Audit 295235

FY End
2023-06-30
Total Expended
$7.57M
Findings
8
Programs
23
Organization: North Adams Community Schools (IN)
Year: 2023 Accepted: 2024-03-14

Organization Exclusion Status:

Checking exclusion status...

Findings

ID Ref Severity Repeat Requirement
380447 2023-003 Material Weakness - F
380448 2023-003 Material Weakness - F
380449 2023-004 Material Weakness - N
380450 2023-004 Material Weakness - N
956889 2023-003 Material Weakness - F
956890 2023-003 Material Weakness - F
956891 2023-004 Material Weakness - N
956892 2023-004 Material Weakness - N

Contacts

Name Title Type
ZNVWP6N7HE24 Beth Quinn Auditee
2607283306 Beth Kelley, Cpa, Cfe Auditor
No contacts on file

Notes to SEFA

Title: Note 3. Adams-Wells Special Services Cooperative Accounting Policies: Note 1. Summary of Significant Accounting Policies A. Basis of Presentation The accompanying Schedule of Expenditures of Federal Awards (SEFA) includes the federal grant activity of the School Corporation under programs of the federal government for the years ended June 30, 2022 and 2023. The information in the SEFA is presented in accordance with the requirements of Title 2 U.S. Code of Federal Regulations Part 200, Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards (Uniform Guidance). Because the SEFA presents only a select portion of the operations of the School Corporation, it is not intended to and does not present the financial position of the School Corporation. The Uniform Guidance requires an annual audit of nonfederal entities expending a total amount of federal awards equal to or in excess of $750,000 in any fiscal year unless by constitution or statute a less frequent audit is required. In accordance with Indiana Code (IC 5-11-1-25), audits of school corporations shall be conducted biennially. Such audits shall include both years within the biennial period. B. Other Significant Accounting Policies Expenditures reported on the SEFA are reported on the cash basis of accounting. Such expenditures are recognized following, as applicable, either the cost principles in OMB Circular A-87, Cost Principles for State, Local, and Indian Tribal Governments, or the cost principles contained in the Uniform Guidance, wherein certain types of expenditures are not allowed or are limited as to reimbursement. When federal grants are received on a reimbursement basis, the federal awards are considered expended when the reimbursement is received. De Minimis Rate Used: N Rate Explanation: Note 2. Indirect Cost Rate The School Corporation has elected not to use the 10 percent de minimis indirect cost rate allowed under the Uniform Guidance. The School Corporation is a member of the Adams-Wells Special Services Cooperative and serves as the fiscal agent. As a result, some of the activity for the Special Education Cluster (IDEA) that is presented as receipts and disbursements in the financial statement is not presented on the SEFA for the School Corporation. This activity is reported on the SEFAs of the member school corporations as appropriate.

Finding Details

FINDING 2023-003 Subject: COVID-19 - Education Stabilization Fund - Equipment and Real Property Management Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Number: 84.425U Federal Award Number: S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Equipment and Real Property Management Audit Findings: Material Weakness, Modified Opinion Condition and Context A property record or capital asset listing which would include a description of the property, a serial number or other identification number, the source of funding for the property (including the federal award identification number (FAIN)), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, and use and condition of the property is to be maintained for assets purchased that exceed the School Corporation's capitalization threshold. The School Corporation purchased the following items during the audit period: an HVAC system in the amount of $1,420,440; paving for a traffic improvement project in the amount of $1,069,051; and a dehumidification unit for the pool in the amount of $328,076. The dehumidification unit for the pool was added to the capital asset listing; however, the source of the funding, who holds title, percentage of federal participation in the project costs for the federal award, and the condition of property were not noted. The HVAC system and the traffic improvement project were not included on the asset listing. The lack of internal controls and noncompliance were systemic issues throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." INDIANA STATE BOARD OF ACCOUNTS 18 NORTH ADAMS COMMUNITY SCHOOLS SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) 2 CFR 200.313(d)(1) states: "Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, and cost of the property, percentage of Federal participation in the project costs for the Federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sale price of the property." Cause A proper system of internal controls was not designed by management of the School Corporation. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. Effect Without the proper implementation of an effectively designed system of internal controls, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. As a result, assets purchased with federal dollars were not properly added to the School Corporation's asset listing. In addition, the one asset added did not have all the required elements. Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of the federal award could result in the loss of future federal funding to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that management of the School Corporation establish a proper system of internal controls and develop policies and procedures to ensure asset records include all the necessary information and new assets are added. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-003 Subject: COVID-19 - Education Stabilization Fund - Equipment and Real Property Management Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Number: 84.425U Federal Award Number: S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Equipment and Real Property Management Audit Findings: Material Weakness, Modified Opinion Condition and Context A property record or capital asset listing which would include a description of the property, a serial number or other identification number, the source of funding for the property (including the federal award identification number (FAIN)), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, and use and condition of the property is to be maintained for assets purchased that exceed the School Corporation's capitalization threshold. The School Corporation purchased the following items during the audit period: an HVAC system in the amount of $1,420,440; paving for a traffic improvement project in the amount of $1,069,051; and a dehumidification unit for the pool in the amount of $328,076. The dehumidification unit for the pool was added to the capital asset listing; however, the source of the funding, who holds title, percentage of federal participation in the project costs for the federal award, and the condition of property were not noted. The HVAC system and the traffic improvement project were not included on the asset listing. The lack of internal controls and noncompliance were systemic issues throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." INDIANA STATE BOARD OF ACCOUNTS 18 NORTH ADAMS COMMUNITY SCHOOLS SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) 2 CFR 200.313(d)(1) states: "Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, and cost of the property, percentage of Federal participation in the project costs for the Federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sale price of the property." Cause A proper system of internal controls was not designed by management of the School Corporation. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. Effect Without the proper implementation of an effectively designed system of internal controls, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. As a result, assets purchased with federal dollars were not properly added to the School Corporation's asset listing. In addition, the one asset added did not have all the required elements. Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of the federal award could result in the loss of future federal funding to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that management of the School Corporation establish a proper system of internal controls and develop policies and procedures to ensure asset records include all the necessary information and new assets are added. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-004 Subject: COVID-19 - Education Stabilization Fund - Special Tests and Provisions - Wage Rate Requirements Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Number: 84.425U Federal Award Number: S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Special Tests and Provisions - Wage Rate Requirements Audit Findings: Material Weakness, Modified Opinion INDIANA STATE BOARD OF ACCOUNTS 19 NORTH ADAMS COMMUNITY SCHOOLS SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Condition and Context Construction contracts in excess of $2,000 financed by federal assistance funds must pay wages not less than those established for the locality of the project (prevailing wage rates) by the Department of Labor (DOL) to their laborers and mechanics. Nonfederal entities are to include in their construction contracts, subject to the Wage Rate Requirements, a provision that the contractor or subcontractor complies with these requirements and the DOL regulations. This would include a requirement to submit a copy of the payroll and statement of compliance to the entity for each week in which contract work was performed. The School Corporation had not designed nor implemented a system of internal controls to ensure that construction contracts in excess of $2,000 paid from federal grant funds included a prevailing wage rate clause. The School Corporation entered into two contracts during the audit period. Both contracts were selected for testing. One contract included the cost of installation for a HVAC system in the amount of $443,020. This contract contained the required wage rate clause. Another contract for paving related to a traffic improvement project contained labor costs in the amount of $1,116,335. This contract did not contain the required wage rate clause. Certified payrolls and a statement of compliance for each week in which contract work was performed were not collected by the School Corporation for either project. The lack of internal controls and noncompliance were systemic issues throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 29 CFR 5.5 states in part: "(a) The Agency head shall cause or require the contracting officer to insert in full in any contract in excess of $2,000 which is entered into for the actual construction, alteration and/or repair, including painting and decorating, of a public building or public work, or building or work financed in whole or in part from Federal funds or in accordance with guarantees of a Federal agency or financed from funds obtained by pledge of any contract of a Federal agency to make a loan, grant or annual contribution (except where a different meaning is expressly indicated), and which is subject to the labor standards provisions of any of the acts listed in § 5.1, the following clauses . . . (1) Minimum wages. INDIANA STATE BOARD OF ACCOUNTS 20 NORTH ADAMS COMMUNITY SCHOOLS SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) (i) All laborers and mechanics employed or working upon the site of the work (or under the United States Housing Act of 1937 or under the Housing Act of 1949 in the construction or development of the project), will be paid unconditionally and not less often than once a week, and without subsequent deduction or rebate on any account (except such payroll deductions as are permitted by regulations issued by the Secretary of Labor under the Copeland Act (29 CFR part 3)), the full amount of wages and bona fide fringe benefits (or cash equivalents thereof) due at time of payment computed at rates not less than those contained in the wage determination of the Secretary of Labor which is attached hereto and made a part hereof, regardless of any contractual relationship which may be alleged to exist between the contractor and such laborers and mechanics. . . . (3) Payrolls and basic records. . . . (ii) (A) The contractor shall submit weekly for each week in which any contract work is performed a copy of all payrolls to the (write in name of appropriate federal agency) if the agency is a party to the contract, but if the agency is not such a party, the contractor will submit the payrolls to the applicant, sponsor, or owner, as the case may be, for transmission to the (write in name of agency). . . ." 2 CFR 200 Appendix II states in part: "In addition to other provisions required by the Federal agency or non-Federal entity; all contracts made by the non-Federal entity under the Federal award must contain provisions covering the following, as applicable. . . . (D) Davis-Bacon Act, as amended (40 U.S.C 3141-3148). When required by Federal program legislations, all prime construction contracts in excess of $2,000 awarded by non- Federal entities must include a provision for compliance with the Davis-Bacon Act (40 U.S.C. 3141-3144, and 3146-3148 as supplemented by Department of Labor regulations (29 CFR Part 5, 'Labor Standards Provisions Applicable to Contracts Covering Federally Financed and Assisted Construction'). In accordance with the statue, contracts must be required to pay wages to laborers and mechanics at a rate note less than the prevailing wages specified in wage determination made by the Secretary of Labor. In addition, contractors must be required to pay wages not less than once a week. . . ." Cause A proper system of internal controls was not designed by management of the School Corporation, which would include segregation of key functions. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. Effect Without the proper implementation of an effectively designed system of internal controls, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. As a result, one construction contract entered into did not contain the required wage rate requirements clauses nor were certified payrolls obtained by the School Corporation. INDIANA STATE BOARD OF ACCOUNTS 21 NORTH ADAMS COMMUNITY SCHOOLS SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Noncompliance with the grant agreement and the compliance requirement could result in the loss of future federal funds to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish a system of internal controls and include the wage rate requirement clause in construction contracts. In addition, certified payrolls should be obtained as required. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-004 Subject: COVID-19 - Education Stabilization Fund - Special Tests and Provisions - Wage Rate Requirements Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Number: 84.425U Federal Award Number: S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Special Tests and Provisions - Wage Rate Requirements Audit Findings: Material Weakness, Modified Opinion INDIANA STATE BOARD OF ACCOUNTS 19 NORTH ADAMS COMMUNITY SCHOOLS SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Condition and Context Construction contracts in excess of $2,000 financed by federal assistance funds must pay wages not less than those established for the locality of the project (prevailing wage rates) by the Department of Labor (DOL) to their laborers and mechanics. Nonfederal entities are to include in their construction contracts, subject to the Wage Rate Requirements, a provision that the contractor or subcontractor complies with these requirements and the DOL regulations. This would include a requirement to submit a copy of the payroll and statement of compliance to the entity for each week in which contract work was performed. The School Corporation had not designed nor implemented a system of internal controls to ensure that construction contracts in excess of $2,000 paid from federal grant funds included a prevailing wage rate clause. The School Corporation entered into two contracts during the audit period. Both contracts were selected for testing. One contract included the cost of installation for a HVAC system in the amount of $443,020. This contract contained the required wage rate clause. Another contract for paving related to a traffic improvement project contained labor costs in the amount of $1,116,335. This contract did not contain the required wage rate clause. Certified payrolls and a statement of compliance for each week in which contract work was performed were not collected by the School Corporation for either project. The lack of internal controls and noncompliance were systemic issues throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 29 CFR 5.5 states in part: "(a) The Agency head shall cause or require the contracting officer to insert in full in any contract in excess of $2,000 which is entered into for the actual construction, alteration and/or repair, including painting and decorating, of a public building or public work, or building or work financed in whole or in part from Federal funds or in accordance with guarantees of a Federal agency or financed from funds obtained by pledge of any contract of a Federal agency to make a loan, grant or annual contribution (except where a different meaning is expressly indicated), and which is subject to the labor standards provisions of any of the acts listed in § 5.1, the following clauses . . . (1) Minimum wages. INDIANA STATE BOARD OF ACCOUNTS 20 NORTH ADAMS COMMUNITY SCHOOLS SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) (i) All laborers and mechanics employed or working upon the site of the work (or under the United States Housing Act of 1937 or under the Housing Act of 1949 in the construction or development of the project), will be paid unconditionally and not less often than once a week, and without subsequent deduction or rebate on any account (except such payroll deductions as are permitted by regulations issued by the Secretary of Labor under the Copeland Act (29 CFR part 3)), the full amount of wages and bona fide fringe benefits (or cash equivalents thereof) due at time of payment computed at rates not less than those contained in the wage determination of the Secretary of Labor which is attached hereto and made a part hereof, regardless of any contractual relationship which may be alleged to exist between the contractor and such laborers and mechanics. . . . (3) Payrolls and basic records. . . . (ii) (A) The contractor shall submit weekly for each week in which any contract work is performed a copy of all payrolls to the (write in name of appropriate federal agency) if the agency is a party to the contract, but if the agency is not such a party, the contractor will submit the payrolls to the applicant, sponsor, or owner, as the case may be, for transmission to the (write in name of agency). . . ." 2 CFR 200 Appendix II states in part: "In addition to other provisions required by the Federal agency or non-Federal entity; all contracts made by the non-Federal entity under the Federal award must contain provisions covering the following, as applicable. . . . (D) Davis-Bacon Act, as amended (40 U.S.C 3141-3148). When required by Federal program legislations, all prime construction contracts in excess of $2,000 awarded by non- Federal entities must include a provision for compliance with the Davis-Bacon Act (40 U.S.C. 3141-3144, and 3146-3148 as supplemented by Department of Labor regulations (29 CFR Part 5, 'Labor Standards Provisions Applicable to Contracts Covering Federally Financed and Assisted Construction'). In accordance with the statue, contracts must be required to pay wages to laborers and mechanics at a rate note less than the prevailing wages specified in wage determination made by the Secretary of Labor. In addition, contractors must be required to pay wages not less than once a week. . . ." Cause A proper system of internal controls was not designed by management of the School Corporation, which would include segregation of key functions. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. Effect Without the proper implementation of an effectively designed system of internal controls, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. As a result, one construction contract entered into did not contain the required wage rate requirements clauses nor were certified payrolls obtained by the School Corporation. INDIANA STATE BOARD OF ACCOUNTS 21 NORTH ADAMS COMMUNITY SCHOOLS SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Noncompliance with the grant agreement and the compliance requirement could result in the loss of future federal funds to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish a system of internal controls and include the wage rate requirement clause in construction contracts. In addition, certified payrolls should be obtained as required. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-003 Subject: COVID-19 - Education Stabilization Fund - Equipment and Real Property Management Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Number: 84.425U Federal Award Number: S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Equipment and Real Property Management Audit Findings: Material Weakness, Modified Opinion Condition and Context A property record or capital asset listing which would include a description of the property, a serial number or other identification number, the source of funding for the property (including the federal award identification number (FAIN)), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, and use and condition of the property is to be maintained for assets purchased that exceed the School Corporation's capitalization threshold. The School Corporation purchased the following items during the audit period: an HVAC system in the amount of $1,420,440; paving for a traffic improvement project in the amount of $1,069,051; and a dehumidification unit for the pool in the amount of $328,076. The dehumidification unit for the pool was added to the capital asset listing; however, the source of the funding, who holds title, percentage of federal participation in the project costs for the federal award, and the condition of property were not noted. The HVAC system and the traffic improvement project were not included on the asset listing. The lack of internal controls and noncompliance were systemic issues throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." INDIANA STATE BOARD OF ACCOUNTS 18 NORTH ADAMS COMMUNITY SCHOOLS SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) 2 CFR 200.313(d)(1) states: "Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, and cost of the property, percentage of Federal participation in the project costs for the Federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sale price of the property." Cause A proper system of internal controls was not designed by management of the School Corporation. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. Effect Without the proper implementation of an effectively designed system of internal controls, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. As a result, assets purchased with federal dollars were not properly added to the School Corporation's asset listing. In addition, the one asset added did not have all the required elements. Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of the federal award could result in the loss of future federal funding to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that management of the School Corporation establish a proper system of internal controls and develop policies and procedures to ensure asset records include all the necessary information and new assets are added. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-003 Subject: COVID-19 - Education Stabilization Fund - Equipment and Real Property Management Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Number: 84.425U Federal Award Number: S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Equipment and Real Property Management Audit Findings: Material Weakness, Modified Opinion Condition and Context A property record or capital asset listing which would include a description of the property, a serial number or other identification number, the source of funding for the property (including the federal award identification number (FAIN)), who holds title, the acquisition date, cost of the property, percentage of federal participation in the project costs for the federal award under which the property was acquired, the location, and use and condition of the property is to be maintained for assets purchased that exceed the School Corporation's capitalization threshold. The School Corporation purchased the following items during the audit period: an HVAC system in the amount of $1,420,440; paving for a traffic improvement project in the amount of $1,069,051; and a dehumidification unit for the pool in the amount of $328,076. The dehumidification unit for the pool was added to the capital asset listing; however, the source of the funding, who holds title, percentage of federal participation in the project costs for the federal award, and the condition of property were not noted. The HVAC system and the traffic improvement project were not included on the asset listing. The lack of internal controls and noncompliance were systemic issues throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." INDIANA STATE BOARD OF ACCOUNTS 18 NORTH ADAMS COMMUNITY SCHOOLS SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) 2 CFR 200.313(d)(1) states: "Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, and cost of the property, percentage of Federal participation in the project costs for the Federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sale price of the property." Cause A proper system of internal controls was not designed by management of the School Corporation. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. Effect Without the proper implementation of an effectively designed system of internal controls, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. As a result, assets purchased with federal dollars were not properly added to the School Corporation's asset listing. In addition, the one asset added did not have all the required elements. Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of the federal award could result in the loss of future federal funding to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that management of the School Corporation establish a proper system of internal controls and develop policies and procedures to ensure asset records include all the necessary information and new assets are added. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-004 Subject: COVID-19 - Education Stabilization Fund - Special Tests and Provisions - Wage Rate Requirements Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Number: 84.425U Federal Award Number: S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Special Tests and Provisions - Wage Rate Requirements Audit Findings: Material Weakness, Modified Opinion INDIANA STATE BOARD OF ACCOUNTS 19 NORTH ADAMS COMMUNITY SCHOOLS SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Condition and Context Construction contracts in excess of $2,000 financed by federal assistance funds must pay wages not less than those established for the locality of the project (prevailing wage rates) by the Department of Labor (DOL) to their laborers and mechanics. Nonfederal entities are to include in their construction contracts, subject to the Wage Rate Requirements, a provision that the contractor or subcontractor complies with these requirements and the DOL regulations. This would include a requirement to submit a copy of the payroll and statement of compliance to the entity for each week in which contract work was performed. The School Corporation had not designed nor implemented a system of internal controls to ensure that construction contracts in excess of $2,000 paid from federal grant funds included a prevailing wage rate clause. The School Corporation entered into two contracts during the audit period. Both contracts were selected for testing. One contract included the cost of installation for a HVAC system in the amount of $443,020. This contract contained the required wage rate clause. Another contract for paving related to a traffic improvement project contained labor costs in the amount of $1,116,335. This contract did not contain the required wage rate clause. Certified payrolls and a statement of compliance for each week in which contract work was performed were not collected by the School Corporation for either project. The lack of internal controls and noncompliance were systemic issues throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 29 CFR 5.5 states in part: "(a) The Agency head shall cause or require the contracting officer to insert in full in any contract in excess of $2,000 which is entered into for the actual construction, alteration and/or repair, including painting and decorating, of a public building or public work, or building or work financed in whole or in part from Federal funds or in accordance with guarantees of a Federal agency or financed from funds obtained by pledge of any contract of a Federal agency to make a loan, grant or annual contribution (except where a different meaning is expressly indicated), and which is subject to the labor standards provisions of any of the acts listed in § 5.1, the following clauses . . . (1) Minimum wages. INDIANA STATE BOARD OF ACCOUNTS 20 NORTH ADAMS COMMUNITY SCHOOLS SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) (i) All laborers and mechanics employed or working upon the site of the work (or under the United States Housing Act of 1937 or under the Housing Act of 1949 in the construction or development of the project), will be paid unconditionally and not less often than once a week, and without subsequent deduction or rebate on any account (except such payroll deductions as are permitted by regulations issued by the Secretary of Labor under the Copeland Act (29 CFR part 3)), the full amount of wages and bona fide fringe benefits (or cash equivalents thereof) due at time of payment computed at rates not less than those contained in the wage determination of the Secretary of Labor which is attached hereto and made a part hereof, regardless of any contractual relationship which may be alleged to exist between the contractor and such laborers and mechanics. . . . (3) Payrolls and basic records. . . . (ii) (A) The contractor shall submit weekly for each week in which any contract work is performed a copy of all payrolls to the (write in name of appropriate federal agency) if the agency is a party to the contract, but if the agency is not such a party, the contractor will submit the payrolls to the applicant, sponsor, or owner, as the case may be, for transmission to the (write in name of agency). . . ." 2 CFR 200 Appendix II states in part: "In addition to other provisions required by the Federal agency or non-Federal entity; all contracts made by the non-Federal entity under the Federal award must contain provisions covering the following, as applicable. . . . (D) Davis-Bacon Act, as amended (40 U.S.C 3141-3148). When required by Federal program legislations, all prime construction contracts in excess of $2,000 awarded by non- Federal entities must include a provision for compliance with the Davis-Bacon Act (40 U.S.C. 3141-3144, and 3146-3148 as supplemented by Department of Labor regulations (29 CFR Part 5, 'Labor Standards Provisions Applicable to Contracts Covering Federally Financed and Assisted Construction'). In accordance with the statue, contracts must be required to pay wages to laborers and mechanics at a rate note less than the prevailing wages specified in wage determination made by the Secretary of Labor. In addition, contractors must be required to pay wages not less than once a week. . . ." Cause A proper system of internal controls was not designed by management of the School Corporation, which would include segregation of key functions. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. Effect Without the proper implementation of an effectively designed system of internal controls, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. As a result, one construction contract entered into did not contain the required wage rate requirements clauses nor were certified payrolls obtained by the School Corporation. INDIANA STATE BOARD OF ACCOUNTS 21 NORTH ADAMS COMMUNITY SCHOOLS SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Noncompliance with the grant agreement and the compliance requirement could result in the loss of future federal funds to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish a system of internal controls and include the wage rate requirement clause in construction contracts. In addition, certified payrolls should be obtained as required. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-004 Subject: COVID-19 - Education Stabilization Fund - Special Tests and Provisions - Wage Rate Requirements Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Number: 84.425U Federal Award Number: S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Special Tests and Provisions - Wage Rate Requirements Audit Findings: Material Weakness, Modified Opinion INDIANA STATE BOARD OF ACCOUNTS 19 NORTH ADAMS COMMUNITY SCHOOLS SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Condition and Context Construction contracts in excess of $2,000 financed by federal assistance funds must pay wages not less than those established for the locality of the project (prevailing wage rates) by the Department of Labor (DOL) to their laborers and mechanics. Nonfederal entities are to include in their construction contracts, subject to the Wage Rate Requirements, a provision that the contractor or subcontractor complies with these requirements and the DOL regulations. This would include a requirement to submit a copy of the payroll and statement of compliance to the entity for each week in which contract work was performed. The School Corporation had not designed nor implemented a system of internal controls to ensure that construction contracts in excess of $2,000 paid from federal grant funds included a prevailing wage rate clause. The School Corporation entered into two contracts during the audit period. Both contracts were selected for testing. One contract included the cost of installation for a HVAC system in the amount of $443,020. This contract contained the required wage rate clause. Another contract for paving related to a traffic improvement project contained labor costs in the amount of $1,116,335. This contract did not contain the required wage rate clause. Certified payrolls and a statement of compliance for each week in which contract work was performed were not collected by the School Corporation for either project. The lack of internal controls and noncompliance were systemic issues throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 29 CFR 5.5 states in part: "(a) The Agency head shall cause or require the contracting officer to insert in full in any contract in excess of $2,000 which is entered into for the actual construction, alteration and/or repair, including painting and decorating, of a public building or public work, or building or work financed in whole or in part from Federal funds or in accordance with guarantees of a Federal agency or financed from funds obtained by pledge of any contract of a Federal agency to make a loan, grant or annual contribution (except where a different meaning is expressly indicated), and which is subject to the labor standards provisions of any of the acts listed in § 5.1, the following clauses . . . (1) Minimum wages. INDIANA STATE BOARD OF ACCOUNTS 20 NORTH ADAMS COMMUNITY SCHOOLS SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) (i) All laborers and mechanics employed or working upon the site of the work (or under the United States Housing Act of 1937 or under the Housing Act of 1949 in the construction or development of the project), will be paid unconditionally and not less often than once a week, and without subsequent deduction or rebate on any account (except such payroll deductions as are permitted by regulations issued by the Secretary of Labor under the Copeland Act (29 CFR part 3)), the full amount of wages and bona fide fringe benefits (or cash equivalents thereof) due at time of payment computed at rates not less than those contained in the wage determination of the Secretary of Labor which is attached hereto and made a part hereof, regardless of any contractual relationship which may be alleged to exist between the contractor and such laborers and mechanics. . . . (3) Payrolls and basic records. . . . (ii) (A) The contractor shall submit weekly for each week in which any contract work is performed a copy of all payrolls to the (write in name of appropriate federal agency) if the agency is a party to the contract, but if the agency is not such a party, the contractor will submit the payrolls to the applicant, sponsor, or owner, as the case may be, for transmission to the (write in name of agency). . . ." 2 CFR 200 Appendix II states in part: "In addition to other provisions required by the Federal agency or non-Federal entity; all contracts made by the non-Federal entity under the Federal award must contain provisions covering the following, as applicable. . . . (D) Davis-Bacon Act, as amended (40 U.S.C 3141-3148). When required by Federal program legislations, all prime construction contracts in excess of $2,000 awarded by non- Federal entities must include a provision for compliance with the Davis-Bacon Act (40 U.S.C. 3141-3144, and 3146-3148 as supplemented by Department of Labor regulations (29 CFR Part 5, 'Labor Standards Provisions Applicable to Contracts Covering Federally Financed and Assisted Construction'). In accordance with the statue, contracts must be required to pay wages to laborers and mechanics at a rate note less than the prevailing wages specified in wage determination made by the Secretary of Labor. In addition, contractors must be required to pay wages not less than once a week. . . ." Cause A proper system of internal controls was not designed by management of the School Corporation, which would include segregation of key functions. Embedded within a properly designed and implemented internal control system should be internal controls consisting of policies and procedures. Policies reflect the School Corporation's management statements of what should be done to effect internal controls, and procedures should consist of actions that would implement these policies. Effect Without the proper implementation of an effectively designed system of internal controls, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. As a result, one construction contract entered into did not contain the required wage rate requirements clauses nor were certified payrolls obtained by the School Corporation. INDIANA STATE BOARD OF ACCOUNTS 21 NORTH ADAMS COMMUNITY SCHOOLS SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Noncompliance with the grant agreement and the compliance requirement could result in the loss of future federal funds to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish a system of internal controls and include the wage rate requirement clause in construction contracts. In addition, certified payrolls should be obtained as required. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.