Audit 320150

FY End
2024-03-31
Total Expended
$1.19M
Findings
12
Programs
9
Organization: Charter Township of Clinton (MI)
Year: 2024 Accepted: 2024-09-20

Organization Exclusion Status:

Checking exclusion status...

Findings

ID Ref Severity Repeat Requirement
497401 2024-001 Material Weakness - N
497402 2024-001 Material Weakness - N
497403 2024-001 Material Weakness - N
497404 2024-001 Material Weakness - N
497405 2024-001 Material Weakness - N
497406 2024-001 Material Weakness - N
1073843 2024-001 Material Weakness - N
1073844 2024-001 Material Weakness - N
1073845 2024-001 Material Weakness - N
1073846 2024-001 Material Weakness - N
1073847 2024-001 Material Weakness - N
1073848 2024-001 Material Weakness - N

Programs

Contacts

Name Title Type
XFRFJ3DZ6116 Mary Hein Auditee
5867238001 Ali Hijazi Auditor
No contacts on file

Notes to SEFA

Accounting Policies: The accompanying schedule of expenditures of federal awards (the “Schedule”) includes the federal grant activity of Charter Township of Clinton (the “Township”) under programs of the federal government for the year ended March 31, 2024. The information in the Schedule is presented in accordance with the requirements of Title 2 U.S. Code of Federal Regulations Part 200, Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards (the “Uniform Guidance”). Because the Schedule presents only a selected portion of the operations of the Township, it is not intended to and does not present the financial position, changes in net position, or cash flows of the Township. Expenditures reported in the Schedule are reported on the same basis of accounting as the basic financial statements. Such expenditures are recognized following the cost principles contained in Title 2 U.S. Code of Federal Regulations Part 200, Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards, wherein certain types of expenditures are not allowable or are limited as to reimbursement. The pass through entity identifying numbers are presented where available. The Township has elected not to use the 10 percent de minimis indirect cost rate to recover indirect costs, as allowed under the Uniform Guidance. De Minimis Rate Used: N Rate Explanation: The Township has elected not to use the 10 percent de minimis indirect cost rate to recover indirect costs, as allowed under the Uniform Guidance.

Finding Details

Assistance Listing Number, Federal Agency, and Program Name - ALN 14.218, U.S. Department of Housing and Urban Development, CDBG Entitlement Grants Cluster - Community Development Block Grant Federal Award Identification Number and Year - B-18-MC-26-0033, B-19-MC-26-0033, B-20-MC-26-0033, B-21-MC-26-0033, B-22-MC-26-0033, B-23-MC-26-0033 Pass-through Entity - N/A Finding Type - Material weakness Repeat Finding - No Criteria - 24 CFR 570.506(b)(9)(ii) requires the Township to prepare and maintain a prerehabilitation inspection report describing the deficiencies to be rehabilitated for residential properties. The Township is also required to inspect the rehabilitation work upon completion to assure that it is carried out in accordance with rehabilitation standards. Condition - We noted no formal evidence that required inspections were performed prior to contract approval in one instance. We also noted no formal evidenced that inspections were performed upon project completion to ensure that work was carried out in accordance with contract specifications in one instance. Questioned Costs - N/A Identification of How Questioned Costs Were Computed - N/A Context - No formal evidence existed where deficiencies were identified after the prerehabilitation and postrehabilitation inspection processes had been completed. Cause and Effect - The lack of documentation of an inspection performed that identified work to be performed prior to contract approval could result in questioned costs if the need for the rehabilitation work could not be substantiated. Recommendation - We recommend the Township implement controls to ensure a formal inspection report is prepared prior to approval of all rehabilitation contracts, including contracts for deficiencies identified after the initial prerehabilitation inspection process is complete. We also recomment implementing controls to ensure a formal inspection report is prepared upon completion of rehabilitation work to ensure that work was carried out in accordance with contract specifications. Additionally, we recomment implementing controls to ensure a review of ongoing rehabilitation projects occurs at a minimum on a monthly basis to ensure that prerehabilitation and postrehabilitation inspections are being performed. Views of Responsible Officials and Corrective Action Plan - After the inspector has done the initial walk through to identify required repairs, a full comprehensive write-up and cost is established for all rehabilitation projects that document additional repairs to be completed that are more preventive in nature. Any additional items discovered during the project or requested by the homeowner will be added to the write-up. For any emergency repairs, a memorandum will be added to the file. To ensure that prerehabilitation and postrehabilitation inspections are taking place, the assistant planning director will review a list of ongoing rehabilitation projects at a minimum on a monthly basis.
Assistance Listing Number, Federal Agency, and Program Name - ALN 14.218, U.S. Department of Housing and Urban Development, CDBG Entitlement Grants Cluster - Community Development Block Grant Federal Award Identification Number and Year - B-18-MC-26-0033, B-19-MC-26-0033, B-20-MC-26-0033, B-21-MC-26-0033, B-22-MC-26-0033, B-23-MC-26-0033 Pass-through Entity - N/A Finding Type - Material weakness Repeat Finding - No Criteria - 24 CFR 570.506(b)(9)(ii) requires the Township to prepare and maintain a prerehabilitation inspection report describing the deficiencies to be rehabilitated for residential properties. The Township is also required to inspect the rehabilitation work upon completion to assure that it is carried out in accordance with rehabilitation standards. Condition - We noted no formal evidence that required inspections were performed prior to contract approval in one instance. We also noted no formal evidenced that inspections were performed upon project completion to ensure that work was carried out in accordance with contract specifications in one instance. Questioned Costs - N/A Identification of How Questioned Costs Were Computed - N/A Context - No formal evidence existed where deficiencies were identified after the prerehabilitation and postrehabilitation inspection processes had been completed. Cause and Effect - The lack of documentation of an inspection performed that identified work to be performed prior to contract approval could result in questioned costs if the need for the rehabilitation work could not be substantiated. Recommendation - We recommend the Township implement controls to ensure a formal inspection report is prepared prior to approval of all rehabilitation contracts, including contracts for deficiencies identified after the initial prerehabilitation inspection process is complete. We also recomment implementing controls to ensure a formal inspection report is prepared upon completion of rehabilitation work to ensure that work was carried out in accordance with contract specifications. Additionally, we recomment implementing controls to ensure a review of ongoing rehabilitation projects occurs at a minimum on a monthly basis to ensure that prerehabilitation and postrehabilitation inspections are being performed. Views of Responsible Officials and Corrective Action Plan - After the inspector has done the initial walk through to identify required repairs, a full comprehensive write-up and cost is established for all rehabilitation projects that document additional repairs to be completed that are more preventive in nature. Any additional items discovered during the project or requested by the homeowner will be added to the write-up. For any emergency repairs, a memorandum will be added to the file. To ensure that prerehabilitation and postrehabilitation inspections are taking place, the assistant planning director will review a list of ongoing rehabilitation projects at a minimum on a monthly basis.
Assistance Listing Number, Federal Agency, and Program Name - ALN 14.218, U.S. Department of Housing and Urban Development, CDBG Entitlement Grants Cluster - Community Development Block Grant Federal Award Identification Number and Year - B-18-MC-26-0033, B-19-MC-26-0033, B-20-MC-26-0033, B-21-MC-26-0033, B-22-MC-26-0033, B-23-MC-26-0033 Pass-through Entity - N/A Finding Type - Material weakness Repeat Finding - No Criteria - 24 CFR 570.506(b)(9)(ii) requires the Township to prepare and maintain a prerehabilitation inspection report describing the deficiencies to be rehabilitated for residential properties. The Township is also required to inspect the rehabilitation work upon completion to assure that it is carried out in accordance with rehabilitation standards. Condition - We noted no formal evidence that required inspections were performed prior to contract approval in one instance. We also noted no formal evidenced that inspections were performed upon project completion to ensure that work was carried out in accordance with contract specifications in one instance. Questioned Costs - N/A Identification of How Questioned Costs Were Computed - N/A Context - No formal evidence existed where deficiencies were identified after the prerehabilitation and postrehabilitation inspection processes had been completed. Cause and Effect - The lack of documentation of an inspection performed that identified work to be performed prior to contract approval could result in questioned costs if the need for the rehabilitation work could not be substantiated. Recommendation - We recommend the Township implement controls to ensure a formal inspection report is prepared prior to approval of all rehabilitation contracts, including contracts for deficiencies identified after the initial prerehabilitation inspection process is complete. We also recomment implementing controls to ensure a formal inspection report is prepared upon completion of rehabilitation work to ensure that work was carried out in accordance with contract specifications. Additionally, we recomment implementing controls to ensure a review of ongoing rehabilitation projects occurs at a minimum on a monthly basis to ensure that prerehabilitation and postrehabilitation inspections are being performed. Views of Responsible Officials and Corrective Action Plan - After the inspector has done the initial walk through to identify required repairs, a full comprehensive write-up and cost is established for all rehabilitation projects that document additional repairs to be completed that are more preventive in nature. Any additional items discovered during the project or requested by the homeowner will be added to the write-up. For any emergency repairs, a memorandum will be added to the file. To ensure that prerehabilitation and postrehabilitation inspections are taking place, the assistant planning director will review a list of ongoing rehabilitation projects at a minimum on a monthly basis.
Assistance Listing Number, Federal Agency, and Program Name - ALN 14.218, U.S. Department of Housing and Urban Development, CDBG Entitlement Grants Cluster - Community Development Block Grant Federal Award Identification Number and Year - B-18-MC-26-0033, B-19-MC-26-0033, B-20-MC-26-0033, B-21-MC-26-0033, B-22-MC-26-0033, B-23-MC-26-0033 Pass-through Entity - N/A Finding Type - Material weakness Repeat Finding - No Criteria - 24 CFR 570.506(b)(9)(ii) requires the Township to prepare and maintain a prerehabilitation inspection report describing the deficiencies to be rehabilitated for residential properties. The Township is also required to inspect the rehabilitation work upon completion to assure that it is carried out in accordance with rehabilitation standards. Condition - We noted no formal evidence that required inspections were performed prior to contract approval in one instance. We also noted no formal evidenced that inspections were performed upon project completion to ensure that work was carried out in accordance with contract specifications in one instance. Questioned Costs - N/A Identification of How Questioned Costs Were Computed - N/A Context - No formal evidence existed where deficiencies were identified after the prerehabilitation and postrehabilitation inspection processes had been completed. Cause and Effect - The lack of documentation of an inspection performed that identified work to be performed prior to contract approval could result in questioned costs if the need for the rehabilitation work could not be substantiated. Recommendation - We recommend the Township implement controls to ensure a formal inspection report is prepared prior to approval of all rehabilitation contracts, including contracts for deficiencies identified after the initial prerehabilitation inspection process is complete. We also recomment implementing controls to ensure a formal inspection report is prepared upon completion of rehabilitation work to ensure that work was carried out in accordance with contract specifications. Additionally, we recomment implementing controls to ensure a review of ongoing rehabilitation projects occurs at a minimum on a monthly basis to ensure that prerehabilitation and postrehabilitation inspections are being performed. Views of Responsible Officials and Corrective Action Plan - After the inspector has done the initial walk through to identify required repairs, a full comprehensive write-up and cost is established for all rehabilitation projects that document additional repairs to be completed that are more preventive in nature. Any additional items discovered during the project or requested by the homeowner will be added to the write-up. For any emergency repairs, a memorandum will be added to the file. To ensure that prerehabilitation and postrehabilitation inspections are taking place, the assistant planning director will review a list of ongoing rehabilitation projects at a minimum on a monthly basis.
Assistance Listing Number, Federal Agency, and Program Name - ALN 14.218, U.S. Department of Housing and Urban Development, CDBG Entitlement Grants Cluster - Community Development Block Grant Federal Award Identification Number and Year - B-18-MC-26-0033, B-19-MC-26-0033, B-20-MC-26-0033, B-21-MC-26-0033, B-22-MC-26-0033, B-23-MC-26-0033 Pass-through Entity - N/A Finding Type - Material weakness Repeat Finding - No Criteria - 24 CFR 570.506(b)(9)(ii) requires the Township to prepare and maintain a prerehabilitation inspection report describing the deficiencies to be rehabilitated for residential properties. The Township is also required to inspect the rehabilitation work upon completion to assure that it is carried out in accordance with rehabilitation standards. Condition - We noted no formal evidence that required inspections were performed prior to contract approval in one instance. We also noted no formal evidenced that inspections were performed upon project completion to ensure that work was carried out in accordance with contract specifications in one instance. Questioned Costs - N/A Identification of How Questioned Costs Were Computed - N/A Context - No formal evidence existed where deficiencies were identified after the prerehabilitation and postrehabilitation inspection processes had been completed. Cause and Effect - The lack of documentation of an inspection performed that identified work to be performed prior to contract approval could result in questioned costs if the need for the rehabilitation work could not be substantiated. Recommendation - We recommend the Township implement controls to ensure a formal inspection report is prepared prior to approval of all rehabilitation contracts, including contracts for deficiencies identified after the initial prerehabilitation inspection process is complete. We also recomment implementing controls to ensure a formal inspection report is prepared upon completion of rehabilitation work to ensure that work was carried out in accordance with contract specifications. Additionally, we recomment implementing controls to ensure a review of ongoing rehabilitation projects occurs at a minimum on a monthly basis to ensure that prerehabilitation and postrehabilitation inspections are being performed. Views of Responsible Officials and Corrective Action Plan - After the inspector has done the initial walk through to identify required repairs, a full comprehensive write-up and cost is established for all rehabilitation projects that document additional repairs to be completed that are more preventive in nature. Any additional items discovered during the project or requested by the homeowner will be added to the write-up. For any emergency repairs, a memorandum will be added to the file. To ensure that prerehabilitation and postrehabilitation inspections are taking place, the assistant planning director will review a list of ongoing rehabilitation projects at a minimum on a monthly basis.
Assistance Listing Number, Federal Agency, and Program Name - ALN 14.218, U.S. Department of Housing and Urban Development, CDBG Entitlement Grants Cluster - Community Development Block Grant Federal Award Identification Number and Year - B-18-MC-26-0033, B-19-MC-26-0033, B-20-MC-26-0033, B-21-MC-26-0033, B-22-MC-26-0033, B-23-MC-26-0033 Pass-through Entity - N/A Finding Type - Material weakness Repeat Finding - No Criteria - 24 CFR 570.506(b)(9)(ii) requires the Township to prepare and maintain a prerehabilitation inspection report describing the deficiencies to be rehabilitated for residential properties. The Township is also required to inspect the rehabilitation work upon completion to assure that it is carried out in accordance with rehabilitation standards. Condition - We noted no formal evidence that required inspections were performed prior to contract approval in one instance. We also noted no formal evidenced that inspections were performed upon project completion to ensure that work was carried out in accordance with contract specifications in one instance. Questioned Costs - N/A Identification of How Questioned Costs Were Computed - N/A Context - No formal evidence existed where deficiencies were identified after the prerehabilitation and postrehabilitation inspection processes had been completed. Cause and Effect - The lack of documentation of an inspection performed that identified work to be performed prior to contract approval could result in questioned costs if the need for the rehabilitation work could not be substantiated. Recommendation - We recommend the Township implement controls to ensure a formal inspection report is prepared prior to approval of all rehabilitation contracts, including contracts for deficiencies identified after the initial prerehabilitation inspection process is complete. We also recomment implementing controls to ensure a formal inspection report is prepared upon completion of rehabilitation work to ensure that work was carried out in accordance with contract specifications. Additionally, we recomment implementing controls to ensure a review of ongoing rehabilitation projects occurs at a minimum on a monthly basis to ensure that prerehabilitation and postrehabilitation inspections are being performed. Views of Responsible Officials and Corrective Action Plan - After the inspector has done the initial walk through to identify required repairs, a full comprehensive write-up and cost is established for all rehabilitation projects that document additional repairs to be completed that are more preventive in nature. Any additional items discovered during the project or requested by the homeowner will be added to the write-up. For any emergency repairs, a memorandum will be added to the file. To ensure that prerehabilitation and postrehabilitation inspections are taking place, the assistant planning director will review a list of ongoing rehabilitation projects at a minimum on a monthly basis.
Assistance Listing Number, Federal Agency, and Program Name - ALN 14.218, U.S. Department of Housing and Urban Development, CDBG Entitlement Grants Cluster - Community Development Block Grant Federal Award Identification Number and Year - B-18-MC-26-0033, B-19-MC-26-0033, B-20-MC-26-0033, B-21-MC-26-0033, B-22-MC-26-0033, B-23-MC-26-0033 Pass-through Entity - N/A Finding Type - Material weakness Repeat Finding - No Criteria - 24 CFR 570.506(b)(9)(ii) requires the Township to prepare and maintain a prerehabilitation inspection report describing the deficiencies to be rehabilitated for residential properties. The Township is also required to inspect the rehabilitation work upon completion to assure that it is carried out in accordance with rehabilitation standards. Condition - We noted no formal evidence that required inspections were performed prior to contract approval in one instance. We also noted no formal evidenced that inspections were performed upon project completion to ensure that work was carried out in accordance with contract specifications in one instance. Questioned Costs - N/A Identification of How Questioned Costs Were Computed - N/A Context - No formal evidence existed where deficiencies were identified after the prerehabilitation and postrehabilitation inspection processes had been completed. Cause and Effect - The lack of documentation of an inspection performed that identified work to be performed prior to contract approval could result in questioned costs if the need for the rehabilitation work could not be substantiated. Recommendation - We recommend the Township implement controls to ensure a formal inspection report is prepared prior to approval of all rehabilitation contracts, including contracts for deficiencies identified after the initial prerehabilitation inspection process is complete. We also recomment implementing controls to ensure a formal inspection report is prepared upon completion of rehabilitation work to ensure that work was carried out in accordance with contract specifications. Additionally, we recomment implementing controls to ensure a review of ongoing rehabilitation projects occurs at a minimum on a monthly basis to ensure that prerehabilitation and postrehabilitation inspections are being performed. Views of Responsible Officials and Corrective Action Plan - After the inspector has done the initial walk through to identify required repairs, a full comprehensive write-up and cost is established for all rehabilitation projects that document additional repairs to be completed that are more preventive in nature. Any additional items discovered during the project or requested by the homeowner will be added to the write-up. For any emergency repairs, a memorandum will be added to the file. To ensure that prerehabilitation and postrehabilitation inspections are taking place, the assistant planning director will review a list of ongoing rehabilitation projects at a minimum on a monthly basis.
Assistance Listing Number, Federal Agency, and Program Name - ALN 14.218, U.S. Department of Housing and Urban Development, CDBG Entitlement Grants Cluster - Community Development Block Grant Federal Award Identification Number and Year - B-18-MC-26-0033, B-19-MC-26-0033, B-20-MC-26-0033, B-21-MC-26-0033, B-22-MC-26-0033, B-23-MC-26-0033 Pass-through Entity - N/A Finding Type - Material weakness Repeat Finding - No Criteria - 24 CFR 570.506(b)(9)(ii) requires the Township to prepare and maintain a prerehabilitation inspection report describing the deficiencies to be rehabilitated for residential properties. The Township is also required to inspect the rehabilitation work upon completion to assure that it is carried out in accordance with rehabilitation standards. Condition - We noted no formal evidence that required inspections were performed prior to contract approval in one instance. We also noted no formal evidenced that inspections were performed upon project completion to ensure that work was carried out in accordance with contract specifications in one instance. Questioned Costs - N/A Identification of How Questioned Costs Were Computed - N/A Context - No formal evidence existed where deficiencies were identified after the prerehabilitation and postrehabilitation inspection processes had been completed. Cause and Effect - The lack of documentation of an inspection performed that identified work to be performed prior to contract approval could result in questioned costs if the need for the rehabilitation work could not be substantiated. Recommendation - We recommend the Township implement controls to ensure a formal inspection report is prepared prior to approval of all rehabilitation contracts, including contracts for deficiencies identified after the initial prerehabilitation inspection process is complete. We also recomment implementing controls to ensure a formal inspection report is prepared upon completion of rehabilitation work to ensure that work was carried out in accordance with contract specifications. Additionally, we recomment implementing controls to ensure a review of ongoing rehabilitation projects occurs at a minimum on a monthly basis to ensure that prerehabilitation and postrehabilitation inspections are being performed. Views of Responsible Officials and Corrective Action Plan - After the inspector has done the initial walk through to identify required repairs, a full comprehensive write-up and cost is established for all rehabilitation projects that document additional repairs to be completed that are more preventive in nature. Any additional items discovered during the project or requested by the homeowner will be added to the write-up. For any emergency repairs, a memorandum will be added to the file. To ensure that prerehabilitation and postrehabilitation inspections are taking place, the assistant planning director will review a list of ongoing rehabilitation projects at a minimum on a monthly basis.
Assistance Listing Number, Federal Agency, and Program Name - ALN 14.218, U.S. Department of Housing and Urban Development, CDBG Entitlement Grants Cluster - Community Development Block Grant Federal Award Identification Number and Year - B-18-MC-26-0033, B-19-MC-26-0033, B-20-MC-26-0033, B-21-MC-26-0033, B-22-MC-26-0033, B-23-MC-26-0033 Pass-through Entity - N/A Finding Type - Material weakness Repeat Finding - No Criteria - 24 CFR 570.506(b)(9)(ii) requires the Township to prepare and maintain a prerehabilitation inspection report describing the deficiencies to be rehabilitated for residential properties. The Township is also required to inspect the rehabilitation work upon completion to assure that it is carried out in accordance with rehabilitation standards. Condition - We noted no formal evidence that required inspections were performed prior to contract approval in one instance. We also noted no formal evidenced that inspections were performed upon project completion to ensure that work was carried out in accordance with contract specifications in one instance. Questioned Costs - N/A Identification of How Questioned Costs Were Computed - N/A Context - No formal evidence existed where deficiencies were identified after the prerehabilitation and postrehabilitation inspection processes had been completed. Cause and Effect - The lack of documentation of an inspection performed that identified work to be performed prior to contract approval could result in questioned costs if the need for the rehabilitation work could not be substantiated. Recommendation - We recommend the Township implement controls to ensure a formal inspection report is prepared prior to approval of all rehabilitation contracts, including contracts for deficiencies identified after the initial prerehabilitation inspection process is complete. We also recomment implementing controls to ensure a formal inspection report is prepared upon completion of rehabilitation work to ensure that work was carried out in accordance with contract specifications. Additionally, we recomment implementing controls to ensure a review of ongoing rehabilitation projects occurs at a minimum on a monthly basis to ensure that prerehabilitation and postrehabilitation inspections are being performed. Views of Responsible Officials and Corrective Action Plan - After the inspector has done the initial walk through to identify required repairs, a full comprehensive write-up and cost is established for all rehabilitation projects that document additional repairs to be completed that are more preventive in nature. Any additional items discovered during the project or requested by the homeowner will be added to the write-up. For any emergency repairs, a memorandum will be added to the file. To ensure that prerehabilitation and postrehabilitation inspections are taking place, the assistant planning director will review a list of ongoing rehabilitation projects at a minimum on a monthly basis.
Assistance Listing Number, Federal Agency, and Program Name - ALN 14.218, U.S. Department of Housing and Urban Development, CDBG Entitlement Grants Cluster - Community Development Block Grant Federal Award Identification Number and Year - B-18-MC-26-0033, B-19-MC-26-0033, B-20-MC-26-0033, B-21-MC-26-0033, B-22-MC-26-0033, B-23-MC-26-0033 Pass-through Entity - N/A Finding Type - Material weakness Repeat Finding - No Criteria - 24 CFR 570.506(b)(9)(ii) requires the Township to prepare and maintain a prerehabilitation inspection report describing the deficiencies to be rehabilitated for residential properties. The Township is also required to inspect the rehabilitation work upon completion to assure that it is carried out in accordance with rehabilitation standards. Condition - We noted no formal evidence that required inspections were performed prior to contract approval in one instance. We also noted no formal evidenced that inspections were performed upon project completion to ensure that work was carried out in accordance with contract specifications in one instance. Questioned Costs - N/A Identification of How Questioned Costs Were Computed - N/A Context - No formal evidence existed where deficiencies were identified after the prerehabilitation and postrehabilitation inspection processes had been completed. Cause and Effect - The lack of documentation of an inspection performed that identified work to be performed prior to contract approval could result in questioned costs if the need for the rehabilitation work could not be substantiated. Recommendation - We recommend the Township implement controls to ensure a formal inspection report is prepared prior to approval of all rehabilitation contracts, including contracts for deficiencies identified after the initial prerehabilitation inspection process is complete. We also recomment implementing controls to ensure a formal inspection report is prepared upon completion of rehabilitation work to ensure that work was carried out in accordance with contract specifications. Additionally, we recomment implementing controls to ensure a review of ongoing rehabilitation projects occurs at a minimum on a monthly basis to ensure that prerehabilitation and postrehabilitation inspections are being performed. Views of Responsible Officials and Corrective Action Plan - After the inspector has done the initial walk through to identify required repairs, a full comprehensive write-up and cost is established for all rehabilitation projects that document additional repairs to be completed that are more preventive in nature. Any additional items discovered during the project or requested by the homeowner will be added to the write-up. For any emergency repairs, a memorandum will be added to the file. To ensure that prerehabilitation and postrehabilitation inspections are taking place, the assistant planning director will review a list of ongoing rehabilitation projects at a minimum on a monthly basis.
Assistance Listing Number, Federal Agency, and Program Name - ALN 14.218, U.S. Department of Housing and Urban Development, CDBG Entitlement Grants Cluster - Community Development Block Grant Federal Award Identification Number and Year - B-18-MC-26-0033, B-19-MC-26-0033, B-20-MC-26-0033, B-21-MC-26-0033, B-22-MC-26-0033, B-23-MC-26-0033 Pass-through Entity - N/A Finding Type - Material weakness Repeat Finding - No Criteria - 24 CFR 570.506(b)(9)(ii) requires the Township to prepare and maintain a prerehabilitation inspection report describing the deficiencies to be rehabilitated for residential properties. The Township is also required to inspect the rehabilitation work upon completion to assure that it is carried out in accordance with rehabilitation standards. Condition - We noted no formal evidence that required inspections were performed prior to contract approval in one instance. We also noted no formal evidenced that inspections were performed upon project completion to ensure that work was carried out in accordance with contract specifications in one instance. Questioned Costs - N/A Identification of How Questioned Costs Were Computed - N/A Context - No formal evidence existed where deficiencies were identified after the prerehabilitation and postrehabilitation inspection processes had been completed. Cause and Effect - The lack of documentation of an inspection performed that identified work to be performed prior to contract approval could result in questioned costs if the need for the rehabilitation work could not be substantiated. Recommendation - We recommend the Township implement controls to ensure a formal inspection report is prepared prior to approval of all rehabilitation contracts, including contracts for deficiencies identified after the initial prerehabilitation inspection process is complete. We also recomment implementing controls to ensure a formal inspection report is prepared upon completion of rehabilitation work to ensure that work was carried out in accordance with contract specifications. Additionally, we recomment implementing controls to ensure a review of ongoing rehabilitation projects occurs at a minimum on a monthly basis to ensure that prerehabilitation and postrehabilitation inspections are being performed. Views of Responsible Officials and Corrective Action Plan - After the inspector has done the initial walk through to identify required repairs, a full comprehensive write-up and cost is established for all rehabilitation projects that document additional repairs to be completed that are more preventive in nature. Any additional items discovered during the project or requested by the homeowner will be added to the write-up. For any emergency repairs, a memorandum will be added to the file. To ensure that prerehabilitation and postrehabilitation inspections are taking place, the assistant planning director will review a list of ongoing rehabilitation projects at a minimum on a monthly basis.
Assistance Listing Number, Federal Agency, and Program Name - ALN 14.218, U.S. Department of Housing and Urban Development, CDBG Entitlement Grants Cluster - Community Development Block Grant Federal Award Identification Number and Year - B-18-MC-26-0033, B-19-MC-26-0033, B-20-MC-26-0033, B-21-MC-26-0033, B-22-MC-26-0033, B-23-MC-26-0033 Pass-through Entity - N/A Finding Type - Material weakness Repeat Finding - No Criteria - 24 CFR 570.506(b)(9)(ii) requires the Township to prepare and maintain a prerehabilitation inspection report describing the deficiencies to be rehabilitated for residential properties. The Township is also required to inspect the rehabilitation work upon completion to assure that it is carried out in accordance with rehabilitation standards. Condition - We noted no formal evidence that required inspections were performed prior to contract approval in one instance. We also noted no formal evidenced that inspections were performed upon project completion to ensure that work was carried out in accordance with contract specifications in one instance. Questioned Costs - N/A Identification of How Questioned Costs Were Computed - N/A Context - No formal evidence existed where deficiencies were identified after the prerehabilitation and postrehabilitation inspection processes had been completed. Cause and Effect - The lack of documentation of an inspection performed that identified work to be performed prior to contract approval could result in questioned costs if the need for the rehabilitation work could not be substantiated. Recommendation - We recommend the Township implement controls to ensure a formal inspection report is prepared prior to approval of all rehabilitation contracts, including contracts for deficiencies identified after the initial prerehabilitation inspection process is complete. We also recomment implementing controls to ensure a formal inspection report is prepared upon completion of rehabilitation work to ensure that work was carried out in accordance with contract specifications. Additionally, we recomment implementing controls to ensure a review of ongoing rehabilitation projects occurs at a minimum on a monthly basis to ensure that prerehabilitation and postrehabilitation inspections are being performed. Views of Responsible Officials and Corrective Action Plan - After the inspector has done the initial walk through to identify required repairs, a full comprehensive write-up and cost is established for all rehabilitation projects that document additional repairs to be completed that are more preventive in nature. Any additional items discovered during the project or requested by the homeowner will be added to the write-up. For any emergency repairs, a memorandum will be added to the file. To ensure that prerehabilitation and postrehabilitation inspections are taking place, the assistant planning director will review a list of ongoing rehabilitation projects at a minimum on a monthly basis.