Responsible Officials and Planned Corrective Actions: Management agrees with the finding
and has prepared a corrective action plan.
Information on the federal program:
Subject: Education Stabilization Fund – Internal Controls
Federal Agency: Department of Education
Federal Program: COVID-19 – Education Stabilization Fund
Assistance Listing Number: 84.425D, 84.425U
Federal Award Numbers: S425D210013, S425U210013
Pass-Through Entity: Indiana Department of Education
Compliance Requirement: Equipment and Real Property Management
Audit Findings: Material Weakness
Criteria: 2 CFR 200.313(d) states in part:
"Management requirements. Procedures for managing equipment (including replacement equipment),
whether acquired in whole or in part under a Federal award, until disposition takes place will, as a minimum,
meet the following requirements:
(1) Property records must be maintained that include a description of the property, a serial number
or other identification number, the source of funding for the property (including the FAIN), who
holds title, the acquisition date, and cost of the property, percentage of Federal participation in
the project costs for the Federal award under which the property was acquired, the location,
use and condition of the property, and any ultimate disposition data including the date of
disposal and sale price of the property.
(2) A physical inventory of the property must be taken and the results reconciled with the property
records at least once every two years.
(3) A control system must be developed to ensure adequate safeguards to prevent loss, damage,
or theft of the property. Any loss, damage, or theft must be investigated.
(4) Adequate maintenance procedures must be developed to keep the property in good condition.
. . ."
Condition: An effective internal control system was not in place at the School Corporation in order to
ensure compliance with requirements related to the grant agreement and the Equipment and Real Property
Management Requirements compliance requirements.
Cause: The School Corporation's management had not developed a system of internal controls to ensure
compliance with the compliance requirements listed above.
Effect: The failure to establish an effective internal control system placed the School Corporation at risk of
noncompliance with the grant agreement and the compliance requirements. A lack of segregation of duties
within an internal control system could have also allowed noncompliance with the compliance requirements
and allowed the misuse and mismanagement of federal funds and assets by not having proper oversight, reviews, and approvals over the activities of the programs. Questioned Costs: There were no questioned costs identified. Context: The School Corporation expended a total of $499,689 for HVAC replacement in the elementary
school gymnasium, which was funded with ESSER II (84.425D) and ESSER III (84.425U) grant awards. It
was noted these capital asset acquisitions were not reported on the capital asset listing for the School
Corporation as of June 30, 2024. Management noted the project had not yet been completed as of June 30,
2024, however the costs incurred up to that date should have been reported as construction in progress on
the capital asset listing.
Additionally, the School Corporation last performed a physical inventory in fall of 2021, which does not meet
the federal compliance requirement to take a physical inventory at least once every two years.
Identification as a repeat finding: No.
Recommendation: We recommend the School Corporation update the capital asset listing at least
annually to include all equipment and real property acquisitions, including construction in progress, and
review for potential capital asset dispositions. The capital asset listing should include all required
information to track capital asset acquisitions purchased with federal funding.
Additionally, we recommend the School Corporation conduct a physical inventory at least once every two
years to meet the federal compliance requirement.
Views of Responsible Officials and Planned Corrective Actions: Management agrees with the finding
and has prepared a corrective action plan.
Information on the federal program:
Subject: Education Stabilization Fund – Special Tests and Provisions - Wage Rate Requirements
Federal Agency: Department of Education
Federal Program: COVID-19 - Education Stabilization Fund
Assistance Listing Number: 84.425D, 84.425U
Federal Award Numbers and Years (or Other Identifying Numbers): S425D210013, S425U210013
Pass-Through Entity: Indiana Department of Education
Compliance Requirement: Special Tests and Provisions - Wage Rate Requirements
Audit Findings: Material Weakness, Material Noncompliance, Qualified Opinion
Criteria: 2 CFR section 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over Federal award that provides reasonable assurance
that the non-Federal entity is managing the Federal awards in compliance with Federal statutes,
regulations, and the terms and conditions of the Federal award. These internal controls should be in
compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the
Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). 29 CFR 5.5 states in part:
(1) Minimum wages.
(i) All laborers and mechanics employed or working upon the site of the work (or under the United
States Housing Act of 1937 or under the Housing Act of 1949 in the construction or development of the
project), will be paid unconditionally and not less often than once a week, and without subsequent deduction
or rebate on any account (except such payroll deductions as are permitted by regulations issued by the
Secretary of Labor under the Copeland Act (29 CFR part 3)), the full amount of wages and bona fide fringe
benefits (or cash equivalents thereof) due at time of payment computed at rates not less than those
contained in the wage determination of the Secretary of Labor which is attached hereto and made a part
hereof, regardless of any contractual relationship which may be alleged to exist between the contractor and
such laborers and mechanics…
(3)(ii)(A) The contractor shall submit weekly for each week in which any contract work is performed a copy
of all payrolls to the (write in name of appropriate federal agency) if the agency is a party to the contract,
but if the agency is not such a party, the contractor will submit the payrolls to the applicant, sponsor, or
owner, as the case may be, for transmission to the (write in name of agency).
2 CFR 200 Appendix II states in part:
In addition to other provisions required by the Federal agency or non-Federal entity; all contracts made by
the non-Federal entity under the Federal award must contain provisions covering the following, as
applicable. . . .
(D) Davis-Bacon Act, as amended (40 U.S.C. 3141-3148). When required by Federal program legislation,
all prime construction contracts in excess of $2,000 awarded by non-Federal entities must include a
provision for compliance with the Davis-Bacon Act (40 U.S.C. 3141-3144, and 3146-3148) as supplemented
by Department of Labor regulations (29 CFR Part 5, “Labor Standards Provisions Applicable to Contracts
Covering Federally Financed and Assisted Construction”). In accordance with the statute, contractors must
be required to pay wages to laborers and mechanics at a rate not less than the prevailing wages specified
in a wage determination made by the Secretary of Labor. In addition, contractors must be required to pay
wages not less than once a week.. . .”
Condition: An effective internal control system was not in place at the School Corporation in order to
ensure compliance with requirements related to the grant agreement and the Special Tests and Provisions
– Wage Rate Requirements compliance requirements.
Cause: The School Corporation's management had not developed a system of internal controls to ensure
compliance with the compliance requirements listed above.
Effect: The failure to design and implement an effective internal control system enabled material
noncompliance to go undetected. Noncompliance with the grant agreement and the Special Tests and
Provisions – Wage Rate Requirements compliance requirement could result in the loss of future federal funds to the School Corporation. Questioned Costs: There were no questioned costs identified. Context: The School Corporation had one project for HVAC replacement in the elementary school
gymnasium, which was funded with ESSER II (84.425D) and ESSER III (84.425U) grant awards. The
School Corporation properly included Davis-Bacon wage rate requirements in the vendor
contract, however, the School Corporation did not obtain the weekly payroll reports certifications
from the construction vendor to monitor compliance with Davis-Bacon wage rate requirements.
Therefore, no review was performed to ensure that pay rates complied with the federal wage rate
requirements. The School Corporation was subsequently able to obtain the payroll certification reports
from the contractor to demonstrate compliance with the wage rate requirements. The total project cost
disbursed during the audit period was $499,689 which included materials and labor. We estimate
approximately 30-40% of the project costs to be labor based on the scheduled values in the contract.
Identification as a repeat finding: No.
Recommendation: We recommend the School Corporation implement a formal process to ensure
the required weekly payroll reports certifications are collected and reviewed for projects requiring
labor installation and funded by federal grants subject to Davis-Bacon wage rate requirements to
ensure compliance with federal regulations.
Views of Responsible Officials and Planned Corrective Actions: Management agrees with the finding
and has prepared a corrective action plan.
Information on the federal program:
Subject: Education Stabilization Fund – Special Tests and Provisions - Wage Rate Requirements
Federal Agency: Department of Education
Federal Program: COVID-19 - Education Stabilization Fund
Assistance Listing Number: 84.425D, 84.425U
Federal Award Numbers and Years (or Other Identifying Numbers): S425D210013, S425U210013
Pass-Through Entity: Indiana Department of Education
Compliance Requirement: Special Tests and Provisions - Wage Rate Requirements
Audit Findings: Material Weakness, Material Noncompliance, Qualified Opinion
Criteria: 2 CFR section 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over Federal award that provides reasonable assurance
that the non-Federal entity is managing the Federal awards in compliance with Federal statutes,
regulations, and the terms and conditions of the Federal award. These internal controls should be in
compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the
Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). 29 CFR 5.5 states in part:
(1) Minimum wages.
(i) All laborers and mechanics employed or working upon the site of the work (or under the United
States Housing Act of 1937 or under the Housing Act of 1949 in the construction or development of the
project), will be paid unconditionally and not less often than once a week, and without subsequent deduction
or rebate on any account (except such payroll deductions as are permitted by regulations issued by the
Secretary of Labor under the Copeland Act (29 CFR part 3)), the full amount of wages and bona fide fringe
benefits (or cash equivalents thereof) due at time of payment computed at rates not less than those
contained in the wage determination of the Secretary of Labor which is attached hereto and made a part
hereof, regardless of any contractual relationship which may be alleged to exist between the contractor and
such laborers and mechanics…
(3)(ii)(A) The contractor shall submit weekly for each week in which any contract work is performed a copy
of all payrolls to the (write in name of appropriate federal agency) if the agency is a party to the contract,
but if the agency is not such a party, the contractor will submit the payrolls to the applicant, sponsor, or
owner, as the case may be, for transmission to the (write in name of agency).
2 CFR 200 Appendix II states in part:
In addition to other provisions required by the Federal agency or non-Federal entity; all contracts made by
the non-Federal entity under the Federal award must contain provisions covering the following, as
applicable. . . .
(D) Davis-Bacon Act, as amended (40 U.S.C. 3141-3148). When required by Federal program legislation,
all prime construction contracts in excess of $2,000 awarded by non-Federal entities must include a
provision for compliance with the Davis-Bacon Act (40 U.S.C. 3141-3144, and 3146-3148) as supplemented
by Department of Labor regulations (29 CFR Part 5, “Labor Standards Provisions Applicable to Contracts
Covering Federally Financed and Assisted Construction”). In accordance with the statute, contractors must
be required to pay wages to laborers and mechanics at a rate not less than the prevailing wages specified
in a wage determination made by the Secretary of Labor. In addition, contractors must be required to pay
wages not less than once a week.. . .”
Condition: An effective internal control system was not in place at the School Corporation in order to
ensure compliance with requirements related to the grant agreement and the Special Tests and Provisions
– Wage Rate Requirements compliance requirements.
Cause: The School Corporation's management had not developed a system of internal controls to ensure
compliance with the compliance requirements listed above.
Effect: The failure to design and implement an effective internal control system enabled material
noncompliance to go undetected. Noncompliance with the grant agreement and the Special Tests and
Provisions – Wage Rate Requirements compliance requirement could result in the loss of future federal funds to the School Corporation. Questioned Costs: There were no questioned costs identified. Context: The School Corporation had one project for HVAC replacement in the elementary school
gymnasium, which was funded with ESSER II (84.425D) and ESSER III (84.425U) grant awards. The
School Corporation properly included Davis-Bacon wage rate requirements in the vendor
contract, however, the School Corporation did not obtain the weekly payroll reports certifications
from the construction vendor to monitor compliance with Davis-Bacon wage rate requirements.
Therefore, no review was performed to ensure that pay rates complied with the federal wage rate
requirements. The School Corporation was subsequently able to obtain the payroll certification reports
from the contractor to demonstrate compliance with the wage rate requirements. The total project cost
disbursed during the audit period was $499,689 which included materials and labor. We estimate
approximately 30-40% of the project costs to be labor based on the scheduled values in the contract.
Identification as a repeat finding: No.
Recommendation: We recommend the School Corporation implement a formal process to ensure
the required weekly payroll reports certifications are collected and reviewed for projects requiring
labor installation and funded by federal grants subject to Davis-Bacon wage rate requirements to
ensure compliance with federal regulations.
Views of Responsible Officials and Planned Corrective Actions: Management agrees with the finding
and has prepared a corrective action plan.
Information on the federal program:
Subject: Education Stabilization Fund – Internal Controls
Federal Agency: Department of Education
Federal Program: COVID-19 – Education Stabilization Fund
Assistance Listing Number: 84.425D, 84.425U
Federal Award Numbers: S425D210013, S425U210013
Pass-Through Entity: Indiana Department of Education
Compliance Requirement: Equipment and Real Property Management
Audit Findings: Material Weakness
Criteria: 2 CFR 200.313(d) states in part:
"Management requirements. Procedures for managing equipment (including replacement equipment),
whether acquired in whole or in part under a Federal award, until disposition takes place will, as a minimum,
meet the following requirements:
(1) Property records must be maintained that include a description of the property, a serial number
or other identification number, the source of funding for the property (including the FAIN), who
holds title, the acquisition date, and cost of the property, percentage of Federal participation in
the project costs for the Federal award under which the property was acquired, the location,
use and condition of the property, and any ultimate disposition data including the date of
disposal and sale price of the property.
(2) A physical inventory of the property must be taken and the results reconciled with the property
records at least once every two years.
(3) A control system must be developed to ensure adequate safeguards to prevent loss, damage,
or theft of the property. Any loss, damage, or theft must be investigated.
(4) Adequate maintenance procedures must be developed to keep the property in good condition.
. . ."
Condition: An effective internal control system was not in place at the School Corporation in order to
ensure compliance with requirements related to the grant agreement and the Equipment and Real Property
Management Requirements compliance requirements.
Cause: The School Corporation's management had not developed a system of internal controls to ensure
compliance with the compliance requirements listed above.
Effect: The failure to establish an effective internal control system placed the School Corporation at risk of
noncompliance with the grant agreement and the compliance requirements. A lack of segregation of duties
within an internal control system could have also allowed noncompliance with the compliance requirements
and allowed the misuse and mismanagement of federal funds and assets by not having proper oversight, reviews, and approvals over the activities of the programs. Questioned Costs: There were no questioned costs identified. Context: The School Corporation expended a total of $499,689 for HVAC replacement in the elementary
school gymnasium, which was funded with ESSER II (84.425D) and ESSER III (84.425U) grant awards. It
was noted these capital asset acquisitions were not reported on the capital asset listing for the School
Corporation as of June 30, 2024. Management noted the project had not yet been completed as of June 30,
2024, however the costs incurred up to that date should have been reported as construction in progress on
the capital asset listing.
Additionally, the School Corporation last performed a physical inventory in fall of 2021, which does not meet
the federal compliance requirement to take a physical inventory at least once every two years.
Identification as a repeat finding: No.
Recommendation: We recommend the School Corporation update the capital asset listing at least
annually to include all equipment and real property acquisitions, including construction in progress, and
review for potential capital asset dispositions. The capital asset listing should include all required
information to track capital asset acquisitions purchased with federal funding.
Additionally, we recommend the School Corporation conduct a physical inventory at least once every two
years to meet the federal compliance requirement.
Views of Responsible Officials and Planned Corrective Actions: Management agrees with the finding
and has prepared a corrective action plan.
Information on the federal program:
Subject: Education Stabilization Fund – Internal Controls
Federal Agency: Department of Education
Federal Program: COVID-19 – Education Stabilization Fund
Assistance Listing Number: 84.425D, 84.425U
Federal Award Numbers: S425D210013, S425U210013
Pass-Through Entity: Indiana Department of Education
Compliance Requirement: Equipment and Real Property Management
Audit Findings: Material Weakness
Criteria: 2 CFR 200.313(d) states in part:
"Management requirements. Procedures for managing equipment (including replacement equipment),
whether acquired in whole or in part under a Federal award, until disposition takes place will, as a minimum,
meet the following requirements:
(1) Property records must be maintained that include a description of the property, a serial number
or other identification number, the source of funding for the property (including the FAIN), who
holds title, the acquisition date, and cost of the property, percentage of Federal participation in
the project costs for the Federal award under which the property was acquired, the location,
use and condition of the property, and any ultimate disposition data including the date of
disposal and sale price of the property.
(2) A physical inventory of the property must be taken and the results reconciled with the property
records at least once every two years.
(3) A control system must be developed to ensure adequate safeguards to prevent loss, damage,
or theft of the property. Any loss, damage, or theft must be investigated.
(4) Adequate maintenance procedures must be developed to keep the property in good condition.
. . ."
Condition: An effective internal control system was not in place at the School Corporation in order to
ensure compliance with requirements related to the grant agreement and the Equipment and Real Property
Management Requirements compliance requirements.
Cause: The School Corporation's management had not developed a system of internal controls to ensure
compliance with the compliance requirements listed above.
Effect: The failure to establish an effective internal control system placed the School Corporation at risk of
noncompliance with the grant agreement and the compliance requirements. A lack of segregation of duties
within an internal control system could have also allowed noncompliance with the compliance requirements
and allowed the misuse and mismanagement of federal funds and assets by not having proper oversight, reviews, and approvals over the activities of the programs. Questioned Costs: There were no questioned costs identified. Context: The School Corporation expended a total of $499,689 for HVAC replacement in the elementary
school gymnasium, which was funded with ESSER II (84.425D) and ESSER III (84.425U) grant awards. It
was noted these capital asset acquisitions were not reported on the capital asset listing for the School
Corporation as of June 30, 2024. Management noted the project had not yet been completed as of June 30,
2024, however the costs incurred up to that date should have been reported as construction in progress on
the capital asset listing.
Additionally, the School Corporation last performed a physical inventory in fall of 2021, which does not meet
the federal compliance requirement to take a physical inventory at least once every two years.
Identification as a repeat finding: No.
Recommendation: We recommend the School Corporation update the capital asset listing at least
annually to include all equipment and real property acquisitions, including construction in progress, and
review for potential capital asset dispositions. The capital asset listing should include all required
information to track capital asset acquisitions purchased with federal funding.
Additionally, we recommend the School Corporation conduct a physical inventory at least once every two
years to meet the federal compliance requirement.
Views of Responsible Officials and Planned Corrective Actions: Management agrees with the finding
and has prepared a corrective action plan.
Information on the federal program:
Subject: Education Stabilization Fund – Special Tests and Provisions - Wage Rate Requirements
Federal Agency: Department of Education
Federal Program: COVID-19 - Education Stabilization Fund
Assistance Listing Number: 84.425D, 84.425U
Federal Award Numbers and Years (or Other Identifying Numbers): S425D210013, S425U210013
Pass-Through Entity: Indiana Department of Education
Compliance Requirement: Special Tests and Provisions - Wage Rate Requirements
Audit Findings: Material Weakness, Material Noncompliance, Qualified Opinion
Criteria: 2 CFR section 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over Federal award that provides reasonable assurance
that the non-Federal entity is managing the Federal awards in compliance with Federal statutes,
regulations, and the terms and conditions of the Federal award. These internal controls should be in
compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the
Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). 29 CFR 5.5 states in part:
(1) Minimum wages.
(i) All laborers and mechanics employed or working upon the site of the work (or under the United
States Housing Act of 1937 or under the Housing Act of 1949 in the construction or development of the
project), will be paid unconditionally and not less often than once a week, and without subsequent deduction
or rebate on any account (except such payroll deductions as are permitted by regulations issued by the
Secretary of Labor under the Copeland Act (29 CFR part 3)), the full amount of wages and bona fide fringe
benefits (or cash equivalents thereof) due at time of payment computed at rates not less than those
contained in the wage determination of the Secretary of Labor which is attached hereto and made a part
hereof, regardless of any contractual relationship which may be alleged to exist between the contractor and
such laborers and mechanics…
(3)(ii)(A) The contractor shall submit weekly for each week in which any contract work is performed a copy
of all payrolls to the (write in name of appropriate federal agency) if the agency is a party to the contract,
but if the agency is not such a party, the contractor will submit the payrolls to the applicant, sponsor, or
owner, as the case may be, for transmission to the (write in name of agency).
2 CFR 200 Appendix II states in part:
In addition to other provisions required by the Federal agency or non-Federal entity; all contracts made by
the non-Federal entity under the Federal award must contain provisions covering the following, as
applicable. . . .
(D) Davis-Bacon Act, as amended (40 U.S.C. 3141-3148). When required by Federal program legislation,
all prime construction contracts in excess of $2,000 awarded by non-Federal entities must include a
provision for compliance with the Davis-Bacon Act (40 U.S.C. 3141-3144, and 3146-3148) as supplemented
by Department of Labor regulations (29 CFR Part 5, “Labor Standards Provisions Applicable to Contracts
Covering Federally Financed and Assisted Construction”). In accordance with the statute, contractors must
be required to pay wages to laborers and mechanics at a rate not less than the prevailing wages specified
in a wage determination made by the Secretary of Labor. In addition, contractors must be required to pay
wages not less than once a week.. . .”
Condition: An effective internal control system was not in place at the School Corporation in order to
ensure compliance with requirements related to the grant agreement and the Special Tests and Provisions
– Wage Rate Requirements compliance requirements.
Cause: The School Corporation's management had not developed a system of internal controls to ensure
compliance with the compliance requirements listed above.
Effect: The failure to design and implement an effective internal control system enabled material
noncompliance to go undetected. Noncompliance with the grant agreement and the Special Tests and
Provisions – Wage Rate Requirements compliance requirement could result in the loss of future federal funds to the School Corporation. Questioned Costs: There were no questioned costs identified. Context: The School Corporation had one project for HVAC replacement in the elementary school
gymnasium, which was funded with ESSER II (84.425D) and ESSER III (84.425U) grant awards. The
School Corporation properly included Davis-Bacon wage rate requirements in the vendor
contract, however, the School Corporation did not obtain the weekly payroll reports certifications
from the construction vendor to monitor compliance with Davis-Bacon wage rate requirements.
Therefore, no review was performed to ensure that pay rates complied with the federal wage rate
requirements. The School Corporation was subsequently able to obtain the payroll certification reports
from the contractor to demonstrate compliance with the wage rate requirements. The total project cost
disbursed during the audit period was $499,689 which included materials and labor. We estimate
approximately 30-40% of the project costs to be labor based on the scheduled values in the contract.
Identification as a repeat finding: No.
Recommendation: We recommend the School Corporation implement a formal process to ensure
the required weekly payroll reports certifications are collected and reviewed for projects requiring
labor installation and funded by federal grants subject to Davis-Bacon wage rate requirements to
ensure compliance with federal regulations.
Views of Responsible Officials and Planned Corrective Actions: Management agrees with the finding
and has prepared a corrective action plan.
Information on the federal program:
Subject: Education Stabilization Fund – Special Tests and Provisions - Wage Rate Requirements
Federal Agency: Department of Education
Federal Program: COVID-19 - Education Stabilization Fund
Assistance Listing Number: 84.425D, 84.425U
Federal Award Numbers and Years (or Other Identifying Numbers): S425D210013, S425U210013
Pass-Through Entity: Indiana Department of Education
Compliance Requirement: Special Tests and Provisions - Wage Rate Requirements
Audit Findings: Material Weakness, Material Noncompliance, Qualified Opinion
Criteria: 2 CFR section 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over Federal award that provides reasonable assurance
that the non-Federal entity is managing the Federal awards in compliance with Federal statutes,
regulations, and the terms and conditions of the Federal award. These internal controls should be in
compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the
Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). 29 CFR 5.5 states in part:
(1) Minimum wages.
(i) All laborers and mechanics employed or working upon the site of the work (or under the United
States Housing Act of 1937 or under the Housing Act of 1949 in the construction or development of the
project), will be paid unconditionally and not less often than once a week, and without subsequent deduction
or rebate on any account (except such payroll deductions as are permitted by regulations issued by the
Secretary of Labor under the Copeland Act (29 CFR part 3)), the full amount of wages and bona fide fringe
benefits (or cash equivalents thereof) due at time of payment computed at rates not less than those
contained in the wage determination of the Secretary of Labor which is attached hereto and made a part
hereof, regardless of any contractual relationship which may be alleged to exist between the contractor and
such laborers and mechanics…
(3)(ii)(A) The contractor shall submit weekly for each week in which any contract work is performed a copy
of all payrolls to the (write in name of appropriate federal agency) if the agency is a party to the contract,
but if the agency is not such a party, the contractor will submit the payrolls to the applicant, sponsor, or
owner, as the case may be, for transmission to the (write in name of agency).
2 CFR 200 Appendix II states in part:
In addition to other provisions required by the Federal agency or non-Federal entity; all contracts made by
the non-Federal entity under the Federal award must contain provisions covering the following, as
applicable. . . .
(D) Davis-Bacon Act, as amended (40 U.S.C. 3141-3148). When required by Federal program legislation,
all prime construction contracts in excess of $2,000 awarded by non-Federal entities must include a
provision for compliance with the Davis-Bacon Act (40 U.S.C. 3141-3144, and 3146-3148) as supplemented
by Department of Labor regulations (29 CFR Part 5, “Labor Standards Provisions Applicable to Contracts
Covering Federally Financed and Assisted Construction”). In accordance with the statute, contractors must
be required to pay wages to laborers and mechanics at a rate not less than the prevailing wages specified
in a wage determination made by the Secretary of Labor. In addition, contractors must be required to pay
wages not less than once a week.. . .”
Condition: An effective internal control system was not in place at the School Corporation in order to
ensure compliance with requirements related to the grant agreement and the Special Tests and Provisions
– Wage Rate Requirements compliance requirements.
Cause: The School Corporation's management had not developed a system of internal controls to ensure
compliance with the compliance requirements listed above.
Effect: The failure to design and implement an effective internal control system enabled material
noncompliance to go undetected. Noncompliance with the grant agreement and the Special Tests and
Provisions – Wage Rate Requirements compliance requirement could result in the loss of future federal funds to the School Corporation. Questioned Costs: There were no questioned costs identified. Context: The School Corporation had one project for HVAC replacement in the elementary school
gymnasium, which was funded with ESSER II (84.425D) and ESSER III (84.425U) grant awards. The
School Corporation properly included Davis-Bacon wage rate requirements in the vendor
contract, however, the School Corporation did not obtain the weekly payroll reports certifications
from the construction vendor to monitor compliance with Davis-Bacon wage rate requirements.
Therefore, no review was performed to ensure that pay rates complied with the federal wage rate
requirements. The School Corporation was subsequently able to obtain the payroll certification reports
from the contractor to demonstrate compliance with the wage rate requirements. The total project cost
disbursed during the audit period was $499,689 which included materials and labor. We estimate
approximately 30-40% of the project costs to be labor based on the scheduled values in the contract.
Identification as a repeat finding: No.
Recommendation: We recommend the School Corporation implement a formal process to ensure
the required weekly payroll reports certifications are collected and reviewed for projects requiring
labor installation and funded by federal grants subject to Davis-Bacon wage rate requirements to
ensure compliance with federal regulations.
Views of Responsible Officials and Planned Corrective Actions: Management agrees with the finding
and has prepared a corrective action plan.