FINDING 2023-003
Subject: COVID-19 - Education Stabilization Fund - Equipment and Real Property Management
Federal Agency: Department of Education
Federal Program: COVID-19 - Education Stabilization Fund
Assistance Listings Number: 84.425U
Federal Award Number: S425U210013
Pass-Through Entity: Indiana Department of Education
Compliance Requirement: Equipment and Real Property Management
Audit Findings: Material Weakness, Modified Opinion
Condition and Context
A property record or capital asset listing which would include a description of the property, a serial
number or other identification number, the source of funding for the property (including the federal award
identification number (FAIN)), who holds title, the acquisition date, cost of the property, percentage of
federal participation in the project costs for the federal award under which the property was acquired, the
location, and use and condition of the property is to be maintained for assets purchased that exceed the
School Corporation's capitalization threshold.
The School Corporation purchased the following items during the audit period: an HVAC system
in the amount of $1,420,440; paving for a traffic improvement project in the amount of $1,069,051; and a
dehumidification unit for the pool in the amount of $328,076. The dehumidification unit for the pool was
added to the capital asset listing; however, the source of the funding, who holds title, percentage of federal
participation in the project costs for the federal award, and the condition of property were not noted. The
HVAC system and the traffic improvement project were not included on the asset listing.
The lack of internal controls and noncompliance were systemic issues throughout the audit period.
Criteria
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
INDIANA STATE BOARD OF ACCOUNTS 18
NORTH ADAMS COMMUNITY SCHOOLS
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
2 CFR 200.313(d)(1) states:
"Property records must be maintained that include a description of the property, a serial number
or other identification number, the source of funding for the property (including the FAIN), who
holds title, the acquisition date, and cost of the property, percentage of Federal participation in
the project costs for the Federal award under which the property was acquired, the location,
use and condition of the property, and any ultimate disposition data including the date of
disposal and sale price of the property."
Cause
A proper system of internal controls was not designed by management of the School Corporation.
Embedded within a properly designed and implemented internal control system should be internal controls
consisting of policies and procedures. Policies reflect the School Corporation's management statements
of what should be done to effect internal controls, and procedures should consist of actions that would
implement these policies.
Effect
Without the proper implementation of an effectively designed system of internal controls, the internal
control system cannot be capable of effectively preventing, or detecting and correcting, material
noncompliance. As a result, assets purchased with federal dollars were not properly added to the School
Corporation's asset listing. In addition, the one asset added did not have all the required elements.
Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of
the federal award could result in the loss of future federal funding to the School Corporation.
Questioned Costs
There were no questioned costs identified.
Recommendation
We recommended that management of the School Corporation establish a proper system of
internal controls and develop policies and procedures to ensure asset records include all the necessary
information and new assets are added.
Views of Responsible Officials
For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-003
Subject: COVID-19 - Education Stabilization Fund - Equipment and Real Property Management
Federal Agency: Department of Education
Federal Program: COVID-19 - Education Stabilization Fund
Assistance Listings Number: 84.425U
Federal Award Number: S425U210013
Pass-Through Entity: Indiana Department of Education
Compliance Requirement: Equipment and Real Property Management
Audit Findings: Material Weakness, Modified Opinion
Condition and Context
A property record or capital asset listing which would include a description of the property, a serial
number or other identification number, the source of funding for the property (including the federal award
identification number (FAIN)), who holds title, the acquisition date, cost of the property, percentage of
federal participation in the project costs for the federal award under which the property was acquired, the
location, and use and condition of the property is to be maintained for assets purchased that exceed the
School Corporation's capitalization threshold.
The School Corporation purchased the following items during the audit period: an HVAC system
in the amount of $1,420,440; paving for a traffic improvement project in the amount of $1,069,051; and a
dehumidification unit for the pool in the amount of $328,076. The dehumidification unit for the pool was
added to the capital asset listing; however, the source of the funding, who holds title, percentage of federal
participation in the project costs for the federal award, and the condition of property were not noted. The
HVAC system and the traffic improvement project were not included on the asset listing.
The lack of internal controls and noncompliance were systemic issues throughout the audit period.
Criteria
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
INDIANA STATE BOARD OF ACCOUNTS 18
NORTH ADAMS COMMUNITY SCHOOLS
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
2 CFR 200.313(d)(1) states:
"Property records must be maintained that include a description of the property, a serial number
or other identification number, the source of funding for the property (including the FAIN), who
holds title, the acquisition date, and cost of the property, percentage of Federal participation in
the project costs for the Federal award under which the property was acquired, the location,
use and condition of the property, and any ultimate disposition data including the date of
disposal and sale price of the property."
Cause
A proper system of internal controls was not designed by management of the School Corporation.
Embedded within a properly designed and implemented internal control system should be internal controls
consisting of policies and procedures. Policies reflect the School Corporation's management statements
of what should be done to effect internal controls, and procedures should consist of actions that would
implement these policies.
Effect
Without the proper implementation of an effectively designed system of internal controls, the internal
control system cannot be capable of effectively preventing, or detecting and correcting, material
noncompliance. As a result, assets purchased with federal dollars were not properly added to the School
Corporation's asset listing. In addition, the one asset added did not have all the required elements.
Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of
the federal award could result in the loss of future federal funding to the School Corporation.
Questioned Costs
There were no questioned costs identified.
Recommendation
We recommended that management of the School Corporation establish a proper system of
internal controls and develop policies and procedures to ensure asset records include all the necessary
information and new assets are added.
Views of Responsible Officials
For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-004
Subject: COVID-19 - Education Stabilization Fund - Special
Tests and Provisions - Wage Rate Requirements
Federal Agency: Department of Education
Federal Program: COVID-19 - Education Stabilization Fund
Assistance Listings Number: 84.425U
Federal Award Number: S425U210013
Pass-Through Entity: Indiana Department of Education
Compliance Requirement: Special Tests and Provisions - Wage Rate Requirements
Audit Findings: Material Weakness, Modified Opinion
INDIANA STATE BOARD OF ACCOUNTS
19
NORTH ADAMS COMMUNITY SCHOOLS
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
Condition and Context
Construction contracts in excess of $2,000 financed by federal assistance funds must pay wages
not less than those established for the locality of the project (prevailing wage rates) by the Department of
Labor (DOL) to their laborers and mechanics. Nonfederal entities are to include in their construction
contracts, subject to the Wage Rate Requirements, a provision that the contractor or subcontractor complies
with these requirements and the DOL regulations. This would include a requirement to submit a copy
of the payroll and statement of compliance to the entity for each week in which contract work was performed.
The School Corporation had not designed nor implemented a system of internal controls to ensure
that construction contracts in excess of $2,000 paid from federal grant funds included a prevailing wage
rate clause. The School Corporation entered into two contracts during the audit period. Both contracts
were selected for testing. One contract included the cost of installation for a HVAC system in the amount
of $443,020. This contract contained the required wage rate clause. Another contract for paving related
to a traffic improvement project contained labor costs in the amount of $1,116,335. This contract did not
contain the required wage rate clause. Certified payrolls and a statement of compliance for each week in
which contract work was performed were not collected by the School Corporation for either project.
The lack of internal controls and noncompliance were systemic issues throughout the audit period.
Criteria
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
29 CFR 5.5 states in part:
"(a) The Agency head shall cause or require the contracting officer to insert in full in any
contract in excess of $2,000 which is entered into for the actual construction, alteration and/or
repair, including painting and decorating, of a public building or public work, or building or work
financed in whole or in part from Federal funds or in accordance with guarantees of a Federal
agency or financed from funds obtained by pledge of any contract of a Federal agency to make
a loan, grant or annual contribution (except where a different meaning is expressly indicated),
and which is subject to the labor standards provisions of any of the acts listed in § 5.1, the
following clauses . . .
(1) Minimum wages.
INDIANA STATE BOARD OF ACCOUNTS
20
NORTH ADAMS COMMUNITY SCHOOLS
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
(i) All laborers and mechanics employed or working upon the site of the work (or
under the United States Housing Act of 1937 or under the Housing Act of 1949 in the
construction or development of the project), will be paid unconditionally and not less
often than once a week, and without subsequent deduction or rebate on any account
(except such payroll deductions as are permitted by regulations issued by the
Secretary of Labor under the Copeland Act (29 CFR part 3)), the full amount of wages
and bona fide fringe benefits (or cash equivalents thereof) due at time of payment
computed at rates not less than those contained in the wage determination of the
Secretary of Labor which is attached hereto and made a part hereof, regardless of any
contractual relationship which may be alleged to exist between the contractor and such
laborers and mechanics. . . .
(3) Payrolls and basic records. . . .
(ii)
(A) The contractor shall submit weekly for each week in which any contract work
is performed a copy of all payrolls to the (write in name of appropriate federal
agency) if the agency is a party to the contract, but if the agency is not such a
party, the contractor will submit the payrolls to the applicant, sponsor, or
owner, as the case may be, for transmission to the (write in name of agency).
. . ."
2 CFR 200 Appendix II states in part:
"In addition to other provisions required by the Federal agency or non-Federal entity; all contracts
made by the non-Federal entity under the Federal award must contain provisions covering
the following, as applicable. . . .
(D) Davis-Bacon Act, as amended (40 U.S.C 3141-3148). When required by Federal
program legislations, all prime construction contracts in excess of $2,000 awarded by non-
Federal entities must include a provision for compliance with the Davis-Bacon Act (40
U.S.C. 3141-3144, and 3146-3148 as supplemented by Department of Labor regulations
(29 CFR Part 5, 'Labor Standards Provisions Applicable to Contracts Covering Federally
Financed and Assisted Construction'). In accordance with the statue, contracts must be
required to pay wages to laborers and mechanics at a rate note less than the prevailing
wages specified in wage determination made by the Secretary of Labor. In addition,
contractors must be required to pay wages not less than once a week. . . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation,
which would include segregation of key functions. Embedded within a properly designed and implemented
internal control system should be internal controls consisting of policies and procedures. Policies reflect
the School Corporation's management statements of what should be done to effect internal controls, and
procedures should consist of actions that would implement these policies.
Effect
Without the proper implementation of an effectively designed system of internal controls, the internal
control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance.
As a result, one construction contract entered into did not contain the required wage rate
requirements clauses nor were certified payrolls obtained by the School Corporation.
INDIANA STATE BOARD OF ACCOUNTS
21
NORTH ADAMS COMMUNITY SCHOOLS
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
Noncompliance with the grant agreement and the compliance requirement could result in the loss
of future federal funds to the School Corporation.
Questioned Costs
There were no questioned costs identified.
Recommendation
We recommended that the School Corporation's management establish a system of internal controls
and include the wage rate requirement clause in construction contracts. In addition, certified payrolls
should be obtained as required.
Views of Responsible Officials
For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-004
Subject: COVID-19 - Education Stabilization Fund - Special
Tests and Provisions - Wage Rate Requirements
Federal Agency: Department of Education
Federal Program: COVID-19 - Education Stabilization Fund
Assistance Listings Number: 84.425U
Federal Award Number: S425U210013
Pass-Through Entity: Indiana Department of Education
Compliance Requirement: Special Tests and Provisions - Wage Rate Requirements
Audit Findings: Material Weakness, Modified Opinion
INDIANA STATE BOARD OF ACCOUNTS
19
NORTH ADAMS COMMUNITY SCHOOLS
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
Condition and Context
Construction contracts in excess of $2,000 financed by federal assistance funds must pay wages
not less than those established for the locality of the project (prevailing wage rates) by the Department of
Labor (DOL) to their laborers and mechanics. Nonfederal entities are to include in their construction
contracts, subject to the Wage Rate Requirements, a provision that the contractor or subcontractor complies
with these requirements and the DOL regulations. This would include a requirement to submit a copy
of the payroll and statement of compliance to the entity for each week in which contract work was performed.
The School Corporation had not designed nor implemented a system of internal controls to ensure
that construction contracts in excess of $2,000 paid from federal grant funds included a prevailing wage
rate clause. The School Corporation entered into two contracts during the audit period. Both contracts
were selected for testing. One contract included the cost of installation for a HVAC system in the amount
of $443,020. This contract contained the required wage rate clause. Another contract for paving related
to a traffic improvement project contained labor costs in the amount of $1,116,335. This contract did not
contain the required wage rate clause. Certified payrolls and a statement of compliance for each week in
which contract work was performed were not collected by the School Corporation for either project.
The lack of internal controls and noncompliance were systemic issues throughout the audit period.
Criteria
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
29 CFR 5.5 states in part:
"(a) The Agency head shall cause or require the contracting officer to insert in full in any
contract in excess of $2,000 which is entered into for the actual construction, alteration and/or
repair, including painting and decorating, of a public building or public work, or building or work
financed in whole or in part from Federal funds or in accordance with guarantees of a Federal
agency or financed from funds obtained by pledge of any contract of a Federal agency to make
a loan, grant or annual contribution (except where a different meaning is expressly indicated),
and which is subject to the labor standards provisions of any of the acts listed in § 5.1, the
following clauses . . .
(1) Minimum wages.
INDIANA STATE BOARD OF ACCOUNTS
20
NORTH ADAMS COMMUNITY SCHOOLS
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
(i) All laborers and mechanics employed or working upon the site of the work (or
under the United States Housing Act of 1937 or under the Housing Act of 1949 in the
construction or development of the project), will be paid unconditionally and not less
often than once a week, and without subsequent deduction or rebate on any account
(except such payroll deductions as are permitted by regulations issued by the
Secretary of Labor under the Copeland Act (29 CFR part 3)), the full amount of wages
and bona fide fringe benefits (or cash equivalents thereof) due at time of payment
computed at rates not less than those contained in the wage determination of the
Secretary of Labor which is attached hereto and made a part hereof, regardless of any
contractual relationship which may be alleged to exist between the contractor and such
laborers and mechanics. . . .
(3) Payrolls and basic records. . . .
(ii)
(A) The contractor shall submit weekly for each week in which any contract work
is performed a copy of all payrolls to the (write in name of appropriate federal
agency) if the agency is a party to the contract, but if the agency is not such a
party, the contractor will submit the payrolls to the applicant, sponsor, or
owner, as the case may be, for transmission to the (write in name of agency).
. . ."
2 CFR 200 Appendix II states in part:
"In addition to other provisions required by the Federal agency or non-Federal entity; all contracts
made by the non-Federal entity under the Federal award must contain provisions covering
the following, as applicable. . . .
(D) Davis-Bacon Act, as amended (40 U.S.C 3141-3148). When required by Federal
program legislations, all prime construction contracts in excess of $2,000 awarded by non-
Federal entities must include a provision for compliance with the Davis-Bacon Act (40
U.S.C. 3141-3144, and 3146-3148 as supplemented by Department of Labor regulations
(29 CFR Part 5, 'Labor Standards Provisions Applicable to Contracts Covering Federally
Financed and Assisted Construction'). In accordance with the statue, contracts must be
required to pay wages to laborers and mechanics at a rate note less than the prevailing
wages specified in wage determination made by the Secretary of Labor. In addition,
contractors must be required to pay wages not less than once a week. . . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation,
which would include segregation of key functions. Embedded within a properly designed and implemented
internal control system should be internal controls consisting of policies and procedures. Policies reflect
the School Corporation's management statements of what should be done to effect internal controls, and
procedures should consist of actions that would implement these policies.
Effect
Without the proper implementation of an effectively designed system of internal controls, the internal
control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance.
As a result, one construction contract entered into did not contain the required wage rate
requirements clauses nor were certified payrolls obtained by the School Corporation.
INDIANA STATE BOARD OF ACCOUNTS
21
NORTH ADAMS COMMUNITY SCHOOLS
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
Noncompliance with the grant agreement and the compliance requirement could result in the loss
of future federal funds to the School Corporation.
Questioned Costs
There were no questioned costs identified.
Recommendation
We recommended that the School Corporation's management establish a system of internal controls
and include the wage rate requirement clause in construction contracts. In addition, certified payrolls
should be obtained as required.
Views of Responsible Officials
For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-003
Subject: COVID-19 - Education Stabilization Fund - Equipment and Real Property Management
Federal Agency: Department of Education
Federal Program: COVID-19 - Education Stabilization Fund
Assistance Listings Number: 84.425U
Federal Award Number: S425U210013
Pass-Through Entity: Indiana Department of Education
Compliance Requirement: Equipment and Real Property Management
Audit Findings: Material Weakness, Modified Opinion
Condition and Context
A property record or capital asset listing which would include a description of the property, a serial
number or other identification number, the source of funding for the property (including the federal award
identification number (FAIN)), who holds title, the acquisition date, cost of the property, percentage of
federal participation in the project costs for the federal award under which the property was acquired, the
location, and use and condition of the property is to be maintained for assets purchased that exceed the
School Corporation's capitalization threshold.
The School Corporation purchased the following items during the audit period: an HVAC system
in the amount of $1,420,440; paving for a traffic improvement project in the amount of $1,069,051; and a
dehumidification unit for the pool in the amount of $328,076. The dehumidification unit for the pool was
added to the capital asset listing; however, the source of the funding, who holds title, percentage of federal
participation in the project costs for the federal award, and the condition of property were not noted. The
HVAC system and the traffic improvement project were not included on the asset listing.
The lack of internal controls and noncompliance were systemic issues throughout the audit period.
Criteria
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
INDIANA STATE BOARD OF ACCOUNTS 18
NORTH ADAMS COMMUNITY SCHOOLS
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
2 CFR 200.313(d)(1) states:
"Property records must be maintained that include a description of the property, a serial number
or other identification number, the source of funding for the property (including the FAIN), who
holds title, the acquisition date, and cost of the property, percentage of Federal participation in
the project costs for the Federal award under which the property was acquired, the location,
use and condition of the property, and any ultimate disposition data including the date of
disposal and sale price of the property."
Cause
A proper system of internal controls was not designed by management of the School Corporation.
Embedded within a properly designed and implemented internal control system should be internal controls
consisting of policies and procedures. Policies reflect the School Corporation's management statements
of what should be done to effect internal controls, and procedures should consist of actions that would
implement these policies.
Effect
Without the proper implementation of an effectively designed system of internal controls, the internal
control system cannot be capable of effectively preventing, or detecting and correcting, material
noncompliance. As a result, assets purchased with federal dollars were not properly added to the School
Corporation's asset listing. In addition, the one asset added did not have all the required elements.
Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of
the federal award could result in the loss of future federal funding to the School Corporation.
Questioned Costs
There were no questioned costs identified.
Recommendation
We recommended that management of the School Corporation establish a proper system of
internal controls and develop policies and procedures to ensure asset records include all the necessary
information and new assets are added.
Views of Responsible Officials
For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-003
Subject: COVID-19 - Education Stabilization Fund - Equipment and Real Property Management
Federal Agency: Department of Education
Federal Program: COVID-19 - Education Stabilization Fund
Assistance Listings Number: 84.425U
Federal Award Number: S425U210013
Pass-Through Entity: Indiana Department of Education
Compliance Requirement: Equipment and Real Property Management
Audit Findings: Material Weakness, Modified Opinion
Condition and Context
A property record or capital asset listing which would include a description of the property, a serial
number or other identification number, the source of funding for the property (including the federal award
identification number (FAIN)), who holds title, the acquisition date, cost of the property, percentage of
federal participation in the project costs for the federal award under which the property was acquired, the
location, and use and condition of the property is to be maintained for assets purchased that exceed the
School Corporation's capitalization threshold.
The School Corporation purchased the following items during the audit period: an HVAC system
in the amount of $1,420,440; paving for a traffic improvement project in the amount of $1,069,051; and a
dehumidification unit for the pool in the amount of $328,076. The dehumidification unit for the pool was
added to the capital asset listing; however, the source of the funding, who holds title, percentage of federal
participation in the project costs for the federal award, and the condition of property were not noted. The
HVAC system and the traffic improvement project were not included on the asset listing.
The lack of internal controls and noncompliance were systemic issues throughout the audit period.
Criteria
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
INDIANA STATE BOARD OF ACCOUNTS 18
NORTH ADAMS COMMUNITY SCHOOLS
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
2 CFR 200.313(d)(1) states:
"Property records must be maintained that include a description of the property, a serial number
or other identification number, the source of funding for the property (including the FAIN), who
holds title, the acquisition date, and cost of the property, percentage of Federal participation in
the project costs for the Federal award under which the property was acquired, the location,
use and condition of the property, and any ultimate disposition data including the date of
disposal and sale price of the property."
Cause
A proper system of internal controls was not designed by management of the School Corporation.
Embedded within a properly designed and implemented internal control system should be internal controls
consisting of policies and procedures. Policies reflect the School Corporation's management statements
of what should be done to effect internal controls, and procedures should consist of actions that would
implement these policies.
Effect
Without the proper implementation of an effectively designed system of internal controls, the internal
control system cannot be capable of effectively preventing, or detecting and correcting, material
noncompliance. As a result, assets purchased with federal dollars were not properly added to the School
Corporation's asset listing. In addition, the one asset added did not have all the required elements.
Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of
the federal award could result in the loss of future federal funding to the School Corporation.
Questioned Costs
There were no questioned costs identified.
Recommendation
We recommended that management of the School Corporation establish a proper system of
internal controls and develop policies and procedures to ensure asset records include all the necessary
information and new assets are added.
Views of Responsible Officials
For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-004
Subject: COVID-19 - Education Stabilization Fund - Special
Tests and Provisions - Wage Rate Requirements
Federal Agency: Department of Education
Federal Program: COVID-19 - Education Stabilization Fund
Assistance Listings Number: 84.425U
Federal Award Number: S425U210013
Pass-Through Entity: Indiana Department of Education
Compliance Requirement: Special Tests and Provisions - Wage Rate Requirements
Audit Findings: Material Weakness, Modified Opinion
INDIANA STATE BOARD OF ACCOUNTS
19
NORTH ADAMS COMMUNITY SCHOOLS
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
Condition and Context
Construction contracts in excess of $2,000 financed by federal assistance funds must pay wages
not less than those established for the locality of the project (prevailing wage rates) by the Department of
Labor (DOL) to their laborers and mechanics. Nonfederal entities are to include in their construction
contracts, subject to the Wage Rate Requirements, a provision that the contractor or subcontractor complies
with these requirements and the DOL regulations. This would include a requirement to submit a copy
of the payroll and statement of compliance to the entity for each week in which contract work was performed.
The School Corporation had not designed nor implemented a system of internal controls to ensure
that construction contracts in excess of $2,000 paid from federal grant funds included a prevailing wage
rate clause. The School Corporation entered into two contracts during the audit period. Both contracts
were selected for testing. One contract included the cost of installation for a HVAC system in the amount
of $443,020. This contract contained the required wage rate clause. Another contract for paving related
to a traffic improvement project contained labor costs in the amount of $1,116,335. This contract did not
contain the required wage rate clause. Certified payrolls and a statement of compliance for each week in
which contract work was performed were not collected by the School Corporation for either project.
The lack of internal controls and noncompliance were systemic issues throughout the audit period.
Criteria
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
29 CFR 5.5 states in part:
"(a) The Agency head shall cause or require the contracting officer to insert in full in any
contract in excess of $2,000 which is entered into for the actual construction, alteration and/or
repair, including painting and decorating, of a public building or public work, or building or work
financed in whole or in part from Federal funds or in accordance with guarantees of a Federal
agency or financed from funds obtained by pledge of any contract of a Federal agency to make
a loan, grant or annual contribution (except where a different meaning is expressly indicated),
and which is subject to the labor standards provisions of any of the acts listed in § 5.1, the
following clauses . . .
(1) Minimum wages.
INDIANA STATE BOARD OF ACCOUNTS
20
NORTH ADAMS COMMUNITY SCHOOLS
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
(i) All laborers and mechanics employed or working upon the site of the work (or
under the United States Housing Act of 1937 or under the Housing Act of 1949 in the
construction or development of the project), will be paid unconditionally and not less
often than once a week, and without subsequent deduction or rebate on any account
(except such payroll deductions as are permitted by regulations issued by the
Secretary of Labor under the Copeland Act (29 CFR part 3)), the full amount of wages
and bona fide fringe benefits (or cash equivalents thereof) due at time of payment
computed at rates not less than those contained in the wage determination of the
Secretary of Labor which is attached hereto and made a part hereof, regardless of any
contractual relationship which may be alleged to exist between the contractor and such
laborers and mechanics. . . .
(3) Payrolls and basic records. . . .
(ii)
(A) The contractor shall submit weekly for each week in which any contract work
is performed a copy of all payrolls to the (write in name of appropriate federal
agency) if the agency is a party to the contract, but if the agency is not such a
party, the contractor will submit the payrolls to the applicant, sponsor, or
owner, as the case may be, for transmission to the (write in name of agency).
. . ."
2 CFR 200 Appendix II states in part:
"In addition to other provisions required by the Federal agency or non-Federal entity; all contracts
made by the non-Federal entity under the Federal award must contain provisions covering
the following, as applicable. . . .
(D) Davis-Bacon Act, as amended (40 U.S.C 3141-3148). When required by Federal
program legislations, all prime construction contracts in excess of $2,000 awarded by non-
Federal entities must include a provision for compliance with the Davis-Bacon Act (40
U.S.C. 3141-3144, and 3146-3148 as supplemented by Department of Labor regulations
(29 CFR Part 5, 'Labor Standards Provisions Applicable to Contracts Covering Federally
Financed and Assisted Construction'). In accordance with the statue, contracts must be
required to pay wages to laborers and mechanics at a rate note less than the prevailing
wages specified in wage determination made by the Secretary of Labor. In addition,
contractors must be required to pay wages not less than once a week. . . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation,
which would include segregation of key functions. Embedded within a properly designed and implemented
internal control system should be internal controls consisting of policies and procedures. Policies reflect
the School Corporation's management statements of what should be done to effect internal controls, and
procedures should consist of actions that would implement these policies.
Effect
Without the proper implementation of an effectively designed system of internal controls, the internal
control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance.
As a result, one construction contract entered into did not contain the required wage rate
requirements clauses nor were certified payrolls obtained by the School Corporation.
INDIANA STATE BOARD OF ACCOUNTS
21
NORTH ADAMS COMMUNITY SCHOOLS
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
Noncompliance with the grant agreement and the compliance requirement could result in the loss
of future federal funds to the School Corporation.
Questioned Costs
There were no questioned costs identified.
Recommendation
We recommended that the School Corporation's management establish a system of internal controls
and include the wage rate requirement clause in construction contracts. In addition, certified payrolls
should be obtained as required.
Views of Responsible Officials
For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-004
Subject: COVID-19 - Education Stabilization Fund - Special
Tests and Provisions - Wage Rate Requirements
Federal Agency: Department of Education
Federal Program: COVID-19 - Education Stabilization Fund
Assistance Listings Number: 84.425U
Federal Award Number: S425U210013
Pass-Through Entity: Indiana Department of Education
Compliance Requirement: Special Tests and Provisions - Wage Rate Requirements
Audit Findings: Material Weakness, Modified Opinion
INDIANA STATE BOARD OF ACCOUNTS
19
NORTH ADAMS COMMUNITY SCHOOLS
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
Condition and Context
Construction contracts in excess of $2,000 financed by federal assistance funds must pay wages
not less than those established for the locality of the project (prevailing wage rates) by the Department of
Labor (DOL) to their laborers and mechanics. Nonfederal entities are to include in their construction
contracts, subject to the Wage Rate Requirements, a provision that the contractor or subcontractor complies
with these requirements and the DOL regulations. This would include a requirement to submit a copy
of the payroll and statement of compliance to the entity for each week in which contract work was performed.
The School Corporation had not designed nor implemented a system of internal controls to ensure
that construction contracts in excess of $2,000 paid from federal grant funds included a prevailing wage
rate clause. The School Corporation entered into two contracts during the audit period. Both contracts
were selected for testing. One contract included the cost of installation for a HVAC system in the amount
of $443,020. This contract contained the required wage rate clause. Another contract for paving related
to a traffic improvement project contained labor costs in the amount of $1,116,335. This contract did not
contain the required wage rate clause. Certified payrolls and a statement of compliance for each week in
which contract work was performed were not collected by the School Corporation for either project.
The lack of internal controls and noncompliance were systemic issues throughout the audit period.
Criteria
2 CFR 200.303 states in part:
"The non-Federal entity must:
(a) Establish and maintain effective internal control over the Federal award that provides
reasonable assurance that the non-Federal entity is managing the Federal award in
compliance with Federal statutes, regulations, and the terms and conditions of the Federal
award. These internal controls should be in compliance with guidance in 'Standards for
Internal Control in the Federal Government' issued by the Comptroller General of the
United States or the 'Internal Control Integrated Framework', issued by the Committee of
Sponsoring Organizations of the Treadway Commission (COSO). . . ."
29 CFR 5.5 states in part:
"(a) The Agency head shall cause or require the contracting officer to insert in full in any
contract in excess of $2,000 which is entered into for the actual construction, alteration and/or
repair, including painting and decorating, of a public building or public work, or building or work
financed in whole or in part from Federal funds or in accordance with guarantees of a Federal
agency or financed from funds obtained by pledge of any contract of a Federal agency to make
a loan, grant or annual contribution (except where a different meaning is expressly indicated),
and which is subject to the labor standards provisions of any of the acts listed in § 5.1, the
following clauses . . .
(1) Minimum wages.
INDIANA STATE BOARD OF ACCOUNTS
20
NORTH ADAMS COMMUNITY SCHOOLS
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
(i) All laborers and mechanics employed or working upon the site of the work (or
under the United States Housing Act of 1937 or under the Housing Act of 1949 in the
construction or development of the project), will be paid unconditionally and not less
often than once a week, and without subsequent deduction or rebate on any account
(except such payroll deductions as are permitted by regulations issued by the
Secretary of Labor under the Copeland Act (29 CFR part 3)), the full amount of wages
and bona fide fringe benefits (or cash equivalents thereof) due at time of payment
computed at rates not less than those contained in the wage determination of the
Secretary of Labor which is attached hereto and made a part hereof, regardless of any
contractual relationship which may be alleged to exist between the contractor and such
laborers and mechanics. . . .
(3) Payrolls and basic records. . . .
(ii)
(A) The contractor shall submit weekly for each week in which any contract work
is performed a copy of all payrolls to the (write in name of appropriate federal
agency) if the agency is a party to the contract, but if the agency is not such a
party, the contractor will submit the payrolls to the applicant, sponsor, or
owner, as the case may be, for transmission to the (write in name of agency).
. . ."
2 CFR 200 Appendix II states in part:
"In addition to other provisions required by the Federal agency or non-Federal entity; all contracts
made by the non-Federal entity under the Federal award must contain provisions covering
the following, as applicable. . . .
(D) Davis-Bacon Act, as amended (40 U.S.C 3141-3148). When required by Federal
program legislations, all prime construction contracts in excess of $2,000 awarded by non-
Federal entities must include a provision for compliance with the Davis-Bacon Act (40
U.S.C. 3141-3144, and 3146-3148 as supplemented by Department of Labor regulations
(29 CFR Part 5, 'Labor Standards Provisions Applicable to Contracts Covering Federally
Financed and Assisted Construction'). In accordance with the statue, contracts must be
required to pay wages to laborers and mechanics at a rate note less than the prevailing
wages specified in wage determination made by the Secretary of Labor. In addition,
contractors must be required to pay wages not less than once a week. . . ."
Cause
A proper system of internal controls was not designed by management of the School Corporation,
which would include segregation of key functions. Embedded within a properly designed and implemented
internal control system should be internal controls consisting of policies and procedures. Policies reflect
the School Corporation's management statements of what should be done to effect internal controls, and
procedures should consist of actions that would implement these policies.
Effect
Without the proper implementation of an effectively designed system of internal controls, the internal
control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance.
As a result, one construction contract entered into did not contain the required wage rate
requirements clauses nor were certified payrolls obtained by the School Corporation.
INDIANA STATE BOARD OF ACCOUNTS
21
NORTH ADAMS COMMUNITY SCHOOLS
SCHEDULE OF FINDINGS AND QUESTIONED COSTS
(Continued)
Noncompliance with the grant agreement and the compliance requirement could result in the loss
of future federal funds to the School Corporation.
Questioned Costs
There were no questioned costs identified.
Recommendation
We recommended that the School Corporation's management establish a system of internal controls
and include the wage rate requirement clause in construction contracts. In addition, certified payrolls
should be obtained as required.
Views of Responsible Officials
For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.