FINDING 2023-003
Subject: COVID-19 - Education Stabilization Fund - Equipment and Real Property Management
Federal Agency: Department of Education
Federal Program: COVID-19 - Education Stabilization Fund
Assistance Listings Numbers: 84.425D, 84.425U, 84.425C
Federal Award Numbers and Years (or Other Identifying Numbers): S425D200013, S425D210013,
S425U210013
Pass-Through Entity: Indiana Department of Education
Compliance Requirement: Equipment and Real Property Management
Audit Findings: Material Weakness, Modified Opinion
Condition and Context
The School Corporation had not properly designed or implemented a system of internal controls,
which would include appropriate segregation of duties, that would likely be effective in preventing, or
detecting and correcting, noncompliance. A property record or capital asset listing, which would include a
description of the property, a serial number or other identification number, the source of funding for the
property (including the federal award identification number (FAIN)), who holds title, the acquisition date,
cost of the property, percentage of federal participation in the project costs for the federal award under
which the property was acquired, the location, and use and condition of the property, is to be maintained
for assets purchased that exceed the School Corporation's capitalization threshold. In addition, a physical
inventory of all assets should be completed at least every two years.
The School Corporation purchased eight assets, totaling $131,205, which exceeded the School
Corporation's capitalization threshold. Two of the eight assets were selected for testing. Neither of the two
assets were determined to have property records, nor were the assets on the inventory listing. Additionally,
the School Corporation did not complete a capital asset inventory every two years as required.
The lack of internal controls and noncompliance were systemic issues throughout the audit period.
Criteria
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
2 CFR 200.313(d) states in part:
"Management requirements. Procedures for managing equipment (including replacement
equipment), whether acquired in whole or in part under a Federal award, until disposition takes
place will, as a minimum, meet the following requirements:
INDIANA STATE BOARD OF ACCOUNTS
19
RANDOLPH EASTERN SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
(1) Property records must be maintained that include a description of the property, a serial
number or other identification number, the source of funding for the property (including
the FAIN), who holds title, the acquisition date, and cost of the property, percentage of
Federal participation in the project costs for the Federal award under which the
property was acquired, the location, use and condition of the property, and any ultimate
disposition data including the date of disposal and sale price of the property.
(2) A physical inventory of the property must be taken and the results reconciled with the
property records at least once every two years.
(3) A control system must be developed to ensure adequate safeguards to prevent loss,
damage, or theft of the property. Any loss, damage, or theft must be investigated.
. . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation.
Embedded within a properly designed and implemented internal control system should be internal controls
consisting of policies and procedures. Policies reflect the School Corporation's management statements
of what should be done to effect internal controls, and procedures should consist of actions that would
implement these policies.
Effect
Without the proper implementation of an effectively designed system of internal controls, the
internal control system cannot be capable of effectively preventing, or detecting and correcting, material
noncompliance. As a result, there was not a complete asset listing nor was there a physical inventory
completed as required.
Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of
the federal award could result in the loss of future federal funding to the School Corporation.
Questioned Costs
There were no questioned costs identified.
Recommendation
We recommended that management of the School Corporation establish a proper system of
internal controls and develop policies and procedures to ensure asset records are maintained and that a
physical inventory is taken every two years.
Views of Responsible Officials
For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-003
Subject: COVID-19 - Education Stabilization Fund - Equipment and Real Property Management
Federal Agency: Department of Education
Federal Program: COVID-19 - Education Stabilization Fund
Assistance Listings Numbers: 84.425D, 84.425U, 84.425C
Federal Award Numbers and Years (or Other Identifying Numbers): S425D200013, S425D210013,
S425U210013
Pass-Through Entity: Indiana Department of Education
Compliance Requirement: Equipment and Real Property Management
Audit Findings: Material Weakness, Modified Opinion
Condition and Context
The School Corporation had not properly designed or implemented a system of internal controls,
which would include appropriate segregation of duties, that would likely be effective in preventing, or
detecting and correcting, noncompliance. A property record or capital asset listing, which would include a
description of the property, a serial number or other identification number, the source of funding for the
property (including the federal award identification number (FAIN)), who holds title, the acquisition date,
cost of the property, percentage of federal participation in the project costs for the federal award under
which the property was acquired, the location, and use and condition of the property, is to be maintained
for assets purchased that exceed the School Corporation's capitalization threshold. In addition, a physical
inventory of all assets should be completed at least every two years.
The School Corporation purchased eight assets, totaling $131,205, which exceeded the School
Corporation's capitalization threshold. Two of the eight assets were selected for testing. Neither of the two
assets were determined to have property records, nor were the assets on the inventory listing. Additionally,
the School Corporation did not complete a capital asset inventory every two years as required.
The lack of internal controls and noncompliance were systemic issues throughout the audit period.
Criteria
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
2 CFR 200.313(d) states in part:
"Management requirements. Procedures for managing equipment (including replacement
equipment), whether acquired in whole or in part under a Federal award, until disposition takes
place will, as a minimum, meet the following requirements:
INDIANA STATE BOARD OF ACCOUNTS
19
RANDOLPH EASTERN SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
(1) Property records must be maintained that include a description of the property, a serial
number or other identification number, the source of funding for the property (including
the FAIN), who holds title, the acquisition date, and cost of the property, percentage of
Federal participation in the project costs for the Federal award under which the
property was acquired, the location, use and condition of the property, and any ultimate
disposition data including the date of disposal and sale price of the property.
(2) A physical inventory of the property must be taken and the results reconciled with the
property records at least once every two years.
(3) A control system must be developed to ensure adequate safeguards to prevent loss,
damage, or theft of the property. Any loss, damage, or theft must be investigated.
. . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation.
Embedded within a properly designed and implemented internal control system should be internal controls
consisting of policies and procedures. Policies reflect the School Corporation's management statements
of what should be done to effect internal controls, and procedures should consist of actions that would
implement these policies.
Effect
Without the proper implementation of an effectively designed system of internal controls, the
internal control system cannot be capable of effectively preventing, or detecting and correcting, material
noncompliance. As a result, there was not a complete asset listing nor was there a physical inventory
completed as required.
Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of
the federal award could result in the loss of future federal funding to the School Corporation.
Questioned Costs
There were no questioned costs identified.
Recommendation
We recommended that management of the School Corporation establish a proper system of
internal controls and develop policies and procedures to ensure asset records are maintained and that a
physical inventory is taken every two years.
Views of Responsible Officials
For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-003
Subject: COVID-19 - Education Stabilization Fund - Equipment and Real Property Management
Federal Agency: Department of Education
Federal Program: COVID-19 - Education Stabilization Fund
Assistance Listings Numbers: 84.425D, 84.425U, 84.425C
Federal Award Numbers and Years (or Other Identifying Numbers): S425D200013, S425D210013,
S425U210013
Pass-Through Entity: Indiana Department of Education
Compliance Requirement: Equipment and Real Property Management
Audit Findings: Material Weakness, Modified Opinion
Condition and Context
The School Corporation had not properly designed or implemented a system of internal controls,
which would include appropriate segregation of duties, that would likely be effective in preventing, or
detecting and correcting, noncompliance. A property record or capital asset listing, which would include a
description of the property, a serial number or other identification number, the source of funding for the
property (including the federal award identification number (FAIN)), who holds title, the acquisition date,
cost of the property, percentage of federal participation in the project costs for the federal award under
which the property was acquired, the location, and use and condition of the property, is to be maintained
for assets purchased that exceed the School Corporation's capitalization threshold. In addition, a physical
inventory of all assets should be completed at least every two years.
The School Corporation purchased eight assets, totaling $131,205, which exceeded the School
Corporation's capitalization threshold. Two of the eight assets were selected for testing. Neither of the two
assets were determined to have property records, nor were the assets on the inventory listing. Additionally,
the School Corporation did not complete a capital asset inventory every two years as required.
The lack of internal controls and noncompliance were systemic issues throughout the audit period.
Criteria
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
2 CFR 200.313(d) states in part:
"Management requirements. Procedures for managing equipment (including replacement
equipment), whether acquired in whole or in part under a Federal award, until disposition takes
place will, as a minimum, meet the following requirements:
INDIANA STATE BOARD OF ACCOUNTS
19
RANDOLPH EASTERN SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
(1) Property records must be maintained that include a description of the property, a serial
number or other identification number, the source of funding for the property (including
the FAIN), who holds title, the acquisition date, and cost of the property, percentage of
Federal participation in the project costs for the Federal award under which the
property was acquired, the location, use and condition of the property, and any ultimate
disposition data including the date of disposal and sale price of the property.
(2) A physical inventory of the property must be taken and the results reconciled with the
property records at least once every two years.
(3) A control system must be developed to ensure adequate safeguards to prevent loss,
damage, or theft of the property. Any loss, damage, or theft must be investigated.
. . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation.
Embedded within a properly designed and implemented internal control system should be internal controls
consisting of policies and procedures. Policies reflect the School Corporation's management statements
of what should be done to effect internal controls, and procedures should consist of actions that would
implement these policies.
Effect
Without the proper implementation of an effectively designed system of internal controls, the
internal control system cannot be capable of effectively preventing, or detecting and correcting, material
noncompliance. As a result, there was not a complete asset listing nor was there a physical inventory
completed as required.
Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of
the federal award could result in the loss of future federal funding to the School Corporation.
Questioned Costs
There were no questioned costs identified.
Recommendation
We recommended that management of the School Corporation establish a proper system of
internal controls and develop policies and procedures to ensure asset records are maintained and that a
physical inventory is taken every two years.
Views of Responsible Officials
For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-003
Subject: COVID-19 - Education Stabilization Fund - Equipment and Real Property Management
Federal Agency: Department of Education
Federal Program: COVID-19 - Education Stabilization Fund
Assistance Listings Numbers: 84.425D, 84.425U, 84.425C
Federal Award Numbers and Years (or Other Identifying Numbers): S425D200013, S425D210013,
S425U210013
Pass-Through Entity: Indiana Department of Education
Compliance Requirement: Equipment and Real Property Management
Audit Findings: Material Weakness, Modified Opinion
Condition and Context
The School Corporation had not properly designed or implemented a system of internal controls,
which would include appropriate segregation of duties, that would likely be effective in preventing, or
detecting and correcting, noncompliance. A property record or capital asset listing, which would include a
description of the property, a serial number or other identification number, the source of funding for the
property (including the federal award identification number (FAIN)), who holds title, the acquisition date,
cost of the property, percentage of federal participation in the project costs for the federal award under
which the property was acquired, the location, and use and condition of the property, is to be maintained
for assets purchased that exceed the School Corporation's capitalization threshold. In addition, a physical
inventory of all assets should be completed at least every two years.
The School Corporation purchased eight assets, totaling $131,205, which exceeded the School
Corporation's capitalization threshold. Two of the eight assets were selected for testing. Neither of the two
assets were determined to have property records, nor were the assets on the inventory listing. Additionally,
the School Corporation did not complete a capital asset inventory every two years as required.
The lack of internal controls and noncompliance were systemic issues throughout the audit period.
Criteria
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
2 CFR 200.313(d) states in part:
"Management requirements. Procedures for managing equipment (including replacement
equipment), whether acquired in whole or in part under a Federal award, until disposition takes
place will, as a minimum, meet the following requirements:
INDIANA STATE BOARD OF ACCOUNTS
19
RANDOLPH EASTERN SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
(1) Property records must be maintained that include a description of the property, a serial
number or other identification number, the source of funding for the property (including
the FAIN), who holds title, the acquisition date, and cost of the property, percentage of
Federal participation in the project costs for the Federal award under which the
property was acquired, the location, use and condition of the property, and any ultimate
disposition data including the date of disposal and sale price of the property.
(2) A physical inventory of the property must be taken and the results reconciled with the
property records at least once every two years.
(3) A control system must be developed to ensure adequate safeguards to prevent loss,
damage, or theft of the property. Any loss, damage, or theft must be investigated.
. . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation.
Embedded within a properly designed and implemented internal control system should be internal controls
consisting of policies and procedures. Policies reflect the School Corporation's management statements
of what should be done to effect internal controls, and procedures should consist of actions that would
implement these policies.
Effect
Without the proper implementation of an effectively designed system of internal controls, the
internal control system cannot be capable of effectively preventing, or detecting and correcting, material
noncompliance. As a result, there was not a complete asset listing nor was there a physical inventory
completed as required.
Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of
the federal award could result in the loss of future federal funding to the School Corporation.
Questioned Costs
There were no questioned costs identified.
Recommendation
We recommended that management of the School Corporation establish a proper system of
internal controls and develop policies and procedures to ensure asset records are maintained and that a
physical inventory is taken every two years.
Views of Responsible Officials
For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-003
Subject: COVID-19 - Education Stabilization Fund - Equipment and Real Property Management
Federal Agency: Department of Education
Federal Program: COVID-19 - Education Stabilization Fund
Assistance Listings Numbers: 84.425D, 84.425U, 84.425C
Federal Award Numbers and Years (or Other Identifying Numbers): S425D200013, S425D210013,
S425U210013
Pass-Through Entity: Indiana Department of Education
Compliance Requirement: Equipment and Real Property Management
Audit Findings: Material Weakness, Modified Opinion
Condition and Context
The School Corporation had not properly designed or implemented a system of internal controls,
which would include appropriate segregation of duties, that would likely be effective in preventing, or
detecting and correcting, noncompliance. A property record or capital asset listing, which would include a
description of the property, a serial number or other identification number, the source of funding for the
property (including the federal award identification number (FAIN)), who holds title, the acquisition date,
cost of the property, percentage of federal participation in the project costs for the federal award under
which the property was acquired, the location, and use and condition of the property, is to be maintained
for assets purchased that exceed the School Corporation's capitalization threshold. In addition, a physical
inventory of all assets should be completed at least every two years.
The School Corporation purchased eight assets, totaling $131,205, which exceeded the School
Corporation's capitalization threshold. Two of the eight assets were selected for testing. Neither of the two
assets were determined to have property records, nor were the assets on the inventory listing. Additionally,
the School Corporation did not complete a capital asset inventory every two years as required.
The lack of internal controls and noncompliance were systemic issues throughout the audit period.
Criteria
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
2 CFR 200.313(d) states in part:
"Management requirements. Procedures for managing equipment (including replacement
equipment), whether acquired in whole or in part under a Federal award, until disposition takes
place will, as a minimum, meet the following requirements:
INDIANA STATE BOARD OF ACCOUNTS
19
RANDOLPH EASTERN SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
(1) Property records must be maintained that include a description of the property, a serial
number or other identification number, the source of funding for the property (including
the FAIN), who holds title, the acquisition date, and cost of the property, percentage of
Federal participation in the project costs for the Federal award under which the
property was acquired, the location, use and condition of the property, and any ultimate
disposition data including the date of disposal and sale price of the property.
(2) A physical inventory of the property must be taken and the results reconciled with the
property records at least once every two years.
(3) A control system must be developed to ensure adequate safeguards to prevent loss,
damage, or theft of the property. Any loss, damage, or theft must be investigated.
. . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation.
Embedded within a properly designed and implemented internal control system should be internal controls
consisting of policies and procedures. Policies reflect the School Corporation's management statements
of what should be done to effect internal controls, and procedures should consist of actions that would
implement these policies.
Effect
Without the proper implementation of an effectively designed system of internal controls, the
internal control system cannot be capable of effectively preventing, or detecting and correcting, material
noncompliance. As a result, there was not a complete asset listing nor was there a physical inventory
completed as required.
Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of
the federal award could result in the loss of future federal funding to the School Corporation.
Questioned Costs
There were no questioned costs identified.
Recommendation
We recommended that management of the School Corporation establish a proper system of
internal controls and develop policies and procedures to ensure asset records are maintained and that a
physical inventory is taken every two years.
Views of Responsible Officials
For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-003
Subject: COVID-19 - Education Stabilization Fund - Equipment and Real Property Management
Federal Agency: Department of Education
Federal Program: COVID-19 - Education Stabilization Fund
Assistance Listings Numbers: 84.425D, 84.425U, 84.425C
Federal Award Numbers and Years (or Other Identifying Numbers): S425D200013, S425D210013,
S425U210013
Pass-Through Entity: Indiana Department of Education
Compliance Requirement: Equipment and Real Property Management
Audit Findings: Material Weakness, Modified Opinion
Condition and Context
The School Corporation had not properly designed or implemented a system of internal controls,
which would include appropriate segregation of duties, that would likely be effective in preventing, or
detecting and correcting, noncompliance. A property record or capital asset listing, which would include a
description of the property, a serial number or other identification number, the source of funding for the
property (including the federal award identification number (FAIN)), who holds title, the acquisition date,
cost of the property, percentage of federal participation in the project costs for the federal award under
which the property was acquired, the location, and use and condition of the property, is to be maintained
for assets purchased that exceed the School Corporation's capitalization threshold. In addition, a physical
inventory of all assets should be completed at least every two years.
The School Corporation purchased eight assets, totaling $131,205, which exceeded the School
Corporation's capitalization threshold. Two of the eight assets were selected for testing. Neither of the two
assets were determined to have property records, nor were the assets on the inventory listing. Additionally,
the School Corporation did not complete a capital asset inventory every two years as required.
The lack of internal controls and noncompliance were systemic issues throughout the audit period.
Criteria
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
2 CFR 200.313(d) states in part:
"Management requirements. Procedures for managing equipment (including replacement
equipment), whether acquired in whole or in part under a Federal award, until disposition takes
place will, as a minimum, meet the following requirements:
INDIANA STATE BOARD OF ACCOUNTS
19
RANDOLPH EASTERN SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
(1) Property records must be maintained that include a description of the property, a serial
number or other identification number, the source of funding for the property (including
the FAIN), who holds title, the acquisition date, and cost of the property, percentage of
Federal participation in the project costs for the Federal award under which the
property was acquired, the location, use and condition of the property, and any ultimate
disposition data including the date of disposal and sale price of the property.
(2) A physical inventory of the property must be taken and the results reconciled with the
property records at least once every two years.
(3) A control system must be developed to ensure adequate safeguards to prevent loss,
damage, or theft of the property. Any loss, damage, or theft must be investigated.
. . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation.
Embedded within a properly designed and implemented internal control system should be internal controls
consisting of policies and procedures. Policies reflect the School Corporation's management statements
of what should be done to effect internal controls, and procedures should consist of actions that would
implement these policies.
Effect
Without the proper implementation of an effectively designed system of internal controls, the
internal control system cannot be capable of effectively preventing, or detecting and correcting, material
noncompliance. As a result, there was not a complete asset listing nor was there a physical inventory
completed as required.
Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of
the federal award could result in the loss of future federal funding to the School Corporation.
Questioned Costs
There were no questioned costs identified.
Recommendation
We recommended that management of the School Corporation establish a proper system of
internal controls and develop policies and procedures to ensure asset records are maintained and that a
physical inventory is taken every two years.
Views of Responsible Officials
For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-003
Subject: COVID-19 - Education Stabilization Fund - Equipment and Real Property Management
Federal Agency: Department of Education
Federal Program: COVID-19 - Education Stabilization Fund
Assistance Listings Numbers: 84.425D, 84.425U, 84.425C
Federal Award Numbers and Years (or Other Identifying Numbers): S425D200013, S425D210013,
S425U210013
Pass-Through Entity: Indiana Department of Education
Compliance Requirement: Equipment and Real Property Management
Audit Findings: Material Weakness, Modified Opinion
Condition and Context
The School Corporation had not properly designed or implemented a system of internal controls,
which would include appropriate segregation of duties, that would likely be effective in preventing, or
detecting and correcting, noncompliance. A property record or capital asset listing, which would include a
description of the property, a serial number or other identification number, the source of funding for the
property (including the federal award identification number (FAIN)), who holds title, the acquisition date,
cost of the property, percentage of federal participation in the project costs for the federal award under
which the property was acquired, the location, and use and condition of the property, is to be maintained
for assets purchased that exceed the School Corporation's capitalization threshold. In addition, a physical
inventory of all assets should be completed at least every two years.
The School Corporation purchased eight assets, totaling $131,205, which exceeded the School
Corporation's capitalization threshold. Two of the eight assets were selected for testing. Neither of the two
assets were determined to have property records, nor were the assets on the inventory listing. Additionally,
the School Corporation did not complete a capital asset inventory every two years as required.
The lack of internal controls and noncompliance were systemic issues throughout the audit period.
Criteria
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
2 CFR 200.313(d) states in part:
"Management requirements. Procedures for managing equipment (including replacement
equipment), whether acquired in whole or in part under a Federal award, until disposition takes
place will, as a minimum, meet the following requirements:
INDIANA STATE BOARD OF ACCOUNTS
19
RANDOLPH EASTERN SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
(1) Property records must be maintained that include a description of the property, a serial
number or other identification number, the source of funding for the property (including
the FAIN), who holds title, the acquisition date, and cost of the property, percentage of
Federal participation in the project costs for the Federal award under which the
property was acquired, the location, use and condition of the property, and any ultimate
disposition data including the date of disposal and sale price of the property.
(2) A physical inventory of the property must be taken and the results reconciled with the
property records at least once every two years.
(3) A control system must be developed to ensure adequate safeguards to prevent loss,
damage, or theft of the property. Any loss, damage, or theft must be investigated.
. . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation.
Embedded within a properly designed and implemented internal control system should be internal controls
consisting of policies and procedures. Policies reflect the School Corporation's management statements
of what should be done to effect internal controls, and procedures should consist of actions that would
implement these policies.
Effect
Without the proper implementation of an effectively designed system of internal controls, the
internal control system cannot be capable of effectively preventing, or detecting and correcting, material
noncompliance. As a result, there was not a complete asset listing nor was there a physical inventory
completed as required.
Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of
the federal award could result in the loss of future federal funding to the School Corporation.
Questioned Costs
There were no questioned costs identified.
Recommendation
We recommended that management of the School Corporation establish a proper system of
internal controls and develop policies and procedures to ensure asset records are maintained and that a
physical inventory is taken every two years.
Views of Responsible Officials
For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-003
Subject: COVID-19 - Education Stabilization Fund - Equipment and Real Property Management
Federal Agency: Department of Education
Federal Program: COVID-19 - Education Stabilization Fund
Assistance Listings Numbers: 84.425D, 84.425U, 84.425C
Federal Award Numbers and Years (or Other Identifying Numbers): S425D200013, S425D210013,
S425U210013
Pass-Through Entity: Indiana Department of Education
Compliance Requirement: Equipment and Real Property Management
Audit Findings: Material Weakness, Modified Opinion
Condition and Context
The School Corporation had not properly designed or implemented a system of internal controls,
which would include appropriate segregation of duties, that would likely be effective in preventing, or
detecting and correcting, noncompliance. A property record or capital asset listing, which would include a
description of the property, a serial number or other identification number, the source of funding for the
property (including the federal award identification number (FAIN)), who holds title, the acquisition date,
cost of the property, percentage of federal participation in the project costs for the federal award under
which the property was acquired, the location, and use and condition of the property, is to be maintained
for assets purchased that exceed the School Corporation's capitalization threshold. In addition, a physical
inventory of all assets should be completed at least every two years.
The School Corporation purchased eight assets, totaling $131,205, which exceeded the School
Corporation's capitalization threshold. Two of the eight assets were selected for testing. Neither of the two
assets were determined to have property records, nor were the assets on the inventory listing. Additionally,
the School Corporation did not complete a capital asset inventory every two years as required.
The lack of internal controls and noncompliance were systemic issues throughout the audit period.
Criteria
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
2 CFR 200.313(d) states in part:
"Management requirements. Procedures for managing equipment (including replacement
equipment), whether acquired in whole or in part under a Federal award, until disposition takes
place will, as a minimum, meet the following requirements:
INDIANA STATE BOARD OF ACCOUNTS
19
RANDOLPH EASTERN SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
(1) Property records must be maintained that include a description of the property, a serial
number or other identification number, the source of funding for the property (including
the FAIN), who holds title, the acquisition date, and cost of the property, percentage of
Federal participation in the project costs for the Federal award under which the
property was acquired, the location, use and condition of the property, and any ultimate
disposition data including the date of disposal and sale price of the property.
(2) A physical inventory of the property must be taken and the results reconciled with the
property records at least once every two years.
(3) A control system must be developed to ensure adequate safeguards to prevent loss,
damage, or theft of the property. Any loss, damage, or theft must be investigated.
. . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation.
Embedded within a properly designed and implemented internal control system should be internal controls
consisting of policies and procedures. Policies reflect the School Corporation's management statements
of what should be done to effect internal controls, and procedures should consist of actions that would
implement these policies.
Effect
Without the proper implementation of an effectively designed system of internal controls, the
internal control system cannot be capable of effectively preventing, or detecting and correcting, material
noncompliance. As a result, there was not a complete asset listing nor was there a physical inventory
completed as required.
Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of
the federal award could result in the loss of future federal funding to the School Corporation.
Questioned Costs
There were no questioned costs identified.
Recommendation
We recommended that management of the School Corporation establish a proper system of
internal controls and develop policies and procedures to ensure asset records are maintained and that a
physical inventory is taken every two years.
Views of Responsible Officials
For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-003
Subject: COVID-19 - Education Stabilization Fund - Equipment and Real Property Management
Federal Agency: Department of Education
Federal Program: COVID-19 - Education Stabilization Fund
Assistance Listings Numbers: 84.425D, 84.425U, 84.425C
Federal Award Numbers and Years (or Other Identifying Numbers): S425D200013, S425D210013,
S425U210013
Pass-Through Entity: Indiana Department of Education
Compliance Requirement: Equipment and Real Property Management
Audit Findings: Material Weakness, Modified Opinion
Condition and Context
The School Corporation had not properly designed or implemented a system of internal controls,
which would include appropriate segregation of duties, that would likely be effective in preventing, or
detecting and correcting, noncompliance. A property record or capital asset listing, which would include a
description of the property, a serial number or other identification number, the source of funding for the
property (including the federal award identification number (FAIN)), who holds title, the acquisition date,
cost of the property, percentage of federal participation in the project costs for the federal award under
which the property was acquired, the location, and use and condition of the property, is to be maintained
for assets purchased that exceed the School Corporation's capitalization threshold. In addition, a physical
inventory of all assets should be completed at least every two years.
The School Corporation purchased eight assets, totaling $131,205, which exceeded the School
Corporation's capitalization threshold. Two of the eight assets were selected for testing. Neither of the two
assets were determined to have property records, nor were the assets on the inventory listing. Additionally,
the School Corporation did not complete a capital asset inventory every two years as required.
The lack of internal controls and noncompliance were systemic issues throughout the audit period.
Criteria
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
2 CFR 200.313(d) states in part:
"Management requirements. Procedures for managing equipment (including replacement
equipment), whether acquired in whole or in part under a Federal award, until disposition takes
place will, as a minimum, meet the following requirements:
INDIANA STATE BOARD OF ACCOUNTS
19
RANDOLPH EASTERN SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
(1) Property records must be maintained that include a description of the property, a serial
number or other identification number, the source of funding for the property (including
the FAIN), who holds title, the acquisition date, and cost of the property, percentage of
Federal participation in the project costs for the Federal award under which the
property was acquired, the location, use and condition of the property, and any ultimate
disposition data including the date of disposal and sale price of the property.
(2) A physical inventory of the property must be taken and the results reconciled with the
property records at least once every two years.
(3) A control system must be developed to ensure adequate safeguards to prevent loss,
damage, or theft of the property. Any loss, damage, or theft must be investigated.
. . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation.
Embedded within a properly designed and implemented internal control system should be internal controls
consisting of policies and procedures. Policies reflect the School Corporation's management statements
of what should be done to effect internal controls, and procedures should consist of actions that would
implement these policies.
Effect
Without the proper implementation of an effectively designed system of internal controls, the
internal control system cannot be capable of effectively preventing, or detecting and correcting, material
noncompliance. As a result, there was not a complete asset listing nor was there a physical inventory
completed as required.
Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of
the federal award could result in the loss of future federal funding to the School Corporation.
Questioned Costs
There were no questioned costs identified.
Recommendation
We recommended that management of the School Corporation establish a proper system of
internal controls and develop policies and procedures to ensure asset records are maintained and that a
physical inventory is taken every two years.
Views of Responsible Officials
For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-004
Subject: COVID-19 - Education Stabilization Fund - Reporting
Federal Agency: Department of Education
Federal Program: COVID-19 - Education Stabilization Fund
Assistance Listings Numbers: 84.425D, 84.425U
Federal Award Numbers and Years (or Other Identifying Numbers): S425D200013, S425D210013
S425U210013
Pass-Through Entity: Department of Education
Compliance Requirement: Reporting
Audit Finding: Material Weakness
Condition and Context
The School Corporation had not properly designed or implemented a system of internal controls
which would include appropriate segregation of duties that would likely be effective in preventing, or
detecting and correcting, noncompliance. The School Corporation was required to submit annual data
reports to the Indiana Department of Education via JotForm, a form/report builder. Data to be submitted
included, but was not limited to, current period expenditures, prior period expenditures, and expenditures
per activity.
During the audit period the School Corporation submitted two ESSER I reports, two ESSER II
reports, and two ESSER III reports, for a total of six reports. The annual data reports were complied,
prepared, and submitted by the Assistant Superintendent of Schools and the Treasurer without an oversight
or review process in place to prevent, or detect and correct, errors.
The lack of internal controls was systemic throughout the audit period.
Criteria
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation.
Embedded within a properly designed and implemented internal control system should be internal controls
consisting of policies and procedures. Policies reflect the School Corporation's management statements
of what should be done to effect internal controls, and procedures should consist of actions that would
implement these policies.
INDIANA STATE BOARD OF ACCOUNTS 21
RANDOLPH EASTERN SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
Effect
Without the proper design or implementation of the components of a system of internal controls,
including policies and procedures that provide segregation of duties and additional oversight as needed,
the internal control system cannot be capable of effectively preventing, or detecting and correcting, material
noncompliance.
Questioned Costs
There were no questioned costs identified.
Recommendation
We recommended that management of the School Corporation design and implement a proper
system of internal controls, including policies and procedures that would provide segregation of duties to
ensure appropriate reviews, approvals, and oversight are taking place prior to filing required reports.
Views of Responsible Officials
For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-004
Subject: COVID-19 - Education Stabilization Fund - Reporting
Federal Agency: Department of Education
Federal Program: COVID-19 - Education Stabilization Fund
Assistance Listings Numbers: 84.425D, 84.425U
Federal Award Numbers and Years (or Other Identifying Numbers): S425D200013, S425D210013
S425U210013
Pass-Through Entity: Department of Education
Compliance Requirement: Reporting
Audit Finding: Material Weakness
Condition and Context
The School Corporation had not properly designed or implemented a system of internal controls
which would include appropriate segregation of duties that would likely be effective in preventing, or
detecting and correcting, noncompliance. The School Corporation was required to submit annual data
reports to the Indiana Department of Education via JotForm, a form/report builder. Data to be submitted
included, but was not limited to, current period expenditures, prior period expenditures, and expenditures
per activity.
During the audit period the School Corporation submitted two ESSER I reports, two ESSER II
reports, and two ESSER III reports, for a total of six reports. The annual data reports were complied,
prepared, and submitted by the Assistant Superintendent of Schools and the Treasurer without an oversight
or review process in place to prevent, or detect and correct, errors.
The lack of internal controls was systemic throughout the audit period.
Criteria
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation.
Embedded within a properly designed and implemented internal control system should be internal controls
consisting of policies and procedures. Policies reflect the School Corporation's management statements
of what should be done to effect internal controls, and procedures should consist of actions that would
implement these policies.
INDIANA STATE BOARD OF ACCOUNTS 21
RANDOLPH EASTERN SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
Effect
Without the proper design or implementation of the components of a system of internal controls,
including policies and procedures that provide segregation of duties and additional oversight as needed,
the internal control system cannot be capable of effectively preventing, or detecting and correcting, material
noncompliance.
Questioned Costs
There were no questioned costs identified.
Recommendation
We recommended that management of the School Corporation design and implement a proper
system of internal controls, including policies and procedures that would provide segregation of duties to
ensure appropriate reviews, approvals, and oversight are taking place prior to filing required reports.
Views of Responsible Officials
For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-004
Subject: COVID-19 - Education Stabilization Fund - Reporting
Federal Agency: Department of Education
Federal Program: COVID-19 - Education Stabilization Fund
Assistance Listings Numbers: 84.425D, 84.425U
Federal Award Numbers and Years (or Other Identifying Numbers): S425D200013, S425D210013
S425U210013
Pass-Through Entity: Department of Education
Compliance Requirement: Reporting
Audit Finding: Material Weakness
Condition and Context
The School Corporation had not properly designed or implemented a system of internal controls
which would include appropriate segregation of duties that would likely be effective in preventing, or
detecting and correcting, noncompliance. The School Corporation was required to submit annual data
reports to the Indiana Department of Education via JotForm, a form/report builder. Data to be submitted
included, but was not limited to, current period expenditures, prior period expenditures, and expenditures
per activity.
During the audit period the School Corporation submitted two ESSER I reports, two ESSER II
reports, and two ESSER III reports, for a total of six reports. The annual data reports were complied,
prepared, and submitted by the Assistant Superintendent of Schools and the Treasurer without an oversight
or review process in place to prevent, or detect and correct, errors.
The lack of internal controls was systemic throughout the audit period.
Criteria
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation.
Embedded within a properly designed and implemented internal control system should be internal controls
consisting of policies and procedures. Policies reflect the School Corporation's management statements
of what should be done to effect internal controls, and procedures should consist of actions that would
implement these policies.
INDIANA STATE BOARD OF ACCOUNTS 21
RANDOLPH EASTERN SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
Effect
Without the proper design or implementation of the components of a system of internal controls,
including policies and procedures that provide segregation of duties and additional oversight as needed,
the internal control system cannot be capable of effectively preventing, or detecting and correcting, material
noncompliance.
Questioned Costs
There were no questioned costs identified.
Recommendation
We recommended that management of the School Corporation design and implement a proper
system of internal controls, including policies and procedures that would provide segregation of duties to
ensure appropriate reviews, approvals, and oversight are taking place prior to filing required reports.
Views of Responsible Officials
For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-004
Subject: COVID-19 - Education Stabilization Fund - Reporting
Federal Agency: Department of Education
Federal Program: COVID-19 - Education Stabilization Fund
Assistance Listings Numbers: 84.425D, 84.425U
Federal Award Numbers and Years (or Other Identifying Numbers): S425D200013, S425D210013
S425U210013
Pass-Through Entity: Department of Education
Compliance Requirement: Reporting
Audit Finding: Material Weakness
Condition and Context
The School Corporation had not properly designed or implemented a system of internal controls
which would include appropriate segregation of duties that would likely be effective in preventing, or
detecting and correcting, noncompliance. The School Corporation was required to submit annual data
reports to the Indiana Department of Education via JotForm, a form/report builder. Data to be submitted
included, but was not limited to, current period expenditures, prior period expenditures, and expenditures
per activity.
During the audit period the School Corporation submitted two ESSER I reports, two ESSER II
reports, and two ESSER III reports, for a total of six reports. The annual data reports were complied,
prepared, and submitted by the Assistant Superintendent of Schools and the Treasurer without an oversight
or review process in place to prevent, or detect and correct, errors.
The lack of internal controls was systemic throughout the audit period.
Criteria
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation.
Embedded within a properly designed and implemented internal control system should be internal controls
consisting of policies and procedures. Policies reflect the School Corporation's management statements
of what should be done to effect internal controls, and procedures should consist of actions that would
implement these policies.
INDIANA STATE BOARD OF ACCOUNTS 21
RANDOLPH EASTERN SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
Effect
Without the proper design or implementation of the components of a system of internal controls,
including policies and procedures that provide segregation of duties and additional oversight as needed,
the internal control system cannot be capable of effectively preventing, or detecting and correcting, material
noncompliance.
Questioned Costs
There were no questioned costs identified.
Recommendation
We recommended that management of the School Corporation design and implement a proper
system of internal controls, including policies and procedures that would provide segregation of duties to
ensure appropriate reviews, approvals, and oversight are taking place prior to filing required reports.
Views of Responsible Officials
For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-004
Subject: COVID-19 - Education Stabilization Fund - Reporting
Federal Agency: Department of Education
Federal Program: COVID-19 - Education Stabilization Fund
Assistance Listings Numbers: 84.425D, 84.425U
Federal Award Numbers and Years (or Other Identifying Numbers): S425D200013, S425D210013
S425U210013
Pass-Through Entity: Department of Education
Compliance Requirement: Reporting
Audit Finding: Material Weakness
Condition and Context
The School Corporation had not properly designed or implemented a system of internal controls
which would include appropriate segregation of duties that would likely be effective in preventing, or
detecting and correcting, noncompliance. The School Corporation was required to submit annual data
reports to the Indiana Department of Education via JotForm, a form/report builder. Data to be submitted
included, but was not limited to, current period expenditures, prior period expenditures, and expenditures
per activity.
During the audit period the School Corporation submitted two ESSER I reports, two ESSER II
reports, and two ESSER III reports, for a total of six reports. The annual data reports were complied,
prepared, and submitted by the Assistant Superintendent of Schools and the Treasurer without an oversight
or review process in place to prevent, or detect and correct, errors.
The lack of internal controls was systemic throughout the audit period.
Criteria
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation.
Embedded within a properly designed and implemented internal control system should be internal controls
consisting of policies and procedures. Policies reflect the School Corporation's management statements
of what should be done to effect internal controls, and procedures should consist of actions that would
implement these policies.
INDIANA STATE BOARD OF ACCOUNTS 21
RANDOLPH EASTERN SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
Effect
Without the proper design or implementation of the components of a system of internal controls,
including policies and procedures that provide segregation of duties and additional oversight as needed,
the internal control system cannot be capable of effectively preventing, or detecting and correcting, material
noncompliance.
Questioned Costs
There were no questioned costs identified.
Recommendation
We recommended that management of the School Corporation design and implement a proper
system of internal controls, including policies and procedures that would provide segregation of duties to
ensure appropriate reviews, approvals, and oversight are taking place prior to filing required reports.
Views of Responsible Officials
For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-004
Subject: COVID-19 - Education Stabilization Fund - Reporting
Federal Agency: Department of Education
Federal Program: COVID-19 - Education Stabilization Fund
Assistance Listings Numbers: 84.425D, 84.425U
Federal Award Numbers and Years (or Other Identifying Numbers): S425D200013, S425D210013
S425U210013
Pass-Through Entity: Department of Education
Compliance Requirement: Reporting
Audit Finding: Material Weakness
Condition and Context
The School Corporation had not properly designed or implemented a system of internal controls
which would include appropriate segregation of duties that would likely be effective in preventing, or
detecting and correcting, noncompliance. The School Corporation was required to submit annual data
reports to the Indiana Department of Education via JotForm, a form/report builder. Data to be submitted
included, but was not limited to, current period expenditures, prior period expenditures, and expenditures
per activity.
During the audit period the School Corporation submitted two ESSER I reports, two ESSER II
reports, and two ESSER III reports, for a total of six reports. The annual data reports were complied,
prepared, and submitted by the Assistant Superintendent of Schools and the Treasurer without an oversight
or review process in place to prevent, or detect and correct, errors.
The lack of internal controls was systemic throughout the audit period.
Criteria
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation.
Embedded within a properly designed and implemented internal control system should be internal controls
consisting of policies and procedures. Policies reflect the School Corporation's management statements
of what should be done to effect internal controls, and procedures should consist of actions that would
implement these policies.
INDIANA STATE BOARD OF ACCOUNTS 21
RANDOLPH EASTERN SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
Effect
Without the proper design or implementation of the components of a system of internal controls,
including policies and procedures that provide segregation of duties and additional oversight as needed,
the internal control system cannot be capable of effectively preventing, or detecting and correcting, material
noncompliance.
Questioned Costs
There were no questioned costs identified.
Recommendation
We recommended that management of the School Corporation design and implement a proper
system of internal controls, including policies and procedures that would provide segregation of duties to
ensure appropriate reviews, approvals, and oversight are taking place prior to filing required reports.
Views of Responsible Officials
For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-004
Subject: COVID-19 - Education Stabilization Fund - Reporting
Federal Agency: Department of Education
Federal Program: COVID-19 - Education Stabilization Fund
Assistance Listings Numbers: 84.425D, 84.425U
Federal Award Numbers and Years (or Other Identifying Numbers): S425D200013, S425D210013
S425U210013
Pass-Through Entity: Department of Education
Compliance Requirement: Reporting
Audit Finding: Material Weakness
Condition and Context
The School Corporation had not properly designed or implemented a system of internal controls
which would include appropriate segregation of duties that would likely be effective in preventing, or
detecting and correcting, noncompliance. The School Corporation was required to submit annual data
reports to the Indiana Department of Education via JotForm, a form/report builder. Data to be submitted
included, but was not limited to, current period expenditures, prior period expenditures, and expenditures
per activity.
During the audit period the School Corporation submitted two ESSER I reports, two ESSER II
reports, and two ESSER III reports, for a total of six reports. The annual data reports were complied,
prepared, and submitted by the Assistant Superintendent of Schools and the Treasurer without an oversight
or review process in place to prevent, or detect and correct, errors.
The lack of internal controls was systemic throughout the audit period.
Criteria
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation.
Embedded within a properly designed and implemented internal control system should be internal controls
consisting of policies and procedures. Policies reflect the School Corporation's management statements
of what should be done to effect internal controls, and procedures should consist of actions that would
implement these policies.
INDIANA STATE BOARD OF ACCOUNTS 21
RANDOLPH EASTERN SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
Effect
Without the proper design or implementation of the components of a system of internal controls,
including policies and procedures that provide segregation of duties and additional oversight as needed,
the internal control system cannot be capable of effectively preventing, or detecting and correcting, material
noncompliance.
Questioned Costs
There were no questioned costs identified.
Recommendation
We recommended that management of the School Corporation design and implement a proper
system of internal controls, including policies and procedures that would provide segregation of duties to
ensure appropriate reviews, approvals, and oversight are taking place prior to filing required reports.
Views of Responsible Officials
For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-004
Subject: COVID-19 - Education Stabilization Fund - Reporting
Federal Agency: Department of Education
Federal Program: COVID-19 - Education Stabilization Fund
Assistance Listings Numbers: 84.425D, 84.425U
Federal Award Numbers and Years (or Other Identifying Numbers): S425D200013, S425D210013
S425U210013
Pass-Through Entity: Department of Education
Compliance Requirement: Reporting
Audit Finding: Material Weakness
Condition and Context
The School Corporation had not properly designed or implemented a system of internal controls
which would include appropriate segregation of duties that would likely be effective in preventing, or
detecting and correcting, noncompliance. The School Corporation was required to submit annual data
reports to the Indiana Department of Education via JotForm, a form/report builder. Data to be submitted
included, but was not limited to, current period expenditures, prior period expenditures, and expenditures
per activity.
During the audit period the School Corporation submitted two ESSER I reports, two ESSER II
reports, and two ESSER III reports, for a total of six reports. The annual data reports were complied,
prepared, and submitted by the Assistant Superintendent of Schools and the Treasurer without an oversight
or review process in place to prevent, or detect and correct, errors.
The lack of internal controls was systemic throughout the audit period.
Criteria
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation.
Embedded within a properly designed and implemented internal control system should be internal controls
consisting of policies and procedures. Policies reflect the School Corporation's management statements
of what should be done to effect internal controls, and procedures should consist of actions that would
implement these policies.
INDIANA STATE BOARD OF ACCOUNTS 21
RANDOLPH EASTERN SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
Effect
Without the proper design or implementation of the components of a system of internal controls,
including policies and procedures that provide segregation of duties and additional oversight as needed,
the internal control system cannot be capable of effectively preventing, or detecting and correcting, material
noncompliance.
Questioned Costs
There were no questioned costs identified.
Recommendation
We recommended that management of the School Corporation design and implement a proper
system of internal controls, including policies and procedures that would provide segregation of duties to
ensure appropriate reviews, approvals, and oversight are taking place prior to filing required reports.
Views of Responsible Officials
For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-004
Subject: COVID-19 - Education Stabilization Fund - Reporting
Federal Agency: Department of Education
Federal Program: COVID-19 - Education Stabilization Fund
Assistance Listings Numbers: 84.425D, 84.425U
Federal Award Numbers and Years (or Other Identifying Numbers): S425D200013, S425D210013
S425U210013
Pass-Through Entity: Department of Education
Compliance Requirement: Reporting
Audit Finding: Material Weakness
Condition and Context
The School Corporation had not properly designed or implemented a system of internal controls
which would include appropriate segregation of duties that would likely be effective in preventing, or
detecting and correcting, noncompliance. The School Corporation was required to submit annual data
reports to the Indiana Department of Education via JotForm, a form/report builder. Data to be submitted
included, but was not limited to, current period expenditures, prior period expenditures, and expenditures
per activity.
During the audit period the School Corporation submitted two ESSER I reports, two ESSER II
reports, and two ESSER III reports, for a total of six reports. The annual data reports were complied,
prepared, and submitted by the Assistant Superintendent of Schools and the Treasurer without an oversight
or review process in place to prevent, or detect and correct, errors.
The lack of internal controls was systemic throughout the audit period.
Criteria
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation.
Embedded within a properly designed and implemented internal control system should be internal controls
consisting of policies and procedures. Policies reflect the School Corporation's management statements
of what should be done to effect internal controls, and procedures should consist of actions that would
implement these policies.
INDIANA STATE BOARD OF ACCOUNTS 21
RANDOLPH EASTERN SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
Effect
Without the proper design or implementation of the components of a system of internal controls,
including policies and procedures that provide segregation of duties and additional oversight as needed,
the internal control system cannot be capable of effectively preventing, or detecting and correcting, material
noncompliance.
Questioned Costs
There were no questioned costs identified.
Recommendation
We recommended that management of the School Corporation design and implement a proper
system of internal controls, including policies and procedures that would provide segregation of duties to
ensure appropriate reviews, approvals, and oversight are taking place prior to filing required reports.
Views of Responsible Officials
For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-005
Subject: Child Nutrition Cluster - Activities Allowed or Unallowed, Allowable Costs/Cost Principles
Federal Agency: Department of Agriculture
Federal Programs: School Breakfast Program, National School Lunch Program,
Summer Food Service Program for Children
Assistance Listings Numbers: 10.553, 10.555, 10.559
Federal Award Numbers and Years (or Other Identifying Numbers): FY 2022, FY 2023
Pass-Through Entity: Indiana Department of Education
Compliance Requirements: Activities Allowed or Unallowed, Allowable Costs/Cost Principles
Audit Findings: Material Weakness, Other Matters
Condition and Context
An effective system of internal controls which would include segregation of duties that would likely
be effective in preventing, or detecting and correcting, noncompliance should be designed and implemented
to ensure expenditures charged to the food service program fund (School Lunch fund) are for the benefit
of the food service program.
The School Corporation's payroll disbursements were prepared by the Payroll Clerk without a
documented review or approval process to prevent, or detect and correct, errors. In addition, vendor claims
were to be reviewed and approved by the Treasurer and the School Board. Of the 40 vendor claims
selected for testing to ensure the internal control was in place and operating effectively, 3 claims did not
have documentation of approval by the Treasurer or the School Board.
In addition, the total amount of trash removal services for the School Corporation was paid from
the School Lunch fund. The total amount charged to the School Lunch fund was $15,448. This amount
was considered questioned costs.
The lack of internal controls over payroll and vendor claims was a systemic issue throughout the
audit period. The noncompliance was isolated to the payments for trash removal services.
INDIANA STATE BOARD OF ACCOUNTS 22
RANDOLPH EASTERN SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
Criteria
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
2 CFR 200.403 states in part:
"Except where otherwise authorized by statute, costs must meet the following general criteria
in order to be allowable under Federal awards:
(a) Be necessary and reasonable for the performance of the Federal award and be
allocable thereto under these principles.
(b) Conform to any limitations or exclusions set forth in these principles or in the Federal
award as to types or amount of cost items. . . .
(g) Be adequately documented. . . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation.
Embedded within a properly designed and implemented internal control system should be internal controls
consisting of policies and procedures. Policies reflect the School Corporation's management statements
of what should be done to effect internal controls, and procedures should consist of actions that would
implement these policies.
Effect
Without the proper implementation of an effectively designed system of internal controls, the
internal control system cannot be capable of effectively preventing, or detecting and correcting, material
noncompliance. As a result, costs for trash removal were incorrectly charged to the food service program.
Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of
the federal award could result in the loss of future federal funding to the School Corporation.
Questioned Costs
Known questioned costs of $15,448 were identified as detailed in the Condition and Context.
Recommendation
We recommended the School Corporation's management establish a proper system of internal
controls and develop policies and procedures to ensure costs are adequately documented.
FINDING 2023-005
Subject: Child Nutrition Cluster - Activities Allowed or Unallowed, Allowable Costs/Cost Principles
Federal Agency: Department of Agriculture
Federal Programs: School Breakfast Program, National School Lunch Program,
Summer Food Service Program for Children
Assistance Listings Numbers: 10.553, 10.555, 10.559
Federal Award Numbers and Years (or Other Identifying Numbers): FY 2022, FY 2023
Pass-Through Entity: Indiana Department of Education
Compliance Requirements: Activities Allowed or Unallowed, Allowable Costs/Cost Principles
Audit Findings: Material Weakness, Other Matters
Condition and Context
An effective system of internal controls which would include segregation of duties that would likely
be effective in preventing, or detecting and correcting, noncompliance should be designed and implemented
to ensure expenditures charged to the food service program fund (School Lunch fund) are for the benefit
of the food service program.
The School Corporation's payroll disbursements were prepared by the Payroll Clerk without a
documented review or approval process to prevent, or detect and correct, errors. In addition, vendor claims
were to be reviewed and approved by the Treasurer and the School Board. Of the 40 vendor claims
selected for testing to ensure the internal control was in place and operating effectively, 3 claims did not
have documentation of approval by the Treasurer or the School Board.
In addition, the total amount of trash removal services for the School Corporation was paid from
the School Lunch fund. The total amount charged to the School Lunch fund was $15,448. This amount
was considered questioned costs.
The lack of internal controls over payroll and vendor claims was a systemic issue throughout the
audit period. The noncompliance was isolated to the payments for trash removal services.
INDIANA STATE BOARD OF ACCOUNTS 22
RANDOLPH EASTERN SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
Criteria
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
2 CFR 200.403 states in part:
"Except where otherwise authorized by statute, costs must meet the following general criteria
in order to be allowable under Federal awards:
(a) Be necessary and reasonable for the performance of the Federal award and be
allocable thereto under these principles.
(b) Conform to any limitations or exclusions set forth in these principles or in the Federal
award as to types or amount of cost items. . . .
(g) Be adequately documented. . . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation.
Embedded within a properly designed and implemented internal control system should be internal controls
consisting of policies and procedures. Policies reflect the School Corporation's management statements
of what should be done to effect internal controls, and procedures should consist of actions that would
implement these policies.
Effect
Without the proper implementation of an effectively designed system of internal controls, the
internal control system cannot be capable of effectively preventing, or detecting and correcting, material
noncompliance. As a result, costs for trash removal were incorrectly charged to the food service program.
Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of
the federal award could result in the loss of future federal funding to the School Corporation.
Questioned Costs
Known questioned costs of $15,448 were identified as detailed in the Condition and Context.
Recommendation
We recommended the School Corporation's management establish a proper system of internal
controls and develop policies and procedures to ensure costs are adequately documented.
FINDING 2023-005
Subject: Child Nutrition Cluster - Activities Allowed or Unallowed, Allowable Costs/Cost Principles
Federal Agency: Department of Agriculture
Federal Programs: School Breakfast Program, National School Lunch Program,
Summer Food Service Program for Children
Assistance Listings Numbers: 10.553, 10.555, 10.559
Federal Award Numbers and Years (or Other Identifying Numbers): FY 2022, FY 2023
Pass-Through Entity: Indiana Department of Education
Compliance Requirements: Activities Allowed or Unallowed, Allowable Costs/Cost Principles
Audit Findings: Material Weakness, Other Matters
Condition and Context
An effective system of internal controls which would include segregation of duties that would likely
be effective in preventing, or detecting and correcting, noncompliance should be designed and implemented
to ensure expenditures charged to the food service program fund (School Lunch fund) are for the benefit
of the food service program.
The School Corporation's payroll disbursements were prepared by the Payroll Clerk without a
documented review or approval process to prevent, or detect and correct, errors. In addition, vendor claims
were to be reviewed and approved by the Treasurer and the School Board. Of the 40 vendor claims
selected for testing to ensure the internal control was in place and operating effectively, 3 claims did not
have documentation of approval by the Treasurer or the School Board.
In addition, the total amount of trash removal services for the School Corporation was paid from
the School Lunch fund. The total amount charged to the School Lunch fund was $15,448. This amount
was considered questioned costs.
The lack of internal controls over payroll and vendor claims was a systemic issue throughout the
audit period. The noncompliance was isolated to the payments for trash removal services.
INDIANA STATE BOARD OF ACCOUNTS 22
RANDOLPH EASTERN SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
Criteria
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
2 CFR 200.403 states in part:
"Except where otherwise authorized by statute, costs must meet the following general criteria
in order to be allowable under Federal awards:
(a) Be necessary and reasonable for the performance of the Federal award and be
allocable thereto under these principles.
(b) Conform to any limitations or exclusions set forth in these principles or in the Federal
award as to types or amount of cost items. . . .
(g) Be adequately documented. . . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation.
Embedded within a properly designed and implemented internal control system should be internal controls
consisting of policies and procedures. Policies reflect the School Corporation's management statements
of what should be done to effect internal controls, and procedures should consist of actions that would
implement these policies.
Effect
Without the proper implementation of an effectively designed system of internal controls, the
internal control system cannot be capable of effectively preventing, or detecting and correcting, material
noncompliance. As a result, costs for trash removal were incorrectly charged to the food service program.
Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of
the federal award could result in the loss of future federal funding to the School Corporation.
Questioned Costs
Known questioned costs of $15,448 were identified as detailed in the Condition and Context.
Recommendation
We recommended the School Corporation's management establish a proper system of internal
controls and develop policies and procedures to ensure costs are adequately documented.
FINDING 2023-005
Subject: Child Nutrition Cluster - Activities Allowed or Unallowed, Allowable Costs/Cost Principles
Federal Agency: Department of Agriculture
Federal Programs: School Breakfast Program, National School Lunch Program,
Summer Food Service Program for Children
Assistance Listings Numbers: 10.553, 10.555, 10.559
Federal Award Numbers and Years (or Other Identifying Numbers): FY 2022, FY 2023
Pass-Through Entity: Indiana Department of Education
Compliance Requirements: Activities Allowed or Unallowed, Allowable Costs/Cost Principles
Audit Findings: Material Weakness, Other Matters
Condition and Context
An effective system of internal controls which would include segregation of duties that would likely
be effective in preventing, or detecting and correcting, noncompliance should be designed and implemented
to ensure expenditures charged to the food service program fund (School Lunch fund) are for the benefit
of the food service program.
The School Corporation's payroll disbursements were prepared by the Payroll Clerk without a
documented review or approval process to prevent, or detect and correct, errors. In addition, vendor claims
were to be reviewed and approved by the Treasurer and the School Board. Of the 40 vendor claims
selected for testing to ensure the internal control was in place and operating effectively, 3 claims did not
have documentation of approval by the Treasurer or the School Board.
In addition, the total amount of trash removal services for the School Corporation was paid from
the School Lunch fund. The total amount charged to the School Lunch fund was $15,448. This amount
was considered questioned costs.
The lack of internal controls over payroll and vendor claims was a systemic issue throughout the
audit period. The noncompliance was isolated to the payments for trash removal services.
INDIANA STATE BOARD OF ACCOUNTS 22
RANDOLPH EASTERN SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
Criteria
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
2 CFR 200.403 states in part:
"Except where otherwise authorized by statute, costs must meet the following general criteria
in order to be allowable under Federal awards:
(a) Be necessary and reasonable for the performance of the Federal award and be
allocable thereto under these principles.
(b) Conform to any limitations or exclusions set forth in these principles or in the Federal
award as to types or amount of cost items. . . .
(g) Be adequately documented. . . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation.
Embedded within a properly designed and implemented internal control system should be internal controls
consisting of policies and procedures. Policies reflect the School Corporation's management statements
of what should be done to effect internal controls, and procedures should consist of actions that would
implement these policies.
Effect
Without the proper implementation of an effectively designed system of internal controls, the
internal control system cannot be capable of effectively preventing, or detecting and correcting, material
noncompliance. As a result, costs for trash removal were incorrectly charged to the food service program.
Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of
the federal award could result in the loss of future federal funding to the School Corporation.
Questioned Costs
Known questioned costs of $15,448 were identified as detailed in the Condition and Context.
Recommendation
We recommended the School Corporation's management establish a proper system of internal
controls and develop policies and procedures to ensure costs are adequately documented.
FINDING 2023-005
Subject: Child Nutrition Cluster - Activities Allowed or Unallowed, Allowable Costs/Cost Principles
Federal Agency: Department of Agriculture
Federal Programs: School Breakfast Program, National School Lunch Program,
Summer Food Service Program for Children
Assistance Listings Numbers: 10.553, 10.555, 10.559
Federal Award Numbers and Years (or Other Identifying Numbers): FY 2022, FY 2023
Pass-Through Entity: Indiana Department of Education
Compliance Requirements: Activities Allowed or Unallowed, Allowable Costs/Cost Principles
Audit Findings: Material Weakness, Other Matters
Condition and Context
An effective system of internal controls which would include segregation of duties that would likely
be effective in preventing, or detecting and correcting, noncompliance should be designed and implemented
to ensure expenditures charged to the food service program fund (School Lunch fund) are for the benefit
of the food service program.
The School Corporation's payroll disbursements were prepared by the Payroll Clerk without a
documented review or approval process to prevent, or detect and correct, errors. In addition, vendor claims
were to be reviewed and approved by the Treasurer and the School Board. Of the 40 vendor claims
selected for testing to ensure the internal control was in place and operating effectively, 3 claims did not
have documentation of approval by the Treasurer or the School Board.
In addition, the total amount of trash removal services for the School Corporation was paid from
the School Lunch fund. The total amount charged to the School Lunch fund was $15,448. This amount
was considered questioned costs.
The lack of internal controls over payroll and vendor claims was a systemic issue throughout the
audit period. The noncompliance was isolated to the payments for trash removal services.
INDIANA STATE BOARD OF ACCOUNTS 22
RANDOLPH EASTERN SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
Criteria
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
2 CFR 200.403 states in part:
"Except where otherwise authorized by statute, costs must meet the following general criteria
in order to be allowable under Federal awards:
(a) Be necessary and reasonable for the performance of the Federal award and be
allocable thereto under these principles.
(b) Conform to any limitations or exclusions set forth in these principles or in the Federal
award as to types or amount of cost items. . . .
(g) Be adequately documented. . . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation.
Embedded within a properly designed and implemented internal control system should be internal controls
consisting of policies and procedures. Policies reflect the School Corporation's management statements
of what should be done to effect internal controls, and procedures should consist of actions that would
implement these policies.
Effect
Without the proper implementation of an effectively designed system of internal controls, the
internal control system cannot be capable of effectively preventing, or detecting and correcting, material
noncompliance. As a result, costs for trash removal were incorrectly charged to the food service program.
Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of
the federal award could result in the loss of future federal funding to the School Corporation.
Questioned Costs
Known questioned costs of $15,448 were identified as detailed in the Condition and Context.
Recommendation
We recommended the School Corporation's management establish a proper system of internal
controls and develop policies and procedures to ensure costs are adequately documented.
FINDING 2023-006
Subject: Child Nutrition Cluster - Reporting
Federal Agency: Department of Agriculture
Federal Programs: School Breakfast Program, National School Lunch Program
Assistance Listings Numbers: 10.553, 10.555
Federal Award Numbers and Years (or Other Identifying Numbers): FY 2022, FY 2023
Pass-Through Entity: Indiana Department of Education
Compliance Requirement: Reporting
Audit Findings: Material Weakness, Other Matters
Condition and Context
The School Corporation had not properly designed or implemented a system of internal controls
which would include appropriate segregation of duties that would likely be effective in preventing, or
detecting and correcting, noncompliance related to the monthly reimbursement claims.
Meal count reports were run from the School Corporation's meal software system on a monthly
basis. The reports were then utilized by the Food Service Director or the Food Service Secretary to prepare
the monthly claims for reimbursement. There was no documented review or oversight process over the
monthly claims for reimbursement to prevent, or detect and correct, errors.
Of the four monthly claims for reimbursement selected for testing, two included overstatements in
the number of meal counts used for reimbursement purposes when compared to the supporting documentation.
The lack of internal controls and noncompliance were systemic issues during the audit period.
Criteria
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
7 CFR 210.8(a) states in part: "The school food authority shall establish internal controls which
ensure the accuracy of meal counts prior to submission of the monthly Claim for Reimbursement. . . ."
INDIANA STATE BOARD OF ACCOUNTS
24
RANDOLPH EASTERN SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
7 CFR 210.7(c)(1) states in part:
"Lunch count system. To ensure that the Claim for Reimbursement accurately reflects the
number of lunches and meal supplements served to eligible children, the school food authority
shall, at a minimum: . . .
(iii) Base Claims for Reimbursement on lunch counts, taken daily at the point of service,
which correctly identify the number of free, reduce price and paid lunches served to
eligible children;
(iv) Correctly record, consolidate and report those lunch and supplement counts on the
Claim for Reimbursement; . . ."
7 CFR 220.11(b) states in part: "Claims for Reimbursement shall include data in sufficient detail to
justify the reimbursement claimed . . ."
7 CFR 220.11(d) states in part: "The school food authority shall establish internal controls which
ensure the accuracy of breakfast counts prior to submission of the monthly Claim for Reimbursement. . . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation.
Embedded within a properly designed and implemented internal control system should be internal controls
consisting of policies and procedures. Policies reflect the School Corporation's management statements
of what should be done to effect internal controls, and procedures should consist of actions that would
implement these policies.
Effect
Without the proper implementation of an effectively designed system of internal controls, the
internal control system cannot be capable of effectively preventing, or detecting and correcting, material
noncompliance. As a result, reimbursement claims were not supported by the underlying records.
Noncompliance with the grant agreement and the Reporting compliance requirement could result
in the loss of future federal funds to the School Corporation.
Questioned Costs
There were no questioned costs identified.
Recommendation
We recommended that the School Corporation's management establish a proper system of internal
controls and develop policies and procedures to ensure meal counts are correctly reported.
Views of Responsible Officials
For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-006
Subject: Child Nutrition Cluster - Reporting
Federal Agency: Department of Agriculture
Federal Programs: School Breakfast Program, National School Lunch Program
Assistance Listings Numbers: 10.553, 10.555
Federal Award Numbers and Years (or Other Identifying Numbers): FY 2022, FY 2023
Pass-Through Entity: Indiana Department of Education
Compliance Requirement: Reporting
Audit Findings: Material Weakness, Other Matters
Condition and Context
The School Corporation had not properly designed or implemented a system of internal controls
which would include appropriate segregation of duties that would likely be effective in preventing, or
detecting and correcting, noncompliance related to the monthly reimbursement claims.
Meal count reports were run from the School Corporation's meal software system on a monthly
basis. The reports were then utilized by the Food Service Director or the Food Service Secretary to prepare
the monthly claims for reimbursement. There was no documented review or oversight process over the
monthly claims for reimbursement to prevent, or detect and correct, errors.
Of the four monthly claims for reimbursement selected for testing, two included overstatements in
the number of meal counts used for reimbursement purposes when compared to the supporting documentation.
The lack of internal controls and noncompliance were systemic issues during the audit period.
Criteria
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
7 CFR 210.8(a) states in part: "The school food authority shall establish internal controls which
ensure the accuracy of meal counts prior to submission of the monthly Claim for Reimbursement. . . ."
INDIANA STATE BOARD OF ACCOUNTS
24
RANDOLPH EASTERN SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
7 CFR 210.7(c)(1) states in part:
"Lunch count system. To ensure that the Claim for Reimbursement accurately reflects the
number of lunches and meal supplements served to eligible children, the school food authority
shall, at a minimum: . . .
(iii) Base Claims for Reimbursement on lunch counts, taken daily at the point of service,
which correctly identify the number of free, reduce price and paid lunches served to
eligible children;
(iv) Correctly record, consolidate and report those lunch and supplement counts on the
Claim for Reimbursement; . . ."
7 CFR 220.11(b) states in part: "Claims for Reimbursement shall include data in sufficient detail to
justify the reimbursement claimed . . ."
7 CFR 220.11(d) states in part: "The school food authority shall establish internal controls which
ensure the accuracy of breakfast counts prior to submission of the monthly Claim for Reimbursement. . . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation.
Embedded within a properly designed and implemented internal control system should be internal controls
consisting of policies and procedures. Policies reflect the School Corporation's management statements
of what should be done to effect internal controls, and procedures should consist of actions that would
implement these policies.
Effect
Without the proper implementation of an effectively designed system of internal controls, the
internal control system cannot be capable of effectively preventing, or detecting and correcting, material
noncompliance. As a result, reimbursement claims were not supported by the underlying records.
Noncompliance with the grant agreement and the Reporting compliance requirement could result
in the loss of future federal funds to the School Corporation.
Questioned Costs
There were no questioned costs identified.
Recommendation
We recommended that the School Corporation's management establish a proper system of internal
controls and develop policies and procedures to ensure meal counts are correctly reported.
Views of Responsible Officials
For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-006
Subject: Child Nutrition Cluster - Reporting
Federal Agency: Department of Agriculture
Federal Programs: School Breakfast Program, National School Lunch Program
Assistance Listings Numbers: 10.553, 10.555
Federal Award Numbers and Years (or Other Identifying Numbers): FY 2022, FY 2023
Pass-Through Entity: Indiana Department of Education
Compliance Requirement: Reporting
Audit Findings: Material Weakness, Other Matters
Condition and Context
The School Corporation had not properly designed or implemented a system of internal controls
which would include appropriate segregation of duties that would likely be effective in preventing, or
detecting and correcting, noncompliance related to the monthly reimbursement claims.
Meal count reports were run from the School Corporation's meal software system on a monthly
basis. The reports were then utilized by the Food Service Director or the Food Service Secretary to prepare
the monthly claims for reimbursement. There was no documented review or oversight process over the
monthly claims for reimbursement to prevent, or detect and correct, errors.
Of the four monthly claims for reimbursement selected for testing, two included overstatements in
the number of meal counts used for reimbursement purposes when compared to the supporting documentation.
The lack of internal controls and noncompliance were systemic issues during the audit period.
Criteria
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
7 CFR 210.8(a) states in part: "The school food authority shall establish internal controls which
ensure the accuracy of meal counts prior to submission of the monthly Claim for Reimbursement. . . ."
INDIANA STATE BOARD OF ACCOUNTS
24
RANDOLPH EASTERN SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
7 CFR 210.7(c)(1) states in part:
"Lunch count system. To ensure that the Claim for Reimbursement accurately reflects the
number of lunches and meal supplements served to eligible children, the school food authority
shall, at a minimum: . . .
(iii) Base Claims for Reimbursement on lunch counts, taken daily at the point of service,
which correctly identify the number of free, reduce price and paid lunches served to
eligible children;
(iv) Correctly record, consolidate and report those lunch and supplement counts on the
Claim for Reimbursement; . . ."
7 CFR 220.11(b) states in part: "Claims for Reimbursement shall include data in sufficient detail to
justify the reimbursement claimed . . ."
7 CFR 220.11(d) states in part: "The school food authority shall establish internal controls which
ensure the accuracy of breakfast counts prior to submission of the monthly Claim for Reimbursement. . . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation.
Embedded within a properly designed and implemented internal control system should be internal controls
consisting of policies and procedures. Policies reflect the School Corporation's management statements
of what should be done to effect internal controls, and procedures should consist of actions that would
implement these policies.
Effect
Without the proper implementation of an effectively designed system of internal controls, the
internal control system cannot be capable of effectively preventing, or detecting and correcting, material
noncompliance. As a result, reimbursement claims were not supported by the underlying records.
Noncompliance with the grant agreement and the Reporting compliance requirement could result
in the loss of future federal funds to the School Corporation.
Questioned Costs
There were no questioned costs identified.
Recommendation
We recommended that the School Corporation's management establish a proper system of internal
controls and develop policies and procedures to ensure meal counts are correctly reported.
Views of Responsible Officials
For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-006
Subject: Child Nutrition Cluster - Reporting
Federal Agency: Department of Agriculture
Federal Programs: School Breakfast Program, National School Lunch Program
Assistance Listings Numbers: 10.553, 10.555
Federal Award Numbers and Years (or Other Identifying Numbers): FY 2022, FY 2023
Pass-Through Entity: Indiana Department of Education
Compliance Requirement: Reporting
Audit Findings: Material Weakness, Other Matters
Condition and Context
The School Corporation had not properly designed or implemented a system of internal controls
which would include appropriate segregation of duties that would likely be effective in preventing, or
detecting and correcting, noncompliance related to the monthly reimbursement claims.
Meal count reports were run from the School Corporation's meal software system on a monthly
basis. The reports were then utilized by the Food Service Director or the Food Service Secretary to prepare
the monthly claims for reimbursement. There was no documented review or oversight process over the
monthly claims for reimbursement to prevent, or detect and correct, errors.
Of the four monthly claims for reimbursement selected for testing, two included overstatements in
the number of meal counts used for reimbursement purposes when compared to the supporting documentation.
The lack of internal controls and noncompliance were systemic issues during the audit period.
Criteria
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
7 CFR 210.8(a) states in part: "The school food authority shall establish internal controls which
ensure the accuracy of meal counts prior to submission of the monthly Claim for Reimbursement. . . ."
INDIANA STATE BOARD OF ACCOUNTS
24
RANDOLPH EASTERN SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
7 CFR 210.7(c)(1) states in part:
"Lunch count system. To ensure that the Claim for Reimbursement accurately reflects the
number of lunches and meal supplements served to eligible children, the school food authority
shall, at a minimum: . . .
(iii) Base Claims for Reimbursement on lunch counts, taken daily at the point of service,
which correctly identify the number of free, reduce price and paid lunches served to
eligible children;
(iv) Correctly record, consolidate and report those lunch and supplement counts on the
Claim for Reimbursement; . . ."
7 CFR 220.11(b) states in part: "Claims for Reimbursement shall include data in sufficient detail to
justify the reimbursement claimed . . ."
7 CFR 220.11(d) states in part: "The school food authority shall establish internal controls which
ensure the accuracy of breakfast counts prior to submission of the monthly Claim for Reimbursement. . . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation.
Embedded within a properly designed and implemented internal control system should be internal controls
consisting of policies and procedures. Policies reflect the School Corporation's management statements
of what should be done to effect internal controls, and procedures should consist of actions that would
implement these policies.
Effect
Without the proper implementation of an effectively designed system of internal controls, the
internal control system cannot be capable of effectively preventing, or detecting and correcting, material
noncompliance. As a result, reimbursement claims were not supported by the underlying records.
Noncompliance with the grant agreement and the Reporting compliance requirement could result
in the loss of future federal funds to the School Corporation.
Questioned Costs
There were no questioned costs identified.
Recommendation
We recommended that the School Corporation's management establish a proper system of internal
controls and develop policies and procedures to ensure meal counts are correctly reported.
Views of Responsible Officials
For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-007
Subject: Child Nutrition Cluster - Special Tests and Provisions -
Non-Profit School Food Service Accounts
Federal Agency: Department of Agriculture
Federal Programs: School Breakfast Program, National School Lunch Program,
Summer Food Service Program for Children
Assistance Listings Numbers: 10.553, 10.555, 10.559
Federal Award Numbers and Years (or Other Identifying Numbers): FY 2022, FY 2023
Pass-Through Entity: Indiana Department of Education
Compliance Requirement: Special Tests and Provisions - Non-Profit School Food Service Accounts
Audit Finding: Material Weakness
Condition and Context
The School Corporation had not properly designed or implemented a system of internal controls
which would include appropriate segregation of duties that would likely be effective in preventing, or
detecting and correcting, noncompliance.
All revenues and expenditures of the non-profit school food service account are to be accounted
for in accordance with state and federal requirements. As such, separate accounting is to be made for the
school food service, federal reimbursements are to be correctly credited to the food service account, and
transfers out of the school food service account are to be for allowable costs of the school food service.
One individual received notification of deposit, receipted funds into accounting software, and
prepared bank reconciliations. There was no documented review of the receipt of monthly meal
reimbursements by a second individual not involved in the original receipt process.
The lack of internal controls was a systemic issue during the audit period.
Criteria
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation,
which would include appropriate segregation of duties. Embedded within a properly designed and
implemented internal control system should be internal controls consisting of policies and procedures.
Policies reflect the School Corporation's management statements of what should be done to effect internal
controls, and procedures should consist of actions that would implement these policies.
INDIANA STATE BOARD OF ACCOUNTS
26
RANDOLPH EASTERN SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
Effect
Without the proper implementation of an effectively designed system of internal controls, the
internal control system cannot be capable of effectively preventing, or detecting and correcting, material
noncompliance.
Questioned Costs
There were no questioned costs identified.
Recommendation
We recommended that the School Corporation's management design and implement a proper
system of internal controls, including policies and procedures that would provide segregation of duties to
ensure appropriate reviews, approvals, and oversight are taking place.
Views of Responsible Officials
For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-007
Subject: Child Nutrition Cluster - Special Tests and Provisions -
Non-Profit School Food Service Accounts
Federal Agency: Department of Agriculture
Federal Programs: School Breakfast Program, National School Lunch Program,
Summer Food Service Program for Children
Assistance Listings Numbers: 10.553, 10.555, 10.559
Federal Award Numbers and Years (or Other Identifying Numbers): FY 2022, FY 2023
Pass-Through Entity: Indiana Department of Education
Compliance Requirement: Special Tests and Provisions - Non-Profit School Food Service Accounts
Audit Finding: Material Weakness
Condition and Context
The School Corporation had not properly designed or implemented a system of internal controls
which would include appropriate segregation of duties that would likely be effective in preventing, or
detecting and correcting, noncompliance.
All revenues and expenditures of the non-profit school food service account are to be accounted
for in accordance with state and federal requirements. As such, separate accounting is to be made for the
school food service, federal reimbursements are to be correctly credited to the food service account, and
transfers out of the school food service account are to be for allowable costs of the school food service.
One individual received notification of deposit, receipted funds into accounting software, and
prepared bank reconciliations. There was no documented review of the receipt of monthly meal
reimbursements by a second individual not involved in the original receipt process.
The lack of internal controls was a systemic issue during the audit period.
Criteria
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation,
which would include appropriate segregation of duties. Embedded within a properly designed and
implemented internal control system should be internal controls consisting of policies and procedures.
Policies reflect the School Corporation's management statements of what should be done to effect internal
controls, and procedures should consist of actions that would implement these policies.
INDIANA STATE BOARD OF ACCOUNTS
26
RANDOLPH EASTERN SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
Effect
Without the proper implementation of an effectively designed system of internal controls, the
internal control system cannot be capable of effectively preventing, or detecting and correcting, material
noncompliance.
Questioned Costs
There were no questioned costs identified.
Recommendation
We recommended that the School Corporation's management design and implement a proper
system of internal controls, including policies and procedures that would provide segregation of duties to
ensure appropriate reviews, approvals, and oversight are taking place.
Views of Responsible Officials
For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-007
Subject: Child Nutrition Cluster - Special Tests and Provisions -
Non-Profit School Food Service Accounts
Federal Agency: Department of Agriculture
Federal Programs: School Breakfast Program, National School Lunch Program,
Summer Food Service Program for Children
Assistance Listings Numbers: 10.553, 10.555, 10.559
Federal Award Numbers and Years (or Other Identifying Numbers): FY 2022, FY 2023
Pass-Through Entity: Indiana Department of Education
Compliance Requirement: Special Tests and Provisions - Non-Profit School Food Service Accounts
Audit Finding: Material Weakness
Condition and Context
The School Corporation had not properly designed or implemented a system of internal controls
which would include appropriate segregation of duties that would likely be effective in preventing, or
detecting and correcting, noncompliance.
All revenues and expenditures of the non-profit school food service account are to be accounted
for in accordance with state and federal requirements. As such, separate accounting is to be made for the
school food service, federal reimbursements are to be correctly credited to the food service account, and
transfers out of the school food service account are to be for allowable costs of the school food service.
One individual received notification of deposit, receipted funds into accounting software, and
prepared bank reconciliations. There was no documented review of the receipt of monthly meal
reimbursements by a second individual not involved in the original receipt process.
The lack of internal controls was a systemic issue during the audit period.
Criteria
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation,
which would include appropriate segregation of duties. Embedded within a properly designed and
implemented internal control system should be internal controls consisting of policies and procedures.
Policies reflect the School Corporation's management statements of what should be done to effect internal
controls, and procedures should consist of actions that would implement these policies.
INDIANA STATE BOARD OF ACCOUNTS
26
RANDOLPH EASTERN SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
Effect
Without the proper implementation of an effectively designed system of internal controls, the
internal control system cannot be capable of effectively preventing, or detecting and correcting, material
noncompliance.
Questioned Costs
There were no questioned costs identified.
Recommendation
We recommended that the School Corporation's management design and implement a proper
system of internal controls, including policies and procedures that would provide segregation of duties to
ensure appropriate reviews, approvals, and oversight are taking place.
Views of Responsible Officials
For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-007
Subject: Child Nutrition Cluster - Special Tests and Provisions -
Non-Profit School Food Service Accounts
Federal Agency: Department of Agriculture
Federal Programs: School Breakfast Program, National School Lunch Program,
Summer Food Service Program for Children
Assistance Listings Numbers: 10.553, 10.555, 10.559
Federal Award Numbers and Years (or Other Identifying Numbers): FY 2022, FY 2023
Pass-Through Entity: Indiana Department of Education
Compliance Requirement: Special Tests and Provisions - Non-Profit School Food Service Accounts
Audit Finding: Material Weakness
Condition and Context
The School Corporation had not properly designed or implemented a system of internal controls
which would include appropriate segregation of duties that would likely be effective in preventing, or
detecting and correcting, noncompliance.
All revenues and expenditures of the non-profit school food service account are to be accounted
for in accordance with state and federal requirements. As such, separate accounting is to be made for the
school food service, federal reimbursements are to be correctly credited to the food service account, and
transfers out of the school food service account are to be for allowable costs of the school food service.
One individual received notification of deposit, receipted funds into accounting software, and
prepared bank reconciliations. There was no documented review of the receipt of monthly meal
reimbursements by a second individual not involved in the original receipt process.
The lack of internal controls was a systemic issue during the audit period.
Criteria
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation,
which would include appropriate segregation of duties. Embedded within a properly designed and
implemented internal control system should be internal controls consisting of policies and procedures.
Policies reflect the School Corporation's management statements of what should be done to effect internal
controls, and procedures should consist of actions that would implement these policies.
INDIANA STATE BOARD OF ACCOUNTS
26
RANDOLPH EASTERN SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
Effect
Without the proper implementation of an effectively designed system of internal controls, the
internal control system cannot be capable of effectively preventing, or detecting and correcting, material
noncompliance.
Questioned Costs
There were no questioned costs identified.
Recommendation
We recommended that the School Corporation's management design and implement a proper
system of internal controls, including policies and procedures that would provide segregation of duties to
ensure appropriate reviews, approvals, and oversight are taking place.
Views of Responsible Officials
For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-007
Subject: Child Nutrition Cluster - Special Tests and Provisions -
Non-Profit School Food Service Accounts
Federal Agency: Department of Agriculture
Federal Programs: School Breakfast Program, National School Lunch Program,
Summer Food Service Program for Children
Assistance Listings Numbers: 10.553, 10.555, 10.559
Federal Award Numbers and Years (or Other Identifying Numbers): FY 2022, FY 2023
Pass-Through Entity: Indiana Department of Education
Compliance Requirement: Special Tests and Provisions - Non-Profit School Food Service Accounts
Audit Finding: Material Weakness
Condition and Context
The School Corporation had not properly designed or implemented a system of internal controls
which would include appropriate segregation of duties that would likely be effective in preventing, or
detecting and correcting, noncompliance.
All revenues and expenditures of the non-profit school food service account are to be accounted
for in accordance with state and federal requirements. As such, separate accounting is to be made for the
school food service, federal reimbursements are to be correctly credited to the food service account, and
transfers out of the school food service account are to be for allowable costs of the school food service.
One individual received notification of deposit, receipted funds into accounting software, and
prepared bank reconciliations. There was no documented review of the receipt of monthly meal
reimbursements by a second individual not involved in the original receipt process.
The lack of internal controls was a systemic issue during the audit period.
Criteria
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation,
which would include appropriate segregation of duties. Embedded within a properly designed and
implemented internal control system should be internal controls consisting of policies and procedures.
Policies reflect the School Corporation's management statements of what should be done to effect internal
controls, and procedures should consist of actions that would implement these policies.
INDIANA STATE BOARD OF ACCOUNTS
26
RANDOLPH EASTERN SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
Effect
Without the proper implementation of an effectively designed system of internal controls, the
internal control system cannot be capable of effectively preventing, or detecting and correcting, material
noncompliance.
Questioned Costs
There were no questioned costs identified.
Recommendation
We recommended that the School Corporation's management design and implement a proper
system of internal controls, including policies and procedures that would provide segregation of duties to
ensure appropriate reviews, approvals, and oversight are taking place.
Views of Responsible Officials
For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-008
Subject: COVID-19 - Education Stabilization Fund - Special Tests
and Provisions - Wage Rate Requirements
Federal Agency: Indiana Department of Education
Federal Program: COVID-19 - Education Stabilization Fund
Assistance Listings Numbers: 84.425U, 84.425C
Federal Award Numbers and Years (or Other Identifying Numbers): S425C200018; S425U2100013
Pass-Through Entity: Indiana Department of Education
Compliance Requirement: Special Tests and Provisions - Wage Rate Requirements
Audit Findings: Material Weakness, Modified Opinion
Condition and Context
Construction contracts in excess of $2,000 financed by federal assistance funds must pay wages
not less than those established for the locality of the project (prevailing wage rates) by the Department of
Labor (DOL) to their laborers and mechanics. Nonfederal entities are to include in their construction
contracts subject to the Wage Rate Requirements a provision that the contractor or subcontractor comply
with these requirements and the DOL regulations. This would include a requirement to submit a copy of
the payroll and statement of compliance to the entity for each week in which contract work was performed.
The School Corporation had not designed nor implemented a system of internal controls to ensure
that construction contracts in excess of $2,000 paid from federal grant funds included a prevailing wage
rate clause. Nine construction contracts, totaling $113,571, were paid for with the COVID-19 - Education
Stabilization Fund award during the audit period. All nine contracts were selected for testing. None of the
contracts included the required prevailing wage rate clause nor were the associated certified payrolls and
statements of compliance obtained.
The lack of internal controls and noncompliance were systemic issues throughout the audit period.
INDIANA STATE BOARD OF ACCOUNTS
27
RANDOLPH EASTERN SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
29 CFR 5.5 states in part:
"(a) The Agency head shall cause or require the contracting officer to insert in full in any
contract in excess of $2,000 which is entered into for the actual construction, alteration and/or
repair, including painting and decorating, of a public building or public work, or building or work
financed in whole or in part from Federal funds or in accordance with guarantees of a Federal
agency or financed from funds obtained by pledge of any contract of a Federal agency to make
a loan, grant or annual contribution (except where a different meaning is expressly indicated),
and which is subject to the labor standards provisions of any of the acts listed in § 5.1, the
following clauses . . .
(1) Minimum wages.
(i) All laborers and mechanics employed or working upon the site of the work (or
under the United States Housing Act of 1937 or under the Housing Act of 1949 in the
construction or development of the project), will be paid unconditionally and not less
often than once a week, and without subsequent deduction or rebate on any account
(except such payroll deductions as are permitted by regulations issued by the
Secretary of Labor under the Copeland Act (29 CFR part 3)), the full amount of wages
and bona fide fringe benefits (or cash equivalents thereof) due at time of payment
computed at rates not less than those contained in the wage determination of the
Secretary of Labor which is attached hereto and made a part hereof, regardless of any
contractual relationship which may be alleged to exist between the contractor and such
laborers and mechanics. . . .
(3) Payrolls and basic records. . . .
(i)
(A) The contractor shall submit weekly for each week in which any contract work
is performed a copy of all payrolls to the (write in name of appropriate federal
agency) if the agency is a party to the contract, but if the agency is not such a
party, the contractor will submit the payrolls to the applicant, sponsor, or
owner, as the case may be, for transmission to the (write in name of agency).
. . ."
2 CFR 200 Appendix II states in part:
"In addition to other provisions required by the Federal agency or non-Federal entity; all
contracts made by the non-Federal entity under the Federal award must contain provisions
covering the following, as applicable. . . .
INDIANA STATE BOARD OF ACCOUNTS
28
RANDOLPH EASTERN SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
(D) Davis-Bacon Act, as amended (40 U.S.C. 3141-3148). When required by Federal
program legislation, all prime construction contracts in excess of $2,000 awarded by
nonFederal entities must include a provision for compliance with the Davis-Bacon Act
(40 U.S.C. 3141-3144, and 3146-3148) as supplemented by Department of Labor
regulations (29 CFR Part 5, 'Labor Standards Provisions Applicable to Contracts Covering
Federally Financed and Assisted Construction'). In accordance with the statute, contractors
must be required to pay wages to laborers and mechanics at a rate not less than the
prevailing wages specified in a wage determination made by the Secretary of Labor. In
addition, contractors must be required to pay wages not less than once a week. . . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation,
which would include segregation of key functions. Embedded within a properly designed and implemented
internal control system should be internal controls consisting of policies and procedures. Policies reflect
the School Corporation's management statements of what should be done to effect internal controls, and
procedures should consist of actions that would implement these policies.
Effect
Without the proper implementation of an effectively designed system of internal controls, the
internal control system cannot be capable of effectively preventing, or detecting and correcting, material
noncompliance. As a result, construction contracts entered into did not contain the required wage rate
requirements clauses nor were certified payrolls obtained by the School Corporation.
Noncompliance with the grant agreement and the compliance requirement could result in the loss
of future federal funds to the School Corporation.
Questioned Costs
There were no questioned costs identified.
Recommendation
We recommended that the School Corporation's management establish a system of internal
controls and include the wage rate requirement clause in construction contracts. In addition, certified
payrolls should be obtained as required.
Views of Responsible Officials
For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-008
Subject: COVID-19 - Education Stabilization Fund - Special Tests
and Provisions - Wage Rate Requirements
Federal Agency: Indiana Department of Education
Federal Program: COVID-19 - Education Stabilization Fund
Assistance Listings Numbers: 84.425U, 84.425C
Federal Award Numbers and Years (or Other Identifying Numbers): S425C200018; S425U2100013
Pass-Through Entity: Indiana Department of Education
Compliance Requirement: Special Tests and Provisions - Wage Rate Requirements
Audit Findings: Material Weakness, Modified Opinion
Condition and Context
Construction contracts in excess of $2,000 financed by federal assistance funds must pay wages
not less than those established for the locality of the project (prevailing wage rates) by the Department of
Labor (DOL) to their laborers and mechanics. Nonfederal entities are to include in their construction
contracts subject to the Wage Rate Requirements a provision that the contractor or subcontractor comply
with these requirements and the DOL regulations. This would include a requirement to submit a copy of
the payroll and statement of compliance to the entity for each week in which contract work was performed.
The School Corporation had not designed nor implemented a system of internal controls to ensure
that construction contracts in excess of $2,000 paid from federal grant funds included a prevailing wage
rate clause. Nine construction contracts, totaling $113,571, were paid for with the COVID-19 - Education
Stabilization Fund award during the audit period. All nine contracts were selected for testing. None of the
contracts included the required prevailing wage rate clause nor were the associated certified payrolls and
statements of compliance obtained.
The lack of internal controls and noncompliance were systemic issues throughout the audit period.
INDIANA STATE BOARD OF ACCOUNTS
27
RANDOLPH EASTERN SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
29 CFR 5.5 states in part:
"(a) The Agency head shall cause or require the contracting officer to insert in full in any
contract in excess of $2,000 which is entered into for the actual construction, alteration and/or
repair, including painting and decorating, of a public building or public work, or building or work
financed in whole or in part from Federal funds or in accordance with guarantees of a Federal
agency or financed from funds obtained by pledge of any contract of a Federal agency to make
a loan, grant or annual contribution (except where a different meaning is expressly indicated),
and which is subject to the labor standards provisions of any of the acts listed in § 5.1, the
following clauses . . .
(1) Minimum wages.
(i) All laborers and mechanics employed or working upon the site of the work (or
under the United States Housing Act of 1937 or under the Housing Act of 1949 in the
construction or development of the project), will be paid unconditionally and not less
often than once a week, and without subsequent deduction or rebate on any account
(except such payroll deductions as are permitted by regulations issued by the
Secretary of Labor under the Copeland Act (29 CFR part 3)), the full amount of wages
and bona fide fringe benefits (or cash equivalents thereof) due at time of payment
computed at rates not less than those contained in the wage determination of the
Secretary of Labor which is attached hereto and made a part hereof, regardless of any
contractual relationship which may be alleged to exist between the contractor and such
laborers and mechanics. . . .
(3) Payrolls and basic records. . . .
(i)
(A) The contractor shall submit weekly for each week in which any contract work
is performed a copy of all payrolls to the (write in name of appropriate federal
agency) if the agency is a party to the contract, but if the agency is not such a
party, the contractor will submit the payrolls to the applicant, sponsor, or
owner, as the case may be, for transmission to the (write in name of agency).
. . ."
2 CFR 200 Appendix II states in part:
"In addition to other provisions required by the Federal agency or non-Federal entity; all
contracts made by the non-Federal entity under the Federal award must contain provisions
covering the following, as applicable. . . .
INDIANA STATE BOARD OF ACCOUNTS
28
RANDOLPH EASTERN SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
(D) Davis-Bacon Act, as amended (40 U.S.C. 3141-3148). When required by Federal
program legislation, all prime construction contracts in excess of $2,000 awarded by
nonFederal entities must include a provision for compliance with the Davis-Bacon Act
(40 U.S.C. 3141-3144, and 3146-3148) as supplemented by Department of Labor
regulations (29 CFR Part 5, 'Labor Standards Provisions Applicable to Contracts Covering
Federally Financed and Assisted Construction'). In accordance with the statute, contractors
must be required to pay wages to laborers and mechanics at a rate not less than the
prevailing wages specified in a wage determination made by the Secretary of Labor. In
addition, contractors must be required to pay wages not less than once a week. . . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation,
which would include segregation of key functions. Embedded within a properly designed and implemented
internal control system should be internal controls consisting of policies and procedures. Policies reflect
the School Corporation's management statements of what should be done to effect internal controls, and
procedures should consist of actions that would implement these policies.
Effect
Without the proper implementation of an effectively designed system of internal controls, the
internal control system cannot be capable of effectively preventing, or detecting and correcting, material
noncompliance. As a result, construction contracts entered into did not contain the required wage rate
requirements clauses nor were certified payrolls obtained by the School Corporation.
Noncompliance with the grant agreement and the compliance requirement could result in the loss
of future federal funds to the School Corporation.
Questioned Costs
There were no questioned costs identified.
Recommendation
We recommended that the School Corporation's management establish a system of internal
controls and include the wage rate requirement clause in construction contracts. In addition, certified
payrolls should be obtained as required.
Views of Responsible Officials
For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-008
Subject: COVID-19 - Education Stabilization Fund - Special Tests
and Provisions - Wage Rate Requirements
Federal Agency: Indiana Department of Education
Federal Program: COVID-19 - Education Stabilization Fund
Assistance Listings Numbers: 84.425U, 84.425C
Federal Award Numbers and Years (or Other Identifying Numbers): S425C200018; S425U2100013
Pass-Through Entity: Indiana Department of Education
Compliance Requirement: Special Tests and Provisions - Wage Rate Requirements
Audit Findings: Material Weakness, Modified Opinion
Condition and Context
Construction contracts in excess of $2,000 financed by federal assistance funds must pay wages
not less than those established for the locality of the project (prevailing wage rates) by the Department of
Labor (DOL) to their laborers and mechanics. Nonfederal entities are to include in their construction
contracts subject to the Wage Rate Requirements a provision that the contractor or subcontractor comply
with these requirements and the DOL regulations. This would include a requirement to submit a copy of
the payroll and statement of compliance to the entity for each week in which contract work was performed.
The School Corporation had not designed nor implemented a system of internal controls to ensure
that construction contracts in excess of $2,000 paid from federal grant funds included a prevailing wage
rate clause. Nine construction contracts, totaling $113,571, were paid for with the COVID-19 - Education
Stabilization Fund award during the audit period. All nine contracts were selected for testing. None of the
contracts included the required prevailing wage rate clause nor were the associated certified payrolls and
statements of compliance obtained.
The lack of internal controls and noncompliance were systemic issues throughout the audit period.
INDIANA STATE BOARD OF ACCOUNTS
27
RANDOLPH EASTERN SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
29 CFR 5.5 states in part:
"(a) The Agency head shall cause or require the contracting officer to insert in full in any
contract in excess of $2,000 which is entered into for the actual construction, alteration and/or
repair, including painting and decorating, of a public building or public work, or building or work
financed in whole or in part from Federal funds or in accordance with guarantees of a Federal
agency or financed from funds obtained by pledge of any contract of a Federal agency to make
a loan, grant or annual contribution (except where a different meaning is expressly indicated),
and which is subject to the labor standards provisions of any of the acts listed in § 5.1, the
following clauses . . .
(1) Minimum wages.
(i) All laborers and mechanics employed or working upon the site of the work (or
under the United States Housing Act of 1937 or under the Housing Act of 1949 in the
construction or development of the project), will be paid unconditionally and not less
often than once a week, and without subsequent deduction or rebate on any account
(except such payroll deductions as are permitted by regulations issued by the
Secretary of Labor under the Copeland Act (29 CFR part 3)), the full amount of wages
and bona fide fringe benefits (or cash equivalents thereof) due at time of payment
computed at rates not less than those contained in the wage determination of the
Secretary of Labor which is attached hereto and made a part hereof, regardless of any
contractual relationship which may be alleged to exist between the contractor and such
laborers and mechanics. . . .
(3) Payrolls and basic records. . . .
(i)
(A) The contractor shall submit weekly for each week in which any contract work
is performed a copy of all payrolls to the (write in name of appropriate federal
agency) if the agency is a party to the contract, but if the agency is not such a
party, the contractor will submit the payrolls to the applicant, sponsor, or
owner, as the case may be, for transmission to the (write in name of agency).
. . ."
2 CFR 200 Appendix II states in part:
"In addition to other provisions required by the Federal agency or non-Federal entity; all
contracts made by the non-Federal entity under the Federal award must contain provisions
covering the following, as applicable. . . .
INDIANA STATE BOARD OF ACCOUNTS
28
RANDOLPH EASTERN SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
(D) Davis-Bacon Act, as amended (40 U.S.C. 3141-3148). When required by Federal
program legislation, all prime construction contracts in excess of $2,000 awarded by
nonFederal entities must include a provision for compliance with the Davis-Bacon Act
(40 U.S.C. 3141-3144, and 3146-3148) as supplemented by Department of Labor
regulations (29 CFR Part 5, 'Labor Standards Provisions Applicable to Contracts Covering
Federally Financed and Assisted Construction'). In accordance with the statute, contractors
must be required to pay wages to laborers and mechanics at a rate not less than the
prevailing wages specified in a wage determination made by the Secretary of Labor. In
addition, contractors must be required to pay wages not less than once a week. . . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation,
which would include segregation of key functions. Embedded within a properly designed and implemented
internal control system should be internal controls consisting of policies and procedures. Policies reflect
the School Corporation's management statements of what should be done to effect internal controls, and
procedures should consist of actions that would implement these policies.
Effect
Without the proper implementation of an effectively designed system of internal controls, the
internal control system cannot be capable of effectively preventing, or detecting and correcting, material
noncompliance. As a result, construction contracts entered into did not contain the required wage rate
requirements clauses nor were certified payrolls obtained by the School Corporation.
Noncompliance with the grant agreement and the compliance requirement could result in the loss
of future federal funds to the School Corporation.
Questioned Costs
There were no questioned costs identified.
Recommendation
We recommended that the School Corporation's management establish a system of internal
controls and include the wage rate requirement clause in construction contracts. In addition, certified
payrolls should be obtained as required.
Views of Responsible Officials
For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-008
Subject: COVID-19 - Education Stabilization Fund - Special Tests
and Provisions - Wage Rate Requirements
Federal Agency: Indiana Department of Education
Federal Program: COVID-19 - Education Stabilization Fund
Assistance Listings Numbers: 84.425U, 84.425C
Federal Award Numbers and Years (or Other Identifying Numbers): S425C200018; S425U2100013
Pass-Through Entity: Indiana Department of Education
Compliance Requirement: Special Tests and Provisions - Wage Rate Requirements
Audit Findings: Material Weakness, Modified Opinion
Condition and Context
Construction contracts in excess of $2,000 financed by federal assistance funds must pay wages
not less than those established for the locality of the project (prevailing wage rates) by the Department of
Labor (DOL) to their laborers and mechanics. Nonfederal entities are to include in their construction
contracts subject to the Wage Rate Requirements a provision that the contractor or subcontractor comply
with these requirements and the DOL regulations. This would include a requirement to submit a copy of
the payroll and statement of compliance to the entity for each week in which contract work was performed.
The School Corporation had not designed nor implemented a system of internal controls to ensure
that construction contracts in excess of $2,000 paid from federal grant funds included a prevailing wage
rate clause. Nine construction contracts, totaling $113,571, were paid for with the COVID-19 - Education
Stabilization Fund award during the audit period. All nine contracts were selected for testing. None of the
contracts included the required prevailing wage rate clause nor were the associated certified payrolls and
statements of compliance obtained.
The lack of internal controls and noncompliance were systemic issues throughout the audit period.
INDIANA STATE BOARD OF ACCOUNTS
27
RANDOLPH EASTERN SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
29 CFR 5.5 states in part:
"(a) The Agency head shall cause or require the contracting officer to insert in full in any
contract in excess of $2,000 which is entered into for the actual construction, alteration and/or
repair, including painting and decorating, of a public building or public work, or building or work
financed in whole or in part from Federal funds or in accordance with guarantees of a Federal
agency or financed from funds obtained by pledge of any contract of a Federal agency to make
a loan, grant or annual contribution (except where a different meaning is expressly indicated),
and which is subject to the labor standards provisions of any of the acts listed in § 5.1, the
following clauses . . .
(1) Minimum wages.
(i) All laborers and mechanics employed or working upon the site of the work (or
under the United States Housing Act of 1937 or under the Housing Act of 1949 in the
construction or development of the project), will be paid unconditionally and not less
often than once a week, and without subsequent deduction or rebate on any account
(except such payroll deductions as are permitted by regulations issued by the
Secretary of Labor under the Copeland Act (29 CFR part 3)), the full amount of wages
and bona fide fringe benefits (or cash equivalents thereof) due at time of payment
computed at rates not less than those contained in the wage determination of the
Secretary of Labor which is attached hereto and made a part hereof, regardless of any
contractual relationship which may be alleged to exist between the contractor and such
laborers and mechanics. . . .
(3) Payrolls and basic records. . . .
(i)
(A) The contractor shall submit weekly for each week in which any contract work
is performed a copy of all payrolls to the (write in name of appropriate federal
agency) if the agency is a party to the contract, but if the agency is not such a
party, the contractor will submit the payrolls to the applicant, sponsor, or
owner, as the case may be, for transmission to the (write in name of agency).
. . ."
2 CFR 200 Appendix II states in part:
"In addition to other provisions required by the Federal agency or non-Federal entity; all
contracts made by the non-Federal entity under the Federal award must contain provisions
covering the following, as applicable. . . .
INDIANA STATE BOARD OF ACCOUNTS
28
RANDOLPH EASTERN SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
(D) Davis-Bacon Act, as amended (40 U.S.C. 3141-3148). When required by Federal
program legislation, all prime construction contracts in excess of $2,000 awarded by
nonFederal entities must include a provision for compliance with the Davis-Bacon Act
(40 U.S.C. 3141-3144, and 3146-3148) as supplemented by Department of Labor
regulations (29 CFR Part 5, 'Labor Standards Provisions Applicable to Contracts Covering
Federally Financed and Assisted Construction'). In accordance with the statute, contractors
must be required to pay wages to laborers and mechanics at a rate not less than the
prevailing wages specified in a wage determination made by the Secretary of Labor. In
addition, contractors must be required to pay wages not less than once a week. . . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation,
which would include segregation of key functions. Embedded within a properly designed and implemented
internal control system should be internal controls consisting of policies and procedures. Policies reflect
the School Corporation's management statements of what should be done to effect internal controls, and
procedures should consist of actions that would implement these policies.
Effect
Without the proper implementation of an effectively designed system of internal controls, the
internal control system cannot be capable of effectively preventing, or detecting and correcting, material
noncompliance. As a result, construction contracts entered into did not contain the required wage rate
requirements clauses nor were certified payrolls obtained by the School Corporation.
Noncompliance with the grant agreement and the compliance requirement could result in the loss
of future federal funds to the School Corporation.
Questioned Costs
There were no questioned costs identified.
Recommendation
We recommended that the School Corporation's management establish a system of internal
controls and include the wage rate requirement clause in construction contracts. In addition, certified
payrolls should be obtained as required.
Views of Responsible Officials
For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-008
Subject: COVID-19 - Education Stabilization Fund - Special Tests
and Provisions - Wage Rate Requirements
Federal Agency: Indiana Department of Education
Federal Program: COVID-19 - Education Stabilization Fund
Assistance Listings Numbers: 84.425U, 84.425C
Federal Award Numbers and Years (or Other Identifying Numbers): S425C200018; S425U2100013
Pass-Through Entity: Indiana Department of Education
Compliance Requirement: Special Tests and Provisions - Wage Rate Requirements
Audit Findings: Material Weakness, Modified Opinion
Condition and Context
Construction contracts in excess of $2,000 financed by federal assistance funds must pay wages
not less than those established for the locality of the project (prevailing wage rates) by the Department of
Labor (DOL) to their laborers and mechanics. Nonfederal entities are to include in their construction
contracts subject to the Wage Rate Requirements a provision that the contractor or subcontractor comply
with these requirements and the DOL regulations. This would include a requirement to submit a copy of
the payroll and statement of compliance to the entity for each week in which contract work was performed.
The School Corporation had not designed nor implemented a system of internal controls to ensure
that construction contracts in excess of $2,000 paid from federal grant funds included a prevailing wage
rate clause. Nine construction contracts, totaling $113,571, were paid for with the COVID-19 - Education
Stabilization Fund award during the audit period. All nine contracts were selected for testing. None of the
contracts included the required prevailing wage rate clause nor were the associated certified payrolls and
statements of compliance obtained.
The lack of internal controls and noncompliance were systemic issues throughout the audit period.
INDIANA STATE BOARD OF ACCOUNTS
27
RANDOLPH EASTERN SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
29 CFR 5.5 states in part:
"(a) The Agency head shall cause or require the contracting officer to insert in full in any
contract in excess of $2,000 which is entered into for the actual construction, alteration and/or
repair, including painting and decorating, of a public building or public work, or building or work
financed in whole or in part from Federal funds or in accordance with guarantees of a Federal
agency or financed from funds obtained by pledge of any contract of a Federal agency to make
a loan, grant or annual contribution (except where a different meaning is expressly indicated),
and which is subject to the labor standards provisions of any of the acts listed in § 5.1, the
following clauses . . .
(1) Minimum wages.
(i) All laborers and mechanics employed or working upon the site of the work (or
under the United States Housing Act of 1937 or under the Housing Act of 1949 in the
construction or development of the project), will be paid unconditionally and not less
often than once a week, and without subsequent deduction or rebate on any account
(except such payroll deductions as are permitted by regulations issued by the
Secretary of Labor under the Copeland Act (29 CFR part 3)), the full amount of wages
and bona fide fringe benefits (or cash equivalents thereof) due at time of payment
computed at rates not less than those contained in the wage determination of the
Secretary of Labor which is attached hereto and made a part hereof, regardless of any
contractual relationship which may be alleged to exist between the contractor and such
laborers and mechanics. . . .
(3) Payrolls and basic records. . . .
(i)
(A) The contractor shall submit weekly for each week in which any contract work
is performed a copy of all payrolls to the (write in name of appropriate federal
agency) if the agency is a party to the contract, but if the agency is not such a
party, the contractor will submit the payrolls to the applicant, sponsor, or
owner, as the case may be, for transmission to the (write in name of agency).
. . ."
2 CFR 200 Appendix II states in part:
"In addition to other provisions required by the Federal agency or non-Federal entity; all
contracts made by the non-Federal entity under the Federal award must contain provisions
covering the following, as applicable. . . .
INDIANA STATE BOARD OF ACCOUNTS
28
RANDOLPH EASTERN SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
(D) Davis-Bacon Act, as amended (40 U.S.C. 3141-3148). When required by Federal
program legislation, all prime construction contracts in excess of $2,000 awarded by
nonFederal entities must include a provision for compliance with the Davis-Bacon Act
(40 U.S.C. 3141-3144, and 3146-3148) as supplemented by Department of Labor
regulations (29 CFR Part 5, 'Labor Standards Provisions Applicable to Contracts Covering
Federally Financed and Assisted Construction'). In accordance with the statute, contractors
must be required to pay wages to laborers and mechanics at a rate not less than the
prevailing wages specified in a wage determination made by the Secretary of Labor. In
addition, contractors must be required to pay wages not less than once a week. . . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation,
which would include segregation of key functions. Embedded within a properly designed and implemented
internal control system should be internal controls consisting of policies and procedures. Policies reflect
the School Corporation's management statements of what should be done to effect internal controls, and
procedures should consist of actions that would implement these policies.
Effect
Without the proper implementation of an effectively designed system of internal controls, the
internal control system cannot be capable of effectively preventing, or detecting and correcting, material
noncompliance. As a result, construction contracts entered into did not contain the required wage rate
requirements clauses nor were certified payrolls obtained by the School Corporation.
Noncompliance with the grant agreement and the compliance requirement could result in the loss
of future federal funds to the School Corporation.
Questioned Costs
There were no questioned costs identified.
Recommendation
We recommended that the School Corporation's management establish a system of internal
controls and include the wage rate requirement clause in construction contracts. In addition, certified
payrolls should be obtained as required.
Views of Responsible Officials
For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-003
Subject: COVID-19 - Education Stabilization Fund - Equipment and Real Property Management
Federal Agency: Department of Education
Federal Program: COVID-19 - Education Stabilization Fund
Assistance Listings Numbers: 84.425D, 84.425U, 84.425C
Federal Award Numbers and Years (or Other Identifying Numbers): S425D200013, S425D210013,
S425U210013
Pass-Through Entity: Indiana Department of Education
Compliance Requirement: Equipment and Real Property Management
Audit Findings: Material Weakness, Modified Opinion
Condition and Context
The School Corporation had not properly designed or implemented a system of internal controls,
which would include appropriate segregation of duties, that would likely be effective in preventing, or
detecting and correcting, noncompliance. A property record or capital asset listing, which would include a
description of the property, a serial number or other identification number, the source of funding for the
property (including the federal award identification number (FAIN)), who holds title, the acquisition date,
cost of the property, percentage of federal participation in the project costs for the federal award under
which the property was acquired, the location, and use and condition of the property, is to be maintained
for assets purchased that exceed the School Corporation's capitalization threshold. In addition, a physical
inventory of all assets should be completed at least every two years.
The School Corporation purchased eight assets, totaling $131,205, which exceeded the School
Corporation's capitalization threshold. Two of the eight assets were selected for testing. Neither of the two
assets were determined to have property records, nor were the assets on the inventory listing. Additionally,
the School Corporation did not complete a capital asset inventory every two years as required.
The lack of internal controls and noncompliance were systemic issues throughout the audit period.
Criteria
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
2 CFR 200.313(d) states in part:
"Management requirements. Procedures for managing equipment (including replacement
equipment), whether acquired in whole or in part under a Federal award, until disposition takes
place will, as a minimum, meet the following requirements:
INDIANA STATE BOARD OF ACCOUNTS
19
RANDOLPH EASTERN SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
(1) Property records must be maintained that include a description of the property, a serial
number or other identification number, the source of funding for the property (including
the FAIN), who holds title, the acquisition date, and cost of the property, percentage of
Federal participation in the project costs for the Federal award under which the
property was acquired, the location, use and condition of the property, and any ultimate
disposition data including the date of disposal and sale price of the property.
(2) A physical inventory of the property must be taken and the results reconciled with the
property records at least once every two years.
(3) A control system must be developed to ensure adequate safeguards to prevent loss,
damage, or theft of the property. Any loss, damage, or theft must be investigated.
. . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation.
Embedded within a properly designed and implemented internal control system should be internal controls
consisting of policies and procedures. Policies reflect the School Corporation's management statements
of what should be done to effect internal controls, and procedures should consist of actions that would
implement these policies.
Effect
Without the proper implementation of an effectively designed system of internal controls, the
internal control system cannot be capable of effectively preventing, or detecting and correcting, material
noncompliance. As a result, there was not a complete asset listing nor was there a physical inventory
completed as required.
Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of
the federal award could result in the loss of future federal funding to the School Corporation.
Questioned Costs
There were no questioned costs identified.
Recommendation
We recommended that management of the School Corporation establish a proper system of
internal controls and develop policies and procedures to ensure asset records are maintained and that a
physical inventory is taken every two years.
Views of Responsible Officials
For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-003
Subject: COVID-19 - Education Stabilization Fund - Equipment and Real Property Management
Federal Agency: Department of Education
Federal Program: COVID-19 - Education Stabilization Fund
Assistance Listings Numbers: 84.425D, 84.425U, 84.425C
Federal Award Numbers and Years (or Other Identifying Numbers): S425D200013, S425D210013,
S425U210013
Pass-Through Entity: Indiana Department of Education
Compliance Requirement: Equipment and Real Property Management
Audit Findings: Material Weakness, Modified Opinion
Condition and Context
The School Corporation had not properly designed or implemented a system of internal controls,
which would include appropriate segregation of duties, that would likely be effective in preventing, or
detecting and correcting, noncompliance. A property record or capital asset listing, which would include a
description of the property, a serial number or other identification number, the source of funding for the
property (including the federal award identification number (FAIN)), who holds title, the acquisition date,
cost of the property, percentage of federal participation in the project costs for the federal award under
which the property was acquired, the location, and use and condition of the property, is to be maintained
for assets purchased that exceed the School Corporation's capitalization threshold. In addition, a physical
inventory of all assets should be completed at least every two years.
The School Corporation purchased eight assets, totaling $131,205, which exceeded the School
Corporation's capitalization threshold. Two of the eight assets were selected for testing. Neither of the two
assets were determined to have property records, nor were the assets on the inventory listing. Additionally,
the School Corporation did not complete a capital asset inventory every two years as required.
The lack of internal controls and noncompliance were systemic issues throughout the audit period.
Criteria
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
2 CFR 200.313(d) states in part:
"Management requirements. Procedures for managing equipment (including replacement
equipment), whether acquired in whole or in part under a Federal award, until disposition takes
place will, as a minimum, meet the following requirements:
INDIANA STATE BOARD OF ACCOUNTS
19
RANDOLPH EASTERN SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
(1) Property records must be maintained that include a description of the property, a serial
number or other identification number, the source of funding for the property (including
the FAIN), who holds title, the acquisition date, and cost of the property, percentage of
Federal participation in the project costs for the Federal award under which the
property was acquired, the location, use and condition of the property, and any ultimate
disposition data including the date of disposal and sale price of the property.
(2) A physical inventory of the property must be taken and the results reconciled with the
property records at least once every two years.
(3) A control system must be developed to ensure adequate safeguards to prevent loss,
damage, or theft of the property. Any loss, damage, or theft must be investigated.
. . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation.
Embedded within a properly designed and implemented internal control system should be internal controls
consisting of policies and procedures. Policies reflect the School Corporation's management statements
of what should be done to effect internal controls, and procedures should consist of actions that would
implement these policies.
Effect
Without the proper implementation of an effectively designed system of internal controls, the
internal control system cannot be capable of effectively preventing, or detecting and correcting, material
noncompliance. As a result, there was not a complete asset listing nor was there a physical inventory
completed as required.
Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of
the federal award could result in the loss of future federal funding to the School Corporation.
Questioned Costs
There were no questioned costs identified.
Recommendation
We recommended that management of the School Corporation establish a proper system of
internal controls and develop policies and procedures to ensure asset records are maintained and that a
physical inventory is taken every two years.
Views of Responsible Officials
For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-003
Subject: COVID-19 - Education Stabilization Fund - Equipment and Real Property Management
Federal Agency: Department of Education
Federal Program: COVID-19 - Education Stabilization Fund
Assistance Listings Numbers: 84.425D, 84.425U, 84.425C
Federal Award Numbers and Years (or Other Identifying Numbers): S425D200013, S425D210013,
S425U210013
Pass-Through Entity: Indiana Department of Education
Compliance Requirement: Equipment and Real Property Management
Audit Findings: Material Weakness, Modified Opinion
Condition and Context
The School Corporation had not properly designed or implemented a system of internal controls,
which would include appropriate segregation of duties, that would likely be effective in preventing, or
detecting and correcting, noncompliance. A property record or capital asset listing, which would include a
description of the property, a serial number or other identification number, the source of funding for the
property (including the federal award identification number (FAIN)), who holds title, the acquisition date,
cost of the property, percentage of federal participation in the project costs for the federal award under
which the property was acquired, the location, and use and condition of the property, is to be maintained
for assets purchased that exceed the School Corporation's capitalization threshold. In addition, a physical
inventory of all assets should be completed at least every two years.
The School Corporation purchased eight assets, totaling $131,205, which exceeded the School
Corporation's capitalization threshold. Two of the eight assets were selected for testing. Neither of the two
assets were determined to have property records, nor were the assets on the inventory listing. Additionally,
the School Corporation did not complete a capital asset inventory every two years as required.
The lack of internal controls and noncompliance were systemic issues throughout the audit period.
Criteria
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
2 CFR 200.313(d) states in part:
"Management requirements. Procedures for managing equipment (including replacement
equipment), whether acquired in whole or in part under a Federal award, until disposition takes
place will, as a minimum, meet the following requirements:
INDIANA STATE BOARD OF ACCOUNTS
19
RANDOLPH EASTERN SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
(1) Property records must be maintained that include a description of the property, a serial
number or other identification number, the source of funding for the property (including
the FAIN), who holds title, the acquisition date, and cost of the property, percentage of
Federal participation in the project costs for the Federal award under which the
property was acquired, the location, use and condition of the property, and any ultimate
disposition data including the date of disposal and sale price of the property.
(2) A physical inventory of the property must be taken and the results reconciled with the
property records at least once every two years.
(3) A control system must be developed to ensure adequate safeguards to prevent loss,
damage, or theft of the property. Any loss, damage, or theft must be investigated.
. . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation.
Embedded within a properly designed and implemented internal control system should be internal controls
consisting of policies and procedures. Policies reflect the School Corporation's management statements
of what should be done to effect internal controls, and procedures should consist of actions that would
implement these policies.
Effect
Without the proper implementation of an effectively designed system of internal controls, the
internal control system cannot be capable of effectively preventing, or detecting and correcting, material
noncompliance. As a result, there was not a complete asset listing nor was there a physical inventory
completed as required.
Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of
the federal award could result in the loss of future federal funding to the School Corporation.
Questioned Costs
There were no questioned costs identified.
Recommendation
We recommended that management of the School Corporation establish a proper system of
internal controls and develop policies and procedures to ensure asset records are maintained and that a
physical inventory is taken every two years.
Views of Responsible Officials
For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-003
Subject: COVID-19 - Education Stabilization Fund - Equipment and Real Property Management
Federal Agency: Department of Education
Federal Program: COVID-19 - Education Stabilization Fund
Assistance Listings Numbers: 84.425D, 84.425U, 84.425C
Federal Award Numbers and Years (or Other Identifying Numbers): S425D200013, S425D210013,
S425U210013
Pass-Through Entity: Indiana Department of Education
Compliance Requirement: Equipment and Real Property Management
Audit Findings: Material Weakness, Modified Opinion
Condition and Context
The School Corporation had not properly designed or implemented a system of internal controls,
which would include appropriate segregation of duties, that would likely be effective in preventing, or
detecting and correcting, noncompliance. A property record or capital asset listing, which would include a
description of the property, a serial number or other identification number, the source of funding for the
property (including the federal award identification number (FAIN)), who holds title, the acquisition date,
cost of the property, percentage of federal participation in the project costs for the federal award under
which the property was acquired, the location, and use and condition of the property, is to be maintained
for assets purchased that exceed the School Corporation's capitalization threshold. In addition, a physical
inventory of all assets should be completed at least every two years.
The School Corporation purchased eight assets, totaling $131,205, which exceeded the School
Corporation's capitalization threshold. Two of the eight assets were selected for testing. Neither of the two
assets were determined to have property records, nor were the assets on the inventory listing. Additionally,
the School Corporation did not complete a capital asset inventory every two years as required.
The lack of internal controls and noncompliance were systemic issues throughout the audit period.
Criteria
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
2 CFR 200.313(d) states in part:
"Management requirements. Procedures for managing equipment (including replacement
equipment), whether acquired in whole or in part under a Federal award, until disposition takes
place will, as a minimum, meet the following requirements:
INDIANA STATE BOARD OF ACCOUNTS
19
RANDOLPH EASTERN SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
(1) Property records must be maintained that include a description of the property, a serial
number or other identification number, the source of funding for the property (including
the FAIN), who holds title, the acquisition date, and cost of the property, percentage of
Federal participation in the project costs for the Federal award under which the
property was acquired, the location, use and condition of the property, and any ultimate
disposition data including the date of disposal and sale price of the property.
(2) A physical inventory of the property must be taken and the results reconciled with the
property records at least once every two years.
(3) A control system must be developed to ensure adequate safeguards to prevent loss,
damage, or theft of the property. Any loss, damage, or theft must be investigated.
. . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation.
Embedded within a properly designed and implemented internal control system should be internal controls
consisting of policies and procedures. Policies reflect the School Corporation's management statements
of what should be done to effect internal controls, and procedures should consist of actions that would
implement these policies.
Effect
Without the proper implementation of an effectively designed system of internal controls, the
internal control system cannot be capable of effectively preventing, or detecting and correcting, material
noncompliance. As a result, there was not a complete asset listing nor was there a physical inventory
completed as required.
Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of
the federal award could result in the loss of future federal funding to the School Corporation.
Questioned Costs
There were no questioned costs identified.
Recommendation
We recommended that management of the School Corporation establish a proper system of
internal controls and develop policies and procedures to ensure asset records are maintained and that a
physical inventory is taken every two years.
Views of Responsible Officials
For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-003
Subject: COVID-19 - Education Stabilization Fund - Equipment and Real Property Management
Federal Agency: Department of Education
Federal Program: COVID-19 - Education Stabilization Fund
Assistance Listings Numbers: 84.425D, 84.425U, 84.425C
Federal Award Numbers and Years (or Other Identifying Numbers): S425D200013, S425D210013,
S425U210013
Pass-Through Entity: Indiana Department of Education
Compliance Requirement: Equipment and Real Property Management
Audit Findings: Material Weakness, Modified Opinion
Condition and Context
The School Corporation had not properly designed or implemented a system of internal controls,
which would include appropriate segregation of duties, that would likely be effective in preventing, or
detecting and correcting, noncompliance. A property record or capital asset listing, which would include a
description of the property, a serial number or other identification number, the source of funding for the
property (including the federal award identification number (FAIN)), who holds title, the acquisition date,
cost of the property, percentage of federal participation in the project costs for the federal award under
which the property was acquired, the location, and use and condition of the property, is to be maintained
for assets purchased that exceed the School Corporation's capitalization threshold. In addition, a physical
inventory of all assets should be completed at least every two years.
The School Corporation purchased eight assets, totaling $131,205, which exceeded the School
Corporation's capitalization threshold. Two of the eight assets were selected for testing. Neither of the two
assets were determined to have property records, nor were the assets on the inventory listing. Additionally,
the School Corporation did not complete a capital asset inventory every two years as required.
The lack of internal controls and noncompliance were systemic issues throughout the audit period.
Criteria
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
2 CFR 200.313(d) states in part:
"Management requirements. Procedures for managing equipment (including replacement
equipment), whether acquired in whole or in part under a Federal award, until disposition takes
place will, as a minimum, meet the following requirements:
INDIANA STATE BOARD OF ACCOUNTS
19
RANDOLPH EASTERN SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
(1) Property records must be maintained that include a description of the property, a serial
number or other identification number, the source of funding for the property (including
the FAIN), who holds title, the acquisition date, and cost of the property, percentage of
Federal participation in the project costs for the Federal award under which the
property was acquired, the location, use and condition of the property, and any ultimate
disposition data including the date of disposal and sale price of the property.
(2) A physical inventory of the property must be taken and the results reconciled with the
property records at least once every two years.
(3) A control system must be developed to ensure adequate safeguards to prevent loss,
damage, or theft of the property. Any loss, damage, or theft must be investigated.
. . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation.
Embedded within a properly designed and implemented internal control system should be internal controls
consisting of policies and procedures. Policies reflect the School Corporation's management statements
of what should be done to effect internal controls, and procedures should consist of actions that would
implement these policies.
Effect
Without the proper implementation of an effectively designed system of internal controls, the
internal control system cannot be capable of effectively preventing, or detecting and correcting, material
noncompliance. As a result, there was not a complete asset listing nor was there a physical inventory
completed as required.
Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of
the federal award could result in the loss of future federal funding to the School Corporation.
Questioned Costs
There were no questioned costs identified.
Recommendation
We recommended that management of the School Corporation establish a proper system of
internal controls and develop policies and procedures to ensure asset records are maintained and that a
physical inventory is taken every two years.
Views of Responsible Officials
For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-003
Subject: COVID-19 - Education Stabilization Fund - Equipment and Real Property Management
Federal Agency: Department of Education
Federal Program: COVID-19 - Education Stabilization Fund
Assistance Listings Numbers: 84.425D, 84.425U, 84.425C
Federal Award Numbers and Years (or Other Identifying Numbers): S425D200013, S425D210013,
S425U210013
Pass-Through Entity: Indiana Department of Education
Compliance Requirement: Equipment and Real Property Management
Audit Findings: Material Weakness, Modified Opinion
Condition and Context
The School Corporation had not properly designed or implemented a system of internal controls,
which would include appropriate segregation of duties, that would likely be effective in preventing, or
detecting and correcting, noncompliance. A property record or capital asset listing, which would include a
description of the property, a serial number or other identification number, the source of funding for the
property (including the federal award identification number (FAIN)), who holds title, the acquisition date,
cost of the property, percentage of federal participation in the project costs for the federal award under
which the property was acquired, the location, and use and condition of the property, is to be maintained
for assets purchased that exceed the School Corporation's capitalization threshold. In addition, a physical
inventory of all assets should be completed at least every two years.
The School Corporation purchased eight assets, totaling $131,205, which exceeded the School
Corporation's capitalization threshold. Two of the eight assets were selected for testing. Neither of the two
assets were determined to have property records, nor were the assets on the inventory listing. Additionally,
the School Corporation did not complete a capital asset inventory every two years as required.
The lack of internal controls and noncompliance were systemic issues throughout the audit period.
Criteria
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
2 CFR 200.313(d) states in part:
"Management requirements. Procedures for managing equipment (including replacement
equipment), whether acquired in whole or in part under a Federal award, until disposition takes
place will, as a minimum, meet the following requirements:
INDIANA STATE BOARD OF ACCOUNTS
19
RANDOLPH EASTERN SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
(1) Property records must be maintained that include a description of the property, a serial
number or other identification number, the source of funding for the property (including
the FAIN), who holds title, the acquisition date, and cost of the property, percentage of
Federal participation in the project costs for the Federal award under which the
property was acquired, the location, use and condition of the property, and any ultimate
disposition data including the date of disposal and sale price of the property.
(2) A physical inventory of the property must be taken and the results reconciled with the
property records at least once every two years.
(3) A control system must be developed to ensure adequate safeguards to prevent loss,
damage, or theft of the property. Any loss, damage, or theft must be investigated.
. . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation.
Embedded within a properly designed and implemented internal control system should be internal controls
consisting of policies and procedures. Policies reflect the School Corporation's management statements
of what should be done to effect internal controls, and procedures should consist of actions that would
implement these policies.
Effect
Without the proper implementation of an effectively designed system of internal controls, the
internal control system cannot be capable of effectively preventing, or detecting and correcting, material
noncompliance. As a result, there was not a complete asset listing nor was there a physical inventory
completed as required.
Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of
the federal award could result in the loss of future federal funding to the School Corporation.
Questioned Costs
There were no questioned costs identified.
Recommendation
We recommended that management of the School Corporation establish a proper system of
internal controls and develop policies and procedures to ensure asset records are maintained and that a
physical inventory is taken every two years.
Views of Responsible Officials
For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-003
Subject: COVID-19 - Education Stabilization Fund - Equipment and Real Property Management
Federal Agency: Department of Education
Federal Program: COVID-19 - Education Stabilization Fund
Assistance Listings Numbers: 84.425D, 84.425U, 84.425C
Federal Award Numbers and Years (or Other Identifying Numbers): S425D200013, S425D210013,
S425U210013
Pass-Through Entity: Indiana Department of Education
Compliance Requirement: Equipment and Real Property Management
Audit Findings: Material Weakness, Modified Opinion
Condition and Context
The School Corporation had not properly designed or implemented a system of internal controls,
which would include appropriate segregation of duties, that would likely be effective in preventing, or
detecting and correcting, noncompliance. A property record or capital asset listing, which would include a
description of the property, a serial number or other identification number, the source of funding for the
property (including the federal award identification number (FAIN)), who holds title, the acquisition date,
cost of the property, percentage of federal participation in the project costs for the federal award under
which the property was acquired, the location, and use and condition of the property, is to be maintained
for assets purchased that exceed the School Corporation's capitalization threshold. In addition, a physical
inventory of all assets should be completed at least every two years.
The School Corporation purchased eight assets, totaling $131,205, which exceeded the School
Corporation's capitalization threshold. Two of the eight assets were selected for testing. Neither of the two
assets were determined to have property records, nor were the assets on the inventory listing. Additionally,
the School Corporation did not complete a capital asset inventory every two years as required.
The lack of internal controls and noncompliance were systemic issues throughout the audit period.
Criteria
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
2 CFR 200.313(d) states in part:
"Management requirements. Procedures for managing equipment (including replacement
equipment), whether acquired in whole or in part under a Federal award, until disposition takes
place will, as a minimum, meet the following requirements:
INDIANA STATE BOARD OF ACCOUNTS
19
RANDOLPH EASTERN SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
(1) Property records must be maintained that include a description of the property, a serial
number or other identification number, the source of funding for the property (including
the FAIN), who holds title, the acquisition date, and cost of the property, percentage of
Federal participation in the project costs for the Federal award under which the
property was acquired, the location, use and condition of the property, and any ultimate
disposition data including the date of disposal and sale price of the property.
(2) A physical inventory of the property must be taken and the results reconciled with the
property records at least once every two years.
(3) A control system must be developed to ensure adequate safeguards to prevent loss,
damage, or theft of the property. Any loss, damage, or theft must be investigated.
. . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation.
Embedded within a properly designed and implemented internal control system should be internal controls
consisting of policies and procedures. Policies reflect the School Corporation's management statements
of what should be done to effect internal controls, and procedures should consist of actions that would
implement these policies.
Effect
Without the proper implementation of an effectively designed system of internal controls, the
internal control system cannot be capable of effectively preventing, or detecting and correcting, material
noncompliance. As a result, there was not a complete asset listing nor was there a physical inventory
completed as required.
Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of
the federal award could result in the loss of future federal funding to the School Corporation.
Questioned Costs
There were no questioned costs identified.
Recommendation
We recommended that management of the School Corporation establish a proper system of
internal controls and develop policies and procedures to ensure asset records are maintained and that a
physical inventory is taken every two years.
Views of Responsible Officials
For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-003
Subject: COVID-19 - Education Stabilization Fund - Equipment and Real Property Management
Federal Agency: Department of Education
Federal Program: COVID-19 - Education Stabilization Fund
Assistance Listings Numbers: 84.425D, 84.425U, 84.425C
Federal Award Numbers and Years (or Other Identifying Numbers): S425D200013, S425D210013,
S425U210013
Pass-Through Entity: Indiana Department of Education
Compliance Requirement: Equipment and Real Property Management
Audit Findings: Material Weakness, Modified Opinion
Condition and Context
The School Corporation had not properly designed or implemented a system of internal controls,
which would include appropriate segregation of duties, that would likely be effective in preventing, or
detecting and correcting, noncompliance. A property record or capital asset listing, which would include a
description of the property, a serial number or other identification number, the source of funding for the
property (including the federal award identification number (FAIN)), who holds title, the acquisition date,
cost of the property, percentage of federal participation in the project costs for the federal award under
which the property was acquired, the location, and use and condition of the property, is to be maintained
for assets purchased that exceed the School Corporation's capitalization threshold. In addition, a physical
inventory of all assets should be completed at least every two years.
The School Corporation purchased eight assets, totaling $131,205, which exceeded the School
Corporation's capitalization threshold. Two of the eight assets were selected for testing. Neither of the two
assets were determined to have property records, nor were the assets on the inventory listing. Additionally,
the School Corporation did not complete a capital asset inventory every two years as required.
The lack of internal controls and noncompliance were systemic issues throughout the audit period.
Criteria
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
2 CFR 200.313(d) states in part:
"Management requirements. Procedures for managing equipment (including replacement
equipment), whether acquired in whole or in part under a Federal award, until disposition takes
place will, as a minimum, meet the following requirements:
INDIANA STATE BOARD OF ACCOUNTS
19
RANDOLPH EASTERN SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
(1) Property records must be maintained that include a description of the property, a serial
number or other identification number, the source of funding for the property (including
the FAIN), who holds title, the acquisition date, and cost of the property, percentage of
Federal participation in the project costs for the Federal award under which the
property was acquired, the location, use and condition of the property, and any ultimate
disposition data including the date of disposal and sale price of the property.
(2) A physical inventory of the property must be taken and the results reconciled with the
property records at least once every two years.
(3) A control system must be developed to ensure adequate safeguards to prevent loss,
damage, or theft of the property. Any loss, damage, or theft must be investigated.
. . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation.
Embedded within a properly designed and implemented internal control system should be internal controls
consisting of policies and procedures. Policies reflect the School Corporation's management statements
of what should be done to effect internal controls, and procedures should consist of actions that would
implement these policies.
Effect
Without the proper implementation of an effectively designed system of internal controls, the
internal control system cannot be capable of effectively preventing, or detecting and correcting, material
noncompliance. As a result, there was not a complete asset listing nor was there a physical inventory
completed as required.
Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of
the federal award could result in the loss of future federal funding to the School Corporation.
Questioned Costs
There were no questioned costs identified.
Recommendation
We recommended that management of the School Corporation establish a proper system of
internal controls and develop policies and procedures to ensure asset records are maintained and that a
physical inventory is taken every two years.
Views of Responsible Officials
For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-003
Subject: COVID-19 - Education Stabilization Fund - Equipment and Real Property Management
Federal Agency: Department of Education
Federal Program: COVID-19 - Education Stabilization Fund
Assistance Listings Numbers: 84.425D, 84.425U, 84.425C
Federal Award Numbers and Years (or Other Identifying Numbers): S425D200013, S425D210013,
S425U210013
Pass-Through Entity: Indiana Department of Education
Compliance Requirement: Equipment and Real Property Management
Audit Findings: Material Weakness, Modified Opinion
Condition and Context
The School Corporation had not properly designed or implemented a system of internal controls,
which would include appropriate segregation of duties, that would likely be effective in preventing, or
detecting and correcting, noncompliance. A property record or capital asset listing, which would include a
description of the property, a serial number or other identification number, the source of funding for the
property (including the federal award identification number (FAIN)), who holds title, the acquisition date,
cost of the property, percentage of federal participation in the project costs for the federal award under
which the property was acquired, the location, and use and condition of the property, is to be maintained
for assets purchased that exceed the School Corporation's capitalization threshold. In addition, a physical
inventory of all assets should be completed at least every two years.
The School Corporation purchased eight assets, totaling $131,205, which exceeded the School
Corporation's capitalization threshold. Two of the eight assets were selected for testing. Neither of the two
assets were determined to have property records, nor were the assets on the inventory listing. Additionally,
the School Corporation did not complete a capital asset inventory every two years as required.
The lack of internal controls and noncompliance were systemic issues throughout the audit period.
Criteria
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
2 CFR 200.313(d) states in part:
"Management requirements. Procedures for managing equipment (including replacement
equipment), whether acquired in whole or in part under a Federal award, until disposition takes
place will, as a minimum, meet the following requirements:
INDIANA STATE BOARD OF ACCOUNTS
19
RANDOLPH EASTERN SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
(1) Property records must be maintained that include a description of the property, a serial
number or other identification number, the source of funding for the property (including
the FAIN), who holds title, the acquisition date, and cost of the property, percentage of
Federal participation in the project costs for the Federal award under which the
property was acquired, the location, use and condition of the property, and any ultimate
disposition data including the date of disposal and sale price of the property.
(2) A physical inventory of the property must be taken and the results reconciled with the
property records at least once every two years.
(3) A control system must be developed to ensure adequate safeguards to prevent loss,
damage, or theft of the property. Any loss, damage, or theft must be investigated.
. . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation.
Embedded within a properly designed and implemented internal control system should be internal controls
consisting of policies and procedures. Policies reflect the School Corporation's management statements
of what should be done to effect internal controls, and procedures should consist of actions that would
implement these policies.
Effect
Without the proper implementation of an effectively designed system of internal controls, the
internal control system cannot be capable of effectively preventing, or detecting and correcting, material
noncompliance. As a result, there was not a complete asset listing nor was there a physical inventory
completed as required.
Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of
the federal award could result in the loss of future federal funding to the School Corporation.
Questioned Costs
There were no questioned costs identified.
Recommendation
We recommended that management of the School Corporation establish a proper system of
internal controls and develop policies and procedures to ensure asset records are maintained and that a
physical inventory is taken every two years.
Views of Responsible Officials
For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-004
Subject: COVID-19 - Education Stabilization Fund - Reporting
Federal Agency: Department of Education
Federal Program: COVID-19 - Education Stabilization Fund
Assistance Listings Numbers: 84.425D, 84.425U
Federal Award Numbers and Years (or Other Identifying Numbers): S425D200013, S425D210013
S425U210013
Pass-Through Entity: Department of Education
Compliance Requirement: Reporting
Audit Finding: Material Weakness
Condition and Context
The School Corporation had not properly designed or implemented a system of internal controls
which would include appropriate segregation of duties that would likely be effective in preventing, or
detecting and correcting, noncompliance. The School Corporation was required to submit annual data
reports to the Indiana Department of Education via JotForm, a form/report builder. Data to be submitted
included, but was not limited to, current period expenditures, prior period expenditures, and expenditures
per activity.
During the audit period the School Corporation submitted two ESSER I reports, two ESSER II
reports, and two ESSER III reports, for a total of six reports. The annual data reports were complied,
prepared, and submitted by the Assistant Superintendent of Schools and the Treasurer without an oversight
or review process in place to prevent, or detect and correct, errors.
The lack of internal controls was systemic throughout the audit period.
Criteria
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation.
Embedded within a properly designed and implemented internal control system should be internal controls
consisting of policies and procedures. Policies reflect the School Corporation's management statements
of what should be done to effect internal controls, and procedures should consist of actions that would
implement these policies.
INDIANA STATE BOARD OF ACCOUNTS 21
RANDOLPH EASTERN SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
Effect
Without the proper design or implementation of the components of a system of internal controls,
including policies and procedures that provide segregation of duties and additional oversight as needed,
the internal control system cannot be capable of effectively preventing, or detecting and correcting, material
noncompliance.
Questioned Costs
There were no questioned costs identified.
Recommendation
We recommended that management of the School Corporation design and implement a proper
system of internal controls, including policies and procedures that would provide segregation of duties to
ensure appropriate reviews, approvals, and oversight are taking place prior to filing required reports.
Views of Responsible Officials
For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-004
Subject: COVID-19 - Education Stabilization Fund - Reporting
Federal Agency: Department of Education
Federal Program: COVID-19 - Education Stabilization Fund
Assistance Listings Numbers: 84.425D, 84.425U
Federal Award Numbers and Years (or Other Identifying Numbers): S425D200013, S425D210013
S425U210013
Pass-Through Entity: Department of Education
Compliance Requirement: Reporting
Audit Finding: Material Weakness
Condition and Context
The School Corporation had not properly designed or implemented a system of internal controls
which would include appropriate segregation of duties that would likely be effective in preventing, or
detecting and correcting, noncompliance. The School Corporation was required to submit annual data
reports to the Indiana Department of Education via JotForm, a form/report builder. Data to be submitted
included, but was not limited to, current period expenditures, prior period expenditures, and expenditures
per activity.
During the audit period the School Corporation submitted two ESSER I reports, two ESSER II
reports, and two ESSER III reports, for a total of six reports. The annual data reports were complied,
prepared, and submitted by the Assistant Superintendent of Schools and the Treasurer without an oversight
or review process in place to prevent, or detect and correct, errors.
The lack of internal controls was systemic throughout the audit period.
Criteria
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation.
Embedded within a properly designed and implemented internal control system should be internal controls
consisting of policies and procedures. Policies reflect the School Corporation's management statements
of what should be done to effect internal controls, and procedures should consist of actions that would
implement these policies.
INDIANA STATE BOARD OF ACCOUNTS 21
RANDOLPH EASTERN SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
Effect
Without the proper design or implementation of the components of a system of internal controls,
including policies and procedures that provide segregation of duties and additional oversight as needed,
the internal control system cannot be capable of effectively preventing, or detecting and correcting, material
noncompliance.
Questioned Costs
There were no questioned costs identified.
Recommendation
We recommended that management of the School Corporation design and implement a proper
system of internal controls, including policies and procedures that would provide segregation of duties to
ensure appropriate reviews, approvals, and oversight are taking place prior to filing required reports.
Views of Responsible Officials
For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-004
Subject: COVID-19 - Education Stabilization Fund - Reporting
Federal Agency: Department of Education
Federal Program: COVID-19 - Education Stabilization Fund
Assistance Listings Numbers: 84.425D, 84.425U
Federal Award Numbers and Years (or Other Identifying Numbers): S425D200013, S425D210013
S425U210013
Pass-Through Entity: Department of Education
Compliance Requirement: Reporting
Audit Finding: Material Weakness
Condition and Context
The School Corporation had not properly designed or implemented a system of internal controls
which would include appropriate segregation of duties that would likely be effective in preventing, or
detecting and correcting, noncompliance. The School Corporation was required to submit annual data
reports to the Indiana Department of Education via JotForm, a form/report builder. Data to be submitted
included, but was not limited to, current period expenditures, prior period expenditures, and expenditures
per activity.
During the audit period the School Corporation submitted two ESSER I reports, two ESSER II
reports, and two ESSER III reports, for a total of six reports. The annual data reports were complied,
prepared, and submitted by the Assistant Superintendent of Schools and the Treasurer without an oversight
or review process in place to prevent, or detect and correct, errors.
The lack of internal controls was systemic throughout the audit period.
Criteria
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation.
Embedded within a properly designed and implemented internal control system should be internal controls
consisting of policies and procedures. Policies reflect the School Corporation's management statements
of what should be done to effect internal controls, and procedures should consist of actions that would
implement these policies.
INDIANA STATE BOARD OF ACCOUNTS 21
RANDOLPH EASTERN SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
Effect
Without the proper design or implementation of the components of a system of internal controls,
including policies and procedures that provide segregation of duties and additional oversight as needed,
the internal control system cannot be capable of effectively preventing, or detecting and correcting, material
noncompliance.
Questioned Costs
There were no questioned costs identified.
Recommendation
We recommended that management of the School Corporation design and implement a proper
system of internal controls, including policies and procedures that would provide segregation of duties to
ensure appropriate reviews, approvals, and oversight are taking place prior to filing required reports.
Views of Responsible Officials
For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-004
Subject: COVID-19 - Education Stabilization Fund - Reporting
Federal Agency: Department of Education
Federal Program: COVID-19 - Education Stabilization Fund
Assistance Listings Numbers: 84.425D, 84.425U
Federal Award Numbers and Years (or Other Identifying Numbers): S425D200013, S425D210013
S425U210013
Pass-Through Entity: Department of Education
Compliance Requirement: Reporting
Audit Finding: Material Weakness
Condition and Context
The School Corporation had not properly designed or implemented a system of internal controls
which would include appropriate segregation of duties that would likely be effective in preventing, or
detecting and correcting, noncompliance. The School Corporation was required to submit annual data
reports to the Indiana Department of Education via JotForm, a form/report builder. Data to be submitted
included, but was not limited to, current period expenditures, prior period expenditures, and expenditures
per activity.
During the audit period the School Corporation submitted two ESSER I reports, two ESSER II
reports, and two ESSER III reports, for a total of six reports. The annual data reports were complied,
prepared, and submitted by the Assistant Superintendent of Schools and the Treasurer without an oversight
or review process in place to prevent, or detect and correct, errors.
The lack of internal controls was systemic throughout the audit period.
Criteria
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation.
Embedded within a properly designed and implemented internal control system should be internal controls
consisting of policies and procedures. Policies reflect the School Corporation's management statements
of what should be done to effect internal controls, and procedures should consist of actions that would
implement these policies.
INDIANA STATE BOARD OF ACCOUNTS 21
RANDOLPH EASTERN SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
Effect
Without the proper design or implementation of the components of a system of internal controls,
including policies and procedures that provide segregation of duties and additional oversight as needed,
the internal control system cannot be capable of effectively preventing, or detecting and correcting, material
noncompliance.
Questioned Costs
There were no questioned costs identified.
Recommendation
We recommended that management of the School Corporation design and implement a proper
system of internal controls, including policies and procedures that would provide segregation of duties to
ensure appropriate reviews, approvals, and oversight are taking place prior to filing required reports.
Views of Responsible Officials
For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-004
Subject: COVID-19 - Education Stabilization Fund - Reporting
Federal Agency: Department of Education
Federal Program: COVID-19 - Education Stabilization Fund
Assistance Listings Numbers: 84.425D, 84.425U
Federal Award Numbers and Years (or Other Identifying Numbers): S425D200013, S425D210013
S425U210013
Pass-Through Entity: Department of Education
Compliance Requirement: Reporting
Audit Finding: Material Weakness
Condition and Context
The School Corporation had not properly designed or implemented a system of internal controls
which would include appropriate segregation of duties that would likely be effective in preventing, or
detecting and correcting, noncompliance. The School Corporation was required to submit annual data
reports to the Indiana Department of Education via JotForm, a form/report builder. Data to be submitted
included, but was not limited to, current period expenditures, prior period expenditures, and expenditures
per activity.
During the audit period the School Corporation submitted two ESSER I reports, two ESSER II
reports, and two ESSER III reports, for a total of six reports. The annual data reports were complied,
prepared, and submitted by the Assistant Superintendent of Schools and the Treasurer without an oversight
or review process in place to prevent, or detect and correct, errors.
The lack of internal controls was systemic throughout the audit period.
Criteria
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation.
Embedded within a properly designed and implemented internal control system should be internal controls
consisting of policies and procedures. Policies reflect the School Corporation's management statements
of what should be done to effect internal controls, and procedures should consist of actions that would
implement these policies.
INDIANA STATE BOARD OF ACCOUNTS 21
RANDOLPH EASTERN SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
Effect
Without the proper design or implementation of the components of a system of internal controls,
including policies and procedures that provide segregation of duties and additional oversight as needed,
the internal control system cannot be capable of effectively preventing, or detecting and correcting, material
noncompliance.
Questioned Costs
There were no questioned costs identified.
Recommendation
We recommended that management of the School Corporation design and implement a proper
system of internal controls, including policies and procedures that would provide segregation of duties to
ensure appropriate reviews, approvals, and oversight are taking place prior to filing required reports.
Views of Responsible Officials
For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-004
Subject: COVID-19 - Education Stabilization Fund - Reporting
Federal Agency: Department of Education
Federal Program: COVID-19 - Education Stabilization Fund
Assistance Listings Numbers: 84.425D, 84.425U
Federal Award Numbers and Years (or Other Identifying Numbers): S425D200013, S425D210013
S425U210013
Pass-Through Entity: Department of Education
Compliance Requirement: Reporting
Audit Finding: Material Weakness
Condition and Context
The School Corporation had not properly designed or implemented a system of internal controls
which would include appropriate segregation of duties that would likely be effective in preventing, or
detecting and correcting, noncompliance. The School Corporation was required to submit annual data
reports to the Indiana Department of Education via JotForm, a form/report builder. Data to be submitted
included, but was not limited to, current period expenditures, prior period expenditures, and expenditures
per activity.
During the audit period the School Corporation submitted two ESSER I reports, two ESSER II
reports, and two ESSER III reports, for a total of six reports. The annual data reports were complied,
prepared, and submitted by the Assistant Superintendent of Schools and the Treasurer without an oversight
or review process in place to prevent, or detect and correct, errors.
The lack of internal controls was systemic throughout the audit period.
Criteria
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation.
Embedded within a properly designed and implemented internal control system should be internal controls
consisting of policies and procedures. Policies reflect the School Corporation's management statements
of what should be done to effect internal controls, and procedures should consist of actions that would
implement these policies.
INDIANA STATE BOARD OF ACCOUNTS 21
RANDOLPH EASTERN SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
Effect
Without the proper design or implementation of the components of a system of internal controls,
including policies and procedures that provide segregation of duties and additional oversight as needed,
the internal control system cannot be capable of effectively preventing, or detecting and correcting, material
noncompliance.
Questioned Costs
There were no questioned costs identified.
Recommendation
We recommended that management of the School Corporation design and implement a proper
system of internal controls, including policies and procedures that would provide segregation of duties to
ensure appropriate reviews, approvals, and oversight are taking place prior to filing required reports.
Views of Responsible Officials
For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-004
Subject: COVID-19 - Education Stabilization Fund - Reporting
Federal Agency: Department of Education
Federal Program: COVID-19 - Education Stabilization Fund
Assistance Listings Numbers: 84.425D, 84.425U
Federal Award Numbers and Years (or Other Identifying Numbers): S425D200013, S425D210013
S425U210013
Pass-Through Entity: Department of Education
Compliance Requirement: Reporting
Audit Finding: Material Weakness
Condition and Context
The School Corporation had not properly designed or implemented a system of internal controls
which would include appropriate segregation of duties that would likely be effective in preventing, or
detecting and correcting, noncompliance. The School Corporation was required to submit annual data
reports to the Indiana Department of Education via JotForm, a form/report builder. Data to be submitted
included, but was not limited to, current period expenditures, prior period expenditures, and expenditures
per activity.
During the audit period the School Corporation submitted two ESSER I reports, two ESSER II
reports, and two ESSER III reports, for a total of six reports. The annual data reports were complied,
prepared, and submitted by the Assistant Superintendent of Schools and the Treasurer without an oversight
or review process in place to prevent, or detect and correct, errors.
The lack of internal controls was systemic throughout the audit period.
Criteria
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation.
Embedded within a properly designed and implemented internal control system should be internal controls
consisting of policies and procedures. Policies reflect the School Corporation's management statements
of what should be done to effect internal controls, and procedures should consist of actions that would
implement these policies.
INDIANA STATE BOARD OF ACCOUNTS 21
RANDOLPH EASTERN SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
Effect
Without the proper design or implementation of the components of a system of internal controls,
including policies and procedures that provide segregation of duties and additional oversight as needed,
the internal control system cannot be capable of effectively preventing, or detecting and correcting, material
noncompliance.
Questioned Costs
There were no questioned costs identified.
Recommendation
We recommended that management of the School Corporation design and implement a proper
system of internal controls, including policies and procedures that would provide segregation of duties to
ensure appropriate reviews, approvals, and oversight are taking place prior to filing required reports.
Views of Responsible Officials
For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-004
Subject: COVID-19 - Education Stabilization Fund - Reporting
Federal Agency: Department of Education
Federal Program: COVID-19 - Education Stabilization Fund
Assistance Listings Numbers: 84.425D, 84.425U
Federal Award Numbers and Years (or Other Identifying Numbers): S425D200013, S425D210013
S425U210013
Pass-Through Entity: Department of Education
Compliance Requirement: Reporting
Audit Finding: Material Weakness
Condition and Context
The School Corporation had not properly designed or implemented a system of internal controls
which would include appropriate segregation of duties that would likely be effective in preventing, or
detecting and correcting, noncompliance. The School Corporation was required to submit annual data
reports to the Indiana Department of Education via JotForm, a form/report builder. Data to be submitted
included, but was not limited to, current period expenditures, prior period expenditures, and expenditures
per activity.
During the audit period the School Corporation submitted two ESSER I reports, two ESSER II
reports, and two ESSER III reports, for a total of six reports. The annual data reports were complied,
prepared, and submitted by the Assistant Superintendent of Schools and the Treasurer without an oversight
or review process in place to prevent, or detect and correct, errors.
The lack of internal controls was systemic throughout the audit period.
Criteria
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation.
Embedded within a properly designed and implemented internal control system should be internal controls
consisting of policies and procedures. Policies reflect the School Corporation's management statements
of what should be done to effect internal controls, and procedures should consist of actions that would
implement these policies.
INDIANA STATE BOARD OF ACCOUNTS 21
RANDOLPH EASTERN SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
Effect
Without the proper design or implementation of the components of a system of internal controls,
including policies and procedures that provide segregation of duties and additional oversight as needed,
the internal control system cannot be capable of effectively preventing, or detecting and correcting, material
noncompliance.
Questioned Costs
There were no questioned costs identified.
Recommendation
We recommended that management of the School Corporation design and implement a proper
system of internal controls, including policies and procedures that would provide segregation of duties to
ensure appropriate reviews, approvals, and oversight are taking place prior to filing required reports.
Views of Responsible Officials
For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-004
Subject: COVID-19 - Education Stabilization Fund - Reporting
Federal Agency: Department of Education
Federal Program: COVID-19 - Education Stabilization Fund
Assistance Listings Numbers: 84.425D, 84.425U
Federal Award Numbers and Years (or Other Identifying Numbers): S425D200013, S425D210013
S425U210013
Pass-Through Entity: Department of Education
Compliance Requirement: Reporting
Audit Finding: Material Weakness
Condition and Context
The School Corporation had not properly designed or implemented a system of internal controls
which would include appropriate segregation of duties that would likely be effective in preventing, or
detecting and correcting, noncompliance. The School Corporation was required to submit annual data
reports to the Indiana Department of Education via JotForm, a form/report builder. Data to be submitted
included, but was not limited to, current period expenditures, prior period expenditures, and expenditures
per activity.
During the audit period the School Corporation submitted two ESSER I reports, two ESSER II
reports, and two ESSER III reports, for a total of six reports. The annual data reports were complied,
prepared, and submitted by the Assistant Superintendent of Schools and the Treasurer without an oversight
or review process in place to prevent, or detect and correct, errors.
The lack of internal controls was systemic throughout the audit period.
Criteria
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation.
Embedded within a properly designed and implemented internal control system should be internal controls
consisting of policies and procedures. Policies reflect the School Corporation's management statements
of what should be done to effect internal controls, and procedures should consist of actions that would
implement these policies.
INDIANA STATE BOARD OF ACCOUNTS 21
RANDOLPH EASTERN SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
Effect
Without the proper design or implementation of the components of a system of internal controls,
including policies and procedures that provide segregation of duties and additional oversight as needed,
the internal control system cannot be capable of effectively preventing, or detecting and correcting, material
noncompliance.
Questioned Costs
There were no questioned costs identified.
Recommendation
We recommended that management of the School Corporation design and implement a proper
system of internal controls, including policies and procedures that would provide segregation of duties to
ensure appropriate reviews, approvals, and oversight are taking place prior to filing required reports.
Views of Responsible Officials
For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-005
Subject: Child Nutrition Cluster - Activities Allowed or Unallowed, Allowable Costs/Cost Principles
Federal Agency: Department of Agriculture
Federal Programs: School Breakfast Program, National School Lunch Program,
Summer Food Service Program for Children
Assistance Listings Numbers: 10.553, 10.555, 10.559
Federal Award Numbers and Years (or Other Identifying Numbers): FY 2022, FY 2023
Pass-Through Entity: Indiana Department of Education
Compliance Requirements: Activities Allowed or Unallowed, Allowable Costs/Cost Principles
Audit Findings: Material Weakness, Other Matters
Condition and Context
An effective system of internal controls which would include segregation of duties that would likely
be effective in preventing, or detecting and correcting, noncompliance should be designed and implemented
to ensure expenditures charged to the food service program fund (School Lunch fund) are for the benefit
of the food service program.
The School Corporation's payroll disbursements were prepared by the Payroll Clerk without a
documented review or approval process to prevent, or detect and correct, errors. In addition, vendor claims
were to be reviewed and approved by the Treasurer and the School Board. Of the 40 vendor claims
selected for testing to ensure the internal control was in place and operating effectively, 3 claims did not
have documentation of approval by the Treasurer or the School Board.
In addition, the total amount of trash removal services for the School Corporation was paid from
the School Lunch fund. The total amount charged to the School Lunch fund was $15,448. This amount
was considered questioned costs.
The lack of internal controls over payroll and vendor claims was a systemic issue throughout the
audit period. The noncompliance was isolated to the payments for trash removal services.
INDIANA STATE BOARD OF ACCOUNTS 22
RANDOLPH EASTERN SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
Criteria
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
2 CFR 200.403 states in part:
"Except where otherwise authorized by statute, costs must meet the following general criteria
in order to be allowable under Federal awards:
(a) Be necessary and reasonable for the performance of the Federal award and be
allocable thereto under these principles.
(b) Conform to any limitations or exclusions set forth in these principles or in the Federal
award as to types or amount of cost items. . . .
(g) Be adequately documented. . . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation.
Embedded within a properly designed and implemented internal control system should be internal controls
consisting of policies and procedures. Policies reflect the School Corporation's management statements
of what should be done to effect internal controls, and procedures should consist of actions that would
implement these policies.
Effect
Without the proper implementation of an effectively designed system of internal controls, the
internal control system cannot be capable of effectively preventing, or detecting and correcting, material
noncompliance. As a result, costs for trash removal were incorrectly charged to the food service program.
Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of
the federal award could result in the loss of future federal funding to the School Corporation.
Questioned Costs
Known questioned costs of $15,448 were identified as detailed in the Condition and Context.
Recommendation
We recommended the School Corporation's management establish a proper system of internal
controls and develop policies and procedures to ensure costs are adequately documented.
FINDING 2023-005
Subject: Child Nutrition Cluster - Activities Allowed or Unallowed, Allowable Costs/Cost Principles
Federal Agency: Department of Agriculture
Federal Programs: School Breakfast Program, National School Lunch Program,
Summer Food Service Program for Children
Assistance Listings Numbers: 10.553, 10.555, 10.559
Federal Award Numbers and Years (or Other Identifying Numbers): FY 2022, FY 2023
Pass-Through Entity: Indiana Department of Education
Compliance Requirements: Activities Allowed or Unallowed, Allowable Costs/Cost Principles
Audit Findings: Material Weakness, Other Matters
Condition and Context
An effective system of internal controls which would include segregation of duties that would likely
be effective in preventing, or detecting and correcting, noncompliance should be designed and implemented
to ensure expenditures charged to the food service program fund (School Lunch fund) are for the benefit
of the food service program.
The School Corporation's payroll disbursements were prepared by the Payroll Clerk without a
documented review or approval process to prevent, or detect and correct, errors. In addition, vendor claims
were to be reviewed and approved by the Treasurer and the School Board. Of the 40 vendor claims
selected for testing to ensure the internal control was in place and operating effectively, 3 claims did not
have documentation of approval by the Treasurer or the School Board.
In addition, the total amount of trash removal services for the School Corporation was paid from
the School Lunch fund. The total amount charged to the School Lunch fund was $15,448. This amount
was considered questioned costs.
The lack of internal controls over payroll and vendor claims was a systemic issue throughout the
audit period. The noncompliance was isolated to the payments for trash removal services.
INDIANA STATE BOARD OF ACCOUNTS 22
RANDOLPH EASTERN SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
Criteria
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
2 CFR 200.403 states in part:
"Except where otherwise authorized by statute, costs must meet the following general criteria
in order to be allowable under Federal awards:
(a) Be necessary and reasonable for the performance of the Federal award and be
allocable thereto under these principles.
(b) Conform to any limitations or exclusions set forth in these principles or in the Federal
award as to types or amount of cost items. . . .
(g) Be adequately documented. . . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation.
Embedded within a properly designed and implemented internal control system should be internal controls
consisting of policies and procedures. Policies reflect the School Corporation's management statements
of what should be done to effect internal controls, and procedures should consist of actions that would
implement these policies.
Effect
Without the proper implementation of an effectively designed system of internal controls, the
internal control system cannot be capable of effectively preventing, or detecting and correcting, material
noncompliance. As a result, costs for trash removal were incorrectly charged to the food service program.
Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of
the federal award could result in the loss of future federal funding to the School Corporation.
Questioned Costs
Known questioned costs of $15,448 were identified as detailed in the Condition and Context.
Recommendation
We recommended the School Corporation's management establish a proper system of internal
controls and develop policies and procedures to ensure costs are adequately documented.
FINDING 2023-005
Subject: Child Nutrition Cluster - Activities Allowed or Unallowed, Allowable Costs/Cost Principles
Federal Agency: Department of Agriculture
Federal Programs: School Breakfast Program, National School Lunch Program,
Summer Food Service Program for Children
Assistance Listings Numbers: 10.553, 10.555, 10.559
Federal Award Numbers and Years (or Other Identifying Numbers): FY 2022, FY 2023
Pass-Through Entity: Indiana Department of Education
Compliance Requirements: Activities Allowed or Unallowed, Allowable Costs/Cost Principles
Audit Findings: Material Weakness, Other Matters
Condition and Context
An effective system of internal controls which would include segregation of duties that would likely
be effective in preventing, or detecting and correcting, noncompliance should be designed and implemented
to ensure expenditures charged to the food service program fund (School Lunch fund) are for the benefit
of the food service program.
The School Corporation's payroll disbursements were prepared by the Payroll Clerk without a
documented review or approval process to prevent, or detect and correct, errors. In addition, vendor claims
were to be reviewed and approved by the Treasurer and the School Board. Of the 40 vendor claims
selected for testing to ensure the internal control was in place and operating effectively, 3 claims did not
have documentation of approval by the Treasurer or the School Board.
In addition, the total amount of trash removal services for the School Corporation was paid from
the School Lunch fund. The total amount charged to the School Lunch fund was $15,448. This amount
was considered questioned costs.
The lack of internal controls over payroll and vendor claims was a systemic issue throughout the
audit period. The noncompliance was isolated to the payments for trash removal services.
INDIANA STATE BOARD OF ACCOUNTS 22
RANDOLPH EASTERN SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
Criteria
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
2 CFR 200.403 states in part:
"Except where otherwise authorized by statute, costs must meet the following general criteria
in order to be allowable under Federal awards:
(a) Be necessary and reasonable for the performance of the Federal award and be
allocable thereto under these principles.
(b) Conform to any limitations or exclusions set forth in these principles or in the Federal
award as to types or amount of cost items. . . .
(g) Be adequately documented. . . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation.
Embedded within a properly designed and implemented internal control system should be internal controls
consisting of policies and procedures. Policies reflect the School Corporation's management statements
of what should be done to effect internal controls, and procedures should consist of actions that would
implement these policies.
Effect
Without the proper implementation of an effectively designed system of internal controls, the
internal control system cannot be capable of effectively preventing, or detecting and correcting, material
noncompliance. As a result, costs for trash removal were incorrectly charged to the food service program.
Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of
the federal award could result in the loss of future federal funding to the School Corporation.
Questioned Costs
Known questioned costs of $15,448 were identified as detailed in the Condition and Context.
Recommendation
We recommended the School Corporation's management establish a proper system of internal
controls and develop policies and procedures to ensure costs are adequately documented.
FINDING 2023-005
Subject: Child Nutrition Cluster - Activities Allowed or Unallowed, Allowable Costs/Cost Principles
Federal Agency: Department of Agriculture
Federal Programs: School Breakfast Program, National School Lunch Program,
Summer Food Service Program for Children
Assistance Listings Numbers: 10.553, 10.555, 10.559
Federal Award Numbers and Years (or Other Identifying Numbers): FY 2022, FY 2023
Pass-Through Entity: Indiana Department of Education
Compliance Requirements: Activities Allowed or Unallowed, Allowable Costs/Cost Principles
Audit Findings: Material Weakness, Other Matters
Condition and Context
An effective system of internal controls which would include segregation of duties that would likely
be effective in preventing, or detecting and correcting, noncompliance should be designed and implemented
to ensure expenditures charged to the food service program fund (School Lunch fund) are for the benefit
of the food service program.
The School Corporation's payroll disbursements were prepared by the Payroll Clerk without a
documented review or approval process to prevent, or detect and correct, errors. In addition, vendor claims
were to be reviewed and approved by the Treasurer and the School Board. Of the 40 vendor claims
selected for testing to ensure the internal control was in place and operating effectively, 3 claims did not
have documentation of approval by the Treasurer or the School Board.
In addition, the total amount of trash removal services for the School Corporation was paid from
the School Lunch fund. The total amount charged to the School Lunch fund was $15,448. This amount
was considered questioned costs.
The lack of internal controls over payroll and vendor claims was a systemic issue throughout the
audit period. The noncompliance was isolated to the payments for trash removal services.
INDIANA STATE BOARD OF ACCOUNTS 22
RANDOLPH EASTERN SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
Criteria
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
2 CFR 200.403 states in part:
"Except where otherwise authorized by statute, costs must meet the following general criteria
in order to be allowable under Federal awards:
(a) Be necessary and reasonable for the performance of the Federal award and be
allocable thereto under these principles.
(b) Conform to any limitations or exclusions set forth in these principles or in the Federal
award as to types or amount of cost items. . . .
(g) Be adequately documented. . . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation.
Embedded within a properly designed and implemented internal control system should be internal controls
consisting of policies and procedures. Policies reflect the School Corporation's management statements
of what should be done to effect internal controls, and procedures should consist of actions that would
implement these policies.
Effect
Without the proper implementation of an effectively designed system of internal controls, the
internal control system cannot be capable of effectively preventing, or detecting and correcting, material
noncompliance. As a result, costs for trash removal were incorrectly charged to the food service program.
Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of
the federal award could result in the loss of future federal funding to the School Corporation.
Questioned Costs
Known questioned costs of $15,448 were identified as detailed in the Condition and Context.
Recommendation
We recommended the School Corporation's management establish a proper system of internal
controls and develop policies and procedures to ensure costs are adequately documented.
FINDING 2023-005
Subject: Child Nutrition Cluster - Activities Allowed or Unallowed, Allowable Costs/Cost Principles
Federal Agency: Department of Agriculture
Federal Programs: School Breakfast Program, National School Lunch Program,
Summer Food Service Program for Children
Assistance Listings Numbers: 10.553, 10.555, 10.559
Federal Award Numbers and Years (or Other Identifying Numbers): FY 2022, FY 2023
Pass-Through Entity: Indiana Department of Education
Compliance Requirements: Activities Allowed or Unallowed, Allowable Costs/Cost Principles
Audit Findings: Material Weakness, Other Matters
Condition and Context
An effective system of internal controls which would include segregation of duties that would likely
be effective in preventing, or detecting and correcting, noncompliance should be designed and implemented
to ensure expenditures charged to the food service program fund (School Lunch fund) are for the benefit
of the food service program.
The School Corporation's payroll disbursements were prepared by the Payroll Clerk without a
documented review or approval process to prevent, or detect and correct, errors. In addition, vendor claims
were to be reviewed and approved by the Treasurer and the School Board. Of the 40 vendor claims
selected for testing to ensure the internal control was in place and operating effectively, 3 claims did not
have documentation of approval by the Treasurer or the School Board.
In addition, the total amount of trash removal services for the School Corporation was paid from
the School Lunch fund. The total amount charged to the School Lunch fund was $15,448. This amount
was considered questioned costs.
The lack of internal controls over payroll and vendor claims was a systemic issue throughout the
audit period. The noncompliance was isolated to the payments for trash removal services.
INDIANA STATE BOARD OF ACCOUNTS 22
RANDOLPH EASTERN SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
Criteria
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
2 CFR 200.403 states in part:
"Except where otherwise authorized by statute, costs must meet the following general criteria
in order to be allowable under Federal awards:
(a) Be necessary and reasonable for the performance of the Federal award and be
allocable thereto under these principles.
(b) Conform to any limitations or exclusions set forth in these principles or in the Federal
award as to types or amount of cost items. . . .
(g) Be adequately documented. . . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation.
Embedded within a properly designed and implemented internal control system should be internal controls
consisting of policies and procedures. Policies reflect the School Corporation's management statements
of what should be done to effect internal controls, and procedures should consist of actions that would
implement these policies.
Effect
Without the proper implementation of an effectively designed system of internal controls, the
internal control system cannot be capable of effectively preventing, or detecting and correcting, material
noncompliance. As a result, costs for trash removal were incorrectly charged to the food service program.
Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of
the federal award could result in the loss of future federal funding to the School Corporation.
Questioned Costs
Known questioned costs of $15,448 were identified as detailed in the Condition and Context.
Recommendation
We recommended the School Corporation's management establish a proper system of internal
controls and develop policies and procedures to ensure costs are adequately documented.
FINDING 2023-006
Subject: Child Nutrition Cluster - Reporting
Federal Agency: Department of Agriculture
Federal Programs: School Breakfast Program, National School Lunch Program
Assistance Listings Numbers: 10.553, 10.555
Federal Award Numbers and Years (or Other Identifying Numbers): FY 2022, FY 2023
Pass-Through Entity: Indiana Department of Education
Compliance Requirement: Reporting
Audit Findings: Material Weakness, Other Matters
Condition and Context
The School Corporation had not properly designed or implemented a system of internal controls
which would include appropriate segregation of duties that would likely be effective in preventing, or
detecting and correcting, noncompliance related to the monthly reimbursement claims.
Meal count reports were run from the School Corporation's meal software system on a monthly
basis. The reports were then utilized by the Food Service Director or the Food Service Secretary to prepare
the monthly claims for reimbursement. There was no documented review or oversight process over the
monthly claims for reimbursement to prevent, or detect and correct, errors.
Of the four monthly claims for reimbursement selected for testing, two included overstatements in
the number of meal counts used for reimbursement purposes when compared to the supporting documentation.
The lack of internal controls and noncompliance were systemic issues during the audit period.
Criteria
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
7 CFR 210.8(a) states in part: "The school food authority shall establish internal controls which
ensure the accuracy of meal counts prior to submission of the monthly Claim for Reimbursement. . . ."
INDIANA STATE BOARD OF ACCOUNTS
24
RANDOLPH EASTERN SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
7 CFR 210.7(c)(1) states in part:
"Lunch count system. To ensure that the Claim for Reimbursement accurately reflects the
number of lunches and meal supplements served to eligible children, the school food authority
shall, at a minimum: . . .
(iii) Base Claims for Reimbursement on lunch counts, taken daily at the point of service,
which correctly identify the number of free, reduce price and paid lunches served to
eligible children;
(iv) Correctly record, consolidate and report those lunch and supplement counts on the
Claim for Reimbursement; . . ."
7 CFR 220.11(b) states in part: "Claims for Reimbursement shall include data in sufficient detail to
justify the reimbursement claimed . . ."
7 CFR 220.11(d) states in part: "The school food authority shall establish internal controls which
ensure the accuracy of breakfast counts prior to submission of the monthly Claim for Reimbursement. . . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation.
Embedded within a properly designed and implemented internal control system should be internal controls
consisting of policies and procedures. Policies reflect the School Corporation's management statements
of what should be done to effect internal controls, and procedures should consist of actions that would
implement these policies.
Effect
Without the proper implementation of an effectively designed system of internal controls, the
internal control system cannot be capable of effectively preventing, or detecting and correcting, material
noncompliance. As a result, reimbursement claims were not supported by the underlying records.
Noncompliance with the grant agreement and the Reporting compliance requirement could result
in the loss of future federal funds to the School Corporation.
Questioned Costs
There were no questioned costs identified.
Recommendation
We recommended that the School Corporation's management establish a proper system of internal
controls and develop policies and procedures to ensure meal counts are correctly reported.
Views of Responsible Officials
For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-006
Subject: Child Nutrition Cluster - Reporting
Federal Agency: Department of Agriculture
Federal Programs: School Breakfast Program, National School Lunch Program
Assistance Listings Numbers: 10.553, 10.555
Federal Award Numbers and Years (or Other Identifying Numbers): FY 2022, FY 2023
Pass-Through Entity: Indiana Department of Education
Compliance Requirement: Reporting
Audit Findings: Material Weakness, Other Matters
Condition and Context
The School Corporation had not properly designed or implemented a system of internal controls
which would include appropriate segregation of duties that would likely be effective in preventing, or
detecting and correcting, noncompliance related to the monthly reimbursement claims.
Meal count reports were run from the School Corporation's meal software system on a monthly
basis. The reports were then utilized by the Food Service Director or the Food Service Secretary to prepare
the monthly claims for reimbursement. There was no documented review or oversight process over the
monthly claims for reimbursement to prevent, or detect and correct, errors.
Of the four monthly claims for reimbursement selected for testing, two included overstatements in
the number of meal counts used for reimbursement purposes when compared to the supporting documentation.
The lack of internal controls and noncompliance were systemic issues during the audit period.
Criteria
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
7 CFR 210.8(a) states in part: "The school food authority shall establish internal controls which
ensure the accuracy of meal counts prior to submission of the monthly Claim for Reimbursement. . . ."
INDIANA STATE BOARD OF ACCOUNTS
24
RANDOLPH EASTERN SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
7 CFR 210.7(c)(1) states in part:
"Lunch count system. To ensure that the Claim for Reimbursement accurately reflects the
number of lunches and meal supplements served to eligible children, the school food authority
shall, at a minimum: . . .
(iii) Base Claims for Reimbursement on lunch counts, taken daily at the point of service,
which correctly identify the number of free, reduce price and paid lunches served to
eligible children;
(iv) Correctly record, consolidate and report those lunch and supplement counts on the
Claim for Reimbursement; . . ."
7 CFR 220.11(b) states in part: "Claims for Reimbursement shall include data in sufficient detail to
justify the reimbursement claimed . . ."
7 CFR 220.11(d) states in part: "The school food authority shall establish internal controls which
ensure the accuracy of breakfast counts prior to submission of the monthly Claim for Reimbursement. . . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation.
Embedded within a properly designed and implemented internal control system should be internal controls
consisting of policies and procedures. Policies reflect the School Corporation's management statements
of what should be done to effect internal controls, and procedures should consist of actions that would
implement these policies.
Effect
Without the proper implementation of an effectively designed system of internal controls, the
internal control system cannot be capable of effectively preventing, or detecting and correcting, material
noncompliance. As a result, reimbursement claims were not supported by the underlying records.
Noncompliance with the grant agreement and the Reporting compliance requirement could result
in the loss of future federal funds to the School Corporation.
Questioned Costs
There were no questioned costs identified.
Recommendation
We recommended that the School Corporation's management establish a proper system of internal
controls and develop policies and procedures to ensure meal counts are correctly reported.
Views of Responsible Officials
For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-006
Subject: Child Nutrition Cluster - Reporting
Federal Agency: Department of Agriculture
Federal Programs: School Breakfast Program, National School Lunch Program
Assistance Listings Numbers: 10.553, 10.555
Federal Award Numbers and Years (or Other Identifying Numbers): FY 2022, FY 2023
Pass-Through Entity: Indiana Department of Education
Compliance Requirement: Reporting
Audit Findings: Material Weakness, Other Matters
Condition and Context
The School Corporation had not properly designed or implemented a system of internal controls
which would include appropriate segregation of duties that would likely be effective in preventing, or
detecting and correcting, noncompliance related to the monthly reimbursement claims.
Meal count reports were run from the School Corporation's meal software system on a monthly
basis. The reports were then utilized by the Food Service Director or the Food Service Secretary to prepare
the monthly claims for reimbursement. There was no documented review or oversight process over the
monthly claims for reimbursement to prevent, or detect and correct, errors.
Of the four monthly claims for reimbursement selected for testing, two included overstatements in
the number of meal counts used for reimbursement purposes when compared to the supporting documentation.
The lack of internal controls and noncompliance were systemic issues during the audit period.
Criteria
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
7 CFR 210.8(a) states in part: "The school food authority shall establish internal controls which
ensure the accuracy of meal counts prior to submission of the monthly Claim for Reimbursement. . . ."
INDIANA STATE BOARD OF ACCOUNTS
24
RANDOLPH EASTERN SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
7 CFR 210.7(c)(1) states in part:
"Lunch count system. To ensure that the Claim for Reimbursement accurately reflects the
number of lunches and meal supplements served to eligible children, the school food authority
shall, at a minimum: . . .
(iii) Base Claims for Reimbursement on lunch counts, taken daily at the point of service,
which correctly identify the number of free, reduce price and paid lunches served to
eligible children;
(iv) Correctly record, consolidate and report those lunch and supplement counts on the
Claim for Reimbursement; . . ."
7 CFR 220.11(b) states in part: "Claims for Reimbursement shall include data in sufficient detail to
justify the reimbursement claimed . . ."
7 CFR 220.11(d) states in part: "The school food authority shall establish internal controls which
ensure the accuracy of breakfast counts prior to submission of the monthly Claim for Reimbursement. . . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation.
Embedded within a properly designed and implemented internal control system should be internal controls
consisting of policies and procedures. Policies reflect the School Corporation's management statements
of what should be done to effect internal controls, and procedures should consist of actions that would
implement these policies.
Effect
Without the proper implementation of an effectively designed system of internal controls, the
internal control system cannot be capable of effectively preventing, or detecting and correcting, material
noncompliance. As a result, reimbursement claims were not supported by the underlying records.
Noncompliance with the grant agreement and the Reporting compliance requirement could result
in the loss of future federal funds to the School Corporation.
Questioned Costs
There were no questioned costs identified.
Recommendation
We recommended that the School Corporation's management establish a proper system of internal
controls and develop policies and procedures to ensure meal counts are correctly reported.
Views of Responsible Officials
For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-006
Subject: Child Nutrition Cluster - Reporting
Federal Agency: Department of Agriculture
Federal Programs: School Breakfast Program, National School Lunch Program
Assistance Listings Numbers: 10.553, 10.555
Federal Award Numbers and Years (or Other Identifying Numbers): FY 2022, FY 2023
Pass-Through Entity: Indiana Department of Education
Compliance Requirement: Reporting
Audit Findings: Material Weakness, Other Matters
Condition and Context
The School Corporation had not properly designed or implemented a system of internal controls
which would include appropriate segregation of duties that would likely be effective in preventing, or
detecting and correcting, noncompliance related to the monthly reimbursement claims.
Meal count reports were run from the School Corporation's meal software system on a monthly
basis. The reports were then utilized by the Food Service Director or the Food Service Secretary to prepare
the monthly claims for reimbursement. There was no documented review or oversight process over the
monthly claims for reimbursement to prevent, or detect and correct, errors.
Of the four monthly claims for reimbursement selected for testing, two included overstatements in
the number of meal counts used for reimbursement purposes when compared to the supporting documentation.
The lack of internal controls and noncompliance were systemic issues during the audit period.
Criteria
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
7 CFR 210.8(a) states in part: "The school food authority shall establish internal controls which
ensure the accuracy of meal counts prior to submission of the monthly Claim for Reimbursement. . . ."
INDIANA STATE BOARD OF ACCOUNTS
24
RANDOLPH EASTERN SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
7 CFR 210.7(c)(1) states in part:
"Lunch count system. To ensure that the Claim for Reimbursement accurately reflects the
number of lunches and meal supplements served to eligible children, the school food authority
shall, at a minimum: . . .
(iii) Base Claims for Reimbursement on lunch counts, taken daily at the point of service,
which correctly identify the number of free, reduce price and paid lunches served to
eligible children;
(iv) Correctly record, consolidate and report those lunch and supplement counts on the
Claim for Reimbursement; . . ."
7 CFR 220.11(b) states in part: "Claims for Reimbursement shall include data in sufficient detail to
justify the reimbursement claimed . . ."
7 CFR 220.11(d) states in part: "The school food authority shall establish internal controls which
ensure the accuracy of breakfast counts prior to submission of the monthly Claim for Reimbursement. . . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation.
Embedded within a properly designed and implemented internal control system should be internal controls
consisting of policies and procedures. Policies reflect the School Corporation's management statements
of what should be done to effect internal controls, and procedures should consist of actions that would
implement these policies.
Effect
Without the proper implementation of an effectively designed system of internal controls, the
internal control system cannot be capable of effectively preventing, or detecting and correcting, material
noncompliance. As a result, reimbursement claims were not supported by the underlying records.
Noncompliance with the grant agreement and the Reporting compliance requirement could result
in the loss of future federal funds to the School Corporation.
Questioned Costs
There were no questioned costs identified.
Recommendation
We recommended that the School Corporation's management establish a proper system of internal
controls and develop policies and procedures to ensure meal counts are correctly reported.
Views of Responsible Officials
For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-007
Subject: Child Nutrition Cluster - Special Tests and Provisions -
Non-Profit School Food Service Accounts
Federal Agency: Department of Agriculture
Federal Programs: School Breakfast Program, National School Lunch Program,
Summer Food Service Program for Children
Assistance Listings Numbers: 10.553, 10.555, 10.559
Federal Award Numbers and Years (or Other Identifying Numbers): FY 2022, FY 2023
Pass-Through Entity: Indiana Department of Education
Compliance Requirement: Special Tests and Provisions - Non-Profit School Food Service Accounts
Audit Finding: Material Weakness
Condition and Context
The School Corporation had not properly designed or implemented a system of internal controls
which would include appropriate segregation of duties that would likely be effective in preventing, or
detecting and correcting, noncompliance.
All revenues and expenditures of the non-profit school food service account are to be accounted
for in accordance with state and federal requirements. As such, separate accounting is to be made for the
school food service, federal reimbursements are to be correctly credited to the food service account, and
transfers out of the school food service account are to be for allowable costs of the school food service.
One individual received notification of deposit, receipted funds into accounting software, and
prepared bank reconciliations. There was no documented review of the receipt of monthly meal
reimbursements by a second individual not involved in the original receipt process.
The lack of internal controls was a systemic issue during the audit period.
Criteria
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation,
which would include appropriate segregation of duties. Embedded within a properly designed and
implemented internal control system should be internal controls consisting of policies and procedures.
Policies reflect the School Corporation's management statements of what should be done to effect internal
controls, and procedures should consist of actions that would implement these policies.
INDIANA STATE BOARD OF ACCOUNTS
26
RANDOLPH EASTERN SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
Effect
Without the proper implementation of an effectively designed system of internal controls, the
internal control system cannot be capable of effectively preventing, or detecting and correcting, material
noncompliance.
Questioned Costs
There were no questioned costs identified.
Recommendation
We recommended that the School Corporation's management design and implement a proper
system of internal controls, including policies and procedures that would provide segregation of duties to
ensure appropriate reviews, approvals, and oversight are taking place.
Views of Responsible Officials
For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-007
Subject: Child Nutrition Cluster - Special Tests and Provisions -
Non-Profit School Food Service Accounts
Federal Agency: Department of Agriculture
Federal Programs: School Breakfast Program, National School Lunch Program,
Summer Food Service Program for Children
Assistance Listings Numbers: 10.553, 10.555, 10.559
Federal Award Numbers and Years (or Other Identifying Numbers): FY 2022, FY 2023
Pass-Through Entity: Indiana Department of Education
Compliance Requirement: Special Tests and Provisions - Non-Profit School Food Service Accounts
Audit Finding: Material Weakness
Condition and Context
The School Corporation had not properly designed or implemented a system of internal controls
which would include appropriate segregation of duties that would likely be effective in preventing, or
detecting and correcting, noncompliance.
All revenues and expenditures of the non-profit school food service account are to be accounted
for in accordance with state and federal requirements. As such, separate accounting is to be made for the
school food service, federal reimbursements are to be correctly credited to the food service account, and
transfers out of the school food service account are to be for allowable costs of the school food service.
One individual received notification of deposit, receipted funds into accounting software, and
prepared bank reconciliations. There was no documented review of the receipt of monthly meal
reimbursements by a second individual not involved in the original receipt process.
The lack of internal controls was a systemic issue during the audit period.
Criteria
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation,
which would include appropriate segregation of duties. Embedded within a properly designed and
implemented internal control system should be internal controls consisting of policies and procedures.
Policies reflect the School Corporation's management statements of what should be done to effect internal
controls, and procedures should consist of actions that would implement these policies.
INDIANA STATE BOARD OF ACCOUNTS
26
RANDOLPH EASTERN SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
Effect
Without the proper implementation of an effectively designed system of internal controls, the
internal control system cannot be capable of effectively preventing, or detecting and correcting, material
noncompliance.
Questioned Costs
There were no questioned costs identified.
Recommendation
We recommended that the School Corporation's management design and implement a proper
system of internal controls, including policies and procedures that would provide segregation of duties to
ensure appropriate reviews, approvals, and oversight are taking place.
Views of Responsible Officials
For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-007
Subject: Child Nutrition Cluster - Special Tests and Provisions -
Non-Profit School Food Service Accounts
Federal Agency: Department of Agriculture
Federal Programs: School Breakfast Program, National School Lunch Program,
Summer Food Service Program for Children
Assistance Listings Numbers: 10.553, 10.555, 10.559
Federal Award Numbers and Years (or Other Identifying Numbers): FY 2022, FY 2023
Pass-Through Entity: Indiana Department of Education
Compliance Requirement: Special Tests and Provisions - Non-Profit School Food Service Accounts
Audit Finding: Material Weakness
Condition and Context
The School Corporation had not properly designed or implemented a system of internal controls
which would include appropriate segregation of duties that would likely be effective in preventing, or
detecting and correcting, noncompliance.
All revenues and expenditures of the non-profit school food service account are to be accounted
for in accordance with state and federal requirements. As such, separate accounting is to be made for the
school food service, federal reimbursements are to be correctly credited to the food service account, and
transfers out of the school food service account are to be for allowable costs of the school food service.
One individual received notification of deposit, receipted funds into accounting software, and
prepared bank reconciliations. There was no documented review of the receipt of monthly meal
reimbursements by a second individual not involved in the original receipt process.
The lack of internal controls was a systemic issue during the audit period.
Criteria
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation,
which would include appropriate segregation of duties. Embedded within a properly designed and
implemented internal control system should be internal controls consisting of policies and procedures.
Policies reflect the School Corporation's management statements of what should be done to effect internal
controls, and procedures should consist of actions that would implement these policies.
INDIANA STATE BOARD OF ACCOUNTS
26
RANDOLPH EASTERN SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
Effect
Without the proper implementation of an effectively designed system of internal controls, the
internal control system cannot be capable of effectively preventing, or detecting and correcting, material
noncompliance.
Questioned Costs
There were no questioned costs identified.
Recommendation
We recommended that the School Corporation's management design and implement a proper
system of internal controls, including policies and procedures that would provide segregation of duties to
ensure appropriate reviews, approvals, and oversight are taking place.
Views of Responsible Officials
For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-007
Subject: Child Nutrition Cluster - Special Tests and Provisions -
Non-Profit School Food Service Accounts
Federal Agency: Department of Agriculture
Federal Programs: School Breakfast Program, National School Lunch Program,
Summer Food Service Program for Children
Assistance Listings Numbers: 10.553, 10.555, 10.559
Federal Award Numbers and Years (or Other Identifying Numbers): FY 2022, FY 2023
Pass-Through Entity: Indiana Department of Education
Compliance Requirement: Special Tests and Provisions - Non-Profit School Food Service Accounts
Audit Finding: Material Weakness
Condition and Context
The School Corporation had not properly designed or implemented a system of internal controls
which would include appropriate segregation of duties that would likely be effective in preventing, or
detecting and correcting, noncompliance.
All revenues and expenditures of the non-profit school food service account are to be accounted
for in accordance with state and federal requirements. As such, separate accounting is to be made for the
school food service, federal reimbursements are to be correctly credited to the food service account, and
transfers out of the school food service account are to be for allowable costs of the school food service.
One individual received notification of deposit, receipted funds into accounting software, and
prepared bank reconciliations. There was no documented review of the receipt of monthly meal
reimbursements by a second individual not involved in the original receipt process.
The lack of internal controls was a systemic issue during the audit period.
Criteria
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation,
which would include appropriate segregation of duties. Embedded within a properly designed and
implemented internal control system should be internal controls consisting of policies and procedures.
Policies reflect the School Corporation's management statements of what should be done to effect internal
controls, and procedures should consist of actions that would implement these policies.
INDIANA STATE BOARD OF ACCOUNTS
26
RANDOLPH EASTERN SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
Effect
Without the proper implementation of an effectively designed system of internal controls, the
internal control system cannot be capable of effectively preventing, or detecting and correcting, material
noncompliance.
Questioned Costs
There were no questioned costs identified.
Recommendation
We recommended that the School Corporation's management design and implement a proper
system of internal controls, including policies and procedures that would provide segregation of duties to
ensure appropriate reviews, approvals, and oversight are taking place.
Views of Responsible Officials
For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-007
Subject: Child Nutrition Cluster - Special Tests and Provisions -
Non-Profit School Food Service Accounts
Federal Agency: Department of Agriculture
Federal Programs: School Breakfast Program, National School Lunch Program,
Summer Food Service Program for Children
Assistance Listings Numbers: 10.553, 10.555, 10.559
Federal Award Numbers and Years (or Other Identifying Numbers): FY 2022, FY 2023
Pass-Through Entity: Indiana Department of Education
Compliance Requirement: Special Tests and Provisions - Non-Profit School Food Service Accounts
Audit Finding: Material Weakness
Condition and Context
The School Corporation had not properly designed or implemented a system of internal controls
which would include appropriate segregation of duties that would likely be effective in preventing, or
detecting and correcting, noncompliance.
All revenues and expenditures of the non-profit school food service account are to be accounted
for in accordance with state and federal requirements. As such, separate accounting is to be made for the
school food service, federal reimbursements are to be correctly credited to the food service account, and
transfers out of the school food service account are to be for allowable costs of the school food service.
One individual received notification of deposit, receipted funds into accounting software, and
prepared bank reconciliations. There was no documented review of the receipt of monthly meal
reimbursements by a second individual not involved in the original receipt process.
The lack of internal controls was a systemic issue during the audit period.
Criteria
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation,
which would include appropriate segregation of duties. Embedded within a properly designed and
implemented internal control system should be internal controls consisting of policies and procedures.
Policies reflect the School Corporation's management statements of what should be done to effect internal
controls, and procedures should consist of actions that would implement these policies.
INDIANA STATE BOARD OF ACCOUNTS
26
RANDOLPH EASTERN SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
Effect
Without the proper implementation of an effectively designed system of internal controls, the
internal control system cannot be capable of effectively preventing, or detecting and correcting, material
noncompliance.
Questioned Costs
There were no questioned costs identified.
Recommendation
We recommended that the School Corporation's management design and implement a proper
system of internal controls, including policies and procedures that would provide segregation of duties to
ensure appropriate reviews, approvals, and oversight are taking place.
Views of Responsible Officials
For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-008
Subject: COVID-19 - Education Stabilization Fund - Special Tests
and Provisions - Wage Rate Requirements
Federal Agency: Indiana Department of Education
Federal Program: COVID-19 - Education Stabilization Fund
Assistance Listings Numbers: 84.425U, 84.425C
Federal Award Numbers and Years (or Other Identifying Numbers): S425C200018; S425U2100013
Pass-Through Entity: Indiana Department of Education
Compliance Requirement: Special Tests and Provisions - Wage Rate Requirements
Audit Findings: Material Weakness, Modified Opinion
Condition and Context
Construction contracts in excess of $2,000 financed by federal assistance funds must pay wages
not less than those established for the locality of the project (prevailing wage rates) by the Department of
Labor (DOL) to their laborers and mechanics. Nonfederal entities are to include in their construction
contracts subject to the Wage Rate Requirements a provision that the contractor or subcontractor comply
with these requirements and the DOL regulations. This would include a requirement to submit a copy of
the payroll and statement of compliance to the entity for each week in which contract work was performed.
The School Corporation had not designed nor implemented a system of internal controls to ensure
that construction contracts in excess of $2,000 paid from federal grant funds included a prevailing wage
rate clause. Nine construction contracts, totaling $113,571, were paid for with the COVID-19 - Education
Stabilization Fund award during the audit period. All nine contracts were selected for testing. None of the
contracts included the required prevailing wage rate clause nor were the associated certified payrolls and
statements of compliance obtained.
The lack of internal controls and noncompliance were systemic issues throughout the audit period.
INDIANA STATE BOARD OF ACCOUNTS
27
RANDOLPH EASTERN SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
29 CFR 5.5 states in part:
"(a) The Agency head shall cause or require the contracting officer to insert in full in any
contract in excess of $2,000 which is entered into for the actual construction, alteration and/or
repair, including painting and decorating, of a public building or public work, or building or work
financed in whole or in part from Federal funds or in accordance with guarantees of a Federal
agency or financed from funds obtained by pledge of any contract of a Federal agency to make
a loan, grant or annual contribution (except where a different meaning is expressly indicated),
and which is subject to the labor standards provisions of any of the acts listed in § 5.1, the
following clauses . . .
(1) Minimum wages.
(i) All laborers and mechanics employed or working upon the site of the work (or
under the United States Housing Act of 1937 or under the Housing Act of 1949 in the
construction or development of the project), will be paid unconditionally and not less
often than once a week, and without subsequent deduction or rebate on any account
(except such payroll deductions as are permitted by regulations issued by the
Secretary of Labor under the Copeland Act (29 CFR part 3)), the full amount of wages
and bona fide fringe benefits (or cash equivalents thereof) due at time of payment
computed at rates not less than those contained in the wage determination of the
Secretary of Labor which is attached hereto and made a part hereof, regardless of any
contractual relationship which may be alleged to exist between the contractor and such
laborers and mechanics. . . .
(3) Payrolls and basic records. . . .
(i)
(A) The contractor shall submit weekly for each week in which any contract work
is performed a copy of all payrolls to the (write in name of appropriate federal
agency) if the agency is a party to the contract, but if the agency is not such a
party, the contractor will submit the payrolls to the applicant, sponsor, or
owner, as the case may be, for transmission to the (write in name of agency).
. . ."
2 CFR 200 Appendix II states in part:
"In addition to other provisions required by the Federal agency or non-Federal entity; all
contracts made by the non-Federal entity under the Federal award must contain provisions
covering the following, as applicable. . . .
INDIANA STATE BOARD OF ACCOUNTS
28
RANDOLPH EASTERN SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
(D) Davis-Bacon Act, as amended (40 U.S.C. 3141-3148). When required by Federal
program legislation, all prime construction contracts in excess of $2,000 awarded by
nonFederal entities must include a provision for compliance with the Davis-Bacon Act
(40 U.S.C. 3141-3144, and 3146-3148) as supplemented by Department of Labor
regulations (29 CFR Part 5, 'Labor Standards Provisions Applicable to Contracts Covering
Federally Financed and Assisted Construction'). In accordance with the statute, contractors
must be required to pay wages to laborers and mechanics at a rate not less than the
prevailing wages specified in a wage determination made by the Secretary of Labor. In
addition, contractors must be required to pay wages not less than once a week. . . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation,
which would include segregation of key functions. Embedded within a properly designed and implemented
internal control system should be internal controls consisting of policies and procedures. Policies reflect
the School Corporation's management statements of what should be done to effect internal controls, and
procedures should consist of actions that would implement these policies.
Effect
Without the proper implementation of an effectively designed system of internal controls, the
internal control system cannot be capable of effectively preventing, or detecting and correcting, material
noncompliance. As a result, construction contracts entered into did not contain the required wage rate
requirements clauses nor were certified payrolls obtained by the School Corporation.
Noncompliance with the grant agreement and the compliance requirement could result in the loss
of future federal funds to the School Corporation.
Questioned Costs
There were no questioned costs identified.
Recommendation
We recommended that the School Corporation's management establish a system of internal
controls and include the wage rate requirement clause in construction contracts. In addition, certified
payrolls should be obtained as required.
Views of Responsible Officials
For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-008
Subject: COVID-19 - Education Stabilization Fund - Special Tests
and Provisions - Wage Rate Requirements
Federal Agency: Indiana Department of Education
Federal Program: COVID-19 - Education Stabilization Fund
Assistance Listings Numbers: 84.425U, 84.425C
Federal Award Numbers and Years (or Other Identifying Numbers): S425C200018; S425U2100013
Pass-Through Entity: Indiana Department of Education
Compliance Requirement: Special Tests and Provisions - Wage Rate Requirements
Audit Findings: Material Weakness, Modified Opinion
Condition and Context
Construction contracts in excess of $2,000 financed by federal assistance funds must pay wages
not less than those established for the locality of the project (prevailing wage rates) by the Department of
Labor (DOL) to their laborers and mechanics. Nonfederal entities are to include in their construction
contracts subject to the Wage Rate Requirements a provision that the contractor or subcontractor comply
with these requirements and the DOL regulations. This would include a requirement to submit a copy of
the payroll and statement of compliance to the entity for each week in which contract work was performed.
The School Corporation had not designed nor implemented a system of internal controls to ensure
that construction contracts in excess of $2,000 paid from federal grant funds included a prevailing wage
rate clause. Nine construction contracts, totaling $113,571, were paid for with the COVID-19 - Education
Stabilization Fund award during the audit period. All nine contracts were selected for testing. None of the
contracts included the required prevailing wage rate clause nor were the associated certified payrolls and
statements of compliance obtained.
The lack of internal controls and noncompliance were systemic issues throughout the audit period.
INDIANA STATE BOARD OF ACCOUNTS
27
RANDOLPH EASTERN SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
29 CFR 5.5 states in part:
"(a) The Agency head shall cause or require the contracting officer to insert in full in any
contract in excess of $2,000 which is entered into for the actual construction, alteration and/or
repair, including painting and decorating, of a public building or public work, or building or work
financed in whole or in part from Federal funds or in accordance with guarantees of a Federal
agency or financed from funds obtained by pledge of any contract of a Federal agency to make
a loan, grant or annual contribution (except where a different meaning is expressly indicated),
and which is subject to the labor standards provisions of any of the acts listed in § 5.1, the
following clauses . . .
(1) Minimum wages.
(i) All laborers and mechanics employed or working upon the site of the work (or
under the United States Housing Act of 1937 or under the Housing Act of 1949 in the
construction or development of the project), will be paid unconditionally and not less
often than once a week, and without subsequent deduction or rebate on any account
(except such payroll deductions as are permitted by regulations issued by the
Secretary of Labor under the Copeland Act (29 CFR part 3)), the full amount of wages
and bona fide fringe benefits (or cash equivalents thereof) due at time of payment
computed at rates not less than those contained in the wage determination of the
Secretary of Labor which is attached hereto and made a part hereof, regardless of any
contractual relationship which may be alleged to exist between the contractor and such
laborers and mechanics. . . .
(3) Payrolls and basic records. . . .
(i)
(A) The contractor shall submit weekly for each week in which any contract work
is performed a copy of all payrolls to the (write in name of appropriate federal
agency) if the agency is a party to the contract, but if the agency is not such a
party, the contractor will submit the payrolls to the applicant, sponsor, or
owner, as the case may be, for transmission to the (write in name of agency).
. . ."
2 CFR 200 Appendix II states in part:
"In addition to other provisions required by the Federal agency or non-Federal entity; all
contracts made by the non-Federal entity under the Federal award must contain provisions
covering the following, as applicable. . . .
INDIANA STATE BOARD OF ACCOUNTS
28
RANDOLPH EASTERN SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
(D) Davis-Bacon Act, as amended (40 U.S.C. 3141-3148). When required by Federal
program legislation, all prime construction contracts in excess of $2,000 awarded by
nonFederal entities must include a provision for compliance with the Davis-Bacon Act
(40 U.S.C. 3141-3144, and 3146-3148) as supplemented by Department of Labor
regulations (29 CFR Part 5, 'Labor Standards Provisions Applicable to Contracts Covering
Federally Financed and Assisted Construction'). In accordance with the statute, contractors
must be required to pay wages to laborers and mechanics at a rate not less than the
prevailing wages specified in a wage determination made by the Secretary of Labor. In
addition, contractors must be required to pay wages not less than once a week. . . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation,
which would include segregation of key functions. Embedded within a properly designed and implemented
internal control system should be internal controls consisting of policies and procedures. Policies reflect
the School Corporation's management statements of what should be done to effect internal controls, and
procedures should consist of actions that would implement these policies.
Effect
Without the proper implementation of an effectively designed system of internal controls, the
internal control system cannot be capable of effectively preventing, or detecting and correcting, material
noncompliance. As a result, construction contracts entered into did not contain the required wage rate
requirements clauses nor were certified payrolls obtained by the School Corporation.
Noncompliance with the grant agreement and the compliance requirement could result in the loss
of future federal funds to the School Corporation.
Questioned Costs
There were no questioned costs identified.
Recommendation
We recommended that the School Corporation's management establish a system of internal
controls and include the wage rate requirement clause in construction contracts. In addition, certified
payrolls should be obtained as required.
Views of Responsible Officials
For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-008
Subject: COVID-19 - Education Stabilization Fund - Special Tests
and Provisions - Wage Rate Requirements
Federal Agency: Indiana Department of Education
Federal Program: COVID-19 - Education Stabilization Fund
Assistance Listings Numbers: 84.425U, 84.425C
Federal Award Numbers and Years (or Other Identifying Numbers): S425C200018; S425U2100013
Pass-Through Entity: Indiana Department of Education
Compliance Requirement: Special Tests and Provisions - Wage Rate Requirements
Audit Findings: Material Weakness, Modified Opinion
Condition and Context
Construction contracts in excess of $2,000 financed by federal assistance funds must pay wages
not less than those established for the locality of the project (prevailing wage rates) by the Department of
Labor (DOL) to their laborers and mechanics. Nonfederal entities are to include in their construction
contracts subject to the Wage Rate Requirements a provision that the contractor or subcontractor comply
with these requirements and the DOL regulations. This would include a requirement to submit a copy of
the payroll and statement of compliance to the entity for each week in which contract work was performed.
The School Corporation had not designed nor implemented a system of internal controls to ensure
that construction contracts in excess of $2,000 paid from federal grant funds included a prevailing wage
rate clause. Nine construction contracts, totaling $113,571, were paid for with the COVID-19 - Education
Stabilization Fund award during the audit period. All nine contracts were selected for testing. None of the
contracts included the required prevailing wage rate clause nor were the associated certified payrolls and
statements of compliance obtained.
The lack of internal controls and noncompliance were systemic issues throughout the audit period.
INDIANA STATE BOARD OF ACCOUNTS
27
RANDOLPH EASTERN SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
29 CFR 5.5 states in part:
"(a) The Agency head shall cause or require the contracting officer to insert in full in any
contract in excess of $2,000 which is entered into for the actual construction, alteration and/or
repair, including painting and decorating, of a public building or public work, or building or work
financed in whole or in part from Federal funds or in accordance with guarantees of a Federal
agency or financed from funds obtained by pledge of any contract of a Federal agency to make
a loan, grant or annual contribution (except where a different meaning is expressly indicated),
and which is subject to the labor standards provisions of any of the acts listed in § 5.1, the
following clauses . . .
(1) Minimum wages.
(i) All laborers and mechanics employed or working upon the site of the work (or
under the United States Housing Act of 1937 or under the Housing Act of 1949 in the
construction or development of the project), will be paid unconditionally and not less
often than once a week, and without subsequent deduction or rebate on any account
(except such payroll deductions as are permitted by regulations issued by the
Secretary of Labor under the Copeland Act (29 CFR part 3)), the full amount of wages
and bona fide fringe benefits (or cash equivalents thereof) due at time of payment
computed at rates not less than those contained in the wage determination of the
Secretary of Labor which is attached hereto and made a part hereof, regardless of any
contractual relationship which may be alleged to exist between the contractor and such
laborers and mechanics. . . .
(3) Payrolls and basic records. . . .
(i)
(A) The contractor shall submit weekly for each week in which any contract work
is performed a copy of all payrolls to the (write in name of appropriate federal
agency) if the agency is a party to the contract, but if the agency is not such a
party, the contractor will submit the payrolls to the applicant, sponsor, or
owner, as the case may be, for transmission to the (write in name of agency).
. . ."
2 CFR 200 Appendix II states in part:
"In addition to other provisions required by the Federal agency or non-Federal entity; all
contracts made by the non-Federal entity under the Federal award must contain provisions
covering the following, as applicable. . . .
INDIANA STATE BOARD OF ACCOUNTS
28
RANDOLPH EASTERN SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
(D) Davis-Bacon Act, as amended (40 U.S.C. 3141-3148). When required by Federal
program legislation, all prime construction contracts in excess of $2,000 awarded by
nonFederal entities must include a provision for compliance with the Davis-Bacon Act
(40 U.S.C. 3141-3144, and 3146-3148) as supplemented by Department of Labor
regulations (29 CFR Part 5, 'Labor Standards Provisions Applicable to Contracts Covering
Federally Financed and Assisted Construction'). In accordance with the statute, contractors
must be required to pay wages to laborers and mechanics at a rate not less than the
prevailing wages specified in a wage determination made by the Secretary of Labor. In
addition, contractors must be required to pay wages not less than once a week. . . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation,
which would include segregation of key functions. Embedded within a properly designed and implemented
internal control system should be internal controls consisting of policies and procedures. Policies reflect
the School Corporation's management statements of what should be done to effect internal controls, and
procedures should consist of actions that would implement these policies.
Effect
Without the proper implementation of an effectively designed system of internal controls, the
internal control system cannot be capable of effectively preventing, or detecting and correcting, material
noncompliance. As a result, construction contracts entered into did not contain the required wage rate
requirements clauses nor were certified payrolls obtained by the School Corporation.
Noncompliance with the grant agreement and the compliance requirement could result in the loss
of future federal funds to the School Corporation.
Questioned Costs
There were no questioned costs identified.
Recommendation
We recommended that the School Corporation's management establish a system of internal
controls and include the wage rate requirement clause in construction contracts. In addition, certified
payrolls should be obtained as required.
Views of Responsible Officials
For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-008
Subject: COVID-19 - Education Stabilization Fund - Special Tests
and Provisions - Wage Rate Requirements
Federal Agency: Indiana Department of Education
Federal Program: COVID-19 - Education Stabilization Fund
Assistance Listings Numbers: 84.425U, 84.425C
Federal Award Numbers and Years (or Other Identifying Numbers): S425C200018; S425U2100013
Pass-Through Entity: Indiana Department of Education
Compliance Requirement: Special Tests and Provisions - Wage Rate Requirements
Audit Findings: Material Weakness, Modified Opinion
Condition and Context
Construction contracts in excess of $2,000 financed by federal assistance funds must pay wages
not less than those established for the locality of the project (prevailing wage rates) by the Department of
Labor (DOL) to their laborers and mechanics. Nonfederal entities are to include in their construction
contracts subject to the Wage Rate Requirements a provision that the contractor or subcontractor comply
with these requirements and the DOL regulations. This would include a requirement to submit a copy of
the payroll and statement of compliance to the entity for each week in which contract work was performed.
The School Corporation had not designed nor implemented a system of internal controls to ensure
that construction contracts in excess of $2,000 paid from federal grant funds included a prevailing wage
rate clause. Nine construction contracts, totaling $113,571, were paid for with the COVID-19 - Education
Stabilization Fund award during the audit period. All nine contracts were selected for testing. None of the
contracts included the required prevailing wage rate clause nor were the associated certified payrolls and
statements of compliance obtained.
The lack of internal controls and noncompliance were systemic issues throughout the audit period.
INDIANA STATE BOARD OF ACCOUNTS
27
RANDOLPH EASTERN SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
29 CFR 5.5 states in part:
"(a) The Agency head shall cause or require the contracting officer to insert in full in any
contract in excess of $2,000 which is entered into for the actual construction, alteration and/or
repair, including painting and decorating, of a public building or public work, or building or work
financed in whole or in part from Federal funds or in accordance with guarantees of a Federal
agency or financed from funds obtained by pledge of any contract of a Federal agency to make
a loan, grant or annual contribution (except where a different meaning is expressly indicated),
and which is subject to the labor standards provisions of any of the acts listed in § 5.1, the
following clauses . . .
(1) Minimum wages.
(i) All laborers and mechanics employed or working upon the site of the work (or
under the United States Housing Act of 1937 or under the Housing Act of 1949 in the
construction or development of the project), will be paid unconditionally and not less
often than once a week, and without subsequent deduction or rebate on any account
(except such payroll deductions as are permitted by regulations issued by the
Secretary of Labor under the Copeland Act (29 CFR part 3)), the full amount of wages
and bona fide fringe benefits (or cash equivalents thereof) due at time of payment
computed at rates not less than those contained in the wage determination of the
Secretary of Labor which is attached hereto and made a part hereof, regardless of any
contractual relationship which may be alleged to exist between the contractor and such
laborers and mechanics. . . .
(3) Payrolls and basic records. . . .
(i)
(A) The contractor shall submit weekly for each week in which any contract work
is performed a copy of all payrolls to the (write in name of appropriate federal
agency) if the agency is a party to the contract, but if the agency is not such a
party, the contractor will submit the payrolls to the applicant, sponsor, or
owner, as the case may be, for transmission to the (write in name of agency).
. . ."
2 CFR 200 Appendix II states in part:
"In addition to other provisions required by the Federal agency or non-Federal entity; all
contracts made by the non-Federal entity under the Federal award must contain provisions
covering the following, as applicable. . . .
INDIANA STATE BOARD OF ACCOUNTS
28
RANDOLPH EASTERN SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
(D) Davis-Bacon Act, as amended (40 U.S.C. 3141-3148). When required by Federal
program legislation, all prime construction contracts in excess of $2,000 awarded by
nonFederal entities must include a provision for compliance with the Davis-Bacon Act
(40 U.S.C. 3141-3144, and 3146-3148) as supplemented by Department of Labor
regulations (29 CFR Part 5, 'Labor Standards Provisions Applicable to Contracts Covering
Federally Financed and Assisted Construction'). In accordance with the statute, contractors
must be required to pay wages to laborers and mechanics at a rate not less than the
prevailing wages specified in a wage determination made by the Secretary of Labor. In
addition, contractors must be required to pay wages not less than once a week. . . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation,
which would include segregation of key functions. Embedded within a properly designed and implemented
internal control system should be internal controls consisting of policies and procedures. Policies reflect
the School Corporation's management statements of what should be done to effect internal controls, and
procedures should consist of actions that would implement these policies.
Effect
Without the proper implementation of an effectively designed system of internal controls, the
internal control system cannot be capable of effectively preventing, or detecting and correcting, material
noncompliance. As a result, construction contracts entered into did not contain the required wage rate
requirements clauses nor were certified payrolls obtained by the School Corporation.
Noncompliance with the grant agreement and the compliance requirement could result in the loss
of future federal funds to the School Corporation.
Questioned Costs
There were no questioned costs identified.
Recommendation
We recommended that the School Corporation's management establish a system of internal
controls and include the wage rate requirement clause in construction contracts. In addition, certified
payrolls should be obtained as required.
Views of Responsible Officials
For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-008
Subject: COVID-19 - Education Stabilization Fund - Special Tests
and Provisions - Wage Rate Requirements
Federal Agency: Indiana Department of Education
Federal Program: COVID-19 - Education Stabilization Fund
Assistance Listings Numbers: 84.425U, 84.425C
Federal Award Numbers and Years (or Other Identifying Numbers): S425C200018; S425U2100013
Pass-Through Entity: Indiana Department of Education
Compliance Requirement: Special Tests and Provisions - Wage Rate Requirements
Audit Findings: Material Weakness, Modified Opinion
Condition and Context
Construction contracts in excess of $2,000 financed by federal assistance funds must pay wages
not less than those established for the locality of the project (prevailing wage rates) by the Department of
Labor (DOL) to their laborers and mechanics. Nonfederal entities are to include in their construction
contracts subject to the Wage Rate Requirements a provision that the contractor or subcontractor comply
with these requirements and the DOL regulations. This would include a requirement to submit a copy of
the payroll and statement of compliance to the entity for each week in which contract work was performed.
The School Corporation had not designed nor implemented a system of internal controls to ensure
that construction contracts in excess of $2,000 paid from federal grant funds included a prevailing wage
rate clause. Nine construction contracts, totaling $113,571, were paid for with the COVID-19 - Education
Stabilization Fund award during the audit period. All nine contracts were selected for testing. None of the
contracts included the required prevailing wage rate clause nor were the associated certified payrolls and
statements of compliance obtained.
The lack of internal controls and noncompliance were systemic issues throughout the audit period.
INDIANA STATE BOARD OF ACCOUNTS
27
RANDOLPH EASTERN SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
29 CFR 5.5 states in part:
"(a) The Agency head shall cause or require the contracting officer to insert in full in any
contract in excess of $2,000 which is entered into for the actual construction, alteration and/or
repair, including painting and decorating, of a public building or public work, or building or work
financed in whole or in part from Federal funds or in accordance with guarantees of a Federal
agency or financed from funds obtained by pledge of any contract of a Federal agency to make
a loan, grant or annual contribution (except where a different meaning is expressly indicated),
and which is subject to the labor standards provisions of any of the acts listed in § 5.1, the
following clauses . . .
(1) Minimum wages.
(i) All laborers and mechanics employed or working upon the site of the work (or
under the United States Housing Act of 1937 or under the Housing Act of 1949 in the
construction or development of the project), will be paid unconditionally and not less
often than once a week, and without subsequent deduction or rebate on any account
(except such payroll deductions as are permitted by regulations issued by the
Secretary of Labor under the Copeland Act (29 CFR part 3)), the full amount of wages
and bona fide fringe benefits (or cash equivalents thereof) due at time of payment
computed at rates not less than those contained in the wage determination of the
Secretary of Labor which is attached hereto and made a part hereof, regardless of any
contractual relationship which may be alleged to exist between the contractor and such
laborers and mechanics. . . .
(3) Payrolls and basic records. . . .
(i)
(A) The contractor shall submit weekly for each week in which any contract work
is performed a copy of all payrolls to the (write in name of appropriate federal
agency) if the agency is a party to the contract, but if the agency is not such a
party, the contractor will submit the payrolls to the applicant, sponsor, or
owner, as the case may be, for transmission to the (write in name of agency).
. . ."
2 CFR 200 Appendix II states in part:
"In addition to other provisions required by the Federal agency or non-Federal entity; all
contracts made by the non-Federal entity under the Federal award must contain provisions
covering the following, as applicable. . . .
INDIANA STATE BOARD OF ACCOUNTS
28
RANDOLPH EASTERN SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
(D) Davis-Bacon Act, as amended (40 U.S.C. 3141-3148). When required by Federal
program legislation, all prime construction contracts in excess of $2,000 awarded by
nonFederal entities must include a provision for compliance with the Davis-Bacon Act
(40 U.S.C. 3141-3144, and 3146-3148) as supplemented by Department of Labor
regulations (29 CFR Part 5, 'Labor Standards Provisions Applicable to Contracts Covering
Federally Financed and Assisted Construction'). In accordance with the statute, contractors
must be required to pay wages to laborers and mechanics at a rate not less than the
prevailing wages specified in a wage determination made by the Secretary of Labor. In
addition, contractors must be required to pay wages not less than once a week. . . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation,
which would include segregation of key functions. Embedded within a properly designed and implemented
internal control system should be internal controls consisting of policies and procedures. Policies reflect
the School Corporation's management statements of what should be done to effect internal controls, and
procedures should consist of actions that would implement these policies.
Effect
Without the proper implementation of an effectively designed system of internal controls, the
internal control system cannot be capable of effectively preventing, or detecting and correcting, material
noncompliance. As a result, construction contracts entered into did not contain the required wage rate
requirements clauses nor were certified payrolls obtained by the School Corporation.
Noncompliance with the grant agreement and the compliance requirement could result in the loss
of future federal funds to the School Corporation.
Questioned Costs
There were no questioned costs identified.
Recommendation
We recommended that the School Corporation's management establish a system of internal
controls and include the wage rate requirement clause in construction contracts. In addition, certified
payrolls should be obtained as required.
Views of Responsible Officials