FINDING 2023-002
Subject: COVID-19 - Education Stabilization Fund – Special Tests
and Provisions - Wage Rate Requirements
Federal Agency: Department of Education
Federal Program: COVID-19 - Education Stabilization Fund
Assistance Listings Numbers: 84.425D, 84.425U
Federal Award Numbers and Years (or Other Identifying Numbers): S425D200013, S425D210013,
S425U210013
Pass-Through Entity: Indiana Department of Education
Compliance Requirement: Special Tests and Provisions - Wage Rate Requirements
Audit Findings: Material Weakness, Modified Opinion
INDIANA STATE BOARD OF ACCOUNTS
15
PIKE COUNTY SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
Condition and Context
The School Corporation had not designed or implemented a system of internal controls, which
would include appropriate segregation of duties, to ensure that construction contracts in excess of $2,000
paid from federal grant funds included a prevailing wage rate clause.
Construction contracts in excess of $2,000 financed by federal assistance funds must pay wages
not less than those established for the locality of the project (prevailing wage rates) by the Department of
Labor (DOL) to their laborers and mechanics. Nonfederal entities are to include in their construction
contracts subject to the Wage Rate Requirements a provision that the contractor or subcontractor comply
with these requirements and the DOL regulations. This would include a requirement to submit a copy of
the payroll and statement of compliance to the entity for each week in which contract work was performed.
Three construction contracts, with expenditures totaling $1,138,605, were paid from the
COVID-19 - Education Stabilization Fund grant award during the audit period. All three contracts were
tested. None of the contracts included the required prevailing wage rate clause. Additionally, only one of
the three contractors provided certified weekly payrolls to the School Corporation.
The lack of internal controls and noncompliance were systemic issues throughout the audit period.
Criteria
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
29 CFR 5.5 states in part:
"(a) The Agency head shall cause or require the contracting officer to insert in full in any
contract in excess of $2,000 which is entered into for the actual construction, alteration and/or
repair, including painting and decorating, of a public building or public work, or building or work
financed in whole or in part from Federal funds or in accordance with guarantees of a Federal
agency or financed from funds obtained by pledge of any contract of a Federal agency to make
a loan, grant or annual contribution (except where a different meaning is expressly indicated),
and which is subject to the labor standards provisions of any of the acts listed in § 5.1, the
following clauses . . .
(1) Minimum wages.
INDIANA STATE BOARD OF ACCOUNTS
16
PIKE COUNTY SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
(i) All laborers and mechanics employed or working upon the site of the work (or
under the United States Housing Act of 1937 or under the Housing Act of 1949 in the
construction or development of the project), will be paid unconditionally and not less
often than once a week, and without subsequent deduction or rebate on any account
(except such payroll deductions as are permitted by regulations issued by the
Secretary of Labor under the Copeland Act (29 CFR part 3)), the full amount of wages
and bona fide fringe benefits (or cash equivalents thereof) due at time of payment
computed at rates not less than those contained in the wage determination of the
Secretary of Labor which is attached hereto and made a part hereof, regardless of any
contractual relationship which may be alleged to exist between the contractor and such
laborers and mechanics. . . .
(3) Payrolls and basic records. . . .
(ii)
(A) The contractor shall submit weekly for each week in which any contract work
is performed a copy of all payrolls to the (write in name of appropriate federal
agency) if the agency is a party to the contract, but if the agency is not such a
party, the contractor will submit the payrolls to the applicant, sponsor, or owner, as
the case may be, for transmission to the (write in name of agency). The payrolls
submitted shall set out accurately and completely all of the information required to
be maintained under 29 CFR 5.5(a)(3)(i), except that full social security numbers
and home addresses shall not be included on weekly transmittals. . . ."
2 CFR 200 Appendix II states in part:
"In addition to other provisions required by the Federal agency or non-Federal entity; all
contracts made by the non-Federal entity under the Federal award must contain provisions
covering the following, as applicable. . . .
(D) Davis-Bacon Act, as amended (40 U.S.C. 3141-3148). When required by Federal
program legislation, all prime construction contracts in excess of $2,000 awarded by non-
Federal entities must include a provision for compliance with the Davis-Bacon Act
(40 U.S.C. 3141-3144, and 3146-3148) as supplemented by Department of Labor regulations
(29 CFR Part 5, 'Labor Standards Provisions Applicable to Contracts Covering
Federally Financed and Assisted Construction'). In accordance with the statute, contractors
must be required to pay wages to laborers and mechanics at a rate not less than
the prevailing wages specified in a wage determination made by the Secretary of Labor.
In addition, contractors must be required to pay wages not less than once a week. . . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation,
which would include segregation of key functions. Embedded within a properly designed and implemented
internal control system should be internal controls consisting of policies and procedures. Policies reflect
the School Corporation's management statements of what should be done to effect internal controls, and
procedures should consist of actions that would implement these policies.
INDIANA STATE BOARD OF ACCOUNTS
17
PIKE COUNTY SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
Effect
Without the proper implementation of an effectively designed system of internal controls, the internal
control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance.
As a result, construction contracts entered into did not contain the required wage rate
requirements clauses nor were all certified payrolls obtained by the School Corporation.
Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of
the federal award could result in the loss of future federal funding to the School Corporation.
Questioned Costs
There were no questioned costs identified.
Recommendation
We recommended that the School Corporation's management establish a system of internal
controls and include the wage rate requirement clause in construction contracts. In addition, certified
payrolls should be obtained as required.
Views of Responsible Officials
For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-002
Subject: COVID-19 - Education Stabilization Fund – Special Tests
and Provisions - Wage Rate Requirements
Federal Agency: Department of Education
Federal Program: COVID-19 - Education Stabilization Fund
Assistance Listings Numbers: 84.425D, 84.425U
Federal Award Numbers and Years (or Other Identifying Numbers): S425D200013, S425D210013,
S425U210013
Pass-Through Entity: Indiana Department of Education
Compliance Requirement: Special Tests and Provisions - Wage Rate Requirements
Audit Findings: Material Weakness, Modified Opinion
INDIANA STATE BOARD OF ACCOUNTS
15
PIKE COUNTY SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
Condition and Context
The School Corporation had not designed or implemented a system of internal controls, which
would include appropriate segregation of duties, to ensure that construction contracts in excess of $2,000
paid from federal grant funds included a prevailing wage rate clause.
Construction contracts in excess of $2,000 financed by federal assistance funds must pay wages
not less than those established for the locality of the project (prevailing wage rates) by the Department of
Labor (DOL) to their laborers and mechanics. Nonfederal entities are to include in their construction
contracts subject to the Wage Rate Requirements a provision that the contractor or subcontractor comply
with these requirements and the DOL regulations. This would include a requirement to submit a copy of
the payroll and statement of compliance to the entity for each week in which contract work was performed.
Three construction contracts, with expenditures totaling $1,138,605, were paid from the
COVID-19 - Education Stabilization Fund grant award during the audit period. All three contracts were
tested. None of the contracts included the required prevailing wage rate clause. Additionally, only one of
the three contractors provided certified weekly payrolls to the School Corporation.
The lack of internal controls and noncompliance were systemic issues throughout the audit period.
Criteria
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
29 CFR 5.5 states in part:
"(a) The Agency head shall cause or require the contracting officer to insert in full in any
contract in excess of $2,000 which is entered into for the actual construction, alteration and/or
repair, including painting and decorating, of a public building or public work, or building or work
financed in whole or in part from Federal funds or in accordance with guarantees of a Federal
agency or financed from funds obtained by pledge of any contract of a Federal agency to make
a loan, grant or annual contribution (except where a different meaning is expressly indicated),
and which is subject to the labor standards provisions of any of the acts listed in § 5.1, the
following clauses . . .
(1) Minimum wages.
INDIANA STATE BOARD OF ACCOUNTS
16
PIKE COUNTY SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
(i) All laborers and mechanics employed or working upon the site of the work (or
under the United States Housing Act of 1937 or under the Housing Act of 1949 in the
construction or development of the project), will be paid unconditionally and not less
often than once a week, and without subsequent deduction or rebate on any account
(except such payroll deductions as are permitted by regulations issued by the
Secretary of Labor under the Copeland Act (29 CFR part 3)), the full amount of wages
and bona fide fringe benefits (or cash equivalents thereof) due at time of payment
computed at rates not less than those contained in the wage determination of the
Secretary of Labor which is attached hereto and made a part hereof, regardless of any
contractual relationship which may be alleged to exist between the contractor and such
laborers and mechanics. . . .
(3) Payrolls and basic records. . . .
(ii)
(A) The contractor shall submit weekly for each week in which any contract work
is performed a copy of all payrolls to the (write in name of appropriate federal
agency) if the agency is a party to the contract, but if the agency is not such a
party, the contractor will submit the payrolls to the applicant, sponsor, or owner, as
the case may be, for transmission to the (write in name of agency). The payrolls
submitted shall set out accurately and completely all of the information required to
be maintained under 29 CFR 5.5(a)(3)(i), except that full social security numbers
and home addresses shall not be included on weekly transmittals. . . ."
2 CFR 200 Appendix II states in part:
"In addition to other provisions required by the Federal agency or non-Federal entity; all
contracts made by the non-Federal entity under the Federal award must contain provisions
covering the following, as applicable. . . .
(D) Davis-Bacon Act, as amended (40 U.S.C. 3141-3148). When required by Federal
program legislation, all prime construction contracts in excess of $2,000 awarded by non-
Federal entities must include a provision for compliance with the Davis-Bacon Act
(40 U.S.C. 3141-3144, and 3146-3148) as supplemented by Department of Labor regulations
(29 CFR Part 5, 'Labor Standards Provisions Applicable to Contracts Covering
Federally Financed and Assisted Construction'). In accordance with the statute, contractors
must be required to pay wages to laborers and mechanics at a rate not less than
the prevailing wages specified in a wage determination made by the Secretary of Labor.
In addition, contractors must be required to pay wages not less than once a week. . . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation,
which would include segregation of key functions. Embedded within a properly designed and implemented
internal control system should be internal controls consisting of policies and procedures. Policies reflect
the School Corporation's management statements of what should be done to effect internal controls, and
procedures should consist of actions that would implement these policies.
INDIANA STATE BOARD OF ACCOUNTS
17
PIKE COUNTY SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
Effect
Without the proper implementation of an effectively designed system of internal controls, the internal
control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance.
As a result, construction contracts entered into did not contain the required wage rate
requirements clauses nor were all certified payrolls obtained by the School Corporation.
Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of
the federal award could result in the loss of future federal funding to the School Corporation.
Questioned Costs
There were no questioned costs identified.
Recommendation
We recommended that the School Corporation's management establish a system of internal
controls and include the wage rate requirement clause in construction contracts. In addition, certified
payrolls should be obtained as required.
Views of Responsible Officials
For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-002
Subject: COVID-19 - Education Stabilization Fund – Special Tests
and Provisions - Wage Rate Requirements
Federal Agency: Department of Education
Federal Program: COVID-19 - Education Stabilization Fund
Assistance Listings Numbers: 84.425D, 84.425U
Federal Award Numbers and Years (or Other Identifying Numbers): S425D200013, S425D210013,
S425U210013
Pass-Through Entity: Indiana Department of Education
Compliance Requirement: Special Tests and Provisions - Wage Rate Requirements
Audit Findings: Material Weakness, Modified Opinion
INDIANA STATE BOARD OF ACCOUNTS
15
PIKE COUNTY SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
Condition and Context
The School Corporation had not designed or implemented a system of internal controls, which
would include appropriate segregation of duties, to ensure that construction contracts in excess of $2,000
paid from federal grant funds included a prevailing wage rate clause.
Construction contracts in excess of $2,000 financed by federal assistance funds must pay wages
not less than those established for the locality of the project (prevailing wage rates) by the Department of
Labor (DOL) to their laborers and mechanics. Nonfederal entities are to include in their construction
contracts subject to the Wage Rate Requirements a provision that the contractor or subcontractor comply
with these requirements and the DOL regulations. This would include a requirement to submit a copy of
the payroll and statement of compliance to the entity for each week in which contract work was performed.
Three construction contracts, with expenditures totaling $1,138,605, were paid from the
COVID-19 - Education Stabilization Fund grant award during the audit period. All three contracts were
tested. None of the contracts included the required prevailing wage rate clause. Additionally, only one of
the three contractors provided certified weekly payrolls to the School Corporation.
The lack of internal controls and noncompliance were systemic issues throughout the audit period.
Criteria
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
29 CFR 5.5 states in part:
"(a) The Agency head shall cause or require the contracting officer to insert in full in any
contract in excess of $2,000 which is entered into for the actual construction, alteration and/or
repair, including painting and decorating, of a public building or public work, or building or work
financed in whole or in part from Federal funds or in accordance with guarantees of a Federal
agency or financed from funds obtained by pledge of any contract of a Federal agency to make
a loan, grant or annual contribution (except where a different meaning is expressly indicated),
and which is subject to the labor standards provisions of any of the acts listed in § 5.1, the
following clauses . . .
(1) Minimum wages.
INDIANA STATE BOARD OF ACCOUNTS
16
PIKE COUNTY SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
(i) All laborers and mechanics employed or working upon the site of the work (or
under the United States Housing Act of 1937 or under the Housing Act of 1949 in the
construction or development of the project), will be paid unconditionally and not less
often than once a week, and without subsequent deduction or rebate on any account
(except such payroll deductions as are permitted by regulations issued by the
Secretary of Labor under the Copeland Act (29 CFR part 3)), the full amount of wages
and bona fide fringe benefits (or cash equivalents thereof) due at time of payment
computed at rates not less than those contained in the wage determination of the
Secretary of Labor which is attached hereto and made a part hereof, regardless of any
contractual relationship which may be alleged to exist between the contractor and such
laborers and mechanics. . . .
(3) Payrolls and basic records. . . .
(ii)
(A) The contractor shall submit weekly for each week in which any contract work
is performed a copy of all payrolls to the (write in name of appropriate federal
agency) if the agency is a party to the contract, but if the agency is not such a
party, the contractor will submit the payrolls to the applicant, sponsor, or owner, as
the case may be, for transmission to the (write in name of agency). The payrolls
submitted shall set out accurately and completely all of the information required to
be maintained under 29 CFR 5.5(a)(3)(i), except that full social security numbers
and home addresses shall not be included on weekly transmittals. . . ."
2 CFR 200 Appendix II states in part:
"In addition to other provisions required by the Federal agency or non-Federal entity; all
contracts made by the non-Federal entity under the Federal award must contain provisions
covering the following, as applicable. . . .
(D) Davis-Bacon Act, as amended (40 U.S.C. 3141-3148). When required by Federal
program legislation, all prime construction contracts in excess of $2,000 awarded by non-
Federal entities must include a provision for compliance with the Davis-Bacon Act
(40 U.S.C. 3141-3144, and 3146-3148) as supplemented by Department of Labor regulations
(29 CFR Part 5, 'Labor Standards Provisions Applicable to Contracts Covering
Federally Financed and Assisted Construction'). In accordance with the statute, contractors
must be required to pay wages to laborers and mechanics at a rate not less than
the prevailing wages specified in a wage determination made by the Secretary of Labor.
In addition, contractors must be required to pay wages not less than once a week. . . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation,
which would include segregation of key functions. Embedded within a properly designed and implemented
internal control system should be internal controls consisting of policies and procedures. Policies reflect
the School Corporation's management statements of what should be done to effect internal controls, and
procedures should consist of actions that would implement these policies.
INDIANA STATE BOARD OF ACCOUNTS
17
PIKE COUNTY SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
Effect
Without the proper implementation of an effectively designed system of internal controls, the internal
control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance.
As a result, construction contracts entered into did not contain the required wage rate
requirements clauses nor were all certified payrolls obtained by the School Corporation.
Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of
the federal award could result in the loss of future federal funding to the School Corporation.
Questioned Costs
There were no questioned costs identified.
Recommendation
We recommended that the School Corporation's management establish a system of internal
controls and include the wage rate requirement clause in construction contracts. In addition, certified
payrolls should be obtained as required.
Views of Responsible Officials
For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-002
Subject: COVID-19 - Education Stabilization Fund – Special Tests
and Provisions - Wage Rate Requirements
Federal Agency: Department of Education
Federal Program: COVID-19 - Education Stabilization Fund
Assistance Listings Numbers: 84.425D, 84.425U
Federal Award Numbers and Years (or Other Identifying Numbers): S425D200013, S425D210013,
S425U210013
Pass-Through Entity: Indiana Department of Education
Compliance Requirement: Special Tests and Provisions - Wage Rate Requirements
Audit Findings: Material Weakness, Modified Opinion
INDIANA STATE BOARD OF ACCOUNTS
15
PIKE COUNTY SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
Condition and Context
The School Corporation had not designed or implemented a system of internal controls, which
would include appropriate segregation of duties, to ensure that construction contracts in excess of $2,000
paid from federal grant funds included a prevailing wage rate clause.
Construction contracts in excess of $2,000 financed by federal assistance funds must pay wages
not less than those established for the locality of the project (prevailing wage rates) by the Department of
Labor (DOL) to their laborers and mechanics. Nonfederal entities are to include in their construction
contracts subject to the Wage Rate Requirements a provision that the contractor or subcontractor comply
with these requirements and the DOL regulations. This would include a requirement to submit a copy of
the payroll and statement of compliance to the entity for each week in which contract work was performed.
Three construction contracts, with expenditures totaling $1,138,605, were paid from the
COVID-19 - Education Stabilization Fund grant award during the audit period. All three contracts were
tested. None of the contracts included the required prevailing wage rate clause. Additionally, only one of
the three contractors provided certified weekly payrolls to the School Corporation.
The lack of internal controls and noncompliance were systemic issues throughout the audit period.
Criteria
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
29 CFR 5.5 states in part:
"(a) The Agency head shall cause or require the contracting officer to insert in full in any
contract in excess of $2,000 which is entered into for the actual construction, alteration and/or
repair, including painting and decorating, of a public building or public work, or building or work
financed in whole or in part from Federal funds or in accordance with guarantees of a Federal
agency or financed from funds obtained by pledge of any contract of a Federal agency to make
a loan, grant or annual contribution (except where a different meaning is expressly indicated),
and which is subject to the labor standards provisions of any of the acts listed in § 5.1, the
following clauses . . .
(1) Minimum wages.
INDIANA STATE BOARD OF ACCOUNTS
16
PIKE COUNTY SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
(i) All laborers and mechanics employed or working upon the site of the work (or
under the United States Housing Act of 1937 or under the Housing Act of 1949 in the
construction or development of the project), will be paid unconditionally and not less
often than once a week, and without subsequent deduction or rebate on any account
(except such payroll deductions as are permitted by regulations issued by the
Secretary of Labor under the Copeland Act (29 CFR part 3)), the full amount of wages
and bona fide fringe benefits (or cash equivalents thereof) due at time of payment
computed at rates not less than those contained in the wage determination of the
Secretary of Labor which is attached hereto and made a part hereof, regardless of any
contractual relationship which may be alleged to exist between the contractor and such
laborers and mechanics. . . .
(3) Payrolls and basic records. . . .
(ii)
(A) The contractor shall submit weekly for each week in which any contract work
is performed a copy of all payrolls to the (write in name of appropriate federal
agency) if the agency is a party to the contract, but if the agency is not such a
party, the contractor will submit the payrolls to the applicant, sponsor, or owner, as
the case may be, for transmission to the (write in name of agency). The payrolls
submitted shall set out accurately and completely all of the information required to
be maintained under 29 CFR 5.5(a)(3)(i), except that full social security numbers
and home addresses shall not be included on weekly transmittals. . . ."
2 CFR 200 Appendix II states in part:
"In addition to other provisions required by the Federal agency or non-Federal entity; all
contracts made by the non-Federal entity under the Federal award must contain provisions
covering the following, as applicable. . . .
(D) Davis-Bacon Act, as amended (40 U.S.C. 3141-3148). When required by Federal
program legislation, all prime construction contracts in excess of $2,000 awarded by non-
Federal entities must include a provision for compliance with the Davis-Bacon Act
(40 U.S.C. 3141-3144, and 3146-3148) as supplemented by Department of Labor regulations
(29 CFR Part 5, 'Labor Standards Provisions Applicable to Contracts Covering
Federally Financed and Assisted Construction'). In accordance with the statute, contractors
must be required to pay wages to laborers and mechanics at a rate not less than
the prevailing wages specified in a wage determination made by the Secretary of Labor.
In addition, contractors must be required to pay wages not less than once a week. . . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation,
which would include segregation of key functions. Embedded within a properly designed and implemented
internal control system should be internal controls consisting of policies and procedures. Policies reflect
the School Corporation's management statements of what should be done to effect internal controls, and
procedures should consist of actions that would implement these policies.
INDIANA STATE BOARD OF ACCOUNTS
17
PIKE COUNTY SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
Effect
Without the proper implementation of an effectively designed system of internal controls, the internal
control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance.
As a result, construction contracts entered into did not contain the required wage rate
requirements clauses nor were all certified payrolls obtained by the School Corporation.
Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of
the federal award could result in the loss of future federal funding to the School Corporation.
Questioned Costs
There were no questioned costs identified.
Recommendation
We recommended that the School Corporation's management establish a system of internal
controls and include the wage rate requirement clause in construction contracts. In addition, certified
payrolls should be obtained as required.
Views of Responsible Officials
For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-002
Subject: COVID-19 - Education Stabilization Fund – Special Tests
and Provisions - Wage Rate Requirements
Federal Agency: Department of Education
Federal Program: COVID-19 - Education Stabilization Fund
Assistance Listings Numbers: 84.425D, 84.425U
Federal Award Numbers and Years (or Other Identifying Numbers): S425D200013, S425D210013,
S425U210013
Pass-Through Entity: Indiana Department of Education
Compliance Requirement: Special Tests and Provisions - Wage Rate Requirements
Audit Findings: Material Weakness, Modified Opinion
INDIANA STATE BOARD OF ACCOUNTS
15
PIKE COUNTY SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
Condition and Context
The School Corporation had not designed or implemented a system of internal controls, which
would include appropriate segregation of duties, to ensure that construction contracts in excess of $2,000
paid from federal grant funds included a prevailing wage rate clause.
Construction contracts in excess of $2,000 financed by federal assistance funds must pay wages
not less than those established for the locality of the project (prevailing wage rates) by the Department of
Labor (DOL) to their laborers and mechanics. Nonfederal entities are to include in their construction
contracts subject to the Wage Rate Requirements a provision that the contractor or subcontractor comply
with these requirements and the DOL regulations. This would include a requirement to submit a copy of
the payroll and statement of compliance to the entity for each week in which contract work was performed.
Three construction contracts, with expenditures totaling $1,138,605, were paid from the
COVID-19 - Education Stabilization Fund grant award during the audit period. All three contracts were
tested. None of the contracts included the required prevailing wage rate clause. Additionally, only one of
the three contractors provided certified weekly payrolls to the School Corporation.
The lack of internal controls and noncompliance were systemic issues throughout the audit period.
Criteria
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
29 CFR 5.5 states in part:
"(a) The Agency head shall cause or require the contracting officer to insert in full in any
contract in excess of $2,000 which is entered into for the actual construction, alteration and/or
repair, including painting and decorating, of a public building or public work, or building or work
financed in whole or in part from Federal funds or in accordance with guarantees of a Federal
agency or financed from funds obtained by pledge of any contract of a Federal agency to make
a loan, grant or annual contribution (except where a different meaning is expressly indicated),
and which is subject to the labor standards provisions of any of the acts listed in § 5.1, the
following clauses . . .
(1) Minimum wages.
INDIANA STATE BOARD OF ACCOUNTS
16
PIKE COUNTY SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
(i) All laborers and mechanics employed or working upon the site of the work (or
under the United States Housing Act of 1937 or under the Housing Act of 1949 in the
construction or development of the project), will be paid unconditionally and not less
often than once a week, and without subsequent deduction or rebate on any account
(except such payroll deductions as are permitted by regulations issued by the
Secretary of Labor under the Copeland Act (29 CFR part 3)), the full amount of wages
and bona fide fringe benefits (or cash equivalents thereof) due at time of payment
computed at rates not less than those contained in the wage determination of the
Secretary of Labor which is attached hereto and made a part hereof, regardless of any
contractual relationship which may be alleged to exist between the contractor and such
laborers and mechanics. . . .
(3) Payrolls and basic records. . . .
(ii)
(A) The contractor shall submit weekly for each week in which any contract work
is performed a copy of all payrolls to the (write in name of appropriate federal
agency) if the agency is a party to the contract, but if the agency is not such a
party, the contractor will submit the payrolls to the applicant, sponsor, or owner, as
the case may be, for transmission to the (write in name of agency). The payrolls
submitted shall set out accurately and completely all of the information required to
be maintained under 29 CFR 5.5(a)(3)(i), except that full social security numbers
and home addresses shall not be included on weekly transmittals. . . ."
2 CFR 200 Appendix II states in part:
"In addition to other provisions required by the Federal agency or non-Federal entity; all
contracts made by the non-Federal entity under the Federal award must contain provisions
covering the following, as applicable. . . .
(D) Davis-Bacon Act, as amended (40 U.S.C. 3141-3148). When required by Federal
program legislation, all prime construction contracts in excess of $2,000 awarded by non-
Federal entities must include a provision for compliance with the Davis-Bacon Act
(40 U.S.C. 3141-3144, and 3146-3148) as supplemented by Department of Labor regulations
(29 CFR Part 5, 'Labor Standards Provisions Applicable to Contracts Covering
Federally Financed and Assisted Construction'). In accordance with the statute, contractors
must be required to pay wages to laborers and mechanics at a rate not less than
the prevailing wages specified in a wage determination made by the Secretary of Labor.
In addition, contractors must be required to pay wages not less than once a week. . . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation,
which would include segregation of key functions. Embedded within a properly designed and implemented
internal control system should be internal controls consisting of policies and procedures. Policies reflect
the School Corporation's management statements of what should be done to effect internal controls, and
procedures should consist of actions that would implement these policies.
INDIANA STATE BOARD OF ACCOUNTS
17
PIKE COUNTY SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
Effect
Without the proper implementation of an effectively designed system of internal controls, the internal
control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance.
As a result, construction contracts entered into did not contain the required wage rate
requirements clauses nor were all certified payrolls obtained by the School Corporation.
Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of
the federal award could result in the loss of future federal funding to the School Corporation.
Questioned Costs
There were no questioned costs identified.
Recommendation
We recommended that the School Corporation's management establish a system of internal
controls and include the wage rate requirement clause in construction contracts. In addition, certified
payrolls should be obtained as required.
Views of Responsible Officials
For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-002
Subject: COVID-19 - Education Stabilization Fund – Special Tests
and Provisions - Wage Rate Requirements
Federal Agency: Department of Education
Federal Program: COVID-19 - Education Stabilization Fund
Assistance Listings Numbers: 84.425D, 84.425U
Federal Award Numbers and Years (or Other Identifying Numbers): S425D200013, S425D210013,
S425U210013
Pass-Through Entity: Indiana Department of Education
Compliance Requirement: Special Tests and Provisions - Wage Rate Requirements
Audit Findings: Material Weakness, Modified Opinion
INDIANA STATE BOARD OF ACCOUNTS
15
PIKE COUNTY SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
Condition and Context
The School Corporation had not designed or implemented a system of internal controls, which
would include appropriate segregation of duties, to ensure that construction contracts in excess of $2,000
paid from federal grant funds included a prevailing wage rate clause.
Construction contracts in excess of $2,000 financed by federal assistance funds must pay wages
not less than those established for the locality of the project (prevailing wage rates) by the Department of
Labor (DOL) to their laborers and mechanics. Nonfederal entities are to include in their construction
contracts subject to the Wage Rate Requirements a provision that the contractor or subcontractor comply
with these requirements and the DOL regulations. This would include a requirement to submit a copy of
the payroll and statement of compliance to the entity for each week in which contract work was performed.
Three construction contracts, with expenditures totaling $1,138,605, were paid from the
COVID-19 - Education Stabilization Fund grant award during the audit period. All three contracts were
tested. None of the contracts included the required prevailing wage rate clause. Additionally, only one of
the three contractors provided certified weekly payrolls to the School Corporation.
The lack of internal controls and noncompliance were systemic issues throughout the audit period.
Criteria
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
29 CFR 5.5 states in part:
"(a) The Agency head shall cause or require the contracting officer to insert in full in any
contract in excess of $2,000 which is entered into for the actual construction, alteration and/or
repair, including painting and decorating, of a public building or public work, or building or work
financed in whole or in part from Federal funds or in accordance with guarantees of a Federal
agency or financed from funds obtained by pledge of any contract of a Federal agency to make
a loan, grant or annual contribution (except where a different meaning is expressly indicated),
and which is subject to the labor standards provisions of any of the acts listed in § 5.1, the
following clauses . . .
(1) Minimum wages.
INDIANA STATE BOARD OF ACCOUNTS
16
PIKE COUNTY SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
(i) All laborers and mechanics employed or working upon the site of the work (or
under the United States Housing Act of 1937 or under the Housing Act of 1949 in the
construction or development of the project), will be paid unconditionally and not less
often than once a week, and without subsequent deduction or rebate on any account
(except such payroll deductions as are permitted by regulations issued by the
Secretary of Labor under the Copeland Act (29 CFR part 3)), the full amount of wages
and bona fide fringe benefits (or cash equivalents thereof) due at time of payment
computed at rates not less than those contained in the wage determination of the
Secretary of Labor which is attached hereto and made a part hereof, regardless of any
contractual relationship which may be alleged to exist between the contractor and such
laborers and mechanics. . . .
(3) Payrolls and basic records. . . .
(ii)
(A) The contractor shall submit weekly for each week in which any contract work
is performed a copy of all payrolls to the (write in name of appropriate federal
agency) if the agency is a party to the contract, but if the agency is not such a
party, the contractor will submit the payrolls to the applicant, sponsor, or owner, as
the case may be, for transmission to the (write in name of agency). The payrolls
submitted shall set out accurately and completely all of the information required to
be maintained under 29 CFR 5.5(a)(3)(i), except that full social security numbers
and home addresses shall not be included on weekly transmittals. . . ."
2 CFR 200 Appendix II states in part:
"In addition to other provisions required by the Federal agency or non-Federal entity; all
contracts made by the non-Federal entity under the Federal award must contain provisions
covering the following, as applicable. . . .
(D) Davis-Bacon Act, as amended (40 U.S.C. 3141-3148). When required by Federal
program legislation, all prime construction contracts in excess of $2,000 awarded by non-
Federal entities must include a provision for compliance with the Davis-Bacon Act
(40 U.S.C. 3141-3144, and 3146-3148) as supplemented by Department of Labor regulations
(29 CFR Part 5, 'Labor Standards Provisions Applicable to Contracts Covering
Federally Financed and Assisted Construction'). In accordance with the statute, contractors
must be required to pay wages to laborers and mechanics at a rate not less than
the prevailing wages specified in a wage determination made by the Secretary of Labor.
In addition, contractors must be required to pay wages not less than once a week. . . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation,
which would include segregation of key functions. Embedded within a properly designed and implemented
internal control system should be internal controls consisting of policies and procedures. Policies reflect
the School Corporation's management statements of what should be done to effect internal controls, and
procedures should consist of actions that would implement these policies.
INDIANA STATE BOARD OF ACCOUNTS
17
PIKE COUNTY SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
Effect
Without the proper implementation of an effectively designed system of internal controls, the internal
control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance.
As a result, construction contracts entered into did not contain the required wage rate
requirements clauses nor were all certified payrolls obtained by the School Corporation.
Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of
the federal award could result in the loss of future federal funding to the School Corporation.
Questioned Costs
There were no questioned costs identified.
Recommendation
We recommended that the School Corporation's management establish a system of internal
controls and include the wage rate requirement clause in construction contracts. In addition, certified
payrolls should be obtained as required.
Views of Responsible Officials
For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-003
Subject: COVID-19 Education Stabilization Fund - Equipment and Real Property Management
Federal Agency: Department of Education
Federal Program: COVID-19 - Education Stabilization Fund
Assistance Listings Numbers: 84.425D, 84.425U
Federal Award Numbers and Years (or Other Identifying Numbers): S425D200013, S425D210013,
S425U210013
Pass-Through Entity: Indiana Department of Education
Compliance Requirement: Equipment and Real Property Management
Audit Findings: Material Weakness, Other Matters
Condition and Context
The School Corporation had not properly designed or implemented a system of internal controls,
which would include appropriate segregation of duties, to ensure that the equipment and real property
records contained all the required information.
A property record or capital asset listing which would include a description of the property, a serial
number or other identification number, the source of funding for the property (including the federal award
identification number (FAIN)), who holds title, the acquisition date, cost of the property, percentage of
federal participation in the project costs for the federal award under which the property was acquired, the
location, and use and condition of the property is to be maintained for assets purchased that exceed the
School Corporation's capitalization threshold.
INDIANA STATE BOARD OF ACCOUNTS
18
PIKE COUNTY SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
The School Corporation maintained and presented the equipment and real property records for the
COVID-19 - Education Stabilization Fund grant equipment; however, the records failed to include a serial
number or other identification number, the source of funding for the property (including the federal award
identification number), percentage of federal participation in the project costs for the federal award under
which the property was acquired, the use, and condition of the property.
The lack of internal controls and noncompliance were systemic issues throughout the audit period.
Criteria
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
2 CFR 200.313(d) states in part:
"Management requirements. Procedures for managing equipment (including replacement
equipment), whether acquired in whole or in part under a Federal award, until disposition takes
place will, as a minimum, meet the following requirements:
(1) Property records must be maintained that include a description of the property, a serial
number or other identification number, the source of funding for the property (including
the FAIN), who holds title, the acquisition date, and cost of the property, percentage of
Federal participation in the project costs for the Federal award under which the
property was acquired, the location, use and condition of the property, and any ultimate
disposition data including the date of disposal and sale price of the property.
(2) A physical inventory of the property must be taken and the results reconciled with the
property records at least once every two years.
(3) A control system must be developed to ensure adequate safeguards to prevent loss,
damage, or theft of the property. Any loss, damage, or theft must be investigated.
(4) Adequate maintenance procedures must be developed to keep property in good
condition. . . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation.
Embedded within a properly designed and implemented internal control system should be internal controls
consisting of policies and procedures. Policies reflect the School Corporation's management statements
of what should be done to effect internal controls, and procedures should consist of actions that would
implement these policies.
INDIANA STATE BOARD OF ACCOUNTS 19
PIKE COUNTY SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
Effect
Without the proper implementation of an effectively designed system of internal controls, the internal
control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance.
As a result, the capital asset listing did not include all the required information.
Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of
the federal award could result in the loss of future federal funding to the School Corporation.
Questioned Costs
There were no questioned costs identified.
Recommendation
We recommended that management of the School Corporation establish a proper system of
internal controls and develop policies and procedures to ensure asset records include all the necessary
information.
Views of Responsible Officials
For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-003
Subject: COVID-19 Education Stabilization Fund - Equipment and Real Property Management
Federal Agency: Department of Education
Federal Program: COVID-19 - Education Stabilization Fund
Assistance Listings Numbers: 84.425D, 84.425U
Federal Award Numbers and Years (or Other Identifying Numbers): S425D200013, S425D210013,
S425U210013
Pass-Through Entity: Indiana Department of Education
Compliance Requirement: Equipment and Real Property Management
Audit Findings: Material Weakness, Other Matters
Condition and Context
The School Corporation had not properly designed or implemented a system of internal controls,
which would include appropriate segregation of duties, to ensure that the equipment and real property
records contained all the required information.
A property record or capital asset listing which would include a description of the property, a serial
number or other identification number, the source of funding for the property (including the federal award
identification number (FAIN)), who holds title, the acquisition date, cost of the property, percentage of
federal participation in the project costs for the federal award under which the property was acquired, the
location, and use and condition of the property is to be maintained for assets purchased that exceed the
School Corporation's capitalization threshold.
INDIANA STATE BOARD OF ACCOUNTS
18
PIKE COUNTY SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
The School Corporation maintained and presented the equipment and real property records for the
COVID-19 - Education Stabilization Fund grant equipment; however, the records failed to include a serial
number or other identification number, the source of funding for the property (including the federal award
identification number), percentage of federal participation in the project costs for the federal award under
which the property was acquired, the use, and condition of the property.
The lack of internal controls and noncompliance were systemic issues throughout the audit period.
Criteria
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
2 CFR 200.313(d) states in part:
"Management requirements. Procedures for managing equipment (including replacement
equipment), whether acquired in whole or in part under a Federal award, until disposition takes
place will, as a minimum, meet the following requirements:
(1) Property records must be maintained that include a description of the property, a serial
number or other identification number, the source of funding for the property (including
the FAIN), who holds title, the acquisition date, and cost of the property, percentage of
Federal participation in the project costs for the Federal award under which the
property was acquired, the location, use and condition of the property, and any ultimate
disposition data including the date of disposal and sale price of the property.
(2) A physical inventory of the property must be taken and the results reconciled with the
property records at least once every two years.
(3) A control system must be developed to ensure adequate safeguards to prevent loss,
damage, or theft of the property. Any loss, damage, or theft must be investigated.
(4) Adequate maintenance procedures must be developed to keep property in good
condition. . . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation.
Embedded within a properly designed and implemented internal control system should be internal controls
consisting of policies and procedures. Policies reflect the School Corporation's management statements
of what should be done to effect internal controls, and procedures should consist of actions that would
implement these policies.
INDIANA STATE BOARD OF ACCOUNTS 19
PIKE COUNTY SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
Effect
Without the proper implementation of an effectively designed system of internal controls, the internal
control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance.
As a result, the capital asset listing did not include all the required information.
Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of
the federal award could result in the loss of future federal funding to the School Corporation.
Questioned Costs
There were no questioned costs identified.
Recommendation
We recommended that management of the School Corporation establish a proper system of
internal controls and develop policies and procedures to ensure asset records include all the necessary
information.
Views of Responsible Officials
For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-003
Subject: COVID-19 Education Stabilization Fund - Equipment and Real Property Management
Federal Agency: Department of Education
Federal Program: COVID-19 - Education Stabilization Fund
Assistance Listings Numbers: 84.425D, 84.425U
Federal Award Numbers and Years (or Other Identifying Numbers): S425D200013, S425D210013,
S425U210013
Pass-Through Entity: Indiana Department of Education
Compliance Requirement: Equipment and Real Property Management
Audit Findings: Material Weakness, Other Matters
Condition and Context
The School Corporation had not properly designed or implemented a system of internal controls,
which would include appropriate segregation of duties, to ensure that the equipment and real property
records contained all the required information.
A property record or capital asset listing which would include a description of the property, a serial
number or other identification number, the source of funding for the property (including the federal award
identification number (FAIN)), who holds title, the acquisition date, cost of the property, percentage of
federal participation in the project costs for the federal award under which the property was acquired, the
location, and use and condition of the property is to be maintained for assets purchased that exceed the
School Corporation's capitalization threshold.
INDIANA STATE BOARD OF ACCOUNTS
18
PIKE COUNTY SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
The School Corporation maintained and presented the equipment and real property records for the
COVID-19 - Education Stabilization Fund grant equipment; however, the records failed to include a serial
number or other identification number, the source of funding for the property (including the federal award
identification number), percentage of federal participation in the project costs for the federal award under
which the property was acquired, the use, and condition of the property.
The lack of internal controls and noncompliance were systemic issues throughout the audit period.
Criteria
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
2 CFR 200.313(d) states in part:
"Management requirements. Procedures for managing equipment (including replacement
equipment), whether acquired in whole or in part under a Federal award, until disposition takes
place will, as a minimum, meet the following requirements:
(1) Property records must be maintained that include a description of the property, a serial
number or other identification number, the source of funding for the property (including
the FAIN), who holds title, the acquisition date, and cost of the property, percentage of
Federal participation in the project costs for the Federal award under which the
property was acquired, the location, use and condition of the property, and any ultimate
disposition data including the date of disposal and sale price of the property.
(2) A physical inventory of the property must be taken and the results reconciled with the
property records at least once every two years.
(3) A control system must be developed to ensure adequate safeguards to prevent loss,
damage, or theft of the property. Any loss, damage, or theft must be investigated.
(4) Adequate maintenance procedures must be developed to keep property in good
condition. . . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation.
Embedded within a properly designed and implemented internal control system should be internal controls
consisting of policies and procedures. Policies reflect the School Corporation's management statements
of what should be done to effect internal controls, and procedures should consist of actions that would
implement these policies.
INDIANA STATE BOARD OF ACCOUNTS 19
PIKE COUNTY SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
Effect
Without the proper implementation of an effectively designed system of internal controls, the internal
control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance.
As a result, the capital asset listing did not include all the required information.
Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of
the federal award could result in the loss of future federal funding to the School Corporation.
Questioned Costs
There were no questioned costs identified.
Recommendation
We recommended that management of the School Corporation establish a proper system of
internal controls and develop policies and procedures to ensure asset records include all the necessary
information.
Views of Responsible Officials
For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-003
Subject: COVID-19 Education Stabilization Fund - Equipment and Real Property Management
Federal Agency: Department of Education
Federal Program: COVID-19 - Education Stabilization Fund
Assistance Listings Numbers: 84.425D, 84.425U
Federal Award Numbers and Years (or Other Identifying Numbers): S425D200013, S425D210013,
S425U210013
Pass-Through Entity: Indiana Department of Education
Compliance Requirement: Equipment and Real Property Management
Audit Findings: Material Weakness, Other Matters
Condition and Context
The School Corporation had not properly designed or implemented a system of internal controls,
which would include appropriate segregation of duties, to ensure that the equipment and real property
records contained all the required information.
A property record or capital asset listing which would include a description of the property, a serial
number or other identification number, the source of funding for the property (including the federal award
identification number (FAIN)), who holds title, the acquisition date, cost of the property, percentage of
federal participation in the project costs for the federal award under which the property was acquired, the
location, and use and condition of the property is to be maintained for assets purchased that exceed the
School Corporation's capitalization threshold.
INDIANA STATE BOARD OF ACCOUNTS
18
PIKE COUNTY SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
The School Corporation maintained and presented the equipment and real property records for the
COVID-19 - Education Stabilization Fund grant equipment; however, the records failed to include a serial
number or other identification number, the source of funding for the property (including the federal award
identification number), percentage of federal participation in the project costs for the federal award under
which the property was acquired, the use, and condition of the property.
The lack of internal controls and noncompliance were systemic issues throughout the audit period.
Criteria
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
2 CFR 200.313(d) states in part:
"Management requirements. Procedures for managing equipment (including replacement
equipment), whether acquired in whole or in part under a Federal award, until disposition takes
place will, as a minimum, meet the following requirements:
(1) Property records must be maintained that include a description of the property, a serial
number or other identification number, the source of funding for the property (including
the FAIN), who holds title, the acquisition date, and cost of the property, percentage of
Federal participation in the project costs for the Federal award under which the
property was acquired, the location, use and condition of the property, and any ultimate
disposition data including the date of disposal and sale price of the property.
(2) A physical inventory of the property must be taken and the results reconciled with the
property records at least once every two years.
(3) A control system must be developed to ensure adequate safeguards to prevent loss,
damage, or theft of the property. Any loss, damage, or theft must be investigated.
(4) Adequate maintenance procedures must be developed to keep property in good
condition. . . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation.
Embedded within a properly designed and implemented internal control system should be internal controls
consisting of policies and procedures. Policies reflect the School Corporation's management statements
of what should be done to effect internal controls, and procedures should consist of actions that would
implement these policies.
INDIANA STATE BOARD OF ACCOUNTS 19
PIKE COUNTY SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
Effect
Without the proper implementation of an effectively designed system of internal controls, the internal
control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance.
As a result, the capital asset listing did not include all the required information.
Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of
the federal award could result in the loss of future federal funding to the School Corporation.
Questioned Costs
There were no questioned costs identified.
Recommendation
We recommended that management of the School Corporation establish a proper system of
internal controls and develop policies and procedures to ensure asset records include all the necessary
information.
Views of Responsible Officials
For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-003
Subject: COVID-19 Education Stabilization Fund - Equipment and Real Property Management
Federal Agency: Department of Education
Federal Program: COVID-19 - Education Stabilization Fund
Assistance Listings Numbers: 84.425D, 84.425U
Federal Award Numbers and Years (or Other Identifying Numbers): S425D200013, S425D210013,
S425U210013
Pass-Through Entity: Indiana Department of Education
Compliance Requirement: Equipment and Real Property Management
Audit Findings: Material Weakness, Other Matters
Condition and Context
The School Corporation had not properly designed or implemented a system of internal controls,
which would include appropriate segregation of duties, to ensure that the equipment and real property
records contained all the required information.
A property record or capital asset listing which would include a description of the property, a serial
number or other identification number, the source of funding for the property (including the federal award
identification number (FAIN)), who holds title, the acquisition date, cost of the property, percentage of
federal participation in the project costs for the federal award under which the property was acquired, the
location, and use and condition of the property is to be maintained for assets purchased that exceed the
School Corporation's capitalization threshold.
INDIANA STATE BOARD OF ACCOUNTS
18
PIKE COUNTY SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
The School Corporation maintained and presented the equipment and real property records for the
COVID-19 - Education Stabilization Fund grant equipment; however, the records failed to include a serial
number or other identification number, the source of funding for the property (including the federal award
identification number), percentage of federal participation in the project costs for the federal award under
which the property was acquired, the use, and condition of the property.
The lack of internal controls and noncompliance were systemic issues throughout the audit period.
Criteria
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
2 CFR 200.313(d) states in part:
"Management requirements. Procedures for managing equipment (including replacement
equipment), whether acquired in whole or in part under a Federal award, until disposition takes
place will, as a minimum, meet the following requirements:
(1) Property records must be maintained that include a description of the property, a serial
number or other identification number, the source of funding for the property (including
the FAIN), who holds title, the acquisition date, and cost of the property, percentage of
Federal participation in the project costs for the Federal award under which the
property was acquired, the location, use and condition of the property, and any ultimate
disposition data including the date of disposal and sale price of the property.
(2) A physical inventory of the property must be taken and the results reconciled with the
property records at least once every two years.
(3) A control system must be developed to ensure adequate safeguards to prevent loss,
damage, or theft of the property. Any loss, damage, or theft must be investigated.
(4) Adequate maintenance procedures must be developed to keep property in good
condition. . . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation.
Embedded within a properly designed and implemented internal control system should be internal controls
consisting of policies and procedures. Policies reflect the School Corporation's management statements
of what should be done to effect internal controls, and procedures should consist of actions that would
implement these policies.
INDIANA STATE BOARD OF ACCOUNTS 19
PIKE COUNTY SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
Effect
Without the proper implementation of an effectively designed system of internal controls, the internal
control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance.
As a result, the capital asset listing did not include all the required information.
Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of
the federal award could result in the loss of future federal funding to the School Corporation.
Questioned Costs
There were no questioned costs identified.
Recommendation
We recommended that management of the School Corporation establish a proper system of
internal controls and develop policies and procedures to ensure asset records include all the necessary
information.
Views of Responsible Officials
For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-003
Subject: COVID-19 Education Stabilization Fund - Equipment and Real Property Management
Federal Agency: Department of Education
Federal Program: COVID-19 - Education Stabilization Fund
Assistance Listings Numbers: 84.425D, 84.425U
Federal Award Numbers and Years (or Other Identifying Numbers): S425D200013, S425D210013,
S425U210013
Pass-Through Entity: Indiana Department of Education
Compliance Requirement: Equipment and Real Property Management
Audit Findings: Material Weakness, Other Matters
Condition and Context
The School Corporation had not properly designed or implemented a system of internal controls,
which would include appropriate segregation of duties, to ensure that the equipment and real property
records contained all the required information.
A property record or capital asset listing which would include a description of the property, a serial
number or other identification number, the source of funding for the property (including the federal award
identification number (FAIN)), who holds title, the acquisition date, cost of the property, percentage of
federal participation in the project costs for the federal award under which the property was acquired, the
location, and use and condition of the property is to be maintained for assets purchased that exceed the
School Corporation's capitalization threshold.
INDIANA STATE BOARD OF ACCOUNTS
18
PIKE COUNTY SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
The School Corporation maintained and presented the equipment and real property records for the
COVID-19 - Education Stabilization Fund grant equipment; however, the records failed to include a serial
number or other identification number, the source of funding for the property (including the federal award
identification number), percentage of federal participation in the project costs for the federal award under
which the property was acquired, the use, and condition of the property.
The lack of internal controls and noncompliance were systemic issues throughout the audit period.
Criteria
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
2 CFR 200.313(d) states in part:
"Management requirements. Procedures for managing equipment (including replacement
equipment), whether acquired in whole or in part under a Federal award, until disposition takes
place will, as a minimum, meet the following requirements:
(1) Property records must be maintained that include a description of the property, a serial
number or other identification number, the source of funding for the property (including
the FAIN), who holds title, the acquisition date, and cost of the property, percentage of
Federal participation in the project costs for the Federal award under which the
property was acquired, the location, use and condition of the property, and any ultimate
disposition data including the date of disposal and sale price of the property.
(2) A physical inventory of the property must be taken and the results reconciled with the
property records at least once every two years.
(3) A control system must be developed to ensure adequate safeguards to prevent loss,
damage, or theft of the property. Any loss, damage, or theft must be investigated.
(4) Adequate maintenance procedures must be developed to keep property in good
condition. . . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation.
Embedded within a properly designed and implemented internal control system should be internal controls
consisting of policies and procedures. Policies reflect the School Corporation's management statements
of what should be done to effect internal controls, and procedures should consist of actions that would
implement these policies.
INDIANA STATE BOARD OF ACCOUNTS 19
PIKE COUNTY SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
Effect
Without the proper implementation of an effectively designed system of internal controls, the internal
control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance.
As a result, the capital asset listing did not include all the required information.
Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of
the federal award could result in the loss of future federal funding to the School Corporation.
Questioned Costs
There were no questioned costs identified.
Recommendation
We recommended that management of the School Corporation establish a proper system of
internal controls and develop policies and procedures to ensure asset records include all the necessary
information.
Views of Responsible Officials
For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-004
Subject: Special Education Cluster (IDEA) - Earmarking
Federal Agency: Department of Education
Federal Program: Special Education Grants to States
Assistance Listings Number: 84.027
Federal Award Number and Year (or Other Identifying Number): 21611-009-PN01
Pass-Through Entity: Indiana Department of Education
Compliance Requirement: Matching, Level of Effort, Earmarking
Audit Findings: Material Weakness, Other Matters
Condition and Context
The School Corporation is a member of the Exceptional Children's Co-op (Cooperative). During
fiscal year 2021-2022, the Cooperative operated the special education programs and spent the federal
money on behalf of all its member schools. As the grant agreements were between the Indiana Department
of Education (IDOE) and each member school corporation, the School Corporation was responsible for
ensuring and providing oversight of the Cooperative. There was inadequate oversight performed by the
School Corporation in order to ensure the required nonpublic proportionate share was met.
The School Corporation did not have internal controls in place to ensure that the Cooperative
complied with the earmarking requirements. The Cooperative did not have adequate procedures in place
to ensure that the required level of expenditure for nonpublic school students with disabilities was met for
each member school corporation. The Cooperative did not have effective internal controls to ensure nonpublic
school expenditures were appropriately identified and reported.
INDIANA STATE BOARD OF ACCOUNTS
20
PIKE COUNTY SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
The Non-Public Proportionate Share expenditures for the 21611-009-PN01 grant award could not
be verified for the individual member school corporations. Total grant expenditures were posted as
expended. The Non-Public Proportionate Share expenditures were determined by applying a percentage
to the nonpublic school budgeted expenditures. These were the amounts reported to the IDOE. As such,
we were unable to identify if the minimum amount per grant award was expended and properly reported to
the IDOE as required.
The lack of internal controls and noncompliance was isolated to 2021-2022 for the
21611-009-PN01 grant award.
Criteria
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
2 CFR 200.403 states in part:
"Except where otherwise authorized by statute, costs must meet the following general criteria
in order to be allowable under Federal awards: . . .
(g) Be adequately documented. . . ."
2 CFR 200.208(b) states in part: "The Federal awarding agency or pass-through entity may adjust
specific Federal award conditions as needed, . . ."
511 IAC 7-34-7(b) states:
"The public agency, in providing special education and related services to students in nonpublic
schools must expend at least an amount that is the same proportion of the public agency total
subgrant under 20 U.S.C. 1411(f) as the number of nonpublic school students with disabilities,
who are enrolled by their parents in nonpublic schools within its boundaries, is to the total
number of students with disabilities of the same age range."
Cause
A proper system of internal controls was not designed by management of the School Corporation.
Embedded within a properly designed and implemented internal control system should be internal controls
consisting of policies and procedures. Policies reflect the School Corporation's management statements
of what should be done to effect internal controls, and procedures should consist of actions that would
implement these policies.
INDIANA STATE BOARD OF ACCOUNTS
21
PIKE COUNTY SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
Effect
Without the proper implementation of an effectively designed system of internal controls, the
internal control system cannot be capable of effectively preventing, or detecting and correcting, material
noncompliance. As such, Non-Public Proportionate Share expenditures per member school could not be
determined.
Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of
the federal award could result in the loss of future federal funding to the School Corporation.
Questioned Costs
There were no questioned costs identified.
Recommendation
We recommended that management of the School Corporation establish a proper system of
internal controls and develop policies and procedures to ensure Non-Public Proportionate Share funds are
appropriately allocated to the member school based on expenses charged directly on behalf of the member
school. Supporting documentation for these expenses should be retained for audit.
Views of Responsible Officials
For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
INDIANA STATE BOARD OF ACCOUNTS
22
FINDING 2023-002
Subject: COVID-19 - Education Stabilization Fund – Special Tests
and Provisions - Wage Rate Requirements
Federal Agency: Department of Education
Federal Program: COVID-19 - Education Stabilization Fund
Assistance Listings Numbers: 84.425D, 84.425U
Federal Award Numbers and Years (or Other Identifying Numbers): S425D200013, S425D210013,
S425U210013
Pass-Through Entity: Indiana Department of Education
Compliance Requirement: Special Tests and Provisions - Wage Rate Requirements
Audit Findings: Material Weakness, Modified Opinion
INDIANA STATE BOARD OF ACCOUNTS
15
PIKE COUNTY SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
Condition and Context
The School Corporation had not designed or implemented a system of internal controls, which
would include appropriate segregation of duties, to ensure that construction contracts in excess of $2,000
paid from federal grant funds included a prevailing wage rate clause.
Construction contracts in excess of $2,000 financed by federal assistance funds must pay wages
not less than those established for the locality of the project (prevailing wage rates) by the Department of
Labor (DOL) to their laborers and mechanics. Nonfederal entities are to include in their construction
contracts subject to the Wage Rate Requirements a provision that the contractor or subcontractor comply
with these requirements and the DOL regulations. This would include a requirement to submit a copy of
the payroll and statement of compliance to the entity for each week in which contract work was performed.
Three construction contracts, with expenditures totaling $1,138,605, were paid from the
COVID-19 - Education Stabilization Fund grant award during the audit period. All three contracts were
tested. None of the contracts included the required prevailing wage rate clause. Additionally, only one of
the three contractors provided certified weekly payrolls to the School Corporation.
The lack of internal controls and noncompliance were systemic issues throughout the audit period.
Criteria
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
29 CFR 5.5 states in part:
"(a) The Agency head shall cause or require the contracting officer to insert in full in any
contract in excess of $2,000 which is entered into for the actual construction, alteration and/or
repair, including painting and decorating, of a public building or public work, or building or work
financed in whole or in part from Federal funds or in accordance with guarantees of a Federal
agency or financed from funds obtained by pledge of any contract of a Federal agency to make
a loan, grant or annual contribution (except where a different meaning is expressly indicated),
and which is subject to the labor standards provisions of any of the acts listed in § 5.1, the
following clauses . . .
(1) Minimum wages.
INDIANA STATE BOARD OF ACCOUNTS
16
PIKE COUNTY SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
(i) All laborers and mechanics employed or working upon the site of the work (or
under the United States Housing Act of 1937 or under the Housing Act of 1949 in the
construction or development of the project), will be paid unconditionally and not less
often than once a week, and without subsequent deduction or rebate on any account
(except such payroll deductions as are permitted by regulations issued by the
Secretary of Labor under the Copeland Act (29 CFR part 3)), the full amount of wages
and bona fide fringe benefits (or cash equivalents thereof) due at time of payment
computed at rates not less than those contained in the wage determination of the
Secretary of Labor which is attached hereto and made a part hereof, regardless of any
contractual relationship which may be alleged to exist between the contractor and such
laborers and mechanics. . . .
(3) Payrolls and basic records. . . .
(ii)
(A) The contractor shall submit weekly for each week in which any contract work
is performed a copy of all payrolls to the (write in name of appropriate federal
agency) if the agency is a party to the contract, but if the agency is not such a
party, the contractor will submit the payrolls to the applicant, sponsor, or owner, as
the case may be, for transmission to the (write in name of agency). The payrolls
submitted shall set out accurately and completely all of the information required to
be maintained under 29 CFR 5.5(a)(3)(i), except that full social security numbers
and home addresses shall not be included on weekly transmittals. . . ."
2 CFR 200 Appendix II states in part:
"In addition to other provisions required by the Federal agency or non-Federal entity; all
contracts made by the non-Federal entity under the Federal award must contain provisions
covering the following, as applicable. . . .
(D) Davis-Bacon Act, as amended (40 U.S.C. 3141-3148). When required by Federal
program legislation, all prime construction contracts in excess of $2,000 awarded by non-
Federal entities must include a provision for compliance with the Davis-Bacon Act
(40 U.S.C. 3141-3144, and 3146-3148) as supplemented by Department of Labor regulations
(29 CFR Part 5, 'Labor Standards Provisions Applicable to Contracts Covering
Federally Financed and Assisted Construction'). In accordance with the statute, contractors
must be required to pay wages to laborers and mechanics at a rate not less than
the prevailing wages specified in a wage determination made by the Secretary of Labor.
In addition, contractors must be required to pay wages not less than once a week. . . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation,
which would include segregation of key functions. Embedded within a properly designed and implemented
internal control system should be internal controls consisting of policies and procedures. Policies reflect
the School Corporation's management statements of what should be done to effect internal controls, and
procedures should consist of actions that would implement these policies.
INDIANA STATE BOARD OF ACCOUNTS
17
PIKE COUNTY SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
Effect
Without the proper implementation of an effectively designed system of internal controls, the internal
control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance.
As a result, construction contracts entered into did not contain the required wage rate
requirements clauses nor were all certified payrolls obtained by the School Corporation.
Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of
the federal award could result in the loss of future federal funding to the School Corporation.
Questioned Costs
There were no questioned costs identified.
Recommendation
We recommended that the School Corporation's management establish a system of internal
controls and include the wage rate requirement clause in construction contracts. In addition, certified
payrolls should be obtained as required.
Views of Responsible Officials
For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-002
Subject: COVID-19 - Education Stabilization Fund – Special Tests
and Provisions - Wage Rate Requirements
Federal Agency: Department of Education
Federal Program: COVID-19 - Education Stabilization Fund
Assistance Listings Numbers: 84.425D, 84.425U
Federal Award Numbers and Years (or Other Identifying Numbers): S425D200013, S425D210013,
S425U210013
Pass-Through Entity: Indiana Department of Education
Compliance Requirement: Special Tests and Provisions - Wage Rate Requirements
Audit Findings: Material Weakness, Modified Opinion
INDIANA STATE BOARD OF ACCOUNTS
15
PIKE COUNTY SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
Condition and Context
The School Corporation had not designed or implemented a system of internal controls, which
would include appropriate segregation of duties, to ensure that construction contracts in excess of $2,000
paid from federal grant funds included a prevailing wage rate clause.
Construction contracts in excess of $2,000 financed by federal assistance funds must pay wages
not less than those established for the locality of the project (prevailing wage rates) by the Department of
Labor (DOL) to their laborers and mechanics. Nonfederal entities are to include in their construction
contracts subject to the Wage Rate Requirements a provision that the contractor or subcontractor comply
with these requirements and the DOL regulations. This would include a requirement to submit a copy of
the payroll and statement of compliance to the entity for each week in which contract work was performed.
Three construction contracts, with expenditures totaling $1,138,605, were paid from the
COVID-19 - Education Stabilization Fund grant award during the audit period. All three contracts were
tested. None of the contracts included the required prevailing wage rate clause. Additionally, only one of
the three contractors provided certified weekly payrolls to the School Corporation.
The lack of internal controls and noncompliance were systemic issues throughout the audit period.
Criteria
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
29 CFR 5.5 states in part:
"(a) The Agency head shall cause or require the contracting officer to insert in full in any
contract in excess of $2,000 which is entered into for the actual construction, alteration and/or
repair, including painting and decorating, of a public building or public work, or building or work
financed in whole or in part from Federal funds or in accordance with guarantees of a Federal
agency or financed from funds obtained by pledge of any contract of a Federal agency to make
a loan, grant or annual contribution (except where a different meaning is expressly indicated),
and which is subject to the labor standards provisions of any of the acts listed in § 5.1, the
following clauses . . .
(1) Minimum wages.
INDIANA STATE BOARD OF ACCOUNTS
16
PIKE COUNTY SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
(i) All laborers and mechanics employed or working upon the site of the work (or
under the United States Housing Act of 1937 or under the Housing Act of 1949 in the
construction or development of the project), will be paid unconditionally and not less
often than once a week, and without subsequent deduction or rebate on any account
(except such payroll deductions as are permitted by regulations issued by the
Secretary of Labor under the Copeland Act (29 CFR part 3)), the full amount of wages
and bona fide fringe benefits (or cash equivalents thereof) due at time of payment
computed at rates not less than those contained in the wage determination of the
Secretary of Labor which is attached hereto and made a part hereof, regardless of any
contractual relationship which may be alleged to exist between the contractor and such
laborers and mechanics. . . .
(3) Payrolls and basic records. . . .
(ii)
(A) The contractor shall submit weekly for each week in which any contract work
is performed a copy of all payrolls to the (write in name of appropriate federal
agency) if the agency is a party to the contract, but if the agency is not such a
party, the contractor will submit the payrolls to the applicant, sponsor, or owner, as
the case may be, for transmission to the (write in name of agency). The payrolls
submitted shall set out accurately and completely all of the information required to
be maintained under 29 CFR 5.5(a)(3)(i), except that full social security numbers
and home addresses shall not be included on weekly transmittals. . . ."
2 CFR 200 Appendix II states in part:
"In addition to other provisions required by the Federal agency or non-Federal entity; all
contracts made by the non-Federal entity under the Federal award must contain provisions
covering the following, as applicable. . . .
(D) Davis-Bacon Act, as amended (40 U.S.C. 3141-3148). When required by Federal
program legislation, all prime construction contracts in excess of $2,000 awarded by non-
Federal entities must include a provision for compliance with the Davis-Bacon Act
(40 U.S.C. 3141-3144, and 3146-3148) as supplemented by Department of Labor regulations
(29 CFR Part 5, 'Labor Standards Provisions Applicable to Contracts Covering
Federally Financed and Assisted Construction'). In accordance with the statute, contractors
must be required to pay wages to laborers and mechanics at a rate not less than
the prevailing wages specified in a wage determination made by the Secretary of Labor.
In addition, contractors must be required to pay wages not less than once a week. . . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation,
which would include segregation of key functions. Embedded within a properly designed and implemented
internal control system should be internal controls consisting of policies and procedures. Policies reflect
the School Corporation's management statements of what should be done to effect internal controls, and
procedures should consist of actions that would implement these policies.
INDIANA STATE BOARD OF ACCOUNTS
17
PIKE COUNTY SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
Effect
Without the proper implementation of an effectively designed system of internal controls, the internal
control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance.
As a result, construction contracts entered into did not contain the required wage rate
requirements clauses nor were all certified payrolls obtained by the School Corporation.
Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of
the federal award could result in the loss of future federal funding to the School Corporation.
Questioned Costs
There were no questioned costs identified.
Recommendation
We recommended that the School Corporation's management establish a system of internal
controls and include the wage rate requirement clause in construction contracts. In addition, certified
payrolls should be obtained as required.
Views of Responsible Officials
For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-002
Subject: COVID-19 - Education Stabilization Fund – Special Tests
and Provisions - Wage Rate Requirements
Federal Agency: Department of Education
Federal Program: COVID-19 - Education Stabilization Fund
Assistance Listings Numbers: 84.425D, 84.425U
Federal Award Numbers and Years (or Other Identifying Numbers): S425D200013, S425D210013,
S425U210013
Pass-Through Entity: Indiana Department of Education
Compliance Requirement: Special Tests and Provisions - Wage Rate Requirements
Audit Findings: Material Weakness, Modified Opinion
INDIANA STATE BOARD OF ACCOUNTS
15
PIKE COUNTY SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
Condition and Context
The School Corporation had not designed or implemented a system of internal controls, which
would include appropriate segregation of duties, to ensure that construction contracts in excess of $2,000
paid from federal grant funds included a prevailing wage rate clause.
Construction contracts in excess of $2,000 financed by federal assistance funds must pay wages
not less than those established for the locality of the project (prevailing wage rates) by the Department of
Labor (DOL) to their laborers and mechanics. Nonfederal entities are to include in their construction
contracts subject to the Wage Rate Requirements a provision that the contractor or subcontractor comply
with these requirements and the DOL regulations. This would include a requirement to submit a copy of
the payroll and statement of compliance to the entity for each week in which contract work was performed.
Three construction contracts, with expenditures totaling $1,138,605, were paid from the
COVID-19 - Education Stabilization Fund grant award during the audit period. All three contracts were
tested. None of the contracts included the required prevailing wage rate clause. Additionally, only one of
the three contractors provided certified weekly payrolls to the School Corporation.
The lack of internal controls and noncompliance were systemic issues throughout the audit period.
Criteria
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
29 CFR 5.5 states in part:
"(a) The Agency head shall cause or require the contracting officer to insert in full in any
contract in excess of $2,000 which is entered into for the actual construction, alteration and/or
repair, including painting and decorating, of a public building or public work, or building or work
financed in whole or in part from Federal funds or in accordance with guarantees of a Federal
agency or financed from funds obtained by pledge of any contract of a Federal agency to make
a loan, grant or annual contribution (except where a different meaning is expressly indicated),
and which is subject to the labor standards provisions of any of the acts listed in § 5.1, the
following clauses . . .
(1) Minimum wages.
INDIANA STATE BOARD OF ACCOUNTS
16
PIKE COUNTY SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
(i) All laborers and mechanics employed or working upon the site of the work (or
under the United States Housing Act of 1937 or under the Housing Act of 1949 in the
construction or development of the project), will be paid unconditionally and not less
often than once a week, and without subsequent deduction or rebate on any account
(except such payroll deductions as are permitted by regulations issued by the
Secretary of Labor under the Copeland Act (29 CFR part 3)), the full amount of wages
and bona fide fringe benefits (or cash equivalents thereof) due at time of payment
computed at rates not less than those contained in the wage determination of the
Secretary of Labor which is attached hereto and made a part hereof, regardless of any
contractual relationship which may be alleged to exist between the contractor and such
laborers and mechanics. . . .
(3) Payrolls and basic records. . . .
(ii)
(A) The contractor shall submit weekly for each week in which any contract work
is performed a copy of all payrolls to the (write in name of appropriate federal
agency) if the agency is a party to the contract, but if the agency is not such a
party, the contractor will submit the payrolls to the applicant, sponsor, or owner, as
the case may be, for transmission to the (write in name of agency). The payrolls
submitted shall set out accurately and completely all of the information required to
be maintained under 29 CFR 5.5(a)(3)(i), except that full social security numbers
and home addresses shall not be included on weekly transmittals. . . ."
2 CFR 200 Appendix II states in part:
"In addition to other provisions required by the Federal agency or non-Federal entity; all
contracts made by the non-Federal entity under the Federal award must contain provisions
covering the following, as applicable. . . .
(D) Davis-Bacon Act, as amended (40 U.S.C. 3141-3148). When required by Federal
program legislation, all prime construction contracts in excess of $2,000 awarded by non-
Federal entities must include a provision for compliance with the Davis-Bacon Act
(40 U.S.C. 3141-3144, and 3146-3148) as supplemented by Department of Labor regulations
(29 CFR Part 5, 'Labor Standards Provisions Applicable to Contracts Covering
Federally Financed and Assisted Construction'). In accordance with the statute, contractors
must be required to pay wages to laborers and mechanics at a rate not less than
the prevailing wages specified in a wage determination made by the Secretary of Labor.
In addition, contractors must be required to pay wages not less than once a week. . . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation,
which would include segregation of key functions. Embedded within a properly designed and implemented
internal control system should be internal controls consisting of policies and procedures. Policies reflect
the School Corporation's management statements of what should be done to effect internal controls, and
procedures should consist of actions that would implement these policies.
INDIANA STATE BOARD OF ACCOUNTS
17
PIKE COUNTY SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
Effect
Without the proper implementation of an effectively designed system of internal controls, the internal
control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance.
As a result, construction contracts entered into did not contain the required wage rate
requirements clauses nor were all certified payrolls obtained by the School Corporation.
Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of
the federal award could result in the loss of future federal funding to the School Corporation.
Questioned Costs
There were no questioned costs identified.
Recommendation
We recommended that the School Corporation's management establish a system of internal
controls and include the wage rate requirement clause in construction contracts. In addition, certified
payrolls should be obtained as required.
Views of Responsible Officials
For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-002
Subject: COVID-19 - Education Stabilization Fund – Special Tests
and Provisions - Wage Rate Requirements
Federal Agency: Department of Education
Federal Program: COVID-19 - Education Stabilization Fund
Assistance Listings Numbers: 84.425D, 84.425U
Federal Award Numbers and Years (or Other Identifying Numbers): S425D200013, S425D210013,
S425U210013
Pass-Through Entity: Indiana Department of Education
Compliance Requirement: Special Tests and Provisions - Wage Rate Requirements
Audit Findings: Material Weakness, Modified Opinion
INDIANA STATE BOARD OF ACCOUNTS
15
PIKE COUNTY SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
Condition and Context
The School Corporation had not designed or implemented a system of internal controls, which
would include appropriate segregation of duties, to ensure that construction contracts in excess of $2,000
paid from federal grant funds included a prevailing wage rate clause.
Construction contracts in excess of $2,000 financed by federal assistance funds must pay wages
not less than those established for the locality of the project (prevailing wage rates) by the Department of
Labor (DOL) to their laborers and mechanics. Nonfederal entities are to include in their construction
contracts subject to the Wage Rate Requirements a provision that the contractor or subcontractor comply
with these requirements and the DOL regulations. This would include a requirement to submit a copy of
the payroll and statement of compliance to the entity for each week in which contract work was performed.
Three construction contracts, with expenditures totaling $1,138,605, were paid from the
COVID-19 - Education Stabilization Fund grant award during the audit period. All three contracts were
tested. None of the contracts included the required prevailing wage rate clause. Additionally, only one of
the three contractors provided certified weekly payrolls to the School Corporation.
The lack of internal controls and noncompliance were systemic issues throughout the audit period.
Criteria
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
29 CFR 5.5 states in part:
"(a) The Agency head shall cause or require the contracting officer to insert in full in any
contract in excess of $2,000 which is entered into for the actual construction, alteration and/or
repair, including painting and decorating, of a public building or public work, or building or work
financed in whole or in part from Federal funds or in accordance with guarantees of a Federal
agency or financed from funds obtained by pledge of any contract of a Federal agency to make
a loan, grant or annual contribution (except where a different meaning is expressly indicated),
and which is subject to the labor standards provisions of any of the acts listed in § 5.1, the
following clauses . . .
(1) Minimum wages.
INDIANA STATE BOARD OF ACCOUNTS
16
PIKE COUNTY SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
(i) All laborers and mechanics employed or working upon the site of the work (or
under the United States Housing Act of 1937 or under the Housing Act of 1949 in the
construction or development of the project), will be paid unconditionally and not less
often than once a week, and without subsequent deduction or rebate on any account
(except such payroll deductions as are permitted by regulations issued by the
Secretary of Labor under the Copeland Act (29 CFR part 3)), the full amount of wages
and bona fide fringe benefits (or cash equivalents thereof) due at time of payment
computed at rates not less than those contained in the wage determination of the
Secretary of Labor which is attached hereto and made a part hereof, regardless of any
contractual relationship which may be alleged to exist between the contractor and such
laborers and mechanics. . . .
(3) Payrolls and basic records. . . .
(ii)
(A) The contractor shall submit weekly for each week in which any contract work
is performed a copy of all payrolls to the (write in name of appropriate federal
agency) if the agency is a party to the contract, but if the agency is not such a
party, the contractor will submit the payrolls to the applicant, sponsor, or owner, as
the case may be, for transmission to the (write in name of agency). The payrolls
submitted shall set out accurately and completely all of the information required to
be maintained under 29 CFR 5.5(a)(3)(i), except that full social security numbers
and home addresses shall not be included on weekly transmittals. . . ."
2 CFR 200 Appendix II states in part:
"In addition to other provisions required by the Federal agency or non-Federal entity; all
contracts made by the non-Federal entity under the Federal award must contain provisions
covering the following, as applicable. . . .
(D) Davis-Bacon Act, as amended (40 U.S.C. 3141-3148). When required by Federal
program legislation, all prime construction contracts in excess of $2,000 awarded by non-
Federal entities must include a provision for compliance with the Davis-Bacon Act
(40 U.S.C. 3141-3144, and 3146-3148) as supplemented by Department of Labor regulations
(29 CFR Part 5, 'Labor Standards Provisions Applicable to Contracts Covering
Federally Financed and Assisted Construction'). In accordance with the statute, contractors
must be required to pay wages to laborers and mechanics at a rate not less than
the prevailing wages specified in a wage determination made by the Secretary of Labor.
In addition, contractors must be required to pay wages not less than once a week. . . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation,
which would include segregation of key functions. Embedded within a properly designed and implemented
internal control system should be internal controls consisting of policies and procedures. Policies reflect
the School Corporation's management statements of what should be done to effect internal controls, and
procedures should consist of actions that would implement these policies.
INDIANA STATE BOARD OF ACCOUNTS
17
PIKE COUNTY SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
Effect
Without the proper implementation of an effectively designed system of internal controls, the internal
control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance.
As a result, construction contracts entered into did not contain the required wage rate
requirements clauses nor were all certified payrolls obtained by the School Corporation.
Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of
the federal award could result in the loss of future federal funding to the School Corporation.
Questioned Costs
There were no questioned costs identified.
Recommendation
We recommended that the School Corporation's management establish a system of internal
controls and include the wage rate requirement clause in construction contracts. In addition, certified
payrolls should be obtained as required.
Views of Responsible Officials
For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-002
Subject: COVID-19 - Education Stabilization Fund – Special Tests
and Provisions - Wage Rate Requirements
Federal Agency: Department of Education
Federal Program: COVID-19 - Education Stabilization Fund
Assistance Listings Numbers: 84.425D, 84.425U
Federal Award Numbers and Years (or Other Identifying Numbers): S425D200013, S425D210013,
S425U210013
Pass-Through Entity: Indiana Department of Education
Compliance Requirement: Special Tests and Provisions - Wage Rate Requirements
Audit Findings: Material Weakness, Modified Opinion
INDIANA STATE BOARD OF ACCOUNTS
15
PIKE COUNTY SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
Condition and Context
The School Corporation had not designed or implemented a system of internal controls, which
would include appropriate segregation of duties, to ensure that construction contracts in excess of $2,000
paid from federal grant funds included a prevailing wage rate clause.
Construction contracts in excess of $2,000 financed by federal assistance funds must pay wages
not less than those established for the locality of the project (prevailing wage rates) by the Department of
Labor (DOL) to their laborers and mechanics. Nonfederal entities are to include in their construction
contracts subject to the Wage Rate Requirements a provision that the contractor or subcontractor comply
with these requirements and the DOL regulations. This would include a requirement to submit a copy of
the payroll and statement of compliance to the entity for each week in which contract work was performed.
Three construction contracts, with expenditures totaling $1,138,605, were paid from the
COVID-19 - Education Stabilization Fund grant award during the audit period. All three contracts were
tested. None of the contracts included the required prevailing wage rate clause. Additionally, only one of
the three contractors provided certified weekly payrolls to the School Corporation.
The lack of internal controls and noncompliance were systemic issues throughout the audit period.
Criteria
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
29 CFR 5.5 states in part:
"(a) The Agency head shall cause or require the contracting officer to insert in full in any
contract in excess of $2,000 which is entered into for the actual construction, alteration and/or
repair, including painting and decorating, of a public building or public work, or building or work
financed in whole or in part from Federal funds or in accordance with guarantees of a Federal
agency or financed from funds obtained by pledge of any contract of a Federal agency to make
a loan, grant or annual contribution (except where a different meaning is expressly indicated),
and which is subject to the labor standards provisions of any of the acts listed in § 5.1, the
following clauses . . .
(1) Minimum wages.
INDIANA STATE BOARD OF ACCOUNTS
16
PIKE COUNTY SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
(i) All laborers and mechanics employed or working upon the site of the work (or
under the United States Housing Act of 1937 or under the Housing Act of 1949 in the
construction or development of the project), will be paid unconditionally and not less
often than once a week, and without subsequent deduction or rebate on any account
(except such payroll deductions as are permitted by regulations issued by the
Secretary of Labor under the Copeland Act (29 CFR part 3)), the full amount of wages
and bona fide fringe benefits (or cash equivalents thereof) due at time of payment
computed at rates not less than those contained in the wage determination of the
Secretary of Labor which is attached hereto and made a part hereof, regardless of any
contractual relationship which may be alleged to exist between the contractor and such
laborers and mechanics. . . .
(3) Payrolls and basic records. . . .
(ii)
(A) The contractor shall submit weekly for each week in which any contract work
is performed a copy of all payrolls to the (write in name of appropriate federal
agency) if the agency is a party to the contract, but if the agency is not such a
party, the contractor will submit the payrolls to the applicant, sponsor, or owner, as
the case may be, for transmission to the (write in name of agency). The payrolls
submitted shall set out accurately and completely all of the information required to
be maintained under 29 CFR 5.5(a)(3)(i), except that full social security numbers
and home addresses shall not be included on weekly transmittals. . . ."
2 CFR 200 Appendix II states in part:
"In addition to other provisions required by the Federal agency or non-Federal entity; all
contracts made by the non-Federal entity under the Federal award must contain provisions
covering the following, as applicable. . . .
(D) Davis-Bacon Act, as amended (40 U.S.C. 3141-3148). When required by Federal
program legislation, all prime construction contracts in excess of $2,000 awarded by non-
Federal entities must include a provision for compliance with the Davis-Bacon Act
(40 U.S.C. 3141-3144, and 3146-3148) as supplemented by Department of Labor regulations
(29 CFR Part 5, 'Labor Standards Provisions Applicable to Contracts Covering
Federally Financed and Assisted Construction'). In accordance with the statute, contractors
must be required to pay wages to laborers and mechanics at a rate not less than
the prevailing wages specified in a wage determination made by the Secretary of Labor.
In addition, contractors must be required to pay wages not less than once a week. . . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation,
which would include segregation of key functions. Embedded within a properly designed and implemented
internal control system should be internal controls consisting of policies and procedures. Policies reflect
the School Corporation's management statements of what should be done to effect internal controls, and
procedures should consist of actions that would implement these policies.
INDIANA STATE BOARD OF ACCOUNTS
17
PIKE COUNTY SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
Effect
Without the proper implementation of an effectively designed system of internal controls, the internal
control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance.
As a result, construction contracts entered into did not contain the required wage rate
requirements clauses nor were all certified payrolls obtained by the School Corporation.
Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of
the federal award could result in the loss of future federal funding to the School Corporation.
Questioned Costs
There were no questioned costs identified.
Recommendation
We recommended that the School Corporation's management establish a system of internal
controls and include the wage rate requirement clause in construction contracts. In addition, certified
payrolls should be obtained as required.
Views of Responsible Officials
For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-002
Subject: COVID-19 - Education Stabilization Fund – Special Tests
and Provisions - Wage Rate Requirements
Federal Agency: Department of Education
Federal Program: COVID-19 - Education Stabilization Fund
Assistance Listings Numbers: 84.425D, 84.425U
Federal Award Numbers and Years (or Other Identifying Numbers): S425D200013, S425D210013,
S425U210013
Pass-Through Entity: Indiana Department of Education
Compliance Requirement: Special Tests and Provisions - Wage Rate Requirements
Audit Findings: Material Weakness, Modified Opinion
INDIANA STATE BOARD OF ACCOUNTS
15
PIKE COUNTY SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
Condition and Context
The School Corporation had not designed or implemented a system of internal controls, which
would include appropriate segregation of duties, to ensure that construction contracts in excess of $2,000
paid from federal grant funds included a prevailing wage rate clause.
Construction contracts in excess of $2,000 financed by federal assistance funds must pay wages
not less than those established for the locality of the project (prevailing wage rates) by the Department of
Labor (DOL) to their laborers and mechanics. Nonfederal entities are to include in their construction
contracts subject to the Wage Rate Requirements a provision that the contractor or subcontractor comply
with these requirements and the DOL regulations. This would include a requirement to submit a copy of
the payroll and statement of compliance to the entity for each week in which contract work was performed.
Three construction contracts, with expenditures totaling $1,138,605, were paid from the
COVID-19 - Education Stabilization Fund grant award during the audit period. All three contracts were
tested. None of the contracts included the required prevailing wage rate clause. Additionally, only one of
the three contractors provided certified weekly payrolls to the School Corporation.
The lack of internal controls and noncompliance were systemic issues throughout the audit period.
Criteria
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
29 CFR 5.5 states in part:
"(a) The Agency head shall cause or require the contracting officer to insert in full in any
contract in excess of $2,000 which is entered into for the actual construction, alteration and/or
repair, including painting and decorating, of a public building or public work, or building or work
financed in whole or in part from Federal funds or in accordance with guarantees of a Federal
agency or financed from funds obtained by pledge of any contract of a Federal agency to make
a loan, grant or annual contribution (except where a different meaning is expressly indicated),
and which is subject to the labor standards provisions of any of the acts listed in § 5.1, the
following clauses . . .
(1) Minimum wages.
INDIANA STATE BOARD OF ACCOUNTS
16
PIKE COUNTY SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
(i) All laborers and mechanics employed or working upon the site of the work (or
under the United States Housing Act of 1937 or under the Housing Act of 1949 in the
construction or development of the project), will be paid unconditionally and not less
often than once a week, and without subsequent deduction or rebate on any account
(except such payroll deductions as are permitted by regulations issued by the
Secretary of Labor under the Copeland Act (29 CFR part 3)), the full amount of wages
and bona fide fringe benefits (or cash equivalents thereof) due at time of payment
computed at rates not less than those contained in the wage determination of the
Secretary of Labor which is attached hereto and made a part hereof, regardless of any
contractual relationship which may be alleged to exist between the contractor and such
laborers and mechanics. . . .
(3) Payrolls and basic records. . . .
(ii)
(A) The contractor shall submit weekly for each week in which any contract work
is performed a copy of all payrolls to the (write in name of appropriate federal
agency) if the agency is a party to the contract, but if the agency is not such a
party, the contractor will submit the payrolls to the applicant, sponsor, or owner, as
the case may be, for transmission to the (write in name of agency). The payrolls
submitted shall set out accurately and completely all of the information required to
be maintained under 29 CFR 5.5(a)(3)(i), except that full social security numbers
and home addresses shall not be included on weekly transmittals. . . ."
2 CFR 200 Appendix II states in part:
"In addition to other provisions required by the Federal agency or non-Federal entity; all
contracts made by the non-Federal entity under the Federal award must contain provisions
covering the following, as applicable. . . .
(D) Davis-Bacon Act, as amended (40 U.S.C. 3141-3148). When required by Federal
program legislation, all prime construction contracts in excess of $2,000 awarded by non-
Federal entities must include a provision for compliance with the Davis-Bacon Act
(40 U.S.C. 3141-3144, and 3146-3148) as supplemented by Department of Labor regulations
(29 CFR Part 5, 'Labor Standards Provisions Applicable to Contracts Covering
Federally Financed and Assisted Construction'). In accordance with the statute, contractors
must be required to pay wages to laborers and mechanics at a rate not less than
the prevailing wages specified in a wage determination made by the Secretary of Labor.
In addition, contractors must be required to pay wages not less than once a week. . . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation,
which would include segregation of key functions. Embedded within a properly designed and implemented
internal control system should be internal controls consisting of policies and procedures. Policies reflect
the School Corporation's management statements of what should be done to effect internal controls, and
procedures should consist of actions that would implement these policies.
INDIANA STATE BOARD OF ACCOUNTS
17
PIKE COUNTY SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
Effect
Without the proper implementation of an effectively designed system of internal controls, the internal
control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance.
As a result, construction contracts entered into did not contain the required wage rate
requirements clauses nor were all certified payrolls obtained by the School Corporation.
Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of
the federal award could result in the loss of future federal funding to the School Corporation.
Questioned Costs
There were no questioned costs identified.
Recommendation
We recommended that the School Corporation's management establish a system of internal
controls and include the wage rate requirement clause in construction contracts. In addition, certified
payrolls should be obtained as required.
Views of Responsible Officials
For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-003
Subject: COVID-19 Education Stabilization Fund - Equipment and Real Property Management
Federal Agency: Department of Education
Federal Program: COVID-19 - Education Stabilization Fund
Assistance Listings Numbers: 84.425D, 84.425U
Federal Award Numbers and Years (or Other Identifying Numbers): S425D200013, S425D210013,
S425U210013
Pass-Through Entity: Indiana Department of Education
Compliance Requirement: Equipment and Real Property Management
Audit Findings: Material Weakness, Other Matters
Condition and Context
The School Corporation had not properly designed or implemented a system of internal controls,
which would include appropriate segregation of duties, to ensure that the equipment and real property
records contained all the required information.
A property record or capital asset listing which would include a description of the property, a serial
number or other identification number, the source of funding for the property (including the federal award
identification number (FAIN)), who holds title, the acquisition date, cost of the property, percentage of
federal participation in the project costs for the federal award under which the property was acquired, the
location, and use and condition of the property is to be maintained for assets purchased that exceed the
School Corporation's capitalization threshold.
INDIANA STATE BOARD OF ACCOUNTS
18
PIKE COUNTY SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
The School Corporation maintained and presented the equipment and real property records for the
COVID-19 - Education Stabilization Fund grant equipment; however, the records failed to include a serial
number or other identification number, the source of funding for the property (including the federal award
identification number), percentage of federal participation in the project costs for the federal award under
which the property was acquired, the use, and condition of the property.
The lack of internal controls and noncompliance were systemic issues throughout the audit period.
Criteria
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
2 CFR 200.313(d) states in part:
"Management requirements. Procedures for managing equipment (including replacement
equipment), whether acquired in whole or in part under a Federal award, until disposition takes
place will, as a minimum, meet the following requirements:
(1) Property records must be maintained that include a description of the property, a serial
number or other identification number, the source of funding for the property (including
the FAIN), who holds title, the acquisition date, and cost of the property, percentage of
Federal participation in the project costs for the Federal award under which the
property was acquired, the location, use and condition of the property, and any ultimate
disposition data including the date of disposal and sale price of the property.
(2) A physical inventory of the property must be taken and the results reconciled with the
property records at least once every two years.
(3) A control system must be developed to ensure adequate safeguards to prevent loss,
damage, or theft of the property. Any loss, damage, or theft must be investigated.
(4) Adequate maintenance procedures must be developed to keep property in good
condition. . . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation.
Embedded within a properly designed and implemented internal control system should be internal controls
consisting of policies and procedures. Policies reflect the School Corporation's management statements
of what should be done to effect internal controls, and procedures should consist of actions that would
implement these policies.
INDIANA STATE BOARD OF ACCOUNTS 19
PIKE COUNTY SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
Effect
Without the proper implementation of an effectively designed system of internal controls, the internal
control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance.
As a result, the capital asset listing did not include all the required information.
Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of
the federal award could result in the loss of future federal funding to the School Corporation.
Questioned Costs
There were no questioned costs identified.
Recommendation
We recommended that management of the School Corporation establish a proper system of
internal controls and develop policies and procedures to ensure asset records include all the necessary
information.
Views of Responsible Officials
For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-003
Subject: COVID-19 Education Stabilization Fund - Equipment and Real Property Management
Federal Agency: Department of Education
Federal Program: COVID-19 - Education Stabilization Fund
Assistance Listings Numbers: 84.425D, 84.425U
Federal Award Numbers and Years (or Other Identifying Numbers): S425D200013, S425D210013,
S425U210013
Pass-Through Entity: Indiana Department of Education
Compliance Requirement: Equipment and Real Property Management
Audit Findings: Material Weakness, Other Matters
Condition and Context
The School Corporation had not properly designed or implemented a system of internal controls,
which would include appropriate segregation of duties, to ensure that the equipment and real property
records contained all the required information.
A property record or capital asset listing which would include a description of the property, a serial
number or other identification number, the source of funding for the property (including the federal award
identification number (FAIN)), who holds title, the acquisition date, cost of the property, percentage of
federal participation in the project costs for the federal award under which the property was acquired, the
location, and use and condition of the property is to be maintained for assets purchased that exceed the
School Corporation's capitalization threshold.
INDIANA STATE BOARD OF ACCOUNTS
18
PIKE COUNTY SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
The School Corporation maintained and presented the equipment and real property records for the
COVID-19 - Education Stabilization Fund grant equipment; however, the records failed to include a serial
number or other identification number, the source of funding for the property (including the federal award
identification number), percentage of federal participation in the project costs for the federal award under
which the property was acquired, the use, and condition of the property.
The lack of internal controls and noncompliance were systemic issues throughout the audit period.
Criteria
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
2 CFR 200.313(d) states in part:
"Management requirements. Procedures for managing equipment (including replacement
equipment), whether acquired in whole or in part under a Federal award, until disposition takes
place will, as a minimum, meet the following requirements:
(1) Property records must be maintained that include a description of the property, a serial
number or other identification number, the source of funding for the property (including
the FAIN), who holds title, the acquisition date, and cost of the property, percentage of
Federal participation in the project costs for the Federal award under which the
property was acquired, the location, use and condition of the property, and any ultimate
disposition data including the date of disposal and sale price of the property.
(2) A physical inventory of the property must be taken and the results reconciled with the
property records at least once every two years.
(3) A control system must be developed to ensure adequate safeguards to prevent loss,
damage, or theft of the property. Any loss, damage, or theft must be investigated.
(4) Adequate maintenance procedures must be developed to keep property in good
condition. . . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation.
Embedded within a properly designed and implemented internal control system should be internal controls
consisting of policies and procedures. Policies reflect the School Corporation's management statements
of what should be done to effect internal controls, and procedures should consist of actions that would
implement these policies.
INDIANA STATE BOARD OF ACCOUNTS 19
PIKE COUNTY SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
Effect
Without the proper implementation of an effectively designed system of internal controls, the internal
control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance.
As a result, the capital asset listing did not include all the required information.
Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of
the federal award could result in the loss of future federal funding to the School Corporation.
Questioned Costs
There were no questioned costs identified.
Recommendation
We recommended that management of the School Corporation establish a proper system of
internal controls and develop policies and procedures to ensure asset records include all the necessary
information.
Views of Responsible Officials
For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-003
Subject: COVID-19 Education Stabilization Fund - Equipment and Real Property Management
Federal Agency: Department of Education
Federal Program: COVID-19 - Education Stabilization Fund
Assistance Listings Numbers: 84.425D, 84.425U
Federal Award Numbers and Years (or Other Identifying Numbers): S425D200013, S425D210013,
S425U210013
Pass-Through Entity: Indiana Department of Education
Compliance Requirement: Equipment and Real Property Management
Audit Findings: Material Weakness, Other Matters
Condition and Context
The School Corporation had not properly designed or implemented a system of internal controls,
which would include appropriate segregation of duties, to ensure that the equipment and real property
records contained all the required information.
A property record or capital asset listing which would include a description of the property, a serial
number or other identification number, the source of funding for the property (including the federal award
identification number (FAIN)), who holds title, the acquisition date, cost of the property, percentage of
federal participation in the project costs for the federal award under which the property was acquired, the
location, and use and condition of the property is to be maintained for assets purchased that exceed the
School Corporation's capitalization threshold.
INDIANA STATE BOARD OF ACCOUNTS
18
PIKE COUNTY SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
The School Corporation maintained and presented the equipment and real property records for the
COVID-19 - Education Stabilization Fund grant equipment; however, the records failed to include a serial
number or other identification number, the source of funding for the property (including the federal award
identification number), percentage of federal participation in the project costs for the federal award under
which the property was acquired, the use, and condition of the property.
The lack of internal controls and noncompliance were systemic issues throughout the audit period.
Criteria
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
2 CFR 200.313(d) states in part:
"Management requirements. Procedures for managing equipment (including replacement
equipment), whether acquired in whole or in part under a Federal award, until disposition takes
place will, as a minimum, meet the following requirements:
(1) Property records must be maintained that include a description of the property, a serial
number or other identification number, the source of funding for the property (including
the FAIN), who holds title, the acquisition date, and cost of the property, percentage of
Federal participation in the project costs for the Federal award under which the
property was acquired, the location, use and condition of the property, and any ultimate
disposition data including the date of disposal and sale price of the property.
(2) A physical inventory of the property must be taken and the results reconciled with the
property records at least once every two years.
(3) A control system must be developed to ensure adequate safeguards to prevent loss,
damage, or theft of the property. Any loss, damage, or theft must be investigated.
(4) Adequate maintenance procedures must be developed to keep property in good
condition. . . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation.
Embedded within a properly designed and implemented internal control system should be internal controls
consisting of policies and procedures. Policies reflect the School Corporation's management statements
of what should be done to effect internal controls, and procedures should consist of actions that would
implement these policies.
INDIANA STATE BOARD OF ACCOUNTS 19
PIKE COUNTY SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
Effect
Without the proper implementation of an effectively designed system of internal controls, the internal
control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance.
As a result, the capital asset listing did not include all the required information.
Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of
the federal award could result in the loss of future federal funding to the School Corporation.
Questioned Costs
There were no questioned costs identified.
Recommendation
We recommended that management of the School Corporation establish a proper system of
internal controls and develop policies and procedures to ensure asset records include all the necessary
information.
Views of Responsible Officials
For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-003
Subject: COVID-19 Education Stabilization Fund - Equipment and Real Property Management
Federal Agency: Department of Education
Federal Program: COVID-19 - Education Stabilization Fund
Assistance Listings Numbers: 84.425D, 84.425U
Federal Award Numbers and Years (or Other Identifying Numbers): S425D200013, S425D210013,
S425U210013
Pass-Through Entity: Indiana Department of Education
Compliance Requirement: Equipment and Real Property Management
Audit Findings: Material Weakness, Other Matters
Condition and Context
The School Corporation had not properly designed or implemented a system of internal controls,
which would include appropriate segregation of duties, to ensure that the equipment and real property
records contained all the required information.
A property record or capital asset listing which would include a description of the property, a serial
number or other identification number, the source of funding for the property (including the federal award
identification number (FAIN)), who holds title, the acquisition date, cost of the property, percentage of
federal participation in the project costs for the federal award under which the property was acquired, the
location, and use and condition of the property is to be maintained for assets purchased that exceed the
School Corporation's capitalization threshold.
INDIANA STATE BOARD OF ACCOUNTS
18
PIKE COUNTY SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
The School Corporation maintained and presented the equipment and real property records for the
COVID-19 - Education Stabilization Fund grant equipment; however, the records failed to include a serial
number or other identification number, the source of funding for the property (including the federal award
identification number), percentage of federal participation in the project costs for the federal award under
which the property was acquired, the use, and condition of the property.
The lack of internal controls and noncompliance were systemic issues throughout the audit period.
Criteria
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
2 CFR 200.313(d) states in part:
"Management requirements. Procedures for managing equipment (including replacement
equipment), whether acquired in whole or in part under a Federal award, until disposition takes
place will, as a minimum, meet the following requirements:
(1) Property records must be maintained that include a description of the property, a serial
number or other identification number, the source of funding for the property (including
the FAIN), who holds title, the acquisition date, and cost of the property, percentage of
Federal participation in the project costs for the Federal award under which the
property was acquired, the location, use and condition of the property, and any ultimate
disposition data including the date of disposal and sale price of the property.
(2) A physical inventory of the property must be taken and the results reconciled with the
property records at least once every two years.
(3) A control system must be developed to ensure adequate safeguards to prevent loss,
damage, or theft of the property. Any loss, damage, or theft must be investigated.
(4) Adequate maintenance procedures must be developed to keep property in good
condition. . . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation.
Embedded within a properly designed and implemented internal control system should be internal controls
consisting of policies and procedures. Policies reflect the School Corporation's management statements
of what should be done to effect internal controls, and procedures should consist of actions that would
implement these policies.
INDIANA STATE BOARD OF ACCOUNTS 19
PIKE COUNTY SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
Effect
Without the proper implementation of an effectively designed system of internal controls, the internal
control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance.
As a result, the capital asset listing did not include all the required information.
Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of
the federal award could result in the loss of future federal funding to the School Corporation.
Questioned Costs
There were no questioned costs identified.
Recommendation
We recommended that management of the School Corporation establish a proper system of
internal controls and develop policies and procedures to ensure asset records include all the necessary
information.
Views of Responsible Officials
For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-003
Subject: COVID-19 Education Stabilization Fund - Equipment and Real Property Management
Federal Agency: Department of Education
Federal Program: COVID-19 - Education Stabilization Fund
Assistance Listings Numbers: 84.425D, 84.425U
Federal Award Numbers and Years (or Other Identifying Numbers): S425D200013, S425D210013,
S425U210013
Pass-Through Entity: Indiana Department of Education
Compliance Requirement: Equipment and Real Property Management
Audit Findings: Material Weakness, Other Matters
Condition and Context
The School Corporation had not properly designed or implemented a system of internal controls,
which would include appropriate segregation of duties, to ensure that the equipment and real property
records contained all the required information.
A property record or capital asset listing which would include a description of the property, a serial
number or other identification number, the source of funding for the property (including the federal award
identification number (FAIN)), who holds title, the acquisition date, cost of the property, percentage of
federal participation in the project costs for the federal award under which the property was acquired, the
location, and use and condition of the property is to be maintained for assets purchased that exceed the
School Corporation's capitalization threshold.
INDIANA STATE BOARD OF ACCOUNTS
18
PIKE COUNTY SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
The School Corporation maintained and presented the equipment and real property records for the
COVID-19 - Education Stabilization Fund grant equipment; however, the records failed to include a serial
number or other identification number, the source of funding for the property (including the federal award
identification number), percentage of federal participation in the project costs for the federal award under
which the property was acquired, the use, and condition of the property.
The lack of internal controls and noncompliance were systemic issues throughout the audit period.
Criteria
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
2 CFR 200.313(d) states in part:
"Management requirements. Procedures for managing equipment (including replacement
equipment), whether acquired in whole or in part under a Federal award, until disposition takes
place will, as a minimum, meet the following requirements:
(1) Property records must be maintained that include a description of the property, a serial
number or other identification number, the source of funding for the property (including
the FAIN), who holds title, the acquisition date, and cost of the property, percentage of
Federal participation in the project costs for the Federal award under which the
property was acquired, the location, use and condition of the property, and any ultimate
disposition data including the date of disposal and sale price of the property.
(2) A physical inventory of the property must be taken and the results reconciled with the
property records at least once every two years.
(3) A control system must be developed to ensure adequate safeguards to prevent loss,
damage, or theft of the property. Any loss, damage, or theft must be investigated.
(4) Adequate maintenance procedures must be developed to keep property in good
condition. . . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation.
Embedded within a properly designed and implemented internal control system should be internal controls
consisting of policies and procedures. Policies reflect the School Corporation's management statements
of what should be done to effect internal controls, and procedures should consist of actions that would
implement these policies.
INDIANA STATE BOARD OF ACCOUNTS 19
PIKE COUNTY SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
Effect
Without the proper implementation of an effectively designed system of internal controls, the internal
control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance.
As a result, the capital asset listing did not include all the required information.
Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of
the federal award could result in the loss of future federal funding to the School Corporation.
Questioned Costs
There were no questioned costs identified.
Recommendation
We recommended that management of the School Corporation establish a proper system of
internal controls and develop policies and procedures to ensure asset records include all the necessary
information.
Views of Responsible Officials
For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-003
Subject: COVID-19 Education Stabilization Fund - Equipment and Real Property Management
Federal Agency: Department of Education
Federal Program: COVID-19 - Education Stabilization Fund
Assistance Listings Numbers: 84.425D, 84.425U
Federal Award Numbers and Years (or Other Identifying Numbers): S425D200013, S425D210013,
S425U210013
Pass-Through Entity: Indiana Department of Education
Compliance Requirement: Equipment and Real Property Management
Audit Findings: Material Weakness, Other Matters
Condition and Context
The School Corporation had not properly designed or implemented a system of internal controls,
which would include appropriate segregation of duties, to ensure that the equipment and real property
records contained all the required information.
A property record or capital asset listing which would include a description of the property, a serial
number or other identification number, the source of funding for the property (including the federal award
identification number (FAIN)), who holds title, the acquisition date, cost of the property, percentage of
federal participation in the project costs for the federal award under which the property was acquired, the
location, and use and condition of the property is to be maintained for assets purchased that exceed the
School Corporation's capitalization threshold.
INDIANA STATE BOARD OF ACCOUNTS
18
PIKE COUNTY SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
The School Corporation maintained and presented the equipment and real property records for the
COVID-19 - Education Stabilization Fund grant equipment; however, the records failed to include a serial
number or other identification number, the source of funding for the property (including the federal award
identification number), percentage of federal participation in the project costs for the federal award under
which the property was acquired, the use, and condition of the property.
The lack of internal controls and noncompliance were systemic issues throughout the audit period.
Criteria
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
2 CFR 200.313(d) states in part:
"Management requirements. Procedures for managing equipment (including replacement
equipment), whether acquired in whole or in part under a Federal award, until disposition takes
place will, as a minimum, meet the following requirements:
(1) Property records must be maintained that include a description of the property, a serial
number or other identification number, the source of funding for the property (including
the FAIN), who holds title, the acquisition date, and cost of the property, percentage of
Federal participation in the project costs for the Federal award under which the
property was acquired, the location, use and condition of the property, and any ultimate
disposition data including the date of disposal and sale price of the property.
(2) A physical inventory of the property must be taken and the results reconciled with the
property records at least once every two years.
(3) A control system must be developed to ensure adequate safeguards to prevent loss,
damage, or theft of the property. Any loss, damage, or theft must be investigated.
(4) Adequate maintenance procedures must be developed to keep property in good
condition. . . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation.
Embedded within a properly designed and implemented internal control system should be internal controls
consisting of policies and procedures. Policies reflect the School Corporation's management statements
of what should be done to effect internal controls, and procedures should consist of actions that would
implement these policies.
INDIANA STATE BOARD OF ACCOUNTS 19
PIKE COUNTY SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
Effect
Without the proper implementation of an effectively designed system of internal controls, the internal
control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance.
As a result, the capital asset listing did not include all the required information.
Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of
the federal award could result in the loss of future federal funding to the School Corporation.
Questioned Costs
There were no questioned costs identified.
Recommendation
We recommended that management of the School Corporation establish a proper system of
internal controls and develop policies and procedures to ensure asset records include all the necessary
information.
Views of Responsible Officials
For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-004
Subject: Special Education Cluster (IDEA) - Earmarking
Federal Agency: Department of Education
Federal Program: Special Education Grants to States
Assistance Listings Number: 84.027
Federal Award Number and Year (or Other Identifying Number): 21611-009-PN01
Pass-Through Entity: Indiana Department of Education
Compliance Requirement: Matching, Level of Effort, Earmarking
Audit Findings: Material Weakness, Other Matters
Condition and Context
The School Corporation is a member of the Exceptional Children's Co-op (Cooperative). During
fiscal year 2021-2022, the Cooperative operated the special education programs and spent the federal
money on behalf of all its member schools. As the grant agreements were between the Indiana Department
of Education (IDOE) and each member school corporation, the School Corporation was responsible for
ensuring and providing oversight of the Cooperative. There was inadequate oversight performed by the
School Corporation in order to ensure the required nonpublic proportionate share was met.
The School Corporation did not have internal controls in place to ensure that the Cooperative
complied with the earmarking requirements. The Cooperative did not have adequate procedures in place
to ensure that the required level of expenditure for nonpublic school students with disabilities was met for
each member school corporation. The Cooperative did not have effective internal controls to ensure nonpublic
school expenditures were appropriately identified and reported.
INDIANA STATE BOARD OF ACCOUNTS
20
PIKE COUNTY SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
The Non-Public Proportionate Share expenditures for the 21611-009-PN01 grant award could not
be verified for the individual member school corporations. Total grant expenditures were posted as
expended. The Non-Public Proportionate Share expenditures were determined by applying a percentage
to the nonpublic school budgeted expenditures. These were the amounts reported to the IDOE. As such,
we were unable to identify if the minimum amount per grant award was expended and properly reported to
the IDOE as required.
The lack of internal controls and noncompliance was isolated to 2021-2022 for the
21611-009-PN01 grant award.
Criteria
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
2 CFR 200.403 states in part:
"Except where otherwise authorized by statute, costs must meet the following general criteria
in order to be allowable under Federal awards: . . .
(g) Be adequately documented. . . ."
2 CFR 200.208(b) states in part: "The Federal awarding agency or pass-through entity may adjust
specific Federal award conditions as needed, . . ."
511 IAC 7-34-7(b) states:
"The public agency, in providing special education and related services to students in nonpublic
schools must expend at least an amount that is the same proportion of the public agency total
subgrant under 20 U.S.C. 1411(f) as the number of nonpublic school students with disabilities,
who are enrolled by their parents in nonpublic schools within its boundaries, is to the total
number of students with disabilities of the same age range."
Cause
A proper system of internal controls was not designed by management of the School Corporation.
Embedded within a properly designed and implemented internal control system should be internal controls
consisting of policies and procedures. Policies reflect the School Corporation's management statements
of what should be done to effect internal controls, and procedures should consist of actions that would
implement these policies.
INDIANA STATE BOARD OF ACCOUNTS
21
PIKE COUNTY SCHOOL CORPORATION
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
Effect
Without the proper implementation of an effectively designed system of internal controls, the
internal control system cannot be capable of effectively preventing, or detecting and correcting, material
noncompliance. As such, Non-Public Proportionate Share expenditures per member school could not be
determined.
Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of
the federal award could result in the loss of future federal funding to the School Corporation.
Questioned Costs
There were no questioned costs identified.
Recommendation
We recommended that management of the School Corporation establish a proper system of
internal controls and develop policies and procedures to ensure Non-Public Proportionate Share funds are
appropriately allocated to the member school based on expenses charged directly on behalf of the member
school. Supporting documentation for these expenses should be retained for audit.
Views of Responsible Officials
For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
INDIANA STATE BOARD OF ACCOUNTS