Audit 304750

FY End
2023-06-30
Total Expended
$4.87M
Findings
74
Programs
25
Year: 2023 Accepted: 2024-04-26

Organization Exclusion Status:

Checking exclusion status...

Findings

ID Ref Severity Repeat Requirement
394826 2023-003 Material Weakness - F
394827 2023-003 Material Weakness - F
394828 2023-003 Material Weakness - F
394829 2023-003 Material Weakness - F
394830 2023-003 Material Weakness - F
394831 2023-003 Material Weakness - F
394832 2023-003 Material Weakness - F
394833 2023-003 Material Weakness - F
394834 2023-003 Material Weakness - F
394835 2023-004 Material Weakness - L
394836 2023-004 Material Weakness - L
394837 2023-004 Material Weakness - L
394838 2023-004 Material Weakness - L
394839 2023-004 Material Weakness - L
394840 2023-004 Material Weakness - L
394841 2023-004 Material Weakness - L
394842 2023-004 Material Weakness - L
394843 2023-004 Material Weakness - L
394844 2023-005 Material Weakness - AB
394845 2023-005 Material Weakness - AB
394846 2023-005 Material Weakness - AB
394847 2023-005 Material Weakness - AB
394848 2023-005 Material Weakness - AB
394849 2023-006 Material Weakness - L
394850 2023-006 Material Weakness - L
394851 2023-006 Material Weakness - L
394852 2023-006 Material Weakness - L
394853 2023-007 Material Weakness - N
394854 2023-007 Material Weakness - N
394855 2023-007 Material Weakness - N
394856 2023-007 Material Weakness - N
394857 2023-007 Material Weakness - N
394858 2023-008 Material Weakness - N
394859 2023-008 Material Weakness - N
394860 2023-008 Material Weakness - N
394861 2023-008 Material Weakness - N
394862 2023-008 Material Weakness - N
971268 2023-003 Material Weakness - F
971269 2023-003 Material Weakness - F
971270 2023-003 Material Weakness - F
971271 2023-003 Material Weakness - F
971272 2023-003 Material Weakness - F
971273 2023-003 Material Weakness - F
971274 2023-003 Material Weakness - F
971275 2023-003 Material Weakness - F
971276 2023-003 Material Weakness - F
971277 2023-004 Material Weakness - L
971278 2023-004 Material Weakness - L
971279 2023-004 Material Weakness - L
971280 2023-004 Material Weakness - L
971281 2023-004 Material Weakness - L
971282 2023-004 Material Weakness - L
971283 2023-004 Material Weakness - L
971284 2023-004 Material Weakness - L
971285 2023-004 Material Weakness - L
971286 2023-005 Material Weakness - AB
971287 2023-005 Material Weakness - AB
971288 2023-005 Material Weakness - AB
971289 2023-005 Material Weakness - AB
971290 2023-005 Material Weakness - AB
971291 2023-006 Material Weakness - L
971292 2023-006 Material Weakness - L
971293 2023-006 Material Weakness - L
971294 2023-006 Material Weakness - L
971295 2023-007 Material Weakness - N
971296 2023-007 Material Weakness - N
971297 2023-007 Material Weakness - N
971298 2023-007 Material Weakness - N
971299 2023-007 Material Weakness - N
971300 2023-008 Material Weakness - N
971301 2023-008 Material Weakness - N
971302 2023-008 Material Weakness - N
971303 2023-008 Material Weakness - N
971304 2023-008 Material Weakness - N

Programs

Contacts

Name Title Type
EN9FXP9N3K33 Kelsey Pechie Auditee
7659644994 Beth Kelley, Cpa, Cfe Auditor
No contacts on file

Notes to SEFA

Title: Note 3. Special Education Cooperative Accounting Policies: Note 1. Summary of Significant Accounting Policies A. Basis of Presentation The accompanying Schedule of Expenditures of Federal Awards (SEFA) includes the federal grant activity of the School Corporation under programs of the federal government for the years ended June 30, 2022 and 2023. The information in the SEFA is presented in accordance with the requirements of Title 2 U.S. Code of Federal Regulations Part 200, Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards (Uniform Guidance). Because the SEFA presents only a select portion of the operations of the School Corporation, it is not intended to and does not present the financial position of the School Corporation. The Uniform Guidance requires an annual audit of nonfederal entities expending a total amount of federal awards equal to or in excess of $750,000 in any fiscal year unless by constitution or statute a less frequent audit is required. In accordance with Indiana Code (IC 5-11-1-25), audits of school corporations shall be conducted biennially. Such audits shall include both years within the biennial period. B. Other Significant Accounting Policies Expenditures reported on the SEFA are reported on the cash basis of accounting. Such expenditures are recognized following, as applicable, either the cost principles in OMB Circular A-87, Cost Principles for State, Local, and Indian Tribal Governments, or the cost principles contained in the Uniform Guidance, wherein certain types of expenditures are not allowed or are limited as to reimbursement. When federal grants are received on a reimbursement basis, the federal awards are considered expended when the reimbursement is received. De Minimis Rate Used: N Rate Explanation: Note 2. Indirect Cost Rate The School Corporation has elected not to use the 10 percent de minimis indirect cost rate allowed under the Uniform Guidance. The School Corporation is a member of the Greater Randolph Interlocal Cooperative (Cooperative). As a result, some of the activity for the Special Education Cluster (IDEA) that is presented on the SEFA is not presented as receipts and disbursements in the financial statement for the School Corporation. This activity is presented in the financial statement of the Cooperative.

Finding Details

FINDING 2023-003 Subject: COVID-19 - Education Stabilization Fund - Equipment and Real Property Management Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Numbers: 84.425D, 84.425U, 84.425C Federal Award Numbers and Years (or Other Identifying Numbers): S425D200013, S425D210013, S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Equipment and Real Property Management Audit Findings: Material Weakness, Modified Opinion Condition and Context The School Corporation had not properly designed or implemented a system of internal controls, which would include appropriate segregation of duties, that would likely be effective in preventing, or detecting and correcting, noncompliance. A property record or capital asset listing, which would include a description of the property, a serial number or other identification number, the source of funding for the property (including the federal award identification number (FAIN)), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, and use and condition of the property, is to be maintained for assets purchased that exceed the School Corporation's capitalization threshold. In addition, a physical inventory of all assets should be completed at least every two years. The School Corporation purchased eight assets, totaling $131,205, which exceeded the School Corporation's capitalization threshold. Two of the eight assets were selected for testing. Neither of the two assets were determined to have property records, nor were the assets on the inventory listing. Additionally, the School Corporation did not complete a capital asset inventory every two years as required. The lack of internal controls and noncompliance were systemic issues throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 2 CFR 200.313(d) states in part: "Management requirements. Procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, as a minimum, meet the following requirements: INDIANA STATE BOARD OF ACCOUNTS 19 RANDOLPH EASTERN SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) (1) Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, and cost of the property, percentage of Federal participation in the project costs for the Federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sale price of the property. (2) A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years. (3) A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated. . . ." Cause A proper system of internal controls was not designed by management of the School Corporation. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. Effect Without the proper implementation of an effectively designed system of internal controls, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. As a result, there was not a complete asset listing nor was there a physical inventory completed as required. Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of the federal award could result in the loss of future federal funding to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that management of the School Corporation establish a proper system of internal controls and develop policies and procedures to ensure asset records are maintained and that a physical inventory is taken every two years. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-003 Subject: COVID-19 - Education Stabilization Fund - Equipment and Real Property Management Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Numbers: 84.425D, 84.425U, 84.425C Federal Award Numbers and Years (or Other Identifying Numbers): S425D200013, S425D210013, S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Equipment and Real Property Management Audit Findings: Material Weakness, Modified Opinion Condition and Context The School Corporation had not properly designed or implemented a system of internal controls, which would include appropriate segregation of duties, that would likely be effective in preventing, or detecting and correcting, noncompliance. A property record or capital asset listing, which would include a description of the property, a serial number or other identification number, the source of funding for the property (including the federal award identification number (FAIN)), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, and use and condition of the property, is to be maintained for assets purchased that exceed the School Corporation's capitalization threshold. In addition, a physical inventory of all assets should be completed at least every two years. The School Corporation purchased eight assets, totaling $131,205, which exceeded the School Corporation's capitalization threshold. Two of the eight assets were selected for testing. Neither of the two assets were determined to have property records, nor were the assets on the inventory listing. Additionally, the School Corporation did not complete a capital asset inventory every two years as required. The lack of internal controls and noncompliance were systemic issues throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 2 CFR 200.313(d) states in part: "Management requirements. Procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, as a minimum, meet the following requirements: INDIANA STATE BOARD OF ACCOUNTS 19 RANDOLPH EASTERN SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) (1) Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, and cost of the property, percentage of Federal participation in the project costs for the Federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sale price of the property. (2) A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years. (3) A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated. . . ." Cause A proper system of internal controls was not designed by management of the School Corporation. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. Effect Without the proper implementation of an effectively designed system of internal controls, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. As a result, there was not a complete asset listing nor was there a physical inventory completed as required. Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of the federal award could result in the loss of future federal funding to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that management of the School Corporation establish a proper system of internal controls and develop policies and procedures to ensure asset records are maintained and that a physical inventory is taken every two years. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-003 Subject: COVID-19 - Education Stabilization Fund - Equipment and Real Property Management Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Numbers: 84.425D, 84.425U, 84.425C Federal Award Numbers and Years (or Other Identifying Numbers): S425D200013, S425D210013, S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Equipment and Real Property Management Audit Findings: Material Weakness, Modified Opinion Condition and Context The School Corporation had not properly designed or implemented a system of internal controls, which would include appropriate segregation of duties, that would likely be effective in preventing, or detecting and correcting, noncompliance. A property record or capital asset listing, which would include a description of the property, a serial number or other identification number, the source of funding for the property (including the federal award identification number (FAIN)), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, and use and condition of the property, is to be maintained for assets purchased that exceed the School Corporation's capitalization threshold. In addition, a physical inventory of all assets should be completed at least every two years. The School Corporation purchased eight assets, totaling $131,205, which exceeded the School Corporation's capitalization threshold. Two of the eight assets were selected for testing. Neither of the two assets were determined to have property records, nor were the assets on the inventory listing. Additionally, the School Corporation did not complete a capital asset inventory every two years as required. The lack of internal controls and noncompliance were systemic issues throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 2 CFR 200.313(d) states in part: "Management requirements. Procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, as a minimum, meet the following requirements: INDIANA STATE BOARD OF ACCOUNTS 19 RANDOLPH EASTERN SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) (1) Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, and cost of the property, percentage of Federal participation in the project costs for the Federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sale price of the property. (2) A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years. (3) A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated. . . ." Cause A proper system of internal controls was not designed by management of the School Corporation. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. Effect Without the proper implementation of an effectively designed system of internal controls, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. As a result, there was not a complete asset listing nor was there a physical inventory completed as required. Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of the federal award could result in the loss of future federal funding to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that management of the School Corporation establish a proper system of internal controls and develop policies and procedures to ensure asset records are maintained and that a physical inventory is taken every two years. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-003 Subject: COVID-19 - Education Stabilization Fund - Equipment and Real Property Management Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Numbers: 84.425D, 84.425U, 84.425C Federal Award Numbers and Years (or Other Identifying Numbers): S425D200013, S425D210013, S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Equipment and Real Property Management Audit Findings: Material Weakness, Modified Opinion Condition and Context The School Corporation had not properly designed or implemented a system of internal controls, which would include appropriate segregation of duties, that would likely be effective in preventing, or detecting and correcting, noncompliance. A property record or capital asset listing, which would include a description of the property, a serial number or other identification number, the source of funding for the property (including the federal award identification number (FAIN)), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, and use and condition of the property, is to be maintained for assets purchased that exceed the School Corporation's capitalization threshold. In addition, a physical inventory of all assets should be completed at least every two years. The School Corporation purchased eight assets, totaling $131,205, which exceeded the School Corporation's capitalization threshold. Two of the eight assets were selected for testing. Neither of the two assets were determined to have property records, nor were the assets on the inventory listing. Additionally, the School Corporation did not complete a capital asset inventory every two years as required. The lack of internal controls and noncompliance were systemic issues throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 2 CFR 200.313(d) states in part: "Management requirements. Procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, as a minimum, meet the following requirements: INDIANA STATE BOARD OF ACCOUNTS 19 RANDOLPH EASTERN SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) (1) Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, and cost of the property, percentage of Federal participation in the project costs for the Federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sale price of the property. (2) A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years. (3) A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated. . . ." Cause A proper system of internal controls was not designed by management of the School Corporation. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. Effect Without the proper implementation of an effectively designed system of internal controls, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. As a result, there was not a complete asset listing nor was there a physical inventory completed as required. Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of the federal award could result in the loss of future federal funding to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that management of the School Corporation establish a proper system of internal controls and develop policies and procedures to ensure asset records are maintained and that a physical inventory is taken every two years. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-003 Subject: COVID-19 - Education Stabilization Fund - Equipment and Real Property Management Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Numbers: 84.425D, 84.425U, 84.425C Federal Award Numbers and Years (or Other Identifying Numbers): S425D200013, S425D210013, S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Equipment and Real Property Management Audit Findings: Material Weakness, Modified Opinion Condition and Context The School Corporation had not properly designed or implemented a system of internal controls, which would include appropriate segregation of duties, that would likely be effective in preventing, or detecting and correcting, noncompliance. A property record or capital asset listing, which would include a description of the property, a serial number or other identification number, the source of funding for the property (including the federal award identification number (FAIN)), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, and use and condition of the property, is to be maintained for assets purchased that exceed the School Corporation's capitalization threshold. In addition, a physical inventory of all assets should be completed at least every two years. The School Corporation purchased eight assets, totaling $131,205, which exceeded the School Corporation's capitalization threshold. Two of the eight assets were selected for testing. Neither of the two assets were determined to have property records, nor were the assets on the inventory listing. Additionally, the School Corporation did not complete a capital asset inventory every two years as required. The lack of internal controls and noncompliance were systemic issues throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 2 CFR 200.313(d) states in part: "Management requirements. Procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, as a minimum, meet the following requirements: INDIANA STATE BOARD OF ACCOUNTS 19 RANDOLPH EASTERN SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) (1) Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, and cost of the property, percentage of Federal participation in the project costs for the Federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sale price of the property. (2) A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years. (3) A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated. . . ." Cause A proper system of internal controls was not designed by management of the School Corporation. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. Effect Without the proper implementation of an effectively designed system of internal controls, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. As a result, there was not a complete asset listing nor was there a physical inventory completed as required. Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of the federal award could result in the loss of future federal funding to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that management of the School Corporation establish a proper system of internal controls and develop policies and procedures to ensure asset records are maintained and that a physical inventory is taken every two years. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-003 Subject: COVID-19 - Education Stabilization Fund - Equipment and Real Property Management Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Numbers: 84.425D, 84.425U, 84.425C Federal Award Numbers and Years (or Other Identifying Numbers): S425D200013, S425D210013, S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Equipment and Real Property Management Audit Findings: Material Weakness, Modified Opinion Condition and Context The School Corporation had not properly designed or implemented a system of internal controls, which would include appropriate segregation of duties, that would likely be effective in preventing, or detecting and correcting, noncompliance. A property record or capital asset listing, which would include a description of the property, a serial number or other identification number, the source of funding for the property (including the federal award identification number (FAIN)), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, and use and condition of the property, is to be maintained for assets purchased that exceed the School Corporation's capitalization threshold. In addition, a physical inventory of all assets should be completed at least every two years. The School Corporation purchased eight assets, totaling $131,205, which exceeded the School Corporation's capitalization threshold. Two of the eight assets were selected for testing. Neither of the two assets were determined to have property records, nor were the assets on the inventory listing. Additionally, the School Corporation did not complete a capital asset inventory every two years as required. The lack of internal controls and noncompliance were systemic issues throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 2 CFR 200.313(d) states in part: "Management requirements. Procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, as a minimum, meet the following requirements: INDIANA STATE BOARD OF ACCOUNTS 19 RANDOLPH EASTERN SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) (1) Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, and cost of the property, percentage of Federal participation in the project costs for the Federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sale price of the property. (2) A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years. (3) A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated. . . ." Cause A proper system of internal controls was not designed by management of the School Corporation. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. Effect Without the proper implementation of an effectively designed system of internal controls, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. As a result, there was not a complete asset listing nor was there a physical inventory completed as required. Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of the federal award could result in the loss of future federal funding to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that management of the School Corporation establish a proper system of internal controls and develop policies and procedures to ensure asset records are maintained and that a physical inventory is taken every two years. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-003 Subject: COVID-19 - Education Stabilization Fund - Equipment and Real Property Management Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Numbers: 84.425D, 84.425U, 84.425C Federal Award Numbers and Years (or Other Identifying Numbers): S425D200013, S425D210013, S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Equipment and Real Property Management Audit Findings: Material Weakness, Modified Opinion Condition and Context The School Corporation had not properly designed or implemented a system of internal controls, which would include appropriate segregation of duties, that would likely be effective in preventing, or detecting and correcting, noncompliance. A property record or capital asset listing, which would include a description of the property, a serial number or other identification number, the source of funding for the property (including the federal award identification number (FAIN)), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, and use and condition of the property, is to be maintained for assets purchased that exceed the School Corporation's capitalization threshold. In addition, a physical inventory of all assets should be completed at least every two years. The School Corporation purchased eight assets, totaling $131,205, which exceeded the School Corporation's capitalization threshold. Two of the eight assets were selected for testing. Neither of the two assets were determined to have property records, nor were the assets on the inventory listing. Additionally, the School Corporation did not complete a capital asset inventory every two years as required. The lack of internal controls and noncompliance were systemic issues throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 2 CFR 200.313(d) states in part: "Management requirements. Procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, as a minimum, meet the following requirements: INDIANA STATE BOARD OF ACCOUNTS 19 RANDOLPH EASTERN SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) (1) Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, and cost of the property, percentage of Federal participation in the project costs for the Federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sale price of the property. (2) A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years. (3) A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated. . . ." Cause A proper system of internal controls was not designed by management of the School Corporation. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. Effect Without the proper implementation of an effectively designed system of internal controls, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. As a result, there was not a complete asset listing nor was there a physical inventory completed as required. Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of the federal award could result in the loss of future federal funding to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that management of the School Corporation establish a proper system of internal controls and develop policies and procedures to ensure asset records are maintained and that a physical inventory is taken every two years. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-003 Subject: COVID-19 - Education Stabilization Fund - Equipment and Real Property Management Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Numbers: 84.425D, 84.425U, 84.425C Federal Award Numbers and Years (or Other Identifying Numbers): S425D200013, S425D210013, S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Equipment and Real Property Management Audit Findings: Material Weakness, Modified Opinion Condition and Context The School Corporation had not properly designed or implemented a system of internal controls, which would include appropriate segregation of duties, that would likely be effective in preventing, or detecting and correcting, noncompliance. A property record or capital asset listing, which would include a description of the property, a serial number or other identification number, the source of funding for the property (including the federal award identification number (FAIN)), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, and use and condition of the property, is to be maintained for assets purchased that exceed the School Corporation's capitalization threshold. In addition, a physical inventory of all assets should be completed at least every two years. The School Corporation purchased eight assets, totaling $131,205, which exceeded the School Corporation's capitalization threshold. Two of the eight assets were selected for testing. Neither of the two assets were determined to have property records, nor were the assets on the inventory listing. Additionally, the School Corporation did not complete a capital asset inventory every two years as required. The lack of internal controls and noncompliance were systemic issues throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 2 CFR 200.313(d) states in part: "Management requirements. Procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, as a minimum, meet the following requirements: INDIANA STATE BOARD OF ACCOUNTS 19 RANDOLPH EASTERN SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) (1) Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, and cost of the property, percentage of Federal participation in the project costs for the Federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sale price of the property. (2) A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years. (3) A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated. . . ." Cause A proper system of internal controls was not designed by management of the School Corporation. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. Effect Without the proper implementation of an effectively designed system of internal controls, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. As a result, there was not a complete asset listing nor was there a physical inventory completed as required. Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of the federal award could result in the loss of future federal funding to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that management of the School Corporation establish a proper system of internal controls and develop policies and procedures to ensure asset records are maintained and that a physical inventory is taken every two years. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-003 Subject: COVID-19 - Education Stabilization Fund - Equipment and Real Property Management Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Numbers: 84.425D, 84.425U, 84.425C Federal Award Numbers and Years (or Other Identifying Numbers): S425D200013, S425D210013, S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Equipment and Real Property Management Audit Findings: Material Weakness, Modified Opinion Condition and Context The School Corporation had not properly designed or implemented a system of internal controls, which would include appropriate segregation of duties, that would likely be effective in preventing, or detecting and correcting, noncompliance. A property record or capital asset listing, which would include a description of the property, a serial number or other identification number, the source of funding for the property (including the federal award identification number (FAIN)), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, and use and condition of the property, is to be maintained for assets purchased that exceed the School Corporation's capitalization threshold. In addition, a physical inventory of all assets should be completed at least every two years. The School Corporation purchased eight assets, totaling $131,205, which exceeded the School Corporation's capitalization threshold. Two of the eight assets were selected for testing. Neither of the two assets were determined to have property records, nor were the assets on the inventory listing. Additionally, the School Corporation did not complete a capital asset inventory every two years as required. The lack of internal controls and noncompliance were systemic issues throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 2 CFR 200.313(d) states in part: "Management requirements. Procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, as a minimum, meet the following requirements: INDIANA STATE BOARD OF ACCOUNTS 19 RANDOLPH EASTERN SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) (1) Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, and cost of the property, percentage of Federal participation in the project costs for the Federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sale price of the property. (2) A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years. (3) A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated. . . ." Cause A proper system of internal controls was not designed by management of the School Corporation. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. Effect Without the proper implementation of an effectively designed system of internal controls, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. As a result, there was not a complete asset listing nor was there a physical inventory completed as required. Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of the federal award could result in the loss of future federal funding to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that management of the School Corporation establish a proper system of internal controls and develop policies and procedures to ensure asset records are maintained and that a physical inventory is taken every two years. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-004 Subject: COVID-19 - Education Stabilization Fund - Reporting Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Numbers: 84.425D, 84.425U Federal Award Numbers and Years (or Other Identifying Numbers): S425D200013, S425D210013 S425U210013 Pass-Through Entity: Department of Education Compliance Requirement: Reporting Audit Finding: Material Weakness Condition and Context The School Corporation had not properly designed or implemented a system of internal controls which would include appropriate segregation of duties that would likely be effective in preventing, or detecting and correcting, noncompliance. The School Corporation was required to submit annual data reports to the Indiana Department of Education via JotForm, a form/report builder. Data to be submitted included, but was not limited to, current period expenditures, prior period expenditures, and expenditures per activity. During the audit period the School Corporation submitted two ESSER I reports, two ESSER II reports, and two ESSER III reports, for a total of six reports. The annual data reports were complied, prepared, and submitted by the Assistant Superintendent of Schools and the Treasurer without an oversight or review process in place to prevent, or detect and correct, errors. The lack of internal controls was systemic throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." Cause A proper system of internal controls was not designed by management of the School Corporation. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. INDIANA STATE BOARD OF ACCOUNTS 21 RANDOLPH EASTERN SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Effect Without the proper design or implementation of the components of a system of internal controls, including policies and procedures that provide segregation of duties and additional oversight as needed, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. Questioned Costs There were no questioned costs identified. Recommendation We recommended that management of the School Corporation design and implement a proper system of internal controls, including policies and procedures that would provide segregation of duties to ensure appropriate reviews, approvals, and oversight are taking place prior to filing required reports. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-004 Subject: COVID-19 - Education Stabilization Fund - Reporting Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Numbers: 84.425D, 84.425U Federal Award Numbers and Years (or Other Identifying Numbers): S425D200013, S425D210013 S425U210013 Pass-Through Entity: Department of Education Compliance Requirement: Reporting Audit Finding: Material Weakness Condition and Context The School Corporation had not properly designed or implemented a system of internal controls which would include appropriate segregation of duties that would likely be effective in preventing, or detecting and correcting, noncompliance. The School Corporation was required to submit annual data reports to the Indiana Department of Education via JotForm, a form/report builder. Data to be submitted included, but was not limited to, current period expenditures, prior period expenditures, and expenditures per activity. During the audit period the School Corporation submitted two ESSER I reports, two ESSER II reports, and two ESSER III reports, for a total of six reports. The annual data reports were complied, prepared, and submitted by the Assistant Superintendent of Schools and the Treasurer without an oversight or review process in place to prevent, or detect and correct, errors. The lack of internal controls was systemic throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." Cause A proper system of internal controls was not designed by management of the School Corporation. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. INDIANA STATE BOARD OF ACCOUNTS 21 RANDOLPH EASTERN SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Effect Without the proper design or implementation of the components of a system of internal controls, including policies and procedures that provide segregation of duties and additional oversight as needed, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. Questioned Costs There were no questioned costs identified. Recommendation We recommended that management of the School Corporation design and implement a proper system of internal controls, including policies and procedures that would provide segregation of duties to ensure appropriate reviews, approvals, and oversight are taking place prior to filing required reports. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-004 Subject: COVID-19 - Education Stabilization Fund - Reporting Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Numbers: 84.425D, 84.425U Federal Award Numbers and Years (or Other Identifying Numbers): S425D200013, S425D210013 S425U210013 Pass-Through Entity: Department of Education Compliance Requirement: Reporting Audit Finding: Material Weakness Condition and Context The School Corporation had not properly designed or implemented a system of internal controls which would include appropriate segregation of duties that would likely be effective in preventing, or detecting and correcting, noncompliance. The School Corporation was required to submit annual data reports to the Indiana Department of Education via JotForm, a form/report builder. Data to be submitted included, but was not limited to, current period expenditures, prior period expenditures, and expenditures per activity. During the audit period the School Corporation submitted two ESSER I reports, two ESSER II reports, and two ESSER III reports, for a total of six reports. The annual data reports were complied, prepared, and submitted by the Assistant Superintendent of Schools and the Treasurer without an oversight or review process in place to prevent, or detect and correct, errors. The lack of internal controls was systemic throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." Cause A proper system of internal controls was not designed by management of the School Corporation. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. INDIANA STATE BOARD OF ACCOUNTS 21 RANDOLPH EASTERN SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Effect Without the proper design or implementation of the components of a system of internal controls, including policies and procedures that provide segregation of duties and additional oversight as needed, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. Questioned Costs There were no questioned costs identified. Recommendation We recommended that management of the School Corporation design and implement a proper system of internal controls, including policies and procedures that would provide segregation of duties to ensure appropriate reviews, approvals, and oversight are taking place prior to filing required reports. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-004 Subject: COVID-19 - Education Stabilization Fund - Reporting Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Numbers: 84.425D, 84.425U Federal Award Numbers and Years (or Other Identifying Numbers): S425D200013, S425D210013 S425U210013 Pass-Through Entity: Department of Education Compliance Requirement: Reporting Audit Finding: Material Weakness Condition and Context The School Corporation had not properly designed or implemented a system of internal controls which would include appropriate segregation of duties that would likely be effective in preventing, or detecting and correcting, noncompliance. The School Corporation was required to submit annual data reports to the Indiana Department of Education via JotForm, a form/report builder. Data to be submitted included, but was not limited to, current period expenditures, prior period expenditures, and expenditures per activity. During the audit period the School Corporation submitted two ESSER I reports, two ESSER II reports, and two ESSER III reports, for a total of six reports. The annual data reports were complied, prepared, and submitted by the Assistant Superintendent of Schools and the Treasurer without an oversight or review process in place to prevent, or detect and correct, errors. The lack of internal controls was systemic throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." Cause A proper system of internal controls was not designed by management of the School Corporation. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. INDIANA STATE BOARD OF ACCOUNTS 21 RANDOLPH EASTERN SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Effect Without the proper design or implementation of the components of a system of internal controls, including policies and procedures that provide segregation of duties and additional oversight as needed, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. Questioned Costs There were no questioned costs identified. Recommendation We recommended that management of the School Corporation design and implement a proper system of internal controls, including policies and procedures that would provide segregation of duties to ensure appropriate reviews, approvals, and oversight are taking place prior to filing required reports. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-004 Subject: COVID-19 - Education Stabilization Fund - Reporting Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Numbers: 84.425D, 84.425U Federal Award Numbers and Years (or Other Identifying Numbers): S425D200013, S425D210013 S425U210013 Pass-Through Entity: Department of Education Compliance Requirement: Reporting Audit Finding: Material Weakness Condition and Context The School Corporation had not properly designed or implemented a system of internal controls which would include appropriate segregation of duties that would likely be effective in preventing, or detecting and correcting, noncompliance. The School Corporation was required to submit annual data reports to the Indiana Department of Education via JotForm, a form/report builder. Data to be submitted included, but was not limited to, current period expenditures, prior period expenditures, and expenditures per activity. During the audit period the School Corporation submitted two ESSER I reports, two ESSER II reports, and two ESSER III reports, for a total of six reports. The annual data reports were complied, prepared, and submitted by the Assistant Superintendent of Schools and the Treasurer without an oversight or review process in place to prevent, or detect and correct, errors. The lack of internal controls was systemic throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." Cause A proper system of internal controls was not designed by management of the School Corporation. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. INDIANA STATE BOARD OF ACCOUNTS 21 RANDOLPH EASTERN SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Effect Without the proper design or implementation of the components of a system of internal controls, including policies and procedures that provide segregation of duties and additional oversight as needed, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. Questioned Costs There were no questioned costs identified. Recommendation We recommended that management of the School Corporation design and implement a proper system of internal controls, including policies and procedures that would provide segregation of duties to ensure appropriate reviews, approvals, and oversight are taking place prior to filing required reports. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-004 Subject: COVID-19 - Education Stabilization Fund - Reporting Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Numbers: 84.425D, 84.425U Federal Award Numbers and Years (or Other Identifying Numbers): S425D200013, S425D210013 S425U210013 Pass-Through Entity: Department of Education Compliance Requirement: Reporting Audit Finding: Material Weakness Condition and Context The School Corporation had not properly designed or implemented a system of internal controls which would include appropriate segregation of duties that would likely be effective in preventing, or detecting and correcting, noncompliance. The School Corporation was required to submit annual data reports to the Indiana Department of Education via JotForm, a form/report builder. Data to be submitted included, but was not limited to, current period expenditures, prior period expenditures, and expenditures per activity. During the audit period the School Corporation submitted two ESSER I reports, two ESSER II reports, and two ESSER III reports, for a total of six reports. The annual data reports were complied, prepared, and submitted by the Assistant Superintendent of Schools and the Treasurer without an oversight or review process in place to prevent, or detect and correct, errors. The lack of internal controls was systemic throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." Cause A proper system of internal controls was not designed by management of the School Corporation. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. INDIANA STATE BOARD OF ACCOUNTS 21 RANDOLPH EASTERN SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Effect Without the proper design or implementation of the components of a system of internal controls, including policies and procedures that provide segregation of duties and additional oversight as needed, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. Questioned Costs There were no questioned costs identified. Recommendation We recommended that management of the School Corporation design and implement a proper system of internal controls, including policies and procedures that would provide segregation of duties to ensure appropriate reviews, approvals, and oversight are taking place prior to filing required reports. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-004 Subject: COVID-19 - Education Stabilization Fund - Reporting Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Numbers: 84.425D, 84.425U Federal Award Numbers and Years (or Other Identifying Numbers): S425D200013, S425D210013 S425U210013 Pass-Through Entity: Department of Education Compliance Requirement: Reporting Audit Finding: Material Weakness Condition and Context The School Corporation had not properly designed or implemented a system of internal controls which would include appropriate segregation of duties that would likely be effective in preventing, or detecting and correcting, noncompliance. The School Corporation was required to submit annual data reports to the Indiana Department of Education via JotForm, a form/report builder. Data to be submitted included, but was not limited to, current period expenditures, prior period expenditures, and expenditures per activity. During the audit period the School Corporation submitted two ESSER I reports, two ESSER II reports, and two ESSER III reports, for a total of six reports. The annual data reports were complied, prepared, and submitted by the Assistant Superintendent of Schools and the Treasurer without an oversight or review process in place to prevent, or detect and correct, errors. The lack of internal controls was systemic throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." Cause A proper system of internal controls was not designed by management of the School Corporation. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. INDIANA STATE BOARD OF ACCOUNTS 21 RANDOLPH EASTERN SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Effect Without the proper design or implementation of the components of a system of internal controls, including policies and procedures that provide segregation of duties and additional oversight as needed, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. Questioned Costs There were no questioned costs identified. Recommendation We recommended that management of the School Corporation design and implement a proper system of internal controls, including policies and procedures that would provide segregation of duties to ensure appropriate reviews, approvals, and oversight are taking place prior to filing required reports. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-004 Subject: COVID-19 - Education Stabilization Fund - Reporting Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Numbers: 84.425D, 84.425U Federal Award Numbers and Years (or Other Identifying Numbers): S425D200013, S425D210013 S425U210013 Pass-Through Entity: Department of Education Compliance Requirement: Reporting Audit Finding: Material Weakness Condition and Context The School Corporation had not properly designed or implemented a system of internal controls which would include appropriate segregation of duties that would likely be effective in preventing, or detecting and correcting, noncompliance. The School Corporation was required to submit annual data reports to the Indiana Department of Education via JotForm, a form/report builder. Data to be submitted included, but was not limited to, current period expenditures, prior period expenditures, and expenditures per activity. During the audit period the School Corporation submitted two ESSER I reports, two ESSER II reports, and two ESSER III reports, for a total of six reports. The annual data reports were complied, prepared, and submitted by the Assistant Superintendent of Schools and the Treasurer without an oversight or review process in place to prevent, or detect and correct, errors. The lack of internal controls was systemic throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." Cause A proper system of internal controls was not designed by management of the School Corporation. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. INDIANA STATE BOARD OF ACCOUNTS 21 RANDOLPH EASTERN SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Effect Without the proper design or implementation of the components of a system of internal controls, including policies and procedures that provide segregation of duties and additional oversight as needed, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. Questioned Costs There were no questioned costs identified. Recommendation We recommended that management of the School Corporation design and implement a proper system of internal controls, including policies and procedures that would provide segregation of duties to ensure appropriate reviews, approvals, and oversight are taking place prior to filing required reports. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-004 Subject: COVID-19 - Education Stabilization Fund - Reporting Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Numbers: 84.425D, 84.425U Federal Award Numbers and Years (or Other Identifying Numbers): S425D200013, S425D210013 S425U210013 Pass-Through Entity: Department of Education Compliance Requirement: Reporting Audit Finding: Material Weakness Condition and Context The School Corporation had not properly designed or implemented a system of internal controls which would include appropriate segregation of duties that would likely be effective in preventing, or detecting and correcting, noncompliance. The School Corporation was required to submit annual data reports to the Indiana Department of Education via JotForm, a form/report builder. Data to be submitted included, but was not limited to, current period expenditures, prior period expenditures, and expenditures per activity. During the audit period the School Corporation submitted two ESSER I reports, two ESSER II reports, and two ESSER III reports, for a total of six reports. The annual data reports were complied, prepared, and submitted by the Assistant Superintendent of Schools and the Treasurer without an oversight or review process in place to prevent, or detect and correct, errors. The lack of internal controls was systemic throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." Cause A proper system of internal controls was not designed by management of the School Corporation. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. INDIANA STATE BOARD OF ACCOUNTS 21 RANDOLPH EASTERN SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Effect Without the proper design or implementation of the components of a system of internal controls, including policies and procedures that provide segregation of duties and additional oversight as needed, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. Questioned Costs There were no questioned costs identified. Recommendation We recommended that management of the School Corporation design and implement a proper system of internal controls, including policies and procedures that would provide segregation of duties to ensure appropriate reviews, approvals, and oversight are taking place prior to filing required reports. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-005 Subject: Child Nutrition Cluster - Activities Allowed or Unallowed, Allowable Costs/Cost Principles Federal Agency: Department of Agriculture Federal Programs: School Breakfast Program, National School Lunch Program, Summer Food Service Program for Children Assistance Listings Numbers: 10.553, 10.555, 10.559 Federal Award Numbers and Years (or Other Identifying Numbers): FY 2022, FY 2023 Pass-Through Entity: Indiana Department of Education Compliance Requirements: Activities Allowed or Unallowed, Allowable Costs/Cost Principles Audit Findings: Material Weakness, Other Matters Condition and Context An effective system of internal controls which would include segregation of duties that would likely be effective in preventing, or detecting and correcting, noncompliance should be designed and implemented to ensure expenditures charged to the food service program fund (School Lunch fund) are for the benefit of the food service program. The School Corporation's payroll disbursements were prepared by the Payroll Clerk without a documented review or approval process to prevent, or detect and correct, errors. In addition, vendor claims were to be reviewed and approved by the Treasurer and the School Board. Of the 40 vendor claims selected for testing to ensure the internal control was in place and operating effectively, 3 claims did not have documentation of approval by the Treasurer or the School Board. In addition, the total amount of trash removal services for the School Corporation was paid from the School Lunch fund. The total amount charged to the School Lunch fund was $15,448. This amount was considered questioned costs. The lack of internal controls over payroll and vendor claims was a systemic issue throughout the audit period. The noncompliance was isolated to the payments for trash removal services. INDIANA STATE BOARD OF ACCOUNTS 22 RANDOLPH EASTERN SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 2 CFR 200.403 states in part: "Except where otherwise authorized by statute, costs must meet the following general criteria in order to be allowable under Federal awards: (a) Be necessary and reasonable for the performance of the Federal award and be allocable thereto under these principles. (b) Conform to any limitations or exclusions set forth in these principles or in the Federal award as to types or amount of cost items. . . . (g) Be adequately documented. . . ." Cause A proper system of internal controls was not designed by management of the School Corporation. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. Effect Without the proper implementation of an effectively designed system of internal controls, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. As a result, costs for trash removal were incorrectly charged to the food service program. Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of the federal award could result in the loss of future federal funding to the School Corporation. Questioned Costs Known questioned costs of $15,448 were identified as detailed in the Condition and Context. Recommendation We recommended the School Corporation's management establish a proper system of internal controls and develop policies and procedures to ensure costs are adequately documented.
FINDING 2023-005 Subject: Child Nutrition Cluster - Activities Allowed or Unallowed, Allowable Costs/Cost Principles Federal Agency: Department of Agriculture Federal Programs: School Breakfast Program, National School Lunch Program, Summer Food Service Program for Children Assistance Listings Numbers: 10.553, 10.555, 10.559 Federal Award Numbers and Years (or Other Identifying Numbers): FY 2022, FY 2023 Pass-Through Entity: Indiana Department of Education Compliance Requirements: Activities Allowed or Unallowed, Allowable Costs/Cost Principles Audit Findings: Material Weakness, Other Matters Condition and Context An effective system of internal controls which would include segregation of duties that would likely be effective in preventing, or detecting and correcting, noncompliance should be designed and implemented to ensure expenditures charged to the food service program fund (School Lunch fund) are for the benefit of the food service program. The School Corporation's payroll disbursements were prepared by the Payroll Clerk without a documented review or approval process to prevent, or detect and correct, errors. In addition, vendor claims were to be reviewed and approved by the Treasurer and the School Board. Of the 40 vendor claims selected for testing to ensure the internal control was in place and operating effectively, 3 claims did not have documentation of approval by the Treasurer or the School Board. In addition, the total amount of trash removal services for the School Corporation was paid from the School Lunch fund. The total amount charged to the School Lunch fund was $15,448. This amount was considered questioned costs. The lack of internal controls over payroll and vendor claims was a systemic issue throughout the audit period. The noncompliance was isolated to the payments for trash removal services. INDIANA STATE BOARD OF ACCOUNTS 22 RANDOLPH EASTERN SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 2 CFR 200.403 states in part: "Except where otherwise authorized by statute, costs must meet the following general criteria in order to be allowable under Federal awards: (a) Be necessary and reasonable for the performance of the Federal award and be allocable thereto under these principles. (b) Conform to any limitations or exclusions set forth in these principles or in the Federal award as to types or amount of cost items. . . . (g) Be adequately documented. . . ." Cause A proper system of internal controls was not designed by management of the School Corporation. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. Effect Without the proper implementation of an effectively designed system of internal controls, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. As a result, costs for trash removal were incorrectly charged to the food service program. Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of the federal award could result in the loss of future federal funding to the School Corporation. Questioned Costs Known questioned costs of $15,448 were identified as detailed in the Condition and Context. Recommendation We recommended the School Corporation's management establish a proper system of internal controls and develop policies and procedures to ensure costs are adequately documented.
FINDING 2023-005 Subject: Child Nutrition Cluster - Activities Allowed or Unallowed, Allowable Costs/Cost Principles Federal Agency: Department of Agriculture Federal Programs: School Breakfast Program, National School Lunch Program, Summer Food Service Program for Children Assistance Listings Numbers: 10.553, 10.555, 10.559 Federal Award Numbers and Years (or Other Identifying Numbers): FY 2022, FY 2023 Pass-Through Entity: Indiana Department of Education Compliance Requirements: Activities Allowed or Unallowed, Allowable Costs/Cost Principles Audit Findings: Material Weakness, Other Matters Condition and Context An effective system of internal controls which would include segregation of duties that would likely be effective in preventing, or detecting and correcting, noncompliance should be designed and implemented to ensure expenditures charged to the food service program fund (School Lunch fund) are for the benefit of the food service program. The School Corporation's payroll disbursements were prepared by the Payroll Clerk without a documented review or approval process to prevent, or detect and correct, errors. In addition, vendor claims were to be reviewed and approved by the Treasurer and the School Board. Of the 40 vendor claims selected for testing to ensure the internal control was in place and operating effectively, 3 claims did not have documentation of approval by the Treasurer or the School Board. In addition, the total amount of trash removal services for the School Corporation was paid from the School Lunch fund. The total amount charged to the School Lunch fund was $15,448. This amount was considered questioned costs. The lack of internal controls over payroll and vendor claims was a systemic issue throughout the audit period. The noncompliance was isolated to the payments for trash removal services. INDIANA STATE BOARD OF ACCOUNTS 22 RANDOLPH EASTERN SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 2 CFR 200.403 states in part: "Except where otherwise authorized by statute, costs must meet the following general criteria in order to be allowable under Federal awards: (a) Be necessary and reasonable for the performance of the Federal award and be allocable thereto under these principles. (b) Conform to any limitations or exclusions set forth in these principles or in the Federal award as to types or amount of cost items. . . . (g) Be adequately documented. . . ." Cause A proper system of internal controls was not designed by management of the School Corporation. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. Effect Without the proper implementation of an effectively designed system of internal controls, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. As a result, costs for trash removal were incorrectly charged to the food service program. Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of the federal award could result in the loss of future federal funding to the School Corporation. Questioned Costs Known questioned costs of $15,448 were identified as detailed in the Condition and Context. Recommendation We recommended the School Corporation's management establish a proper system of internal controls and develop policies and procedures to ensure costs are adequately documented.
FINDING 2023-005 Subject: Child Nutrition Cluster - Activities Allowed or Unallowed, Allowable Costs/Cost Principles Federal Agency: Department of Agriculture Federal Programs: School Breakfast Program, National School Lunch Program, Summer Food Service Program for Children Assistance Listings Numbers: 10.553, 10.555, 10.559 Federal Award Numbers and Years (or Other Identifying Numbers): FY 2022, FY 2023 Pass-Through Entity: Indiana Department of Education Compliance Requirements: Activities Allowed or Unallowed, Allowable Costs/Cost Principles Audit Findings: Material Weakness, Other Matters Condition and Context An effective system of internal controls which would include segregation of duties that would likely be effective in preventing, or detecting and correcting, noncompliance should be designed and implemented to ensure expenditures charged to the food service program fund (School Lunch fund) are for the benefit of the food service program. The School Corporation's payroll disbursements were prepared by the Payroll Clerk without a documented review or approval process to prevent, or detect and correct, errors. In addition, vendor claims were to be reviewed and approved by the Treasurer and the School Board. Of the 40 vendor claims selected for testing to ensure the internal control was in place and operating effectively, 3 claims did not have documentation of approval by the Treasurer or the School Board. In addition, the total amount of trash removal services for the School Corporation was paid from the School Lunch fund. The total amount charged to the School Lunch fund was $15,448. This amount was considered questioned costs. The lack of internal controls over payroll and vendor claims was a systemic issue throughout the audit period. The noncompliance was isolated to the payments for trash removal services. INDIANA STATE BOARD OF ACCOUNTS 22 RANDOLPH EASTERN SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 2 CFR 200.403 states in part: "Except where otherwise authorized by statute, costs must meet the following general criteria in order to be allowable under Federal awards: (a) Be necessary and reasonable for the performance of the Federal award and be allocable thereto under these principles. (b) Conform to any limitations or exclusions set forth in these principles or in the Federal award as to types or amount of cost items. . . . (g) Be adequately documented. . . ." Cause A proper system of internal controls was not designed by management of the School Corporation. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. Effect Without the proper implementation of an effectively designed system of internal controls, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. As a result, costs for trash removal were incorrectly charged to the food service program. Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of the federal award could result in the loss of future federal funding to the School Corporation. Questioned Costs Known questioned costs of $15,448 were identified as detailed in the Condition and Context. Recommendation We recommended the School Corporation's management establish a proper system of internal controls and develop policies and procedures to ensure costs are adequately documented.
FINDING 2023-005 Subject: Child Nutrition Cluster - Activities Allowed or Unallowed, Allowable Costs/Cost Principles Federal Agency: Department of Agriculture Federal Programs: School Breakfast Program, National School Lunch Program, Summer Food Service Program for Children Assistance Listings Numbers: 10.553, 10.555, 10.559 Federal Award Numbers and Years (or Other Identifying Numbers): FY 2022, FY 2023 Pass-Through Entity: Indiana Department of Education Compliance Requirements: Activities Allowed or Unallowed, Allowable Costs/Cost Principles Audit Findings: Material Weakness, Other Matters Condition and Context An effective system of internal controls which would include segregation of duties that would likely be effective in preventing, or detecting and correcting, noncompliance should be designed and implemented to ensure expenditures charged to the food service program fund (School Lunch fund) are for the benefit of the food service program. The School Corporation's payroll disbursements were prepared by the Payroll Clerk without a documented review or approval process to prevent, or detect and correct, errors. In addition, vendor claims were to be reviewed and approved by the Treasurer and the School Board. Of the 40 vendor claims selected for testing to ensure the internal control was in place and operating effectively, 3 claims did not have documentation of approval by the Treasurer or the School Board. In addition, the total amount of trash removal services for the School Corporation was paid from the School Lunch fund. The total amount charged to the School Lunch fund was $15,448. This amount was considered questioned costs. The lack of internal controls over payroll and vendor claims was a systemic issue throughout the audit period. The noncompliance was isolated to the payments for trash removal services. INDIANA STATE BOARD OF ACCOUNTS 22 RANDOLPH EASTERN SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 2 CFR 200.403 states in part: "Except where otherwise authorized by statute, costs must meet the following general criteria in order to be allowable under Federal awards: (a) Be necessary and reasonable for the performance of the Federal award and be allocable thereto under these principles. (b) Conform to any limitations or exclusions set forth in these principles or in the Federal award as to types or amount of cost items. . . . (g) Be adequately documented. . . ." Cause A proper system of internal controls was not designed by management of the School Corporation. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. Effect Without the proper implementation of an effectively designed system of internal controls, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. As a result, costs for trash removal were incorrectly charged to the food service program. Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of the federal award could result in the loss of future federal funding to the School Corporation. Questioned Costs Known questioned costs of $15,448 were identified as detailed in the Condition and Context. Recommendation We recommended the School Corporation's management establish a proper system of internal controls and develop policies and procedures to ensure costs are adequately documented.
FINDING 2023-006 Subject: Child Nutrition Cluster - Reporting Federal Agency: Department of Agriculture Federal Programs: School Breakfast Program, National School Lunch Program Assistance Listings Numbers: 10.553, 10.555 Federal Award Numbers and Years (or Other Identifying Numbers): FY 2022, FY 2023 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Reporting Audit Findings: Material Weakness, Other Matters Condition and Context The School Corporation had not properly designed or implemented a system of internal controls which would include appropriate segregation of duties that would likely be effective in preventing, or detecting and correcting, noncompliance related to the monthly reimbursement claims. Meal count reports were run from the School Corporation's meal software system on a monthly basis. The reports were then utilized by the Food Service Director or the Food Service Secretary to prepare the monthly claims for reimbursement. There was no documented review or oversight process over the monthly claims for reimbursement to prevent, or detect and correct, errors. Of the four monthly claims for reimbursement selected for testing, two included overstatements in the number of meal counts used for reimbursement purposes when compared to the supporting documentation. The lack of internal controls and noncompliance were systemic issues during the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 7 CFR 210.8(a) states in part: "The school food authority shall establish internal controls which ensure the accuracy of meal counts prior to submission of the monthly Claim for Reimbursement. . . ." INDIANA STATE BOARD OF ACCOUNTS 24 RANDOLPH EASTERN SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) 7 CFR 210.7(c)(1) states in part: "Lunch count system. To ensure that the Claim for Reimbursement accurately reflects the number of lunches and meal supplements served to eligible children, the school food authority shall, at a minimum: . . . (iii) Base Claims for Reimbursement on lunch counts, taken daily at the point of service, which correctly identify the number of free, reduce price and paid lunches served to eligible children; (iv) Correctly record, consolidate and report those lunch and supplement counts on the Claim for Reimbursement; . . ." 7 CFR 220.11(b) states in part: "Claims for Reimbursement shall include data in sufficient detail to justify the reimbursement claimed . . ." 7 CFR 220.11(d) states in part: "The school food authority shall establish internal controls which ensure the accuracy of breakfast counts prior to submission of the monthly Claim for Reimbursement. . . ." Cause A proper system of internal controls was not designed by management of the School Corporation. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. Effect Without the proper implementation of an effectively designed system of internal controls, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. As a result, reimbursement claims were not supported by the underlying records. Noncompliance with the grant agreement and the Reporting compliance requirement could result in the loss of future federal funds to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish a proper system of internal controls and develop policies and procedures to ensure meal counts are correctly reported. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-006 Subject: Child Nutrition Cluster - Reporting Federal Agency: Department of Agriculture Federal Programs: School Breakfast Program, National School Lunch Program Assistance Listings Numbers: 10.553, 10.555 Federal Award Numbers and Years (or Other Identifying Numbers): FY 2022, FY 2023 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Reporting Audit Findings: Material Weakness, Other Matters Condition and Context The School Corporation had not properly designed or implemented a system of internal controls which would include appropriate segregation of duties that would likely be effective in preventing, or detecting and correcting, noncompliance related to the monthly reimbursement claims. Meal count reports were run from the School Corporation's meal software system on a monthly basis. The reports were then utilized by the Food Service Director or the Food Service Secretary to prepare the monthly claims for reimbursement. There was no documented review or oversight process over the monthly claims for reimbursement to prevent, or detect and correct, errors. Of the four monthly claims for reimbursement selected for testing, two included overstatements in the number of meal counts used for reimbursement purposes when compared to the supporting documentation. The lack of internal controls and noncompliance were systemic issues during the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 7 CFR 210.8(a) states in part: "The school food authority shall establish internal controls which ensure the accuracy of meal counts prior to submission of the monthly Claim for Reimbursement. . . ." INDIANA STATE BOARD OF ACCOUNTS 24 RANDOLPH EASTERN SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) 7 CFR 210.7(c)(1) states in part: "Lunch count system. To ensure that the Claim for Reimbursement accurately reflects the number of lunches and meal supplements served to eligible children, the school food authority shall, at a minimum: . . . (iii) Base Claims for Reimbursement on lunch counts, taken daily at the point of service, which correctly identify the number of free, reduce price and paid lunches served to eligible children; (iv) Correctly record, consolidate and report those lunch and supplement counts on the Claim for Reimbursement; . . ." 7 CFR 220.11(b) states in part: "Claims for Reimbursement shall include data in sufficient detail to justify the reimbursement claimed . . ." 7 CFR 220.11(d) states in part: "The school food authority shall establish internal controls which ensure the accuracy of breakfast counts prior to submission of the monthly Claim for Reimbursement. . . ." Cause A proper system of internal controls was not designed by management of the School Corporation. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. Effect Without the proper implementation of an effectively designed system of internal controls, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. As a result, reimbursement claims were not supported by the underlying records. Noncompliance with the grant agreement and the Reporting compliance requirement could result in the loss of future federal funds to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish a proper system of internal controls and develop policies and procedures to ensure meal counts are correctly reported. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-006 Subject: Child Nutrition Cluster - Reporting Federal Agency: Department of Agriculture Federal Programs: School Breakfast Program, National School Lunch Program Assistance Listings Numbers: 10.553, 10.555 Federal Award Numbers and Years (or Other Identifying Numbers): FY 2022, FY 2023 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Reporting Audit Findings: Material Weakness, Other Matters Condition and Context The School Corporation had not properly designed or implemented a system of internal controls which would include appropriate segregation of duties that would likely be effective in preventing, or detecting and correcting, noncompliance related to the monthly reimbursement claims. Meal count reports were run from the School Corporation's meal software system on a monthly basis. The reports were then utilized by the Food Service Director or the Food Service Secretary to prepare the monthly claims for reimbursement. There was no documented review or oversight process over the monthly claims for reimbursement to prevent, or detect and correct, errors. Of the four monthly claims for reimbursement selected for testing, two included overstatements in the number of meal counts used for reimbursement purposes when compared to the supporting documentation. The lack of internal controls and noncompliance were systemic issues during the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 7 CFR 210.8(a) states in part: "The school food authority shall establish internal controls which ensure the accuracy of meal counts prior to submission of the monthly Claim for Reimbursement. . . ." INDIANA STATE BOARD OF ACCOUNTS 24 RANDOLPH EASTERN SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) 7 CFR 210.7(c)(1) states in part: "Lunch count system. To ensure that the Claim for Reimbursement accurately reflects the number of lunches and meal supplements served to eligible children, the school food authority shall, at a minimum: . . . (iii) Base Claims for Reimbursement on lunch counts, taken daily at the point of service, which correctly identify the number of free, reduce price and paid lunches served to eligible children; (iv) Correctly record, consolidate and report those lunch and supplement counts on the Claim for Reimbursement; . . ." 7 CFR 220.11(b) states in part: "Claims for Reimbursement shall include data in sufficient detail to justify the reimbursement claimed . . ." 7 CFR 220.11(d) states in part: "The school food authority shall establish internal controls which ensure the accuracy of breakfast counts prior to submission of the monthly Claim for Reimbursement. . . ." Cause A proper system of internal controls was not designed by management of the School Corporation. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. Effect Without the proper implementation of an effectively designed system of internal controls, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. As a result, reimbursement claims were not supported by the underlying records. Noncompliance with the grant agreement and the Reporting compliance requirement could result in the loss of future federal funds to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish a proper system of internal controls and develop policies and procedures to ensure meal counts are correctly reported. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-006 Subject: Child Nutrition Cluster - Reporting Federal Agency: Department of Agriculture Federal Programs: School Breakfast Program, National School Lunch Program Assistance Listings Numbers: 10.553, 10.555 Federal Award Numbers and Years (or Other Identifying Numbers): FY 2022, FY 2023 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Reporting Audit Findings: Material Weakness, Other Matters Condition and Context The School Corporation had not properly designed or implemented a system of internal controls which would include appropriate segregation of duties that would likely be effective in preventing, or detecting and correcting, noncompliance related to the monthly reimbursement claims. Meal count reports were run from the School Corporation's meal software system on a monthly basis. The reports were then utilized by the Food Service Director or the Food Service Secretary to prepare the monthly claims for reimbursement. There was no documented review or oversight process over the monthly claims for reimbursement to prevent, or detect and correct, errors. Of the four monthly claims for reimbursement selected for testing, two included overstatements in the number of meal counts used for reimbursement purposes when compared to the supporting documentation. The lack of internal controls and noncompliance were systemic issues during the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 7 CFR 210.8(a) states in part: "The school food authority shall establish internal controls which ensure the accuracy of meal counts prior to submission of the monthly Claim for Reimbursement. . . ." INDIANA STATE BOARD OF ACCOUNTS 24 RANDOLPH EASTERN SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) 7 CFR 210.7(c)(1) states in part: "Lunch count system. To ensure that the Claim for Reimbursement accurately reflects the number of lunches and meal supplements served to eligible children, the school food authority shall, at a minimum: . . . (iii) Base Claims for Reimbursement on lunch counts, taken daily at the point of service, which correctly identify the number of free, reduce price and paid lunches served to eligible children; (iv) Correctly record, consolidate and report those lunch and supplement counts on the Claim for Reimbursement; . . ." 7 CFR 220.11(b) states in part: "Claims for Reimbursement shall include data in sufficient detail to justify the reimbursement claimed . . ." 7 CFR 220.11(d) states in part: "The school food authority shall establish internal controls which ensure the accuracy of breakfast counts prior to submission of the monthly Claim for Reimbursement. . . ." Cause A proper system of internal controls was not designed by management of the School Corporation. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. Effect Without the proper implementation of an effectively designed system of internal controls, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. As a result, reimbursement claims were not supported by the underlying records. Noncompliance with the grant agreement and the Reporting compliance requirement could result in the loss of future federal funds to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish a proper system of internal controls and develop policies and procedures to ensure meal counts are correctly reported. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-007 Subject: Child Nutrition Cluster - Special Tests and Provisions - Non-Profit School Food Service Accounts Federal Agency: Department of Agriculture Federal Programs: School Breakfast Program, National School Lunch Program, Summer Food Service Program for Children Assistance Listings Numbers: 10.553, 10.555, 10.559 Federal Award Numbers and Years (or Other Identifying Numbers): FY 2022, FY 2023 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Special Tests and Provisions - Non-Profit School Food Service Accounts Audit Finding: Material Weakness Condition and Context The School Corporation had not properly designed or implemented a system of internal controls which would include appropriate segregation of duties that would likely be effective in preventing, or detecting and correcting, noncompliance. All revenues and expenditures of the non-profit school food service account are to be accounted for in accordance with state and federal requirements. As such, separate accounting is to be made for the school food service, federal reimbursements are to be correctly credited to the food service account, and transfers out of the school food service account are to be for allowable costs of the school food service. One individual received notification of deposit, receipted funds into accounting software, and prepared bank reconciliations. There was no documented review of the receipt of monthly meal reimbursements by a second individual not involved in the original receipt process. The lack of internal controls was a systemic issue during the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." Cause A proper system of internal controls was not designed by management of the School Corporation, which would include appropriate segregation of duties. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. INDIANA STATE BOARD OF ACCOUNTS 26 RANDOLPH EASTERN SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Effect Without the proper implementation of an effectively designed system of internal controls, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management design and implement a proper system of internal controls, including policies and procedures that would provide segregation of duties to ensure appropriate reviews, approvals, and oversight are taking place. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-007 Subject: Child Nutrition Cluster - Special Tests and Provisions - Non-Profit School Food Service Accounts Federal Agency: Department of Agriculture Federal Programs: School Breakfast Program, National School Lunch Program, Summer Food Service Program for Children Assistance Listings Numbers: 10.553, 10.555, 10.559 Federal Award Numbers and Years (or Other Identifying Numbers): FY 2022, FY 2023 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Special Tests and Provisions - Non-Profit School Food Service Accounts Audit Finding: Material Weakness Condition and Context The School Corporation had not properly designed or implemented a system of internal controls which would include appropriate segregation of duties that would likely be effective in preventing, or detecting and correcting, noncompliance. All revenues and expenditures of the non-profit school food service account are to be accounted for in accordance with state and federal requirements. As such, separate accounting is to be made for the school food service, federal reimbursements are to be correctly credited to the food service account, and transfers out of the school food service account are to be for allowable costs of the school food service. One individual received notification of deposit, receipted funds into accounting software, and prepared bank reconciliations. There was no documented review of the receipt of monthly meal reimbursements by a second individual not involved in the original receipt process. The lack of internal controls was a systemic issue during the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." Cause A proper system of internal controls was not designed by management of the School Corporation, which would include appropriate segregation of duties. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. INDIANA STATE BOARD OF ACCOUNTS 26 RANDOLPH EASTERN SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Effect Without the proper implementation of an effectively designed system of internal controls, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management design and implement a proper system of internal controls, including policies and procedures that would provide segregation of duties to ensure appropriate reviews, approvals, and oversight are taking place. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-007 Subject: Child Nutrition Cluster - Special Tests and Provisions - Non-Profit School Food Service Accounts Federal Agency: Department of Agriculture Federal Programs: School Breakfast Program, National School Lunch Program, Summer Food Service Program for Children Assistance Listings Numbers: 10.553, 10.555, 10.559 Federal Award Numbers and Years (or Other Identifying Numbers): FY 2022, FY 2023 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Special Tests and Provisions - Non-Profit School Food Service Accounts Audit Finding: Material Weakness Condition and Context The School Corporation had not properly designed or implemented a system of internal controls which would include appropriate segregation of duties that would likely be effective in preventing, or detecting and correcting, noncompliance. All revenues and expenditures of the non-profit school food service account are to be accounted for in accordance with state and federal requirements. As such, separate accounting is to be made for the school food service, federal reimbursements are to be correctly credited to the food service account, and transfers out of the school food service account are to be for allowable costs of the school food service. One individual received notification of deposit, receipted funds into accounting software, and prepared bank reconciliations. There was no documented review of the receipt of monthly meal reimbursements by a second individual not involved in the original receipt process. The lack of internal controls was a systemic issue during the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." Cause A proper system of internal controls was not designed by management of the School Corporation, which would include appropriate segregation of duties. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. INDIANA STATE BOARD OF ACCOUNTS 26 RANDOLPH EASTERN SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Effect Without the proper implementation of an effectively designed system of internal controls, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management design and implement a proper system of internal controls, including policies and procedures that would provide segregation of duties to ensure appropriate reviews, approvals, and oversight are taking place. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-007 Subject: Child Nutrition Cluster - Special Tests and Provisions - Non-Profit School Food Service Accounts Federal Agency: Department of Agriculture Federal Programs: School Breakfast Program, National School Lunch Program, Summer Food Service Program for Children Assistance Listings Numbers: 10.553, 10.555, 10.559 Federal Award Numbers and Years (or Other Identifying Numbers): FY 2022, FY 2023 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Special Tests and Provisions - Non-Profit School Food Service Accounts Audit Finding: Material Weakness Condition and Context The School Corporation had not properly designed or implemented a system of internal controls which would include appropriate segregation of duties that would likely be effective in preventing, or detecting and correcting, noncompliance. All revenues and expenditures of the non-profit school food service account are to be accounted for in accordance with state and federal requirements. As such, separate accounting is to be made for the school food service, federal reimbursements are to be correctly credited to the food service account, and transfers out of the school food service account are to be for allowable costs of the school food service. One individual received notification of deposit, receipted funds into accounting software, and prepared bank reconciliations. There was no documented review of the receipt of monthly meal reimbursements by a second individual not involved in the original receipt process. The lack of internal controls was a systemic issue during the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." Cause A proper system of internal controls was not designed by management of the School Corporation, which would include appropriate segregation of duties. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. INDIANA STATE BOARD OF ACCOUNTS 26 RANDOLPH EASTERN SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Effect Without the proper implementation of an effectively designed system of internal controls, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management design and implement a proper system of internal controls, including policies and procedures that would provide segregation of duties to ensure appropriate reviews, approvals, and oversight are taking place. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-007 Subject: Child Nutrition Cluster - Special Tests and Provisions - Non-Profit School Food Service Accounts Federal Agency: Department of Agriculture Federal Programs: School Breakfast Program, National School Lunch Program, Summer Food Service Program for Children Assistance Listings Numbers: 10.553, 10.555, 10.559 Federal Award Numbers and Years (or Other Identifying Numbers): FY 2022, FY 2023 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Special Tests and Provisions - Non-Profit School Food Service Accounts Audit Finding: Material Weakness Condition and Context The School Corporation had not properly designed or implemented a system of internal controls which would include appropriate segregation of duties that would likely be effective in preventing, or detecting and correcting, noncompliance. All revenues and expenditures of the non-profit school food service account are to be accounted for in accordance with state and federal requirements. As such, separate accounting is to be made for the school food service, federal reimbursements are to be correctly credited to the food service account, and transfers out of the school food service account are to be for allowable costs of the school food service. One individual received notification of deposit, receipted funds into accounting software, and prepared bank reconciliations. There was no documented review of the receipt of monthly meal reimbursements by a second individual not involved in the original receipt process. The lack of internal controls was a systemic issue during the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." Cause A proper system of internal controls was not designed by management of the School Corporation, which would include appropriate segregation of duties. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. INDIANA STATE BOARD OF ACCOUNTS 26 RANDOLPH EASTERN SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Effect Without the proper implementation of an effectively designed system of internal controls, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management design and implement a proper system of internal controls, including policies and procedures that would provide segregation of duties to ensure appropriate reviews, approvals, and oversight are taking place. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-008 Subject: COVID-19 - Education Stabilization Fund - Special Tests and Provisions - Wage Rate Requirements Federal Agency: Indiana Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Numbers: 84.425U, 84.425C Federal Award Numbers and Years (or Other Identifying Numbers): S425C200018; S425U2100013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Special Tests and Provisions - Wage Rate Requirements Audit Findings: Material Weakness, Modified Opinion Condition and Context Construction contracts in excess of $2,000 financed by federal assistance funds must pay wages not less than those established for the locality of the project (prevailing wage rates) by the Department of Labor (DOL) to their laborers and mechanics. Nonfederal entities are to include in their construction contracts subject to the Wage Rate Requirements a provision that the contractor or subcontractor comply with these requirements and the DOL regulations. This would include a requirement to submit a copy of the payroll and statement of compliance to the entity for each week in which contract work was performed. The School Corporation had not designed nor implemented a system of internal controls to ensure that construction contracts in excess of $2,000 paid from federal grant funds included a prevailing wage rate clause. Nine construction contracts, totaling $113,571, were paid for with the COVID-19 - Education Stabilization Fund award during the audit period. All nine contracts were selected for testing. None of the contracts included the required prevailing wage rate clause nor were the associated certified payrolls and statements of compliance obtained. The lack of internal controls and noncompliance were systemic issues throughout the audit period. INDIANA STATE BOARD OF ACCOUNTS 27 RANDOLPH EASTERN SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 29 CFR 5.5 states in part: "(a) The Agency head shall cause or require the contracting officer to insert in full in any contract in excess of $2,000 which is entered into for the actual construction, alteration and/or repair, including painting and decorating, of a public building or public work, or building or work financed in whole or in part from Federal funds or in accordance with guarantees of a Federal agency or financed from funds obtained by pledge of any contract of a Federal agency to make a loan, grant or annual contribution (except where a different meaning is expressly indicated), and which is subject to the labor standards provisions of any of the acts listed in § 5.1, the following clauses . . . (1) Minimum wages. (i) All laborers and mechanics employed or working upon the site of the work (or under the United States Housing Act of 1937 or under the Housing Act of 1949 in the construction or development of the project), will be paid unconditionally and not less often than once a week, and without subsequent deduction or rebate on any account (except such payroll deductions as are permitted by regulations issued by the Secretary of Labor under the Copeland Act (29 CFR part 3)), the full amount of wages and bona fide fringe benefits (or cash equivalents thereof) due at time of payment computed at rates not less than those contained in the wage determination of the Secretary of Labor which is attached hereto and made a part hereof, regardless of any contractual relationship which may be alleged to exist between the contractor and such laborers and mechanics. . . . (3) Payrolls and basic records. . . . (i) (A) The contractor shall submit weekly for each week in which any contract work is performed a copy of all payrolls to the (write in name of appropriate federal agency) if the agency is a party to the contract, but if the agency is not such a party, the contractor will submit the payrolls to the applicant, sponsor, or owner, as the case may be, for transmission to the (write in name of agency). . . ." 2 CFR 200 Appendix II states in part: "In addition to other provisions required by the Federal agency or non-Federal entity; all contracts made by the non-Federal entity under the Federal award must contain provisions covering the following, as applicable. . . . INDIANA STATE BOARD OF ACCOUNTS 28 RANDOLPH EASTERN SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) (D) Davis-Bacon Act, as amended (40 U.S.C. 3141-3148). When required by Federal program legislation, all prime construction contracts in excess of $2,000 awarded by nonFederal entities must include a provision for compliance with the Davis-Bacon Act (40 U.S.C. 3141-3144, and 3146-3148) as supplemented by Department of Labor regulations (29 CFR Part 5, 'Labor Standards Provisions Applicable to Contracts Covering Federally Financed and Assisted Construction'). In accordance with the statute, contractors must be required to pay wages to laborers and mechanics at a rate not less than the prevailing wages specified in a wage determination made by the Secretary of Labor. In addition, contractors must be required to pay wages not less than once a week. . . ." Cause A proper system of internal controls was not designed by management of the School Corporation, which would include segregation of key functions. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. Effect Without the proper implementation of an effectively designed system of internal controls, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. As a result, construction contracts entered into did not contain the required wage rate requirements clauses nor were certified payrolls obtained by the School Corporation. Noncompliance with the grant agreement and the compliance requirement could result in the loss of future federal funds to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish a system of internal controls and include the wage rate requirement clause in construction contracts. In addition, certified payrolls should be obtained as required. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-008 Subject: COVID-19 - Education Stabilization Fund - Special Tests and Provisions - Wage Rate Requirements Federal Agency: Indiana Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Numbers: 84.425U, 84.425C Federal Award Numbers and Years (or Other Identifying Numbers): S425C200018; S425U2100013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Special Tests and Provisions - Wage Rate Requirements Audit Findings: Material Weakness, Modified Opinion Condition and Context Construction contracts in excess of $2,000 financed by federal assistance funds must pay wages not less than those established for the locality of the project (prevailing wage rates) by the Department of Labor (DOL) to their laborers and mechanics. Nonfederal entities are to include in their construction contracts subject to the Wage Rate Requirements a provision that the contractor or subcontractor comply with these requirements and the DOL regulations. This would include a requirement to submit a copy of the payroll and statement of compliance to the entity for each week in which contract work was performed. The School Corporation had not designed nor implemented a system of internal controls to ensure that construction contracts in excess of $2,000 paid from federal grant funds included a prevailing wage rate clause. Nine construction contracts, totaling $113,571, were paid for with the COVID-19 - Education Stabilization Fund award during the audit period. All nine contracts were selected for testing. None of the contracts included the required prevailing wage rate clause nor were the associated certified payrolls and statements of compliance obtained. The lack of internal controls and noncompliance were systemic issues throughout the audit period. INDIANA STATE BOARD OF ACCOUNTS 27 RANDOLPH EASTERN SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 29 CFR 5.5 states in part: "(a) The Agency head shall cause or require the contracting officer to insert in full in any contract in excess of $2,000 which is entered into for the actual construction, alteration and/or repair, including painting and decorating, of a public building or public work, or building or work financed in whole or in part from Federal funds or in accordance with guarantees of a Federal agency or financed from funds obtained by pledge of any contract of a Federal agency to make a loan, grant or annual contribution (except where a different meaning is expressly indicated), and which is subject to the labor standards provisions of any of the acts listed in § 5.1, the following clauses . . . (1) Minimum wages. (i) All laborers and mechanics employed or working upon the site of the work (or under the United States Housing Act of 1937 or under the Housing Act of 1949 in the construction or development of the project), will be paid unconditionally and not less often than once a week, and without subsequent deduction or rebate on any account (except such payroll deductions as are permitted by regulations issued by the Secretary of Labor under the Copeland Act (29 CFR part 3)), the full amount of wages and bona fide fringe benefits (or cash equivalents thereof) due at time of payment computed at rates not less than those contained in the wage determination of the Secretary of Labor which is attached hereto and made a part hereof, regardless of any contractual relationship which may be alleged to exist between the contractor and such laborers and mechanics. . . . (3) Payrolls and basic records. . . . (i) (A) The contractor shall submit weekly for each week in which any contract work is performed a copy of all payrolls to the (write in name of appropriate federal agency) if the agency is a party to the contract, but if the agency is not such a party, the contractor will submit the payrolls to the applicant, sponsor, or owner, as the case may be, for transmission to the (write in name of agency). . . ." 2 CFR 200 Appendix II states in part: "In addition to other provisions required by the Federal agency or non-Federal entity; all contracts made by the non-Federal entity under the Federal award must contain provisions covering the following, as applicable. . . . INDIANA STATE BOARD OF ACCOUNTS 28 RANDOLPH EASTERN SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) (D) Davis-Bacon Act, as amended (40 U.S.C. 3141-3148). When required by Federal program legislation, all prime construction contracts in excess of $2,000 awarded by nonFederal entities must include a provision for compliance with the Davis-Bacon Act (40 U.S.C. 3141-3144, and 3146-3148) as supplemented by Department of Labor regulations (29 CFR Part 5, 'Labor Standards Provisions Applicable to Contracts Covering Federally Financed and Assisted Construction'). In accordance with the statute, contractors must be required to pay wages to laborers and mechanics at a rate not less than the prevailing wages specified in a wage determination made by the Secretary of Labor. In addition, contractors must be required to pay wages not less than once a week. . . ." Cause A proper system of internal controls was not designed by management of the School Corporation, which would include segregation of key functions. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. Effect Without the proper implementation of an effectively designed system of internal controls, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. As a result, construction contracts entered into did not contain the required wage rate requirements clauses nor were certified payrolls obtained by the School Corporation. Noncompliance with the grant agreement and the compliance requirement could result in the loss of future federal funds to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish a system of internal controls and include the wage rate requirement clause in construction contracts. In addition, certified payrolls should be obtained as required. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-008 Subject: COVID-19 - Education Stabilization Fund - Special Tests and Provisions - Wage Rate Requirements Federal Agency: Indiana Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Numbers: 84.425U, 84.425C Federal Award Numbers and Years (or Other Identifying Numbers): S425C200018; S425U2100013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Special Tests and Provisions - Wage Rate Requirements Audit Findings: Material Weakness, Modified Opinion Condition and Context Construction contracts in excess of $2,000 financed by federal assistance funds must pay wages not less than those established for the locality of the project (prevailing wage rates) by the Department of Labor (DOL) to their laborers and mechanics. Nonfederal entities are to include in their construction contracts subject to the Wage Rate Requirements a provision that the contractor or subcontractor comply with these requirements and the DOL regulations. This would include a requirement to submit a copy of the payroll and statement of compliance to the entity for each week in which contract work was performed. The School Corporation had not designed nor implemented a system of internal controls to ensure that construction contracts in excess of $2,000 paid from federal grant funds included a prevailing wage rate clause. Nine construction contracts, totaling $113,571, were paid for with the COVID-19 - Education Stabilization Fund award during the audit period. All nine contracts were selected for testing. None of the contracts included the required prevailing wage rate clause nor were the associated certified payrolls and statements of compliance obtained. The lack of internal controls and noncompliance were systemic issues throughout the audit period. INDIANA STATE BOARD OF ACCOUNTS 27 RANDOLPH EASTERN SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 29 CFR 5.5 states in part: "(a) The Agency head shall cause or require the contracting officer to insert in full in any contract in excess of $2,000 which is entered into for the actual construction, alteration and/or repair, including painting and decorating, of a public building or public work, or building or work financed in whole or in part from Federal funds or in accordance with guarantees of a Federal agency or financed from funds obtained by pledge of any contract of a Federal agency to make a loan, grant or annual contribution (except where a different meaning is expressly indicated), and which is subject to the labor standards provisions of any of the acts listed in § 5.1, the following clauses . . . (1) Minimum wages. (i) All laborers and mechanics employed or working upon the site of the work (or under the United States Housing Act of 1937 or under the Housing Act of 1949 in the construction or development of the project), will be paid unconditionally and not less often than once a week, and without subsequent deduction or rebate on any account (except such payroll deductions as are permitted by regulations issued by the Secretary of Labor under the Copeland Act (29 CFR part 3)), the full amount of wages and bona fide fringe benefits (or cash equivalents thereof) due at time of payment computed at rates not less than those contained in the wage determination of the Secretary of Labor which is attached hereto and made a part hereof, regardless of any contractual relationship which may be alleged to exist between the contractor and such laborers and mechanics. . . . (3) Payrolls and basic records. . . . (i) (A) The contractor shall submit weekly for each week in which any contract work is performed a copy of all payrolls to the (write in name of appropriate federal agency) if the agency is a party to the contract, but if the agency is not such a party, the contractor will submit the payrolls to the applicant, sponsor, or owner, as the case may be, for transmission to the (write in name of agency). . . ." 2 CFR 200 Appendix II states in part: "In addition to other provisions required by the Federal agency or non-Federal entity; all contracts made by the non-Federal entity under the Federal award must contain provisions covering the following, as applicable. . . . INDIANA STATE BOARD OF ACCOUNTS 28 RANDOLPH EASTERN SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) (D) Davis-Bacon Act, as amended (40 U.S.C. 3141-3148). When required by Federal program legislation, all prime construction contracts in excess of $2,000 awarded by nonFederal entities must include a provision for compliance with the Davis-Bacon Act (40 U.S.C. 3141-3144, and 3146-3148) as supplemented by Department of Labor regulations (29 CFR Part 5, 'Labor Standards Provisions Applicable to Contracts Covering Federally Financed and Assisted Construction'). In accordance with the statute, contractors must be required to pay wages to laborers and mechanics at a rate not less than the prevailing wages specified in a wage determination made by the Secretary of Labor. In addition, contractors must be required to pay wages not less than once a week. . . ." Cause A proper system of internal controls was not designed by management of the School Corporation, which would include segregation of key functions. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. Effect Without the proper implementation of an effectively designed system of internal controls, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. As a result, construction contracts entered into did not contain the required wage rate requirements clauses nor were certified payrolls obtained by the School Corporation. Noncompliance with the grant agreement and the compliance requirement could result in the loss of future federal funds to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish a system of internal controls and include the wage rate requirement clause in construction contracts. In addition, certified payrolls should be obtained as required. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-008 Subject: COVID-19 - Education Stabilization Fund - Special Tests and Provisions - Wage Rate Requirements Federal Agency: Indiana Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Numbers: 84.425U, 84.425C Federal Award Numbers and Years (or Other Identifying Numbers): S425C200018; S425U2100013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Special Tests and Provisions - Wage Rate Requirements Audit Findings: Material Weakness, Modified Opinion Condition and Context Construction contracts in excess of $2,000 financed by federal assistance funds must pay wages not less than those established for the locality of the project (prevailing wage rates) by the Department of Labor (DOL) to their laborers and mechanics. Nonfederal entities are to include in their construction contracts subject to the Wage Rate Requirements a provision that the contractor or subcontractor comply with these requirements and the DOL regulations. This would include a requirement to submit a copy of the payroll and statement of compliance to the entity for each week in which contract work was performed. The School Corporation had not designed nor implemented a system of internal controls to ensure that construction contracts in excess of $2,000 paid from federal grant funds included a prevailing wage rate clause. Nine construction contracts, totaling $113,571, were paid for with the COVID-19 - Education Stabilization Fund award during the audit period. All nine contracts were selected for testing. None of the contracts included the required prevailing wage rate clause nor were the associated certified payrolls and statements of compliance obtained. The lack of internal controls and noncompliance were systemic issues throughout the audit period. INDIANA STATE BOARD OF ACCOUNTS 27 RANDOLPH EASTERN SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 29 CFR 5.5 states in part: "(a) The Agency head shall cause or require the contracting officer to insert in full in any contract in excess of $2,000 which is entered into for the actual construction, alteration and/or repair, including painting and decorating, of a public building or public work, or building or work financed in whole or in part from Federal funds or in accordance with guarantees of a Federal agency or financed from funds obtained by pledge of any contract of a Federal agency to make a loan, grant or annual contribution (except where a different meaning is expressly indicated), and which is subject to the labor standards provisions of any of the acts listed in § 5.1, the following clauses . . . (1) Minimum wages. (i) All laborers and mechanics employed or working upon the site of the work (or under the United States Housing Act of 1937 or under the Housing Act of 1949 in the construction or development of the project), will be paid unconditionally and not less often than once a week, and without subsequent deduction or rebate on any account (except such payroll deductions as are permitted by regulations issued by the Secretary of Labor under the Copeland Act (29 CFR part 3)), the full amount of wages and bona fide fringe benefits (or cash equivalents thereof) due at time of payment computed at rates not less than those contained in the wage determination of the Secretary of Labor which is attached hereto and made a part hereof, regardless of any contractual relationship which may be alleged to exist between the contractor and such laborers and mechanics. . . . (3) Payrolls and basic records. . . . (i) (A) The contractor shall submit weekly for each week in which any contract work is performed a copy of all payrolls to the (write in name of appropriate federal agency) if the agency is a party to the contract, but if the agency is not such a party, the contractor will submit the payrolls to the applicant, sponsor, or owner, as the case may be, for transmission to the (write in name of agency). . . ." 2 CFR 200 Appendix II states in part: "In addition to other provisions required by the Federal agency or non-Federal entity; all contracts made by the non-Federal entity under the Federal award must contain provisions covering the following, as applicable. . . . INDIANA STATE BOARD OF ACCOUNTS 28 RANDOLPH EASTERN SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) (D) Davis-Bacon Act, as amended (40 U.S.C. 3141-3148). When required by Federal program legislation, all prime construction contracts in excess of $2,000 awarded by nonFederal entities must include a provision for compliance with the Davis-Bacon Act (40 U.S.C. 3141-3144, and 3146-3148) as supplemented by Department of Labor regulations (29 CFR Part 5, 'Labor Standards Provisions Applicable to Contracts Covering Federally Financed and Assisted Construction'). In accordance with the statute, contractors must be required to pay wages to laborers and mechanics at a rate not less than the prevailing wages specified in a wage determination made by the Secretary of Labor. In addition, contractors must be required to pay wages not less than once a week. . . ." Cause A proper system of internal controls was not designed by management of the School Corporation, which would include segregation of key functions. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. Effect Without the proper implementation of an effectively designed system of internal controls, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. As a result, construction contracts entered into did not contain the required wage rate requirements clauses nor were certified payrolls obtained by the School Corporation. Noncompliance with the grant agreement and the compliance requirement could result in the loss of future federal funds to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish a system of internal controls and include the wage rate requirement clause in construction contracts. In addition, certified payrolls should be obtained as required. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-008 Subject: COVID-19 - Education Stabilization Fund - Special Tests and Provisions - Wage Rate Requirements Federal Agency: Indiana Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Numbers: 84.425U, 84.425C Federal Award Numbers and Years (or Other Identifying Numbers): S425C200018; S425U2100013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Special Tests and Provisions - Wage Rate Requirements Audit Findings: Material Weakness, Modified Opinion Condition and Context Construction contracts in excess of $2,000 financed by federal assistance funds must pay wages not less than those established for the locality of the project (prevailing wage rates) by the Department of Labor (DOL) to their laborers and mechanics. Nonfederal entities are to include in their construction contracts subject to the Wage Rate Requirements a provision that the contractor or subcontractor comply with these requirements and the DOL regulations. This would include a requirement to submit a copy of the payroll and statement of compliance to the entity for each week in which contract work was performed. The School Corporation had not designed nor implemented a system of internal controls to ensure that construction contracts in excess of $2,000 paid from federal grant funds included a prevailing wage rate clause. Nine construction contracts, totaling $113,571, were paid for with the COVID-19 - Education Stabilization Fund award during the audit period. All nine contracts were selected for testing. None of the contracts included the required prevailing wage rate clause nor were the associated certified payrolls and statements of compliance obtained. The lack of internal controls and noncompliance were systemic issues throughout the audit period. INDIANA STATE BOARD OF ACCOUNTS 27 RANDOLPH EASTERN SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 29 CFR 5.5 states in part: "(a) The Agency head shall cause or require the contracting officer to insert in full in any contract in excess of $2,000 which is entered into for the actual construction, alteration and/or repair, including painting and decorating, of a public building or public work, or building or work financed in whole or in part from Federal funds or in accordance with guarantees of a Federal agency or financed from funds obtained by pledge of any contract of a Federal agency to make a loan, grant or annual contribution (except where a different meaning is expressly indicated), and which is subject to the labor standards provisions of any of the acts listed in § 5.1, the following clauses . . . (1) Minimum wages. (i) All laborers and mechanics employed or working upon the site of the work (or under the United States Housing Act of 1937 or under the Housing Act of 1949 in the construction or development of the project), will be paid unconditionally and not less often than once a week, and without subsequent deduction or rebate on any account (except such payroll deductions as are permitted by regulations issued by the Secretary of Labor under the Copeland Act (29 CFR part 3)), the full amount of wages and bona fide fringe benefits (or cash equivalents thereof) due at time of payment computed at rates not less than those contained in the wage determination of the Secretary of Labor which is attached hereto and made a part hereof, regardless of any contractual relationship which may be alleged to exist between the contractor and such laborers and mechanics. . . . (3) Payrolls and basic records. . . . (i) (A) The contractor shall submit weekly for each week in which any contract work is performed a copy of all payrolls to the (write in name of appropriate federal agency) if the agency is a party to the contract, but if the agency is not such a party, the contractor will submit the payrolls to the applicant, sponsor, or owner, as the case may be, for transmission to the (write in name of agency). . . ." 2 CFR 200 Appendix II states in part: "In addition to other provisions required by the Federal agency or non-Federal entity; all contracts made by the non-Federal entity under the Federal award must contain provisions covering the following, as applicable. . . . INDIANA STATE BOARD OF ACCOUNTS 28 RANDOLPH EASTERN SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) (D) Davis-Bacon Act, as amended (40 U.S.C. 3141-3148). When required by Federal program legislation, all prime construction contracts in excess of $2,000 awarded by nonFederal entities must include a provision for compliance with the Davis-Bacon Act (40 U.S.C. 3141-3144, and 3146-3148) as supplemented by Department of Labor regulations (29 CFR Part 5, 'Labor Standards Provisions Applicable to Contracts Covering Federally Financed and Assisted Construction'). In accordance with the statute, contractors must be required to pay wages to laborers and mechanics at a rate not less than the prevailing wages specified in a wage determination made by the Secretary of Labor. In addition, contractors must be required to pay wages not less than once a week. . . ." Cause A proper system of internal controls was not designed by management of the School Corporation, which would include segregation of key functions. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. Effect Without the proper implementation of an effectively designed system of internal controls, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. As a result, construction contracts entered into did not contain the required wage rate requirements clauses nor were certified payrolls obtained by the School Corporation. Noncompliance with the grant agreement and the compliance requirement could result in the loss of future federal funds to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish a system of internal controls and include the wage rate requirement clause in construction contracts. In addition, certified payrolls should be obtained as required. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-003 Subject: COVID-19 - Education Stabilization Fund - Equipment and Real Property Management Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Numbers: 84.425D, 84.425U, 84.425C Federal Award Numbers and Years (or Other Identifying Numbers): S425D200013, S425D210013, S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Equipment and Real Property Management Audit Findings: Material Weakness, Modified Opinion Condition and Context The School Corporation had not properly designed or implemented a system of internal controls, which would include appropriate segregation of duties, that would likely be effective in preventing, or detecting and correcting, noncompliance. A property record or capital asset listing, which would include a description of the property, a serial number or other identification number, the source of funding for the property (including the federal award identification number (FAIN)), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, and use and condition of the property, is to be maintained for assets purchased that exceed the School Corporation's capitalization threshold. In addition, a physical inventory of all assets should be completed at least every two years. The School Corporation purchased eight assets, totaling $131,205, which exceeded the School Corporation's capitalization threshold. Two of the eight assets were selected for testing. Neither of the two assets were determined to have property records, nor were the assets on the inventory listing. Additionally, the School Corporation did not complete a capital asset inventory every two years as required. The lack of internal controls and noncompliance were systemic issues throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 2 CFR 200.313(d) states in part: "Management requirements. Procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, as a minimum, meet the following requirements: INDIANA STATE BOARD OF ACCOUNTS 19 RANDOLPH EASTERN SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) (1) Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, and cost of the property, percentage of Federal participation in the project costs for the Federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sale price of the property. (2) A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years. (3) A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated. . . ." Cause A proper system of internal controls was not designed by management of the School Corporation. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. Effect Without the proper implementation of an effectively designed system of internal controls, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. As a result, there was not a complete asset listing nor was there a physical inventory completed as required. Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of the federal award could result in the loss of future federal funding to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that management of the School Corporation establish a proper system of internal controls and develop policies and procedures to ensure asset records are maintained and that a physical inventory is taken every two years. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-003 Subject: COVID-19 - Education Stabilization Fund - Equipment and Real Property Management Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Numbers: 84.425D, 84.425U, 84.425C Federal Award Numbers and Years (or Other Identifying Numbers): S425D200013, S425D210013, S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Equipment and Real Property Management Audit Findings: Material Weakness, Modified Opinion Condition and Context The School Corporation had not properly designed or implemented a system of internal controls, which would include appropriate segregation of duties, that would likely be effective in preventing, or detecting and correcting, noncompliance. A property record or capital asset listing, which would include a description of the property, a serial number or other identification number, the source of funding for the property (including the federal award identification number (FAIN)), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, and use and condition of the property, is to be maintained for assets purchased that exceed the School Corporation's capitalization threshold. In addition, a physical inventory of all assets should be completed at least every two years. The School Corporation purchased eight assets, totaling $131,205, which exceeded the School Corporation's capitalization threshold. Two of the eight assets were selected for testing. Neither of the two assets were determined to have property records, nor were the assets on the inventory listing. Additionally, the School Corporation did not complete a capital asset inventory every two years as required. The lack of internal controls and noncompliance were systemic issues throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 2 CFR 200.313(d) states in part: "Management requirements. Procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, as a minimum, meet the following requirements: INDIANA STATE BOARD OF ACCOUNTS 19 RANDOLPH EASTERN SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) (1) Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, and cost of the property, percentage of Federal participation in the project costs for the Federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sale price of the property. (2) A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years. (3) A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated. . . ." Cause A proper system of internal controls was not designed by management of the School Corporation. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. Effect Without the proper implementation of an effectively designed system of internal controls, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. As a result, there was not a complete asset listing nor was there a physical inventory completed as required. Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of the federal award could result in the loss of future federal funding to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that management of the School Corporation establish a proper system of internal controls and develop policies and procedures to ensure asset records are maintained and that a physical inventory is taken every two years. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-003 Subject: COVID-19 - Education Stabilization Fund - Equipment and Real Property Management Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Numbers: 84.425D, 84.425U, 84.425C Federal Award Numbers and Years (or Other Identifying Numbers): S425D200013, S425D210013, S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Equipment and Real Property Management Audit Findings: Material Weakness, Modified Opinion Condition and Context The School Corporation had not properly designed or implemented a system of internal controls, which would include appropriate segregation of duties, that would likely be effective in preventing, or detecting and correcting, noncompliance. A property record or capital asset listing, which would include a description of the property, a serial number or other identification number, the source of funding for the property (including the federal award identification number (FAIN)), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, and use and condition of the property, is to be maintained for assets purchased that exceed the School Corporation's capitalization threshold. In addition, a physical inventory of all assets should be completed at least every two years. The School Corporation purchased eight assets, totaling $131,205, which exceeded the School Corporation's capitalization threshold. Two of the eight assets were selected for testing. Neither of the two assets were determined to have property records, nor were the assets on the inventory listing. Additionally, the School Corporation did not complete a capital asset inventory every two years as required. The lack of internal controls and noncompliance were systemic issues throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 2 CFR 200.313(d) states in part: "Management requirements. Procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, as a minimum, meet the following requirements: INDIANA STATE BOARD OF ACCOUNTS 19 RANDOLPH EASTERN SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) (1) Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, and cost of the property, percentage of Federal participation in the project costs for the Federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sale price of the property. (2) A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years. (3) A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated. . . ." Cause A proper system of internal controls was not designed by management of the School Corporation. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. Effect Without the proper implementation of an effectively designed system of internal controls, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. As a result, there was not a complete asset listing nor was there a physical inventory completed as required. Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of the federal award could result in the loss of future federal funding to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that management of the School Corporation establish a proper system of internal controls and develop policies and procedures to ensure asset records are maintained and that a physical inventory is taken every two years. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-003 Subject: COVID-19 - Education Stabilization Fund - Equipment and Real Property Management Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Numbers: 84.425D, 84.425U, 84.425C Federal Award Numbers and Years (or Other Identifying Numbers): S425D200013, S425D210013, S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Equipment and Real Property Management Audit Findings: Material Weakness, Modified Opinion Condition and Context The School Corporation had not properly designed or implemented a system of internal controls, which would include appropriate segregation of duties, that would likely be effective in preventing, or detecting and correcting, noncompliance. A property record or capital asset listing, which would include a description of the property, a serial number or other identification number, the source of funding for the property (including the federal award identification number (FAIN)), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, and use and condition of the property, is to be maintained for assets purchased that exceed the School Corporation's capitalization threshold. In addition, a physical inventory of all assets should be completed at least every two years. The School Corporation purchased eight assets, totaling $131,205, which exceeded the School Corporation's capitalization threshold. Two of the eight assets were selected for testing. Neither of the two assets were determined to have property records, nor were the assets on the inventory listing. Additionally, the School Corporation did not complete a capital asset inventory every two years as required. The lack of internal controls and noncompliance were systemic issues throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 2 CFR 200.313(d) states in part: "Management requirements. Procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, as a minimum, meet the following requirements: INDIANA STATE BOARD OF ACCOUNTS 19 RANDOLPH EASTERN SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) (1) Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, and cost of the property, percentage of Federal participation in the project costs for the Federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sale price of the property. (2) A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years. (3) A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated. . . ." Cause A proper system of internal controls was not designed by management of the School Corporation. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. Effect Without the proper implementation of an effectively designed system of internal controls, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. As a result, there was not a complete asset listing nor was there a physical inventory completed as required. Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of the federal award could result in the loss of future federal funding to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that management of the School Corporation establish a proper system of internal controls and develop policies and procedures to ensure asset records are maintained and that a physical inventory is taken every two years. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-003 Subject: COVID-19 - Education Stabilization Fund - Equipment and Real Property Management Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Numbers: 84.425D, 84.425U, 84.425C Federal Award Numbers and Years (or Other Identifying Numbers): S425D200013, S425D210013, S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Equipment and Real Property Management Audit Findings: Material Weakness, Modified Opinion Condition and Context The School Corporation had not properly designed or implemented a system of internal controls, which would include appropriate segregation of duties, that would likely be effective in preventing, or detecting and correcting, noncompliance. A property record or capital asset listing, which would include a description of the property, a serial number or other identification number, the source of funding for the property (including the federal award identification number (FAIN)), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, and use and condition of the property, is to be maintained for assets purchased that exceed the School Corporation's capitalization threshold. In addition, a physical inventory of all assets should be completed at least every two years. The School Corporation purchased eight assets, totaling $131,205, which exceeded the School Corporation's capitalization threshold. Two of the eight assets were selected for testing. Neither of the two assets were determined to have property records, nor were the assets on the inventory listing. Additionally, the School Corporation did not complete a capital asset inventory every two years as required. The lack of internal controls and noncompliance were systemic issues throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 2 CFR 200.313(d) states in part: "Management requirements. Procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, as a minimum, meet the following requirements: INDIANA STATE BOARD OF ACCOUNTS 19 RANDOLPH EASTERN SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) (1) Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, and cost of the property, percentage of Federal participation in the project costs for the Federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sale price of the property. (2) A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years. (3) A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated. . . ." Cause A proper system of internal controls was not designed by management of the School Corporation. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. Effect Without the proper implementation of an effectively designed system of internal controls, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. As a result, there was not a complete asset listing nor was there a physical inventory completed as required. Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of the federal award could result in the loss of future federal funding to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that management of the School Corporation establish a proper system of internal controls and develop policies and procedures to ensure asset records are maintained and that a physical inventory is taken every two years. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-003 Subject: COVID-19 - Education Stabilization Fund - Equipment and Real Property Management Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Numbers: 84.425D, 84.425U, 84.425C Federal Award Numbers and Years (or Other Identifying Numbers): S425D200013, S425D210013, S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Equipment and Real Property Management Audit Findings: Material Weakness, Modified Opinion Condition and Context The School Corporation had not properly designed or implemented a system of internal controls, which would include appropriate segregation of duties, that would likely be effective in preventing, or detecting and correcting, noncompliance. A property record or capital asset listing, which would include a description of the property, a serial number or other identification number, the source of funding for the property (including the federal award identification number (FAIN)), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, and use and condition of the property, is to be maintained for assets purchased that exceed the School Corporation's capitalization threshold. In addition, a physical inventory of all assets should be completed at least every two years. The School Corporation purchased eight assets, totaling $131,205, which exceeded the School Corporation's capitalization threshold. Two of the eight assets were selected for testing. Neither of the two assets were determined to have property records, nor were the assets on the inventory listing. Additionally, the School Corporation did not complete a capital asset inventory every two years as required. The lack of internal controls and noncompliance were systemic issues throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 2 CFR 200.313(d) states in part: "Management requirements. Procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, as a minimum, meet the following requirements: INDIANA STATE BOARD OF ACCOUNTS 19 RANDOLPH EASTERN SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) (1) Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, and cost of the property, percentage of Federal participation in the project costs for the Federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sale price of the property. (2) A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years. (3) A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated. . . ." Cause A proper system of internal controls was not designed by management of the School Corporation. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. Effect Without the proper implementation of an effectively designed system of internal controls, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. As a result, there was not a complete asset listing nor was there a physical inventory completed as required. Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of the federal award could result in the loss of future federal funding to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that management of the School Corporation establish a proper system of internal controls and develop policies and procedures to ensure asset records are maintained and that a physical inventory is taken every two years. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-003 Subject: COVID-19 - Education Stabilization Fund - Equipment and Real Property Management Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Numbers: 84.425D, 84.425U, 84.425C Federal Award Numbers and Years (or Other Identifying Numbers): S425D200013, S425D210013, S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Equipment and Real Property Management Audit Findings: Material Weakness, Modified Opinion Condition and Context The School Corporation had not properly designed or implemented a system of internal controls, which would include appropriate segregation of duties, that would likely be effective in preventing, or detecting and correcting, noncompliance. A property record or capital asset listing, which would include a description of the property, a serial number or other identification number, the source of funding for the property (including the federal award identification number (FAIN)), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, and use and condition of the property, is to be maintained for assets purchased that exceed the School Corporation's capitalization threshold. In addition, a physical inventory of all assets should be completed at least every two years. The School Corporation purchased eight assets, totaling $131,205, which exceeded the School Corporation's capitalization threshold. Two of the eight assets were selected for testing. Neither of the two assets were determined to have property records, nor were the assets on the inventory listing. Additionally, the School Corporation did not complete a capital asset inventory every two years as required. The lack of internal controls and noncompliance were systemic issues throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 2 CFR 200.313(d) states in part: "Management requirements. Procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, as a minimum, meet the following requirements: INDIANA STATE BOARD OF ACCOUNTS 19 RANDOLPH EASTERN SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) (1) Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, and cost of the property, percentage of Federal participation in the project costs for the Federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sale price of the property. (2) A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years. (3) A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated. . . ." Cause A proper system of internal controls was not designed by management of the School Corporation. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. Effect Without the proper implementation of an effectively designed system of internal controls, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. As a result, there was not a complete asset listing nor was there a physical inventory completed as required. Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of the federal award could result in the loss of future federal funding to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that management of the School Corporation establish a proper system of internal controls and develop policies and procedures to ensure asset records are maintained and that a physical inventory is taken every two years. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-003 Subject: COVID-19 - Education Stabilization Fund - Equipment and Real Property Management Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Numbers: 84.425D, 84.425U, 84.425C Federal Award Numbers and Years (or Other Identifying Numbers): S425D200013, S425D210013, S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Equipment and Real Property Management Audit Findings: Material Weakness, Modified Opinion Condition and Context The School Corporation had not properly designed or implemented a system of internal controls, which would include appropriate segregation of duties, that would likely be effective in preventing, or detecting and correcting, noncompliance. A property record or capital asset listing, which would include a description of the property, a serial number or other identification number, the source of funding for the property (including the federal award identification number (FAIN)), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, and use and condition of the property, is to be maintained for assets purchased that exceed the School Corporation's capitalization threshold. In addition, a physical inventory of all assets should be completed at least every two years. The School Corporation purchased eight assets, totaling $131,205, which exceeded the School Corporation's capitalization threshold. Two of the eight assets were selected for testing. Neither of the two assets were determined to have property records, nor were the assets on the inventory listing. Additionally, the School Corporation did not complete a capital asset inventory every two years as required. The lack of internal controls and noncompliance were systemic issues throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 2 CFR 200.313(d) states in part: "Management requirements. Procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, as a minimum, meet the following requirements: INDIANA STATE BOARD OF ACCOUNTS 19 RANDOLPH EASTERN SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) (1) Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, and cost of the property, percentage of Federal participation in the project costs for the Federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sale price of the property. (2) A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years. (3) A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated. . . ." Cause A proper system of internal controls was not designed by management of the School Corporation. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. Effect Without the proper implementation of an effectively designed system of internal controls, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. As a result, there was not a complete asset listing nor was there a physical inventory completed as required. Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of the federal award could result in the loss of future federal funding to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that management of the School Corporation establish a proper system of internal controls and develop policies and procedures to ensure asset records are maintained and that a physical inventory is taken every two years. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-003 Subject: COVID-19 - Education Stabilization Fund - Equipment and Real Property Management Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Numbers: 84.425D, 84.425U, 84.425C Federal Award Numbers and Years (or Other Identifying Numbers): S425D200013, S425D210013, S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Equipment and Real Property Management Audit Findings: Material Weakness, Modified Opinion Condition and Context The School Corporation had not properly designed or implemented a system of internal controls, which would include appropriate segregation of duties, that would likely be effective in preventing, or detecting and correcting, noncompliance. A property record or capital asset listing, which would include a description of the property, a serial number or other identification number, the source of funding for the property (including the federal award identification number (FAIN)), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, and use and condition of the property, is to be maintained for assets purchased that exceed the School Corporation's capitalization threshold. In addition, a physical inventory of all assets should be completed at least every two years. The School Corporation purchased eight assets, totaling $131,205, which exceeded the School Corporation's capitalization threshold. Two of the eight assets were selected for testing. Neither of the two assets were determined to have property records, nor were the assets on the inventory listing. Additionally, the School Corporation did not complete a capital asset inventory every two years as required. The lack of internal controls and noncompliance were systemic issues throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 2 CFR 200.313(d) states in part: "Management requirements. Procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, as a minimum, meet the following requirements: INDIANA STATE BOARD OF ACCOUNTS 19 RANDOLPH EASTERN SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) (1) Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, and cost of the property, percentage of Federal participation in the project costs for the Federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sale price of the property. (2) A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years. (3) A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated. . . ." Cause A proper system of internal controls was not designed by management of the School Corporation. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. Effect Without the proper implementation of an effectively designed system of internal controls, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. As a result, there was not a complete asset listing nor was there a physical inventory completed as required. Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of the federal award could result in the loss of future federal funding to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that management of the School Corporation establish a proper system of internal controls and develop policies and procedures to ensure asset records are maintained and that a physical inventory is taken every two years. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-004 Subject: COVID-19 - Education Stabilization Fund - Reporting Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Numbers: 84.425D, 84.425U Federal Award Numbers and Years (or Other Identifying Numbers): S425D200013, S425D210013 S425U210013 Pass-Through Entity: Department of Education Compliance Requirement: Reporting Audit Finding: Material Weakness Condition and Context The School Corporation had not properly designed or implemented a system of internal controls which would include appropriate segregation of duties that would likely be effective in preventing, or detecting and correcting, noncompliance. The School Corporation was required to submit annual data reports to the Indiana Department of Education via JotForm, a form/report builder. Data to be submitted included, but was not limited to, current period expenditures, prior period expenditures, and expenditures per activity. During the audit period the School Corporation submitted two ESSER I reports, two ESSER II reports, and two ESSER III reports, for a total of six reports. The annual data reports were complied, prepared, and submitted by the Assistant Superintendent of Schools and the Treasurer without an oversight or review process in place to prevent, or detect and correct, errors. The lack of internal controls was systemic throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." Cause A proper system of internal controls was not designed by management of the School Corporation. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. INDIANA STATE BOARD OF ACCOUNTS 21 RANDOLPH EASTERN SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Effect Without the proper design or implementation of the components of a system of internal controls, including policies and procedures that provide segregation of duties and additional oversight as needed, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. Questioned Costs There were no questioned costs identified. Recommendation We recommended that management of the School Corporation design and implement a proper system of internal controls, including policies and procedures that would provide segregation of duties to ensure appropriate reviews, approvals, and oversight are taking place prior to filing required reports. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-004 Subject: COVID-19 - Education Stabilization Fund - Reporting Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Numbers: 84.425D, 84.425U Federal Award Numbers and Years (or Other Identifying Numbers): S425D200013, S425D210013 S425U210013 Pass-Through Entity: Department of Education Compliance Requirement: Reporting Audit Finding: Material Weakness Condition and Context The School Corporation had not properly designed or implemented a system of internal controls which would include appropriate segregation of duties that would likely be effective in preventing, or detecting and correcting, noncompliance. The School Corporation was required to submit annual data reports to the Indiana Department of Education via JotForm, a form/report builder. Data to be submitted included, but was not limited to, current period expenditures, prior period expenditures, and expenditures per activity. During the audit period the School Corporation submitted two ESSER I reports, two ESSER II reports, and two ESSER III reports, for a total of six reports. The annual data reports were complied, prepared, and submitted by the Assistant Superintendent of Schools and the Treasurer without an oversight or review process in place to prevent, or detect and correct, errors. The lack of internal controls was systemic throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." Cause A proper system of internal controls was not designed by management of the School Corporation. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. INDIANA STATE BOARD OF ACCOUNTS 21 RANDOLPH EASTERN SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Effect Without the proper design or implementation of the components of a system of internal controls, including policies and procedures that provide segregation of duties and additional oversight as needed, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. Questioned Costs There were no questioned costs identified. Recommendation We recommended that management of the School Corporation design and implement a proper system of internal controls, including policies and procedures that would provide segregation of duties to ensure appropriate reviews, approvals, and oversight are taking place prior to filing required reports. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-004 Subject: COVID-19 - Education Stabilization Fund - Reporting Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Numbers: 84.425D, 84.425U Federal Award Numbers and Years (or Other Identifying Numbers): S425D200013, S425D210013 S425U210013 Pass-Through Entity: Department of Education Compliance Requirement: Reporting Audit Finding: Material Weakness Condition and Context The School Corporation had not properly designed or implemented a system of internal controls which would include appropriate segregation of duties that would likely be effective in preventing, or detecting and correcting, noncompliance. The School Corporation was required to submit annual data reports to the Indiana Department of Education via JotForm, a form/report builder. Data to be submitted included, but was not limited to, current period expenditures, prior period expenditures, and expenditures per activity. During the audit period the School Corporation submitted two ESSER I reports, two ESSER II reports, and two ESSER III reports, for a total of six reports. The annual data reports were complied, prepared, and submitted by the Assistant Superintendent of Schools and the Treasurer without an oversight or review process in place to prevent, or detect and correct, errors. The lack of internal controls was systemic throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." Cause A proper system of internal controls was not designed by management of the School Corporation. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. INDIANA STATE BOARD OF ACCOUNTS 21 RANDOLPH EASTERN SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Effect Without the proper design or implementation of the components of a system of internal controls, including policies and procedures that provide segregation of duties and additional oversight as needed, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. Questioned Costs There were no questioned costs identified. Recommendation We recommended that management of the School Corporation design and implement a proper system of internal controls, including policies and procedures that would provide segregation of duties to ensure appropriate reviews, approvals, and oversight are taking place prior to filing required reports. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-004 Subject: COVID-19 - Education Stabilization Fund - Reporting Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Numbers: 84.425D, 84.425U Federal Award Numbers and Years (or Other Identifying Numbers): S425D200013, S425D210013 S425U210013 Pass-Through Entity: Department of Education Compliance Requirement: Reporting Audit Finding: Material Weakness Condition and Context The School Corporation had not properly designed or implemented a system of internal controls which would include appropriate segregation of duties that would likely be effective in preventing, or detecting and correcting, noncompliance. The School Corporation was required to submit annual data reports to the Indiana Department of Education via JotForm, a form/report builder. Data to be submitted included, but was not limited to, current period expenditures, prior period expenditures, and expenditures per activity. During the audit period the School Corporation submitted two ESSER I reports, two ESSER II reports, and two ESSER III reports, for a total of six reports. The annual data reports were complied, prepared, and submitted by the Assistant Superintendent of Schools and the Treasurer without an oversight or review process in place to prevent, or detect and correct, errors. The lack of internal controls was systemic throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." Cause A proper system of internal controls was not designed by management of the School Corporation. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. INDIANA STATE BOARD OF ACCOUNTS 21 RANDOLPH EASTERN SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Effect Without the proper design or implementation of the components of a system of internal controls, including policies and procedures that provide segregation of duties and additional oversight as needed, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. Questioned Costs There were no questioned costs identified. Recommendation We recommended that management of the School Corporation design and implement a proper system of internal controls, including policies and procedures that would provide segregation of duties to ensure appropriate reviews, approvals, and oversight are taking place prior to filing required reports. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-004 Subject: COVID-19 - Education Stabilization Fund - Reporting Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Numbers: 84.425D, 84.425U Federal Award Numbers and Years (or Other Identifying Numbers): S425D200013, S425D210013 S425U210013 Pass-Through Entity: Department of Education Compliance Requirement: Reporting Audit Finding: Material Weakness Condition and Context The School Corporation had not properly designed or implemented a system of internal controls which would include appropriate segregation of duties that would likely be effective in preventing, or detecting and correcting, noncompliance. The School Corporation was required to submit annual data reports to the Indiana Department of Education via JotForm, a form/report builder. Data to be submitted included, but was not limited to, current period expenditures, prior period expenditures, and expenditures per activity. During the audit period the School Corporation submitted two ESSER I reports, two ESSER II reports, and two ESSER III reports, for a total of six reports. The annual data reports were complied, prepared, and submitted by the Assistant Superintendent of Schools and the Treasurer without an oversight or review process in place to prevent, or detect and correct, errors. The lack of internal controls was systemic throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." Cause A proper system of internal controls was not designed by management of the School Corporation. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. INDIANA STATE BOARD OF ACCOUNTS 21 RANDOLPH EASTERN SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Effect Without the proper design or implementation of the components of a system of internal controls, including policies and procedures that provide segregation of duties and additional oversight as needed, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. Questioned Costs There were no questioned costs identified. Recommendation We recommended that management of the School Corporation design and implement a proper system of internal controls, including policies and procedures that would provide segregation of duties to ensure appropriate reviews, approvals, and oversight are taking place prior to filing required reports. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-004 Subject: COVID-19 - Education Stabilization Fund - Reporting Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Numbers: 84.425D, 84.425U Federal Award Numbers and Years (or Other Identifying Numbers): S425D200013, S425D210013 S425U210013 Pass-Through Entity: Department of Education Compliance Requirement: Reporting Audit Finding: Material Weakness Condition and Context The School Corporation had not properly designed or implemented a system of internal controls which would include appropriate segregation of duties that would likely be effective in preventing, or detecting and correcting, noncompliance. The School Corporation was required to submit annual data reports to the Indiana Department of Education via JotForm, a form/report builder. Data to be submitted included, but was not limited to, current period expenditures, prior period expenditures, and expenditures per activity. During the audit period the School Corporation submitted two ESSER I reports, two ESSER II reports, and two ESSER III reports, for a total of six reports. The annual data reports were complied, prepared, and submitted by the Assistant Superintendent of Schools and the Treasurer without an oversight or review process in place to prevent, or detect and correct, errors. The lack of internal controls was systemic throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." Cause A proper system of internal controls was not designed by management of the School Corporation. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. INDIANA STATE BOARD OF ACCOUNTS 21 RANDOLPH EASTERN SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Effect Without the proper design or implementation of the components of a system of internal controls, including policies and procedures that provide segregation of duties and additional oversight as needed, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. Questioned Costs There were no questioned costs identified. Recommendation We recommended that management of the School Corporation design and implement a proper system of internal controls, including policies and procedures that would provide segregation of duties to ensure appropriate reviews, approvals, and oversight are taking place prior to filing required reports. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-004 Subject: COVID-19 - Education Stabilization Fund - Reporting Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Numbers: 84.425D, 84.425U Federal Award Numbers and Years (or Other Identifying Numbers): S425D200013, S425D210013 S425U210013 Pass-Through Entity: Department of Education Compliance Requirement: Reporting Audit Finding: Material Weakness Condition and Context The School Corporation had not properly designed or implemented a system of internal controls which would include appropriate segregation of duties that would likely be effective in preventing, or detecting and correcting, noncompliance. The School Corporation was required to submit annual data reports to the Indiana Department of Education via JotForm, a form/report builder. Data to be submitted included, but was not limited to, current period expenditures, prior period expenditures, and expenditures per activity. During the audit period the School Corporation submitted two ESSER I reports, two ESSER II reports, and two ESSER III reports, for a total of six reports. The annual data reports were complied, prepared, and submitted by the Assistant Superintendent of Schools and the Treasurer without an oversight or review process in place to prevent, or detect and correct, errors. The lack of internal controls was systemic throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." Cause A proper system of internal controls was not designed by management of the School Corporation. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. INDIANA STATE BOARD OF ACCOUNTS 21 RANDOLPH EASTERN SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Effect Without the proper design or implementation of the components of a system of internal controls, including policies and procedures that provide segregation of duties and additional oversight as needed, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. Questioned Costs There were no questioned costs identified. Recommendation We recommended that management of the School Corporation design and implement a proper system of internal controls, including policies and procedures that would provide segregation of duties to ensure appropriate reviews, approvals, and oversight are taking place prior to filing required reports. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-004 Subject: COVID-19 - Education Stabilization Fund - Reporting Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Numbers: 84.425D, 84.425U Federal Award Numbers and Years (or Other Identifying Numbers): S425D200013, S425D210013 S425U210013 Pass-Through Entity: Department of Education Compliance Requirement: Reporting Audit Finding: Material Weakness Condition and Context The School Corporation had not properly designed or implemented a system of internal controls which would include appropriate segregation of duties that would likely be effective in preventing, or detecting and correcting, noncompliance. The School Corporation was required to submit annual data reports to the Indiana Department of Education via JotForm, a form/report builder. Data to be submitted included, but was not limited to, current period expenditures, prior period expenditures, and expenditures per activity. During the audit period the School Corporation submitted two ESSER I reports, two ESSER II reports, and two ESSER III reports, for a total of six reports. The annual data reports were complied, prepared, and submitted by the Assistant Superintendent of Schools and the Treasurer without an oversight or review process in place to prevent, or detect and correct, errors. The lack of internal controls was systemic throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." Cause A proper system of internal controls was not designed by management of the School Corporation. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. INDIANA STATE BOARD OF ACCOUNTS 21 RANDOLPH EASTERN SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Effect Without the proper design or implementation of the components of a system of internal controls, including policies and procedures that provide segregation of duties and additional oversight as needed, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. Questioned Costs There were no questioned costs identified. Recommendation We recommended that management of the School Corporation design and implement a proper system of internal controls, including policies and procedures that would provide segregation of duties to ensure appropriate reviews, approvals, and oversight are taking place prior to filing required reports. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-004 Subject: COVID-19 - Education Stabilization Fund - Reporting Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Numbers: 84.425D, 84.425U Federal Award Numbers and Years (or Other Identifying Numbers): S425D200013, S425D210013 S425U210013 Pass-Through Entity: Department of Education Compliance Requirement: Reporting Audit Finding: Material Weakness Condition and Context The School Corporation had not properly designed or implemented a system of internal controls which would include appropriate segregation of duties that would likely be effective in preventing, or detecting and correcting, noncompliance. The School Corporation was required to submit annual data reports to the Indiana Department of Education via JotForm, a form/report builder. Data to be submitted included, but was not limited to, current period expenditures, prior period expenditures, and expenditures per activity. During the audit period the School Corporation submitted two ESSER I reports, two ESSER II reports, and two ESSER III reports, for a total of six reports. The annual data reports were complied, prepared, and submitted by the Assistant Superintendent of Schools and the Treasurer without an oversight or review process in place to prevent, or detect and correct, errors. The lack of internal controls was systemic throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." Cause A proper system of internal controls was not designed by management of the School Corporation. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. INDIANA STATE BOARD OF ACCOUNTS 21 RANDOLPH EASTERN SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Effect Without the proper design or implementation of the components of a system of internal controls, including policies and procedures that provide segregation of duties and additional oversight as needed, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. Questioned Costs There were no questioned costs identified. Recommendation We recommended that management of the School Corporation design and implement a proper system of internal controls, including policies and procedures that would provide segregation of duties to ensure appropriate reviews, approvals, and oversight are taking place prior to filing required reports. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-005 Subject: Child Nutrition Cluster - Activities Allowed or Unallowed, Allowable Costs/Cost Principles Federal Agency: Department of Agriculture Federal Programs: School Breakfast Program, National School Lunch Program, Summer Food Service Program for Children Assistance Listings Numbers: 10.553, 10.555, 10.559 Federal Award Numbers and Years (or Other Identifying Numbers): FY 2022, FY 2023 Pass-Through Entity: Indiana Department of Education Compliance Requirements: Activities Allowed or Unallowed, Allowable Costs/Cost Principles Audit Findings: Material Weakness, Other Matters Condition and Context An effective system of internal controls which would include segregation of duties that would likely be effective in preventing, or detecting and correcting, noncompliance should be designed and implemented to ensure expenditures charged to the food service program fund (School Lunch fund) are for the benefit of the food service program. The School Corporation's payroll disbursements were prepared by the Payroll Clerk without a documented review or approval process to prevent, or detect and correct, errors. In addition, vendor claims were to be reviewed and approved by the Treasurer and the School Board. Of the 40 vendor claims selected for testing to ensure the internal control was in place and operating effectively, 3 claims did not have documentation of approval by the Treasurer or the School Board. In addition, the total amount of trash removal services for the School Corporation was paid from the School Lunch fund. The total amount charged to the School Lunch fund was $15,448. This amount was considered questioned costs. The lack of internal controls over payroll and vendor claims was a systemic issue throughout the audit period. The noncompliance was isolated to the payments for trash removal services. INDIANA STATE BOARD OF ACCOUNTS 22 RANDOLPH EASTERN SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 2 CFR 200.403 states in part: "Except where otherwise authorized by statute, costs must meet the following general criteria in order to be allowable under Federal awards: (a) Be necessary and reasonable for the performance of the Federal award and be allocable thereto under these principles. (b) Conform to any limitations or exclusions set forth in these principles or in the Federal award as to types or amount of cost items. . . . (g) Be adequately documented. . . ." Cause A proper system of internal controls was not designed by management of the School Corporation. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. Effect Without the proper implementation of an effectively designed system of internal controls, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. As a result, costs for trash removal were incorrectly charged to the food service program. Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of the federal award could result in the loss of future federal funding to the School Corporation. Questioned Costs Known questioned costs of $15,448 were identified as detailed in the Condition and Context. Recommendation We recommended the School Corporation's management establish a proper system of internal controls and develop policies and procedures to ensure costs are adequately documented.
FINDING 2023-005 Subject: Child Nutrition Cluster - Activities Allowed or Unallowed, Allowable Costs/Cost Principles Federal Agency: Department of Agriculture Federal Programs: School Breakfast Program, National School Lunch Program, Summer Food Service Program for Children Assistance Listings Numbers: 10.553, 10.555, 10.559 Federal Award Numbers and Years (or Other Identifying Numbers): FY 2022, FY 2023 Pass-Through Entity: Indiana Department of Education Compliance Requirements: Activities Allowed or Unallowed, Allowable Costs/Cost Principles Audit Findings: Material Weakness, Other Matters Condition and Context An effective system of internal controls which would include segregation of duties that would likely be effective in preventing, or detecting and correcting, noncompliance should be designed and implemented to ensure expenditures charged to the food service program fund (School Lunch fund) are for the benefit of the food service program. The School Corporation's payroll disbursements were prepared by the Payroll Clerk without a documented review or approval process to prevent, or detect and correct, errors. In addition, vendor claims were to be reviewed and approved by the Treasurer and the School Board. Of the 40 vendor claims selected for testing to ensure the internal control was in place and operating effectively, 3 claims did not have documentation of approval by the Treasurer or the School Board. In addition, the total amount of trash removal services for the School Corporation was paid from the School Lunch fund. The total amount charged to the School Lunch fund was $15,448. This amount was considered questioned costs. The lack of internal controls over payroll and vendor claims was a systemic issue throughout the audit period. The noncompliance was isolated to the payments for trash removal services. INDIANA STATE BOARD OF ACCOUNTS 22 RANDOLPH EASTERN SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 2 CFR 200.403 states in part: "Except where otherwise authorized by statute, costs must meet the following general criteria in order to be allowable under Federal awards: (a) Be necessary and reasonable for the performance of the Federal award and be allocable thereto under these principles. (b) Conform to any limitations or exclusions set forth in these principles or in the Federal award as to types or amount of cost items. . . . (g) Be adequately documented. . . ." Cause A proper system of internal controls was not designed by management of the School Corporation. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. Effect Without the proper implementation of an effectively designed system of internal controls, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. As a result, costs for trash removal were incorrectly charged to the food service program. Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of the federal award could result in the loss of future federal funding to the School Corporation. Questioned Costs Known questioned costs of $15,448 were identified as detailed in the Condition and Context. Recommendation We recommended the School Corporation's management establish a proper system of internal controls and develop policies and procedures to ensure costs are adequately documented.
FINDING 2023-005 Subject: Child Nutrition Cluster - Activities Allowed or Unallowed, Allowable Costs/Cost Principles Federal Agency: Department of Agriculture Federal Programs: School Breakfast Program, National School Lunch Program, Summer Food Service Program for Children Assistance Listings Numbers: 10.553, 10.555, 10.559 Federal Award Numbers and Years (or Other Identifying Numbers): FY 2022, FY 2023 Pass-Through Entity: Indiana Department of Education Compliance Requirements: Activities Allowed or Unallowed, Allowable Costs/Cost Principles Audit Findings: Material Weakness, Other Matters Condition and Context An effective system of internal controls which would include segregation of duties that would likely be effective in preventing, or detecting and correcting, noncompliance should be designed and implemented to ensure expenditures charged to the food service program fund (School Lunch fund) are for the benefit of the food service program. The School Corporation's payroll disbursements were prepared by the Payroll Clerk without a documented review or approval process to prevent, or detect and correct, errors. In addition, vendor claims were to be reviewed and approved by the Treasurer and the School Board. Of the 40 vendor claims selected for testing to ensure the internal control was in place and operating effectively, 3 claims did not have documentation of approval by the Treasurer or the School Board. In addition, the total amount of trash removal services for the School Corporation was paid from the School Lunch fund. The total amount charged to the School Lunch fund was $15,448. This amount was considered questioned costs. The lack of internal controls over payroll and vendor claims was a systemic issue throughout the audit period. The noncompliance was isolated to the payments for trash removal services. INDIANA STATE BOARD OF ACCOUNTS 22 RANDOLPH EASTERN SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 2 CFR 200.403 states in part: "Except where otherwise authorized by statute, costs must meet the following general criteria in order to be allowable under Federal awards: (a) Be necessary and reasonable for the performance of the Federal award and be allocable thereto under these principles. (b) Conform to any limitations or exclusions set forth in these principles or in the Federal award as to types or amount of cost items. . . . (g) Be adequately documented. . . ." Cause A proper system of internal controls was not designed by management of the School Corporation. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. Effect Without the proper implementation of an effectively designed system of internal controls, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. As a result, costs for trash removal were incorrectly charged to the food service program. Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of the federal award could result in the loss of future federal funding to the School Corporation. Questioned Costs Known questioned costs of $15,448 were identified as detailed in the Condition and Context. Recommendation We recommended the School Corporation's management establish a proper system of internal controls and develop policies and procedures to ensure costs are adequately documented.
FINDING 2023-005 Subject: Child Nutrition Cluster - Activities Allowed or Unallowed, Allowable Costs/Cost Principles Federal Agency: Department of Agriculture Federal Programs: School Breakfast Program, National School Lunch Program, Summer Food Service Program for Children Assistance Listings Numbers: 10.553, 10.555, 10.559 Federal Award Numbers and Years (or Other Identifying Numbers): FY 2022, FY 2023 Pass-Through Entity: Indiana Department of Education Compliance Requirements: Activities Allowed or Unallowed, Allowable Costs/Cost Principles Audit Findings: Material Weakness, Other Matters Condition and Context An effective system of internal controls which would include segregation of duties that would likely be effective in preventing, or detecting and correcting, noncompliance should be designed and implemented to ensure expenditures charged to the food service program fund (School Lunch fund) are for the benefit of the food service program. The School Corporation's payroll disbursements were prepared by the Payroll Clerk without a documented review or approval process to prevent, or detect and correct, errors. In addition, vendor claims were to be reviewed and approved by the Treasurer and the School Board. Of the 40 vendor claims selected for testing to ensure the internal control was in place and operating effectively, 3 claims did not have documentation of approval by the Treasurer or the School Board. In addition, the total amount of trash removal services for the School Corporation was paid from the School Lunch fund. The total amount charged to the School Lunch fund was $15,448. This amount was considered questioned costs. The lack of internal controls over payroll and vendor claims was a systemic issue throughout the audit period. The noncompliance was isolated to the payments for trash removal services. INDIANA STATE BOARD OF ACCOUNTS 22 RANDOLPH EASTERN SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 2 CFR 200.403 states in part: "Except where otherwise authorized by statute, costs must meet the following general criteria in order to be allowable under Federal awards: (a) Be necessary and reasonable for the performance of the Federal award and be allocable thereto under these principles. (b) Conform to any limitations or exclusions set forth in these principles or in the Federal award as to types or amount of cost items. . . . (g) Be adequately documented. . . ." Cause A proper system of internal controls was not designed by management of the School Corporation. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. Effect Without the proper implementation of an effectively designed system of internal controls, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. As a result, costs for trash removal were incorrectly charged to the food service program. Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of the federal award could result in the loss of future federal funding to the School Corporation. Questioned Costs Known questioned costs of $15,448 were identified as detailed in the Condition and Context. Recommendation We recommended the School Corporation's management establish a proper system of internal controls and develop policies and procedures to ensure costs are adequately documented.
FINDING 2023-005 Subject: Child Nutrition Cluster - Activities Allowed or Unallowed, Allowable Costs/Cost Principles Federal Agency: Department of Agriculture Federal Programs: School Breakfast Program, National School Lunch Program, Summer Food Service Program for Children Assistance Listings Numbers: 10.553, 10.555, 10.559 Federal Award Numbers and Years (or Other Identifying Numbers): FY 2022, FY 2023 Pass-Through Entity: Indiana Department of Education Compliance Requirements: Activities Allowed or Unallowed, Allowable Costs/Cost Principles Audit Findings: Material Weakness, Other Matters Condition and Context An effective system of internal controls which would include segregation of duties that would likely be effective in preventing, or detecting and correcting, noncompliance should be designed and implemented to ensure expenditures charged to the food service program fund (School Lunch fund) are for the benefit of the food service program. The School Corporation's payroll disbursements were prepared by the Payroll Clerk without a documented review or approval process to prevent, or detect and correct, errors. In addition, vendor claims were to be reviewed and approved by the Treasurer and the School Board. Of the 40 vendor claims selected for testing to ensure the internal control was in place and operating effectively, 3 claims did not have documentation of approval by the Treasurer or the School Board. In addition, the total amount of trash removal services for the School Corporation was paid from the School Lunch fund. The total amount charged to the School Lunch fund was $15,448. This amount was considered questioned costs. The lack of internal controls over payroll and vendor claims was a systemic issue throughout the audit period. The noncompliance was isolated to the payments for trash removal services. INDIANA STATE BOARD OF ACCOUNTS 22 RANDOLPH EASTERN SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 2 CFR 200.403 states in part: "Except where otherwise authorized by statute, costs must meet the following general criteria in order to be allowable under Federal awards: (a) Be necessary and reasonable for the performance of the Federal award and be allocable thereto under these principles. (b) Conform to any limitations or exclusions set forth in these principles or in the Federal award as to types or amount of cost items. . . . (g) Be adequately documented. . . ." Cause A proper system of internal controls was not designed by management of the School Corporation. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. Effect Without the proper implementation of an effectively designed system of internal controls, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. As a result, costs for trash removal were incorrectly charged to the food service program. Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of the federal award could result in the loss of future federal funding to the School Corporation. Questioned Costs Known questioned costs of $15,448 were identified as detailed in the Condition and Context. Recommendation We recommended the School Corporation's management establish a proper system of internal controls and develop policies and procedures to ensure costs are adequately documented.
FINDING 2023-006 Subject: Child Nutrition Cluster - Reporting Federal Agency: Department of Agriculture Federal Programs: School Breakfast Program, National School Lunch Program Assistance Listings Numbers: 10.553, 10.555 Federal Award Numbers and Years (or Other Identifying Numbers): FY 2022, FY 2023 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Reporting Audit Findings: Material Weakness, Other Matters Condition and Context The School Corporation had not properly designed or implemented a system of internal controls which would include appropriate segregation of duties that would likely be effective in preventing, or detecting and correcting, noncompliance related to the monthly reimbursement claims. Meal count reports were run from the School Corporation's meal software system on a monthly basis. The reports were then utilized by the Food Service Director or the Food Service Secretary to prepare the monthly claims for reimbursement. There was no documented review or oversight process over the monthly claims for reimbursement to prevent, or detect and correct, errors. Of the four monthly claims for reimbursement selected for testing, two included overstatements in the number of meal counts used for reimbursement purposes when compared to the supporting documentation. The lack of internal controls and noncompliance were systemic issues during the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 7 CFR 210.8(a) states in part: "The school food authority shall establish internal controls which ensure the accuracy of meal counts prior to submission of the monthly Claim for Reimbursement. . . ." INDIANA STATE BOARD OF ACCOUNTS 24 RANDOLPH EASTERN SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) 7 CFR 210.7(c)(1) states in part: "Lunch count system. To ensure that the Claim for Reimbursement accurately reflects the number of lunches and meal supplements served to eligible children, the school food authority shall, at a minimum: . . . (iii) Base Claims for Reimbursement on lunch counts, taken daily at the point of service, which correctly identify the number of free, reduce price and paid lunches served to eligible children; (iv) Correctly record, consolidate and report those lunch and supplement counts on the Claim for Reimbursement; . . ." 7 CFR 220.11(b) states in part: "Claims for Reimbursement shall include data in sufficient detail to justify the reimbursement claimed . . ." 7 CFR 220.11(d) states in part: "The school food authority shall establish internal controls which ensure the accuracy of breakfast counts prior to submission of the monthly Claim for Reimbursement. . . ." Cause A proper system of internal controls was not designed by management of the School Corporation. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. Effect Without the proper implementation of an effectively designed system of internal controls, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. As a result, reimbursement claims were not supported by the underlying records. Noncompliance with the grant agreement and the Reporting compliance requirement could result in the loss of future federal funds to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish a proper system of internal controls and develop policies and procedures to ensure meal counts are correctly reported. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-006 Subject: Child Nutrition Cluster - Reporting Federal Agency: Department of Agriculture Federal Programs: School Breakfast Program, National School Lunch Program Assistance Listings Numbers: 10.553, 10.555 Federal Award Numbers and Years (or Other Identifying Numbers): FY 2022, FY 2023 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Reporting Audit Findings: Material Weakness, Other Matters Condition and Context The School Corporation had not properly designed or implemented a system of internal controls which would include appropriate segregation of duties that would likely be effective in preventing, or detecting and correcting, noncompliance related to the monthly reimbursement claims. Meal count reports were run from the School Corporation's meal software system on a monthly basis. The reports were then utilized by the Food Service Director or the Food Service Secretary to prepare the monthly claims for reimbursement. There was no documented review or oversight process over the monthly claims for reimbursement to prevent, or detect and correct, errors. Of the four monthly claims for reimbursement selected for testing, two included overstatements in the number of meal counts used for reimbursement purposes when compared to the supporting documentation. The lack of internal controls and noncompliance were systemic issues during the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 7 CFR 210.8(a) states in part: "The school food authority shall establish internal controls which ensure the accuracy of meal counts prior to submission of the monthly Claim for Reimbursement. . . ." INDIANA STATE BOARD OF ACCOUNTS 24 RANDOLPH EASTERN SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) 7 CFR 210.7(c)(1) states in part: "Lunch count system. To ensure that the Claim for Reimbursement accurately reflects the number of lunches and meal supplements served to eligible children, the school food authority shall, at a minimum: . . . (iii) Base Claims for Reimbursement on lunch counts, taken daily at the point of service, which correctly identify the number of free, reduce price and paid lunches served to eligible children; (iv) Correctly record, consolidate and report those lunch and supplement counts on the Claim for Reimbursement; . . ." 7 CFR 220.11(b) states in part: "Claims for Reimbursement shall include data in sufficient detail to justify the reimbursement claimed . . ." 7 CFR 220.11(d) states in part: "The school food authority shall establish internal controls which ensure the accuracy of breakfast counts prior to submission of the monthly Claim for Reimbursement. . . ." Cause A proper system of internal controls was not designed by management of the School Corporation. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. Effect Without the proper implementation of an effectively designed system of internal controls, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. As a result, reimbursement claims were not supported by the underlying records. Noncompliance with the grant agreement and the Reporting compliance requirement could result in the loss of future federal funds to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish a proper system of internal controls and develop policies and procedures to ensure meal counts are correctly reported. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-006 Subject: Child Nutrition Cluster - Reporting Federal Agency: Department of Agriculture Federal Programs: School Breakfast Program, National School Lunch Program Assistance Listings Numbers: 10.553, 10.555 Federal Award Numbers and Years (or Other Identifying Numbers): FY 2022, FY 2023 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Reporting Audit Findings: Material Weakness, Other Matters Condition and Context The School Corporation had not properly designed or implemented a system of internal controls which would include appropriate segregation of duties that would likely be effective in preventing, or detecting and correcting, noncompliance related to the monthly reimbursement claims. Meal count reports were run from the School Corporation's meal software system on a monthly basis. The reports were then utilized by the Food Service Director or the Food Service Secretary to prepare the monthly claims for reimbursement. There was no documented review or oversight process over the monthly claims for reimbursement to prevent, or detect and correct, errors. Of the four monthly claims for reimbursement selected for testing, two included overstatements in the number of meal counts used for reimbursement purposes when compared to the supporting documentation. The lack of internal controls and noncompliance were systemic issues during the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 7 CFR 210.8(a) states in part: "The school food authority shall establish internal controls which ensure the accuracy of meal counts prior to submission of the monthly Claim for Reimbursement. . . ." INDIANA STATE BOARD OF ACCOUNTS 24 RANDOLPH EASTERN SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) 7 CFR 210.7(c)(1) states in part: "Lunch count system. To ensure that the Claim for Reimbursement accurately reflects the number of lunches and meal supplements served to eligible children, the school food authority shall, at a minimum: . . . (iii) Base Claims for Reimbursement on lunch counts, taken daily at the point of service, which correctly identify the number of free, reduce price and paid lunches served to eligible children; (iv) Correctly record, consolidate and report those lunch and supplement counts on the Claim for Reimbursement; . . ." 7 CFR 220.11(b) states in part: "Claims for Reimbursement shall include data in sufficient detail to justify the reimbursement claimed . . ." 7 CFR 220.11(d) states in part: "The school food authority shall establish internal controls which ensure the accuracy of breakfast counts prior to submission of the monthly Claim for Reimbursement. . . ." Cause A proper system of internal controls was not designed by management of the School Corporation. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. Effect Without the proper implementation of an effectively designed system of internal controls, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. As a result, reimbursement claims were not supported by the underlying records. Noncompliance with the grant agreement and the Reporting compliance requirement could result in the loss of future federal funds to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish a proper system of internal controls and develop policies and procedures to ensure meal counts are correctly reported. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-006 Subject: Child Nutrition Cluster - Reporting Federal Agency: Department of Agriculture Federal Programs: School Breakfast Program, National School Lunch Program Assistance Listings Numbers: 10.553, 10.555 Federal Award Numbers and Years (or Other Identifying Numbers): FY 2022, FY 2023 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Reporting Audit Findings: Material Weakness, Other Matters Condition and Context The School Corporation had not properly designed or implemented a system of internal controls which would include appropriate segregation of duties that would likely be effective in preventing, or detecting and correcting, noncompliance related to the monthly reimbursement claims. Meal count reports were run from the School Corporation's meal software system on a monthly basis. The reports were then utilized by the Food Service Director or the Food Service Secretary to prepare the monthly claims for reimbursement. There was no documented review or oversight process over the monthly claims for reimbursement to prevent, or detect and correct, errors. Of the four monthly claims for reimbursement selected for testing, two included overstatements in the number of meal counts used for reimbursement purposes when compared to the supporting documentation. The lack of internal controls and noncompliance were systemic issues during the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 7 CFR 210.8(a) states in part: "The school food authority shall establish internal controls which ensure the accuracy of meal counts prior to submission of the monthly Claim for Reimbursement. . . ." INDIANA STATE BOARD OF ACCOUNTS 24 RANDOLPH EASTERN SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) 7 CFR 210.7(c)(1) states in part: "Lunch count system. To ensure that the Claim for Reimbursement accurately reflects the number of lunches and meal supplements served to eligible children, the school food authority shall, at a minimum: . . . (iii) Base Claims for Reimbursement on lunch counts, taken daily at the point of service, which correctly identify the number of free, reduce price and paid lunches served to eligible children; (iv) Correctly record, consolidate and report those lunch and supplement counts on the Claim for Reimbursement; . . ." 7 CFR 220.11(b) states in part: "Claims for Reimbursement shall include data in sufficient detail to justify the reimbursement claimed . . ." 7 CFR 220.11(d) states in part: "The school food authority shall establish internal controls which ensure the accuracy of breakfast counts prior to submission of the monthly Claim for Reimbursement. . . ." Cause A proper system of internal controls was not designed by management of the School Corporation. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. Effect Without the proper implementation of an effectively designed system of internal controls, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. As a result, reimbursement claims were not supported by the underlying records. Noncompliance with the grant agreement and the Reporting compliance requirement could result in the loss of future federal funds to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish a proper system of internal controls and develop policies and procedures to ensure meal counts are correctly reported. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-007 Subject: Child Nutrition Cluster - Special Tests and Provisions - Non-Profit School Food Service Accounts Federal Agency: Department of Agriculture Federal Programs: School Breakfast Program, National School Lunch Program, Summer Food Service Program for Children Assistance Listings Numbers: 10.553, 10.555, 10.559 Federal Award Numbers and Years (or Other Identifying Numbers): FY 2022, FY 2023 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Special Tests and Provisions - Non-Profit School Food Service Accounts Audit Finding: Material Weakness Condition and Context The School Corporation had not properly designed or implemented a system of internal controls which would include appropriate segregation of duties that would likely be effective in preventing, or detecting and correcting, noncompliance. All revenues and expenditures of the non-profit school food service account are to be accounted for in accordance with state and federal requirements. As such, separate accounting is to be made for the school food service, federal reimbursements are to be correctly credited to the food service account, and transfers out of the school food service account are to be for allowable costs of the school food service. One individual received notification of deposit, receipted funds into accounting software, and prepared bank reconciliations. There was no documented review of the receipt of monthly meal reimbursements by a second individual not involved in the original receipt process. The lack of internal controls was a systemic issue during the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." Cause A proper system of internal controls was not designed by management of the School Corporation, which would include appropriate segregation of duties. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. INDIANA STATE BOARD OF ACCOUNTS 26 RANDOLPH EASTERN SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Effect Without the proper implementation of an effectively designed system of internal controls, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management design and implement a proper system of internal controls, including policies and procedures that would provide segregation of duties to ensure appropriate reviews, approvals, and oversight are taking place. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-007 Subject: Child Nutrition Cluster - Special Tests and Provisions - Non-Profit School Food Service Accounts Federal Agency: Department of Agriculture Federal Programs: School Breakfast Program, National School Lunch Program, Summer Food Service Program for Children Assistance Listings Numbers: 10.553, 10.555, 10.559 Federal Award Numbers and Years (or Other Identifying Numbers): FY 2022, FY 2023 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Special Tests and Provisions - Non-Profit School Food Service Accounts Audit Finding: Material Weakness Condition and Context The School Corporation had not properly designed or implemented a system of internal controls which would include appropriate segregation of duties that would likely be effective in preventing, or detecting and correcting, noncompliance. All revenues and expenditures of the non-profit school food service account are to be accounted for in accordance with state and federal requirements. As such, separate accounting is to be made for the school food service, federal reimbursements are to be correctly credited to the food service account, and transfers out of the school food service account are to be for allowable costs of the school food service. One individual received notification of deposit, receipted funds into accounting software, and prepared bank reconciliations. There was no documented review of the receipt of monthly meal reimbursements by a second individual not involved in the original receipt process. The lack of internal controls was a systemic issue during the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." Cause A proper system of internal controls was not designed by management of the School Corporation, which would include appropriate segregation of duties. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. INDIANA STATE BOARD OF ACCOUNTS 26 RANDOLPH EASTERN SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Effect Without the proper implementation of an effectively designed system of internal controls, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management design and implement a proper system of internal controls, including policies and procedures that would provide segregation of duties to ensure appropriate reviews, approvals, and oversight are taking place. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-007 Subject: Child Nutrition Cluster - Special Tests and Provisions - Non-Profit School Food Service Accounts Federal Agency: Department of Agriculture Federal Programs: School Breakfast Program, National School Lunch Program, Summer Food Service Program for Children Assistance Listings Numbers: 10.553, 10.555, 10.559 Federal Award Numbers and Years (or Other Identifying Numbers): FY 2022, FY 2023 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Special Tests and Provisions - Non-Profit School Food Service Accounts Audit Finding: Material Weakness Condition and Context The School Corporation had not properly designed or implemented a system of internal controls which would include appropriate segregation of duties that would likely be effective in preventing, or detecting and correcting, noncompliance. All revenues and expenditures of the non-profit school food service account are to be accounted for in accordance with state and federal requirements. As such, separate accounting is to be made for the school food service, federal reimbursements are to be correctly credited to the food service account, and transfers out of the school food service account are to be for allowable costs of the school food service. One individual received notification of deposit, receipted funds into accounting software, and prepared bank reconciliations. There was no documented review of the receipt of monthly meal reimbursements by a second individual not involved in the original receipt process. The lack of internal controls was a systemic issue during the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." Cause A proper system of internal controls was not designed by management of the School Corporation, which would include appropriate segregation of duties. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. INDIANA STATE BOARD OF ACCOUNTS 26 RANDOLPH EASTERN SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Effect Without the proper implementation of an effectively designed system of internal controls, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management design and implement a proper system of internal controls, including policies and procedures that would provide segregation of duties to ensure appropriate reviews, approvals, and oversight are taking place. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-007 Subject: Child Nutrition Cluster - Special Tests and Provisions - Non-Profit School Food Service Accounts Federal Agency: Department of Agriculture Federal Programs: School Breakfast Program, National School Lunch Program, Summer Food Service Program for Children Assistance Listings Numbers: 10.553, 10.555, 10.559 Federal Award Numbers and Years (or Other Identifying Numbers): FY 2022, FY 2023 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Special Tests and Provisions - Non-Profit School Food Service Accounts Audit Finding: Material Weakness Condition and Context The School Corporation had not properly designed or implemented a system of internal controls which would include appropriate segregation of duties that would likely be effective in preventing, or detecting and correcting, noncompliance. All revenues and expenditures of the non-profit school food service account are to be accounted for in accordance with state and federal requirements. As such, separate accounting is to be made for the school food service, federal reimbursements are to be correctly credited to the food service account, and transfers out of the school food service account are to be for allowable costs of the school food service. One individual received notification of deposit, receipted funds into accounting software, and prepared bank reconciliations. There was no documented review of the receipt of monthly meal reimbursements by a second individual not involved in the original receipt process. The lack of internal controls was a systemic issue during the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." Cause A proper system of internal controls was not designed by management of the School Corporation, which would include appropriate segregation of duties. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. INDIANA STATE BOARD OF ACCOUNTS 26 RANDOLPH EASTERN SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Effect Without the proper implementation of an effectively designed system of internal controls, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management design and implement a proper system of internal controls, including policies and procedures that would provide segregation of duties to ensure appropriate reviews, approvals, and oversight are taking place. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-007 Subject: Child Nutrition Cluster - Special Tests and Provisions - Non-Profit School Food Service Accounts Federal Agency: Department of Agriculture Federal Programs: School Breakfast Program, National School Lunch Program, Summer Food Service Program for Children Assistance Listings Numbers: 10.553, 10.555, 10.559 Federal Award Numbers and Years (or Other Identifying Numbers): FY 2022, FY 2023 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Special Tests and Provisions - Non-Profit School Food Service Accounts Audit Finding: Material Weakness Condition and Context The School Corporation had not properly designed or implemented a system of internal controls which would include appropriate segregation of duties that would likely be effective in preventing, or detecting and correcting, noncompliance. All revenues and expenditures of the non-profit school food service account are to be accounted for in accordance with state and federal requirements. As such, separate accounting is to be made for the school food service, federal reimbursements are to be correctly credited to the food service account, and transfers out of the school food service account are to be for allowable costs of the school food service. One individual received notification of deposit, receipted funds into accounting software, and prepared bank reconciliations. There was no documented review of the receipt of monthly meal reimbursements by a second individual not involved in the original receipt process. The lack of internal controls was a systemic issue during the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." Cause A proper system of internal controls was not designed by management of the School Corporation, which would include appropriate segregation of duties. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. INDIANA STATE BOARD OF ACCOUNTS 26 RANDOLPH EASTERN SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Effect Without the proper implementation of an effectively designed system of internal controls, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management design and implement a proper system of internal controls, including policies and procedures that would provide segregation of duties to ensure appropriate reviews, approvals, and oversight are taking place. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-008 Subject: COVID-19 - Education Stabilization Fund - Special Tests and Provisions - Wage Rate Requirements Federal Agency: Indiana Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Numbers: 84.425U, 84.425C Federal Award Numbers and Years (or Other Identifying Numbers): S425C200018; S425U2100013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Special Tests and Provisions - Wage Rate Requirements Audit Findings: Material Weakness, Modified Opinion Condition and Context Construction contracts in excess of $2,000 financed by federal assistance funds must pay wages not less than those established for the locality of the project (prevailing wage rates) by the Department of Labor (DOL) to their laborers and mechanics. Nonfederal entities are to include in their construction contracts subject to the Wage Rate Requirements a provision that the contractor or subcontractor comply with these requirements and the DOL regulations. This would include a requirement to submit a copy of the payroll and statement of compliance to the entity for each week in which contract work was performed. The School Corporation had not designed nor implemented a system of internal controls to ensure that construction contracts in excess of $2,000 paid from federal grant funds included a prevailing wage rate clause. Nine construction contracts, totaling $113,571, were paid for with the COVID-19 - Education Stabilization Fund award during the audit period. All nine contracts were selected for testing. None of the contracts included the required prevailing wage rate clause nor were the associated certified payrolls and statements of compliance obtained. The lack of internal controls and noncompliance were systemic issues throughout the audit period. INDIANA STATE BOARD OF ACCOUNTS 27 RANDOLPH EASTERN SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 29 CFR 5.5 states in part: "(a) The Agency head shall cause or require the contracting officer to insert in full in any contract in excess of $2,000 which is entered into for the actual construction, alteration and/or repair, including painting and decorating, of a public building or public work, or building or work financed in whole or in part from Federal funds or in accordance with guarantees of a Federal agency or financed from funds obtained by pledge of any contract of a Federal agency to make a loan, grant or annual contribution (except where a different meaning is expressly indicated), and which is subject to the labor standards provisions of any of the acts listed in § 5.1, the following clauses . . . (1) Minimum wages. (i) All laborers and mechanics employed or working upon the site of the work (or under the United States Housing Act of 1937 or under the Housing Act of 1949 in the construction or development of the project), will be paid unconditionally and not less often than once a week, and without subsequent deduction or rebate on any account (except such payroll deductions as are permitted by regulations issued by the Secretary of Labor under the Copeland Act (29 CFR part 3)), the full amount of wages and bona fide fringe benefits (or cash equivalents thereof) due at time of payment computed at rates not less than those contained in the wage determination of the Secretary of Labor which is attached hereto and made a part hereof, regardless of any contractual relationship which may be alleged to exist between the contractor and such laborers and mechanics. . . . (3) Payrolls and basic records. . . . (i) (A) The contractor shall submit weekly for each week in which any contract work is performed a copy of all payrolls to the (write in name of appropriate federal agency) if the agency is a party to the contract, but if the agency is not such a party, the contractor will submit the payrolls to the applicant, sponsor, or owner, as the case may be, for transmission to the (write in name of agency). . . ." 2 CFR 200 Appendix II states in part: "In addition to other provisions required by the Federal agency or non-Federal entity; all contracts made by the non-Federal entity under the Federal award must contain provisions covering the following, as applicable. . . . INDIANA STATE BOARD OF ACCOUNTS 28 RANDOLPH EASTERN SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) (D) Davis-Bacon Act, as amended (40 U.S.C. 3141-3148). When required by Federal program legislation, all prime construction contracts in excess of $2,000 awarded by nonFederal entities must include a provision for compliance with the Davis-Bacon Act (40 U.S.C. 3141-3144, and 3146-3148) as supplemented by Department of Labor regulations (29 CFR Part 5, 'Labor Standards Provisions Applicable to Contracts Covering Federally Financed and Assisted Construction'). In accordance with the statute, contractors must be required to pay wages to laborers and mechanics at a rate not less than the prevailing wages specified in a wage determination made by the Secretary of Labor. In addition, contractors must be required to pay wages not less than once a week. . . ." Cause A proper system of internal controls was not designed by management of the School Corporation, which would include segregation of key functions. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. Effect Without the proper implementation of an effectively designed system of internal controls, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. As a result, construction contracts entered into did not contain the required wage rate requirements clauses nor were certified payrolls obtained by the School Corporation. Noncompliance with the grant agreement and the compliance requirement could result in the loss of future federal funds to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish a system of internal controls and include the wage rate requirement clause in construction contracts. In addition, certified payrolls should be obtained as required. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-008 Subject: COVID-19 - Education Stabilization Fund - Special Tests and Provisions - Wage Rate Requirements Federal Agency: Indiana Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Numbers: 84.425U, 84.425C Federal Award Numbers and Years (or Other Identifying Numbers): S425C200018; S425U2100013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Special Tests and Provisions - Wage Rate Requirements Audit Findings: Material Weakness, Modified Opinion Condition and Context Construction contracts in excess of $2,000 financed by federal assistance funds must pay wages not less than those established for the locality of the project (prevailing wage rates) by the Department of Labor (DOL) to their laborers and mechanics. Nonfederal entities are to include in their construction contracts subject to the Wage Rate Requirements a provision that the contractor or subcontractor comply with these requirements and the DOL regulations. This would include a requirement to submit a copy of the payroll and statement of compliance to the entity for each week in which contract work was performed. The School Corporation had not designed nor implemented a system of internal controls to ensure that construction contracts in excess of $2,000 paid from federal grant funds included a prevailing wage rate clause. Nine construction contracts, totaling $113,571, were paid for with the COVID-19 - Education Stabilization Fund award during the audit period. All nine contracts were selected for testing. None of the contracts included the required prevailing wage rate clause nor were the associated certified payrolls and statements of compliance obtained. The lack of internal controls and noncompliance were systemic issues throughout the audit period. INDIANA STATE BOARD OF ACCOUNTS 27 RANDOLPH EASTERN SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 29 CFR 5.5 states in part: "(a) The Agency head shall cause or require the contracting officer to insert in full in any contract in excess of $2,000 which is entered into for the actual construction, alteration and/or repair, including painting and decorating, of a public building or public work, or building or work financed in whole or in part from Federal funds or in accordance with guarantees of a Federal agency or financed from funds obtained by pledge of any contract of a Federal agency to make a loan, grant or annual contribution (except where a different meaning is expressly indicated), and which is subject to the labor standards provisions of any of the acts listed in § 5.1, the following clauses . . . (1) Minimum wages. (i) All laborers and mechanics employed or working upon the site of the work (or under the United States Housing Act of 1937 or under the Housing Act of 1949 in the construction or development of the project), will be paid unconditionally and not less often than once a week, and without subsequent deduction or rebate on any account (except such payroll deductions as are permitted by regulations issued by the Secretary of Labor under the Copeland Act (29 CFR part 3)), the full amount of wages and bona fide fringe benefits (or cash equivalents thereof) due at time of payment computed at rates not less than those contained in the wage determination of the Secretary of Labor which is attached hereto and made a part hereof, regardless of any contractual relationship which may be alleged to exist between the contractor and such laborers and mechanics. . . . (3) Payrolls and basic records. . . . (i) (A) The contractor shall submit weekly for each week in which any contract work is performed a copy of all payrolls to the (write in name of appropriate federal agency) if the agency is a party to the contract, but if the agency is not such a party, the contractor will submit the payrolls to the applicant, sponsor, or owner, as the case may be, for transmission to the (write in name of agency). . . ." 2 CFR 200 Appendix II states in part: "In addition to other provisions required by the Federal agency or non-Federal entity; all contracts made by the non-Federal entity under the Federal award must contain provisions covering the following, as applicable. . . . INDIANA STATE BOARD OF ACCOUNTS 28 RANDOLPH EASTERN SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) (D) Davis-Bacon Act, as amended (40 U.S.C. 3141-3148). When required by Federal program legislation, all prime construction contracts in excess of $2,000 awarded by nonFederal entities must include a provision for compliance with the Davis-Bacon Act (40 U.S.C. 3141-3144, and 3146-3148) as supplemented by Department of Labor regulations (29 CFR Part 5, 'Labor Standards Provisions Applicable to Contracts Covering Federally Financed and Assisted Construction'). In accordance with the statute, contractors must be required to pay wages to laborers and mechanics at a rate not less than the prevailing wages specified in a wage determination made by the Secretary of Labor. In addition, contractors must be required to pay wages not less than once a week. . . ." Cause A proper system of internal controls was not designed by management of the School Corporation, which would include segregation of key functions. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. Effect Without the proper implementation of an effectively designed system of internal controls, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. As a result, construction contracts entered into did not contain the required wage rate requirements clauses nor were certified payrolls obtained by the School Corporation. Noncompliance with the grant agreement and the compliance requirement could result in the loss of future federal funds to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish a system of internal controls and include the wage rate requirement clause in construction contracts. In addition, certified payrolls should be obtained as required. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-008 Subject: COVID-19 - Education Stabilization Fund - Special Tests and Provisions - Wage Rate Requirements Federal Agency: Indiana Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Numbers: 84.425U, 84.425C Federal Award Numbers and Years (or Other Identifying Numbers): S425C200018; S425U2100013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Special Tests and Provisions - Wage Rate Requirements Audit Findings: Material Weakness, Modified Opinion Condition and Context Construction contracts in excess of $2,000 financed by federal assistance funds must pay wages not less than those established for the locality of the project (prevailing wage rates) by the Department of Labor (DOL) to their laborers and mechanics. Nonfederal entities are to include in their construction contracts subject to the Wage Rate Requirements a provision that the contractor or subcontractor comply with these requirements and the DOL regulations. This would include a requirement to submit a copy of the payroll and statement of compliance to the entity for each week in which contract work was performed. The School Corporation had not designed nor implemented a system of internal controls to ensure that construction contracts in excess of $2,000 paid from federal grant funds included a prevailing wage rate clause. Nine construction contracts, totaling $113,571, were paid for with the COVID-19 - Education Stabilization Fund award during the audit period. All nine contracts were selected for testing. None of the contracts included the required prevailing wage rate clause nor were the associated certified payrolls and statements of compliance obtained. The lack of internal controls and noncompliance were systemic issues throughout the audit period. INDIANA STATE BOARD OF ACCOUNTS 27 RANDOLPH EASTERN SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 29 CFR 5.5 states in part: "(a) The Agency head shall cause or require the contracting officer to insert in full in any contract in excess of $2,000 which is entered into for the actual construction, alteration and/or repair, including painting and decorating, of a public building or public work, or building or work financed in whole or in part from Federal funds or in accordance with guarantees of a Federal agency or financed from funds obtained by pledge of any contract of a Federal agency to make a loan, grant or annual contribution (except where a different meaning is expressly indicated), and which is subject to the labor standards provisions of any of the acts listed in § 5.1, the following clauses . . . (1) Minimum wages. (i) All laborers and mechanics employed or working upon the site of the work (or under the United States Housing Act of 1937 or under the Housing Act of 1949 in the construction or development of the project), will be paid unconditionally and not less often than once a week, and without subsequent deduction or rebate on any account (except such payroll deductions as are permitted by regulations issued by the Secretary of Labor under the Copeland Act (29 CFR part 3)), the full amount of wages and bona fide fringe benefits (or cash equivalents thereof) due at time of payment computed at rates not less than those contained in the wage determination of the Secretary of Labor which is attached hereto and made a part hereof, regardless of any contractual relationship which may be alleged to exist between the contractor and such laborers and mechanics. . . . (3) Payrolls and basic records. . . . (i) (A) The contractor shall submit weekly for each week in which any contract work is performed a copy of all payrolls to the (write in name of appropriate federal agency) if the agency is a party to the contract, but if the agency is not such a party, the contractor will submit the payrolls to the applicant, sponsor, or owner, as the case may be, for transmission to the (write in name of agency). . . ." 2 CFR 200 Appendix II states in part: "In addition to other provisions required by the Federal agency or non-Federal entity; all contracts made by the non-Federal entity under the Federal award must contain provisions covering the following, as applicable. . . . INDIANA STATE BOARD OF ACCOUNTS 28 RANDOLPH EASTERN SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) (D) Davis-Bacon Act, as amended (40 U.S.C. 3141-3148). When required by Federal program legislation, all prime construction contracts in excess of $2,000 awarded by nonFederal entities must include a provision for compliance with the Davis-Bacon Act (40 U.S.C. 3141-3144, and 3146-3148) as supplemented by Department of Labor regulations (29 CFR Part 5, 'Labor Standards Provisions Applicable to Contracts Covering Federally Financed and Assisted Construction'). In accordance with the statute, contractors must be required to pay wages to laborers and mechanics at a rate not less than the prevailing wages specified in a wage determination made by the Secretary of Labor. In addition, contractors must be required to pay wages not less than once a week. . . ." Cause A proper system of internal controls was not designed by management of the School Corporation, which would include segregation of key functions. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. Effect Without the proper implementation of an effectively designed system of internal controls, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. As a result, construction contracts entered into did not contain the required wage rate requirements clauses nor were certified payrolls obtained by the School Corporation. Noncompliance with the grant agreement and the compliance requirement could result in the loss of future federal funds to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish a system of internal controls and include the wage rate requirement clause in construction contracts. In addition, certified payrolls should be obtained as required. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-008 Subject: COVID-19 - Education Stabilization Fund - Special Tests and Provisions - Wage Rate Requirements Federal Agency: Indiana Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Numbers: 84.425U, 84.425C Federal Award Numbers and Years (or Other Identifying Numbers): S425C200018; S425U2100013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Special Tests and Provisions - Wage Rate Requirements Audit Findings: Material Weakness, Modified Opinion Condition and Context Construction contracts in excess of $2,000 financed by federal assistance funds must pay wages not less than those established for the locality of the project (prevailing wage rates) by the Department of Labor (DOL) to their laborers and mechanics. Nonfederal entities are to include in their construction contracts subject to the Wage Rate Requirements a provision that the contractor or subcontractor comply with these requirements and the DOL regulations. This would include a requirement to submit a copy of the payroll and statement of compliance to the entity for each week in which contract work was performed. The School Corporation had not designed nor implemented a system of internal controls to ensure that construction contracts in excess of $2,000 paid from federal grant funds included a prevailing wage rate clause. Nine construction contracts, totaling $113,571, were paid for with the COVID-19 - Education Stabilization Fund award during the audit period. All nine contracts were selected for testing. None of the contracts included the required prevailing wage rate clause nor were the associated certified payrolls and statements of compliance obtained. The lack of internal controls and noncompliance were systemic issues throughout the audit period. INDIANA STATE BOARD OF ACCOUNTS 27 RANDOLPH EASTERN SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 29 CFR 5.5 states in part: "(a) The Agency head shall cause or require the contracting officer to insert in full in any contract in excess of $2,000 which is entered into for the actual construction, alteration and/or repair, including painting and decorating, of a public building or public work, or building or work financed in whole or in part from Federal funds or in accordance with guarantees of a Federal agency or financed from funds obtained by pledge of any contract of a Federal agency to make a loan, grant or annual contribution (except where a different meaning is expressly indicated), and which is subject to the labor standards provisions of any of the acts listed in § 5.1, the following clauses . . . (1) Minimum wages. (i) All laborers and mechanics employed or working upon the site of the work (or under the United States Housing Act of 1937 or under the Housing Act of 1949 in the construction or development of the project), will be paid unconditionally and not less often than once a week, and without subsequent deduction or rebate on any account (except such payroll deductions as are permitted by regulations issued by the Secretary of Labor under the Copeland Act (29 CFR part 3)), the full amount of wages and bona fide fringe benefits (or cash equivalents thereof) due at time of payment computed at rates not less than those contained in the wage determination of the Secretary of Labor which is attached hereto and made a part hereof, regardless of any contractual relationship which may be alleged to exist between the contractor and such laborers and mechanics. . . . (3) Payrolls and basic records. . . . (i) (A) The contractor shall submit weekly for each week in which any contract work is performed a copy of all payrolls to the (write in name of appropriate federal agency) if the agency is a party to the contract, but if the agency is not such a party, the contractor will submit the payrolls to the applicant, sponsor, or owner, as the case may be, for transmission to the (write in name of agency). . . ." 2 CFR 200 Appendix II states in part: "In addition to other provisions required by the Federal agency or non-Federal entity; all contracts made by the non-Federal entity under the Federal award must contain provisions covering the following, as applicable. . . . INDIANA STATE BOARD OF ACCOUNTS 28 RANDOLPH EASTERN SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) (D) Davis-Bacon Act, as amended (40 U.S.C. 3141-3148). When required by Federal program legislation, all prime construction contracts in excess of $2,000 awarded by nonFederal entities must include a provision for compliance with the Davis-Bacon Act (40 U.S.C. 3141-3144, and 3146-3148) as supplemented by Department of Labor regulations (29 CFR Part 5, 'Labor Standards Provisions Applicable to Contracts Covering Federally Financed and Assisted Construction'). In accordance with the statute, contractors must be required to pay wages to laborers and mechanics at a rate not less than the prevailing wages specified in a wage determination made by the Secretary of Labor. In addition, contractors must be required to pay wages not less than once a week. . . ." Cause A proper system of internal controls was not designed by management of the School Corporation, which would include segregation of key functions. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. Effect Without the proper implementation of an effectively designed system of internal controls, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. As a result, construction contracts entered into did not contain the required wage rate requirements clauses nor were certified payrolls obtained by the School Corporation. Noncompliance with the grant agreement and the compliance requirement could result in the loss of future federal funds to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish a system of internal controls and include the wage rate requirement clause in construction contracts. In addition, certified payrolls should be obtained as required. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-008 Subject: COVID-19 - Education Stabilization Fund - Special Tests and Provisions - Wage Rate Requirements Federal Agency: Indiana Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Numbers: 84.425U, 84.425C Federal Award Numbers and Years (or Other Identifying Numbers): S425C200018; S425U2100013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Special Tests and Provisions - Wage Rate Requirements Audit Findings: Material Weakness, Modified Opinion Condition and Context Construction contracts in excess of $2,000 financed by federal assistance funds must pay wages not less than those established for the locality of the project (prevailing wage rates) by the Department of Labor (DOL) to their laborers and mechanics. Nonfederal entities are to include in their construction contracts subject to the Wage Rate Requirements a provision that the contractor or subcontractor comply with these requirements and the DOL regulations. This would include a requirement to submit a copy of the payroll and statement of compliance to the entity for each week in which contract work was performed. The School Corporation had not designed nor implemented a system of internal controls to ensure that construction contracts in excess of $2,000 paid from federal grant funds included a prevailing wage rate clause. Nine construction contracts, totaling $113,571, were paid for with the COVID-19 - Education Stabilization Fund award during the audit period. All nine contracts were selected for testing. None of the contracts included the required prevailing wage rate clause nor were the associated certified payrolls and statements of compliance obtained. The lack of internal controls and noncompliance were systemic issues throughout the audit period. INDIANA STATE BOARD OF ACCOUNTS 27 RANDOLPH EASTERN SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 29 CFR 5.5 states in part: "(a) The Agency head shall cause or require the contracting officer to insert in full in any contract in excess of $2,000 which is entered into for the actual construction, alteration and/or repair, including painting and decorating, of a public building or public work, or building or work financed in whole or in part from Federal funds or in accordance with guarantees of a Federal agency or financed from funds obtained by pledge of any contract of a Federal agency to make a loan, grant or annual contribution (except where a different meaning is expressly indicated), and which is subject to the labor standards provisions of any of the acts listed in § 5.1, the following clauses . . . (1) Minimum wages. (i) All laborers and mechanics employed or working upon the site of the work (or under the United States Housing Act of 1937 or under the Housing Act of 1949 in the construction or development of the project), will be paid unconditionally and not less often than once a week, and without subsequent deduction or rebate on any account (except such payroll deductions as are permitted by regulations issued by the Secretary of Labor under the Copeland Act (29 CFR part 3)), the full amount of wages and bona fide fringe benefits (or cash equivalents thereof) due at time of payment computed at rates not less than those contained in the wage determination of the Secretary of Labor which is attached hereto and made a part hereof, regardless of any contractual relationship which may be alleged to exist between the contractor and such laborers and mechanics. . . . (3) Payrolls and basic records. . . . (i) (A) The contractor shall submit weekly for each week in which any contract work is performed a copy of all payrolls to the (write in name of appropriate federal agency) if the agency is a party to the contract, but if the agency is not such a party, the contractor will submit the payrolls to the applicant, sponsor, or owner, as the case may be, for transmission to the (write in name of agency). . . ." 2 CFR 200 Appendix II states in part: "In addition to other provisions required by the Federal agency or non-Federal entity; all contracts made by the non-Federal entity under the Federal award must contain provisions covering the following, as applicable. . . . INDIANA STATE BOARD OF ACCOUNTS 28 RANDOLPH EASTERN SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) (D) Davis-Bacon Act, as amended (40 U.S.C. 3141-3148). When required by Federal program legislation, all prime construction contracts in excess of $2,000 awarded by nonFederal entities must include a provision for compliance with the Davis-Bacon Act (40 U.S.C. 3141-3144, and 3146-3148) as supplemented by Department of Labor regulations (29 CFR Part 5, 'Labor Standards Provisions Applicable to Contracts Covering Federally Financed and Assisted Construction'). In accordance with the statute, contractors must be required to pay wages to laborers and mechanics at a rate not less than the prevailing wages specified in a wage determination made by the Secretary of Labor. In addition, contractors must be required to pay wages not less than once a week. . . ." Cause A proper system of internal controls was not designed by management of the School Corporation, which would include segregation of key functions. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. Effect Without the proper implementation of an effectively designed system of internal controls, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. As a result, construction contracts entered into did not contain the required wage rate requirements clauses nor were certified payrolls obtained by the School Corporation. Noncompliance with the grant agreement and the compliance requirement could result in the loss of future federal funds to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish a system of internal controls and include the wage rate requirement clause in construction contracts. In addition, certified payrolls should be obtained as required. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.